CN212642268U - Container movable air supply unit overhaul workstation - Google Patents
Container movable air supply unit overhaul workstation Download PDFInfo
- Publication number
- CN212642268U CN212642268U CN201922383830.8U CN201922383830U CN212642268U CN 212642268 U CN212642268 U CN 212642268U CN 201922383830 U CN201922383830 U CN 201922383830U CN 212642268 U CN212642268 U CN 212642268U
- Authority
- CN
- China
- Prior art keywords
- container
- air compressor
- drying tower
- supply unit
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
Abstract
The utility model discloses a container movable air feed unit overhaul workstation, including the container, the container is equipped with the wing door that makes it upwards open through drive arrangement, the container has transport state and operating condition through the closure of wing door with open and make it, install the material dolly of fixed mounting's testing arrangement and activity setting in the container. In this way, the utility model discloses can satisfy the requirement of customer delivery date, reduce cost of maintenance, it is rational in infrastructure, convenient to use.
Description
Technical Field
The utility model relates to an intelligence field of making especially relates to a container movable air feed unit overhaul workstation.
Background
Since the air supply equipment needs to be maintained and the customers are far away from the company, even overseas customers, and the procedure of goods circulation is complicated and the required time is long, the following adverse effects are brought: the overseas logistics procedure is complex; 2. the cost of the round trip is high; 3. due to the long logistics time, it is difficult to meet the delivery period of the customer.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the main technical problem who solves provides a container movable air feed unit overhaul workstation, can satisfy the requirement of customer delivery date, reduces cost of maintenance, and is rational in infrastructure, convenient to use.
In order to solve the technical problem, the utility model discloses a technical scheme be: the utility model provides a container movable air supply unit overhaul workstation, includes the container, the container is equipped with the wing door that makes it upwards open through drive arrangement, the container has transportation state and operating condition through the closure of wing door with open, install fixed mounting's testing arrangement and the material dolly of activity setting in the container.
Further, the testing device is fixed through bolts, and a damping material is installed at the joint of the testing device and the container.
Further, the shock absorbing material is made of polyurethane.
Further, the testing device comprises a piston valve testing platform, a piston valve assembly, a drying tower assembly, an air compressor preassembly, an air compressor general assembly line, a drying tower testing platform and an air compressor testing platform.
Further, the material trolley comprises a piston valve drying tower material trolley, an air compressor material trolley, a drying tower assembling trolley, an air compressor tool trolley and a disassembling workbench.
Further, the piston valve assembly line, the drying tower assembly line, the piston valve test board line, the air compressor preassembly line and the air compressor general assembly line are sequentially and fixedly installed in the container, and the working platforms of the piston valve assembly line, the drying tower assembly line, the piston valve test board line, the air compressor preassembly line and the air compressor general assembly line face the wing door; the drying tower test bench and the air compressor test bench are located at two ends of the container, and the workbench of the drying tower test bench and the workbench of the air compressor test bench face to the other wing door.
Further, the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley, the air compressor tool trolley and the disassembling workbench are respectively positioned in the space between the testing devices.
Further, the driving device is an electric cylinder.
Furthermore, a plurality of electric cylinders are arranged between the wing door and the inner wall of the container.
Further, in the working state, the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley, the air compressor tool trolley and the disassembling workbench push out the containers to be respectively positioned on the front side and the back side of the container.
The utility model has the advantages that: the utility model discloses a container movable air feed unit overhaul workstation can satisfy the requirement of customer delivery date, reduces cost of maintenance, rational in infrastructure, convenient to use.
Drawings
Fig. 1 is a schematic structural view of a container of a mobile air supply unit overhaul workstation of the container of the invention;
fig. 2 is a schematic front view of the working state of the container of the movable air supply unit overhaul workstation for the container of the present invention;
fig. 3 is a schematic back view of the working state of the container of the mobile air supply unit overhaul workstation of the container of the present invention;
fig. 4 is a schematic view of the internal structure of the transportation state of the container of the mobile air supply unit overhaul workstation of the container;
fig. 5 is the internal structure schematic diagram of the working state of the container movable air supply unit overhaul workstation of the utility model.
1. A piston valve test stand; 2. a piston valve drying tower material vehicle; 3. an air compressor material vehicle; 4. assembling a trolley on the drying tower; 5. an air compressor assembling trolley; 6. assembling a piston valve; 7. assembling a drying tower; 8. preassembling an air compressor; 9. an air compressor general assembly line; 10. a drying tower test bench; 11. an air compressor test bench; 12. an air compressor tool trolley; 13. disassembling the workbench; 14. a container; 15. a flap door; 16. and (4) an electric cylinder.
Detailed Description
The following detailed description of the preferred embodiments of the present invention will be provided to enable those skilled in the art to more easily understand the advantages and features of the present invention, and to make clear and definite definitions of the protection scope of the present invention.
Referring to fig. 1 to 5, an embodiment of the present invention includes: a movable air supply unit overhaul workstation for a container comprises a container 14, wherein the container 14 is provided with a wing door 15 which is opened upwards through a driving device, the container 14 has a transportation state and a working state through the closing and opening of the wing door 15, and a fixedly installed testing device and a movably arranged material trolley are installed in the container 14. The testing device comprises a piston valve testing platform 1, a piston valve assembly 6, a drying tower assembly 7, an air compressor preassembly 8, an air compressor general assembly line 9, a drying tower testing platform 10 and an air compressor testing platform 11. The material trolley comprises a piston valve drying tower material trolley 2, an air compressor material trolley 3, a drying tower assembling trolley 4, an air compressor assembling trolley 5, an air compressor tool trolley 12 and a disassembling workbench 13.
Further, the testing device is fixed through bolts, and a damping material is installed at the joint of the testing device and the container. The shock-absorbing material is made of polyurethane.
Further, the piston valve assembly 6, the drying tower assembly 7, the piston valve test bench 1, the air compressor preassembly 8 and the air compressor general assembly line 9 are sequentially and fixedly installed in the container 14, and the work benches of the piston valve assembly 6, the drying tower assembly 7, the piston valve test bench 1, the air compressor preassembly 8 and the air compressor general assembly line 9 face the wing door 15; the drying tower test bench 10 and the air compressor test bench 11 are located at two ends of the container 14, and the workbench of the drying tower test bench 10 and the air compressor test bench 11 faces the other wing door 15.
Further, the plug valve drying tower material vehicle 2, the air compressor material vehicle 3, the drying tower assembling trolley 4, the air compressor assembling trolley 5, the air compressor tool trolley 12 and the disassembling workbench 13 are respectively positioned in the space between the testing devices.
Further, the driving means is an electric cylinder 16.
Further, a plurality of electric cylinders 16 are installed between the wing doors 15 and the inner wall of the container 14.
Further, in the working state, the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley, the air compressor tool trolley and the disassembling workbench push out the containers to be respectively positioned on the front side and the back side of the container.
The utility model discloses a working state of container movable air feed unit overhaul workstation: the container is lifted from the vehicle, the wing doors on two sides of the container are opened through the electric cylinder after the container is installed, the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley and the air compressor assembling trolley are placed below the wing door on the back of the container from the inside of the container in sequence, and the air compressor tool trolley and the disassembling workbench are placed below the front wing door of the container from the inside of the container in sequence to form a disassembling area.
The utility model discloses a container movable air feed unit overhaul workstation can satisfy the requirement of customer delivery date, reduces cost of maintenance, rational in infrastructure, convenient to use.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.
Claims (10)
1. The movable air supply unit overhaul workstation for the container is characterized by comprising a container, wherein the container is provided with a wing door which is upwards opened through a driving device, the container has a transportation state and a working state through the closing and the opening of the wing door, and a fixedly installed testing device and a movably arranged material trolley are installed in the container.
2. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: the testing device is fixed through bolts, and damping materials are installed at the joint of the testing device and the container.
3. The container movable air supply unit overhaul workstation as claimed in claim 2, wherein: the shock absorbing material is made of polyurethane.
4. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: the testing device comprises a piston valve testing platform, a piston valve assembly, a drying tower assembly, an air compressor preassembly, an air compressor general assembly line, a drying tower testing platform and an air compressor testing platform.
5. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: the material trolley comprises a piston valve drying tower material trolley, an air compressor material trolley, a drying tower assembling trolley, an air compressor tool trolley and a disassembling workbench.
6. The container movable air supply unit overhaul workstation as claimed in claim 4, wherein: the piston valve assembly line, the drying tower assembly line, the piston valve test bench, the air compressor preassembly line and the air compressor general assembly line are sequentially and fixedly installed in the container, and the working platforms of the piston valve assembly line, the drying tower assembly line, the piston valve test bench, the air compressor preassembly line and the air compressor general assembly line face the wing door; the drying tower test bench and the air compressor test bench are located at two ends of the container, and the workbench of the drying tower test bench and the workbench of the air compressor test bench face to the other wing door.
7. The container movable air supply unit overhaul workstation as claimed in claim 5, wherein: the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley, the air compressor tool trolley and the disassembling workbench are respectively positioned in the space between the testing devices.
8. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: the driving device is an electric cylinder.
9. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: and a plurality of electric cylinders are arranged between the wing door and the inner wall of the container.
10. The container movable air supply unit overhaul workstation as claimed in claim 1, wherein: and in the working state, the piston valve drying tower material vehicle, the air compressor material vehicle, the drying tower assembling trolley, the air compressor tool trolley and the disassembling workbench push out the containers to be respectively positioned on the front and the back of the container.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922383830.8U CN212642268U (en) | 2019-12-26 | 2019-12-26 | Container movable air supply unit overhaul workstation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922383830.8U CN212642268U (en) | 2019-12-26 | 2019-12-26 | Container movable air supply unit overhaul workstation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212642268U true CN212642268U (en) | 2021-03-02 |
Family
ID=74767148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922383830.8U Active CN212642268U (en) | 2019-12-26 | 2019-12-26 | Container movable air supply unit overhaul workstation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212642268U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114454798A (en) * | 2021-08-11 | 2022-05-10 | 上海融青新能源科技有限公司 | Mobile battery charging and replacing vehicle and battery charging and replacing method thereof |
-
2019
- 2019-12-26 CN CN201922383830.8U patent/CN212642268U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114454798A (en) * | 2021-08-11 | 2022-05-10 | 上海融青新能源科技有限公司 | Mobile battery charging and replacing vehicle and battery charging and replacing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212642268U (en) | Container movable air supply unit overhaul workstation | |
CN202726418U (en) | Pin inserting and pulling device and engineering machine | |
CN205838483U (en) | A kind of rotation pusher | |
CN107804380A (en) | A kind of automobile rear cargo door structure | |
CN215091687U (en) | Vehicle door assembling machine | |
CN211969284U (en) | Petroleum pipeline transportation frame | |
CN213619998U (en) | Box type transport truck | |
CN210128819U (en) | Elevator hydraulic buffer test tower assembly line | |
CN210133436U (en) | Medium-sized fixed wing unmanned aerial vehicle packing box | |
CN110040334B (en) | Medium-sized fixed wing unmanned aerial vehicle packing box | |
CN109556888B (en) | Cab locking mechanism assembly durability detection table for heavy truck | |
CN208451584U (en) | A kind of portable multi-function tool box | |
CN209209060U (en) | One kind loading drop-test device for aircraft bomb shackle | |
CN205852145U (en) | Tailstock three station welding workstation and welding tooling after a kind of truck | |
CN111674809B (en) | Medical instrument stores in a warehouse logistics platform and uses inventory management device | |
CN103063426A (en) | Pin-plug and pin-pull device testing table of single cylinder plug pin hydraulic cylinder | |
CN220907051U (en) | Frock is binded in shipment of lift | |
CN214273392U (en) | Novel building elevator guard gate | |
CN204861119U (en) | It is box from weighing hydraulic baling press to move package | |
CN216970712U (en) | External packing box transportation parallel arrangement | |
CN207208230U (en) | A kind of automobile rear cargo door structure | |
CN215510902U (en) | Mobile service maintenance vehicle for engine | |
CN207773521U (en) | A kind of aeronautical maintenance auxiliary vehicle | |
CN219969642U (en) | Tyre inflation protection device | |
CN2287195Y (en) | Locking device for unloading door of tipper |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |