Brick tea automatic packing mechanism
Technical field
The utility model relates to package mechanism fields, specifically brick tea automatic packing mechanism.
Background technique
It is all that the little Jin a small bay in a river brick tea that will be distributed in temporary container manually takes at present when being packed to little Jin a small bay in a river brick tea
Under be poured into pail pack, then temporary container is resetted again, temporary container is made to accept brick tea next time.This just must at least make
With one it is artificial complete this work, complete automatic packaging is not achieved.But automatic packaging equipment in the market due to
Its function strong applicability has exceeded the estimated cost of tablet tea company so expensive, and automatic packaging equipment its
He also takes less than function.So need a kind of structure simple, the brick tea automatic packing mechanism of customizations at low cost.
Utility model content
The purpose of this utility model is to provide brick tea automatic packing mechanisms, its structural principle is simple, can use simple machine
Tool principle solves the problems, such as the production that brick tea is packed automatically, saves cost of labor, convenient for management.
The utility model to achieve the above object, is achieved through the following technical solutions:
Brick tea automatic packing mechanism, including fixed plate, two sides transmission belt, temporary container, pail pack conveyer belt, brick tea packet
Barrelling;Container fixing sleeve is equipped between the two sides transmission belt, the temporary container is fixed by container fixing sleeve, the temporary appearance
Opening is equipped at the top and bottom of device, the temporary container bottom opening is bonded or remains less than 5mm with fixed plate top surface
Spacing;The fixed plate side is equipped with drain spout, and the drain spout is corresponding with temporary container bottom aperture position, described
Drain spout bottom is equipped with material leakage funnel;The brick tea pail pack is arranged on pail pack conveyer belt, and on pail pack conveyer belt
Brick tea pail pack is corresponding with material leakage funnel position, and brick tea pail pack is located at material leakage funnel bottom.
The temporary container is funnel-form.
The temporary container bottom opening is equipped with rubber ring set.
The drain spout is bar shaped drain spout.
The prior art is compared, the utility model has the beneficial effects that:
Brick tea little Jin a small bay in a river in temporary container can be run under the action of the transmission belt of two sides to drain spout, keep in container bottom
Portion's opening is bonded or remains less than the spacing of 5mm with fixed plate top surface, ensure that brick tea little Jin a small bay in a river is not in the process of running
It can be leaked out from temporary container bottom.When temporary container is run to drain spout, internal brick tea little Jin a small bay in a river can be from drain spout
It escapes in material leakage funnel, is leaked by material leakage funnel and complete to pack in brick tea pail pack.This certain structure needs two sides to pass
The Collaboration of dynamic band and pail pack conveyer belt, pail pack conveyer belt is static when temporary container is run to drain spout, makes brick tea
Little Jin a small bay in a river leaks into brick tea pail pack by drain spout, material leakage funnel;When between two temporary containers part with to it is corresponding when
Pail pack conveyer belt runs a packaging position, keeps next brick tea pail pack corresponding with material leakage funnel, and then static waiting is next
Brick tea little Jin a small bay in a river in a temporary container leaks into brick tea pail pack by drain spout, material leakage funnel.
Present apparatus structural principle is simple, can use simple machine by the Collaboration of two sides transmission belt and pail pack conveyer belt
Tool principle solves the problems, such as the production that brick tea is packed automatically, saves cost of labor, convenient for management.
Detailed description of the invention
Attached drawing 1 is the utility model structure diagram.
Attached drawing 2 is the utility model structure diagram.
Label shown in attached drawing:
1, fixed plate;2, two sides transmission belt;3, container is kept in;4, pail pack conveyer belt;5, brick tea pail pack;6, container
Fixing sleeve;7, drain spout;8, material leakage funnel.
Specific embodiment
The present invention will be further illustrated below in conjunction with specific embodiments.It should be understood that these embodiments are merely to illustrate this
Utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, in the content for having read the utility model instruction
Later, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Shen
It please limited range.
Described in the utility model is brick tea automatic packing mechanism, and main structure includes fixed plate 1, two sides transmission belt 2, temporarily
Deposit container 3, pail pack conveyer belt 4, brick tea pail pack 5;Container fixing sleeve 6 is equipped between the two sides transmission belt 2, it is described temporary
Container 3 is funnel-form, and temporary 3 bottom of container covers fixed by container fixing sleeve 6 in container fixing sleeve 6, container fixing sleeve 6
Using rubber fixing sleeve, rubber is fixed with certain deformability, and convenient temporary container 3 is inserted into rubber fixing sleeve, also side
Just taking-up.Opening is equipped at the top and bottom of the temporary container 3, brick tea little Jin a small bay in a river enters from temporary 3 top opening of container
Into temporary container 3, temporary 3 bottom opening of container is bonded or remains less than the spacing of 5mm with fixed 1 top surface of plate,
It ensure that brick tea little Jin a small bay in a river will not be leaked out from temporary 3 bottom of container in the process of running.It is set at 3 bottom opening of temporary container
There is rubber ring set, when temporary 3 bottom opening of container is bonded with fixed 1 top surface of plate, noise can be reduced in operational process, avoided
There is scratch on fixed plate 1.1 side of fixed plate is equipped with drain spout 7, and the drain spout 7 is opened with temporary 3 bottom of container
Mouth position is corresponding, and 7 bottom of drain spout is equipped with material leakage funnel 8, and the drain spout 7 is bar shaped drain spout 7, keeps in container 3
Bottom opening can guarantee that internal brick tea little Jin a small bay in a river can have more sufficient time from drain spout when running to bar shaped drain spout 7
7 drop into material leakage funnel 8;The brick tea pail pack 5 is arranged on pail pack conveyer belt 4, and the brick on pail pack conveyer belt 4
Tea bag barrelling 5 is corresponding with 8 position of material leakage funnel, and brick tea pail pack 5 is located at 8 bottom of material leakage funnel.Brick tea in temporary container 3
Little Jin a small bay in a river can be run under the action of two sides transmission belt 2 to drain spout 7, keep in 3 bottom opening of container and fixed 1 top surface of plate
It is bonded or is remained less than the spacing of 5mm, ensure that brick tea little Jin a small bay in a river will not be leaked from temporary 3 bottom of container in the process of running
Out.When at the temporary operation to drain spout 7 of container 3, internal brick tea little Jin a small bay in a river can escape to material leakage funnel 8 from drain spout 7
It is interior, it is leaked by material leakage funnel 8 and completes to pack in brick tea pail pack 5.This certain structure needs two sides transmission belt 2 and pail pack
The Collaboration of conveyer belt 4, pail pack conveyer belt 4 is static when keeping in the operation of container 3 at drain spout 7, passes through brick tea little Jin a small bay in a river
Cross drain spout 7, material leakage funnel 8 leaks into brick tea pail pack 5;When between two temporary containers 3 part with to it is corresponding when pack
Bucket conveyer belt 4 runs a packaging position, keeps next brick tea pail pack 5 corresponding with material leakage funnel 8, and then static waiting is next
Brick tea little Jin a small bay in a river in temporary container 3 leaks into brick tea pail pack 5 by drain spout 7, material leakage funnel 8.Present apparatus structure is former
Reason is simple, and it is automatic to solve brick tea with simple theory of mechanics by the Collaboration of two sides transmission belt 2 and pail pack conveyer belt 4
The production problem of packaging saves cost of labor, convenient for management.