CN212642131U CN202020652072.5U CN202020652072U CN212642131U CN 212642131 U CN212642131 U CN 212642131U CN 202020652072 U CN202020652072 U CN 202020652072U CN 212642131 U CN212642131 U CN 212642131U
Authority
CN
China
Prior art keywords
template
fixing
rod
electric telescopic
spout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020652072.5U
Other languages
Chinese (zh)
Inventor
蒋中军
王健
陆杰
鞠玲
贾俊
翁蓓蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN202020652072.5U priority Critical patent/CN212642131U/en
Application granted granted Critical
Publication of CN212642131U publication Critical patent/CN212642131U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building templates fixing device for transformer substation capital construction, including first template and second template, the outside of first template, second template all is provided with dead lever and fixing base, the dead lever is provided with the multiunit, and the multiunit dead lever is parallel arrangement, the fixing base is located the dead lever under, the upper end of first template, second template is provided with the horizontal pole, first jack has been seted up to the lower extreme of horizontal pole, first template, second template pass through the inserted bar butt with the horizontal pole. The utility model discloses a set up horizontal pole, dead lever, inserted bar and fixing base, realized not only having improved the fixed stability of building templates to the fixing of building templates, made things convenient for the staff to install moreover, dismantled the device, improved work efficiency.

Description

A building templates fixing device for transformer substation's capital construction
Technical Field
The utility model relates to a power station building equipment technical field specifically is a building templates fixing device for transformer substation's capital construction.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost. A building template structure for cast-in-place concrete structural engineering construction mainly comprises a panel, a supporting structure and a connecting piece. The panel is a bearing plate directly contacting with newly cast concrete; the supporting structure is a temporary structure for supporting the panel, the concrete and the construction load, so that the building template structure is firmly combined and is not deformed or damaged; the connecting piece is a fitting for integrally connecting the panel and the support structure.
Traditional fixing device structure is more single for stability when the fixed of bracing piece is relatively poor, because the multi-angle modeling can appear during the capital construction, the angle is accurate difficult during the modeling, and traditional mounting is difficult to satisfy the demand, and fixing device is when not using, is unfavorable for depositing and transporting, occupies great space, and is very inconvenient.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building templates fixing device for transformer substation's capital construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building templates fixing device for transformer substation capital construction, includes first template and second template, the outside of first template, second template all is provided with dead lever and fixing base, the dead lever is provided with the multiunit, and the multiunit dead lever is parallel arrangement, the fixing base is located the dead lever under, the upper end of first template, second template is provided with the horizontal pole, first jack has been seted up to the lower extreme of horizontal pole, first template, second template pass through the inserted bar butt with the horizontal pole.
Preferably, a plurality of groups of first through holes are formed in the outer wall of the fixing rod and are in plug-in connection with the insertion rod, and the diameter of each group of first through holes is larger than that of the insertion rod and passes through the insertion rod.
Preferably, the upper end of fixing base is provided with fixed knot through the second through-hole and constructs, fixed knot constructs including first electric telescopic handle and push rod, first electric telescopic handle passes through the mount and sets up the upper end at the fixing base, the upper end of push rod is passed through the connector and is connected with first electric telescopic handle's output, the lower extreme and the second through-hole of push rod are pegged graft, just the diameter size of push rod is greater than the diameter size of second through-hole, just the lower extreme of push rod is provided with the cone head, the upper end of fixing base is through seting up second jack and inserted bar grafting connection.
Preferably, the inside of horizontal pole is provided with the spout, be provided with drive structure in the spout, the drive structure of telling includes second electric telescopic handle and slider, second electric telescopic handle sets up in the inside of spout, just electric telescopic handle's upper end, lower extreme respectively with the top of spout, bottom butt, the slider sets up in the inside of spout, one side of slider is passed through the connecting rod and is connected with second electric telescopic handle's output, the upper end of slider, lower extreme respectively with the top of spout, bottom butt, just the slider is sliding connection with the spout.
Preferably, the diameter of the first insertion hole is larger than that of the insertion rod.
Preferably, the cross bars are provided with a plurality of groups, and the cross bars are arranged in parallel.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up the dead lever, through having seted up multiunit second through-hole at the dead lever outer wall, the accessible sets up multiunit inserted bar and pegs graft with the second through-hole, fixes first template and second template to the device's stability has been improved.
2. The utility model discloses a through setting up the horizontal pole, inserted bar and fixing base, it slides in the spout to drive the slider through second electric telescopic handle, the inserted bar passes through second jack and fixing base butt, drive the push rod through first electric telescopic handle again and peg graft through second through-hole and ground, the fixing base is fixed first template and second template, thereby realized the fixed of first template and second template, and then made things convenient for staff's installation or dismantled first template and second template, staff's work efficiency has also been improved.
Drawings
Fig. 1 is a schematic view of the overall structure of a building formwork fixing device for the infrastructure of a transformer substation according to the present invention;
fig. 2 is a schematic view of the internal structure of the cross bar of the building formwork fixing device for the infrastructure of the transformer substation of the present invention;
fig. 3 is a schematic diagram of a fixing rod structure of the building formwork fixing device for the infrastructure of the transformer substation of the present invention;
fig. 4 is the utility model relates to a building templates fixing device for transformer substation capital construction A department enlargies the structure schematic diagram in fig. 1.
In the figure: 1-a first template; 2-a second template; 3-fixing the rod; 4-fixing the base; 5-a cross bar; 6-inserting a rod; 7-a first electric telescopic rod; 8-a push rod; 9-a chute; 10-a second electric telescopic rod; 11-a slide block; 12-second via.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a building templates fixing device for transformer substation capital construction, includes first template 1 and second template 2, the outside of first template 1, second template 2 all is provided with dead lever 3 and fixing base 4, dead lever 3 is provided with the multiunit, and multiunit dead lever 3 is parallel arrangement, fixing base 4 is located dead lever 3 under, the upper end of first template 1, second template 2 is provided with horizontal pole 5, first jack has been seted up to the lower extreme of horizontal pole 5, first template 1, second template 2 pass through 6 butts of inserted bar with horizontal pole 5.
A plurality of groups of first through holes 12 are formed in the outer wall of the fixed rod 3, the plurality of groups of first through holes 12 are connected with the inserting rod 6 in an inserting mode, the diameter of each group of first through holes 12 is larger than that of the inserting rod 6, and the inserting rod 6 is inserted into the first through holes 12, so that the first template 1 and the second template 2 can be fixed by the inserting rod 6;
a fixing structure is arranged at the upper end of the fixing seat 4 through a second through hole and comprises a first electric telescopic rod 7 and a push rod 8, the first electric telescopic rod 7 is arranged at the upper end of the fixing seat 4 through a fixing frame, the upper end of the push rod 8 is connected with the output end of the first electric telescopic rod 7 through a connector, the lower end of the push rod 8 is inserted into the second through hole, the diameter of the push rod 8 is larger than that of the second through hole, a conical head is arranged at the lower end of the push rod 8, the upper end of the fixing seat 4 is inserted into the insertion rod 6 through a second insertion hole, the push rod 8 is driven by the first electric telescopic rod 7 to be inserted into the ground through the second through hole, and the fixing seat 4 can fix the first template 1 and the second template 2;
a sliding groove 9 is formed in the cross rod 5, a driving structure is arranged in the sliding groove 9, the driving structure comprises a second electric telescopic rod 10 and a sliding block 11, the second electric telescopic rod 10 is arranged in the sliding groove 9, the upper end and the lower end of the electric telescopic rod are respectively abutted to the top end and the bottom end of the sliding groove 9, the sliding block 11 is arranged in the sliding groove 9, one side of the sliding block 11 is connected with the output end of the second electric telescopic rod 10 through a connecting rod, the upper end and the lower end of the sliding block 11 are respectively abutted to the top end and the bottom end of the sliding groove 9, the sliding block 11 is in sliding connection with the sliding groove 9, the sliding block 11 is driven by the second electric telescopic rod 10 to slide in the sliding groove 9, and the insertion rod 6 can be abutted to the fixing;
the diameter of the first jack is larger than that of the inserted link 6, so that the inserted link 6 can move in the first jack;
the horizontal pole 5 is provided with the multiunit, just multiunit horizontal pole 5 is parallel arrangement, can realize the inserted bar 6 through multiunit horizontal pole 5 to the further fixed of first template 1 and second template 2, and then has improved the device's stability.
The working principle is as follows: when using the device, the staff injects the upper end of inserted bar 6 in the spout 9 of horizontal pole through first jack, at this moment the staff pegs graft inserted bar 6 with dead lever 3 through first through-hole 12, align inserted bar 6 with the second through-hole of fixing base 4 upper end simultaneously, start first electric telescopic handle 7 this moment, first electric telescopic handle 7 drives push rod 8 and pegs graft with ground through the second through-hole, can realize fixing base 4 and fix first template 1 and second template 2, second electric telescopic handle 10 simultaneously, second electric telescopic handle 10 drives slider 11 and slides in spout 9, can realize that inserted bar 6 passes through second jack and fixing base butt, thereby realized the device fixed to first template 1 and second template 2.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A building templates fixing device for transformer substation's capital construction, includes first template (1) and second template (2), its characterized in that: the fixing device is characterized in that fixing rods (3) and fixing seats (4) are arranged on the outer sides of the first template (1) and the second template (2), a plurality of groups of fixing rods (3) are arranged in parallel, the fixing seats (4) are positioned under the fixing rods (3), cross rods (5) are arranged at the upper ends of the first template (1) and the second template (2), first inserting holes are formed in the lower ends of the cross rods (5), the first template (1) and the second template (2) are abutted to the cross rods (5) through inserting rods (6), a fixing structure is arranged at the upper end of the fixing seat (4) through a second through hole and comprises a first electric telescopic rod (7) and a push rod (8), the first electric telescopic rod (7) is arranged at the upper end of the fixing seat (4) through a fixing frame, and the upper end of the push rod (8) is connected with the output end of the first electric telescopic rod (7) through a connector, the lower end of the push rod (8) is connected with the second through hole in an inserting mode, the diameter of the push rod (8) is larger than that of the second through hole, a conical head is arranged at the lower end of the push rod (8), and the upper end of the fixing seat (4) is connected with the inserting rod (6) in an inserting mode through a second inserting hole.
2. A building template fixing device for the infrastructure of a substation according to claim 1, characterized in that: the outer wall of the fixing rod (3) is provided with a plurality of groups of first through holes (12), the plurality of groups of first through holes (12) are connected with the inserted rod (6) in an inserting mode, and the diameter of the plurality of groups of first through holes (12) is larger than that of the inserted rod (6).
3. A building template fixing device for the infrastructure of a substation according to claim 1, characterized in that: the inside of horizontal pole (5) is provided with spout (9), be provided with the drive structure in spout (9), the drive structure of telling includes second electric telescopic handle (10) and slider (11), second electric telescopic handle (10) set up the inside at spout (9), just electric telescopic handle's upper end, lower extreme respectively with the top of spout (9), bottom butt, slider (11) set up the inside at spout (9), one side of slider (11) is passed through the connecting rod and is connected with the output of second electric telescopic handle (10), the upper end of slider (11), lower extreme respectively with the top of spout (9), bottom butt, just slider (11) and spout (9) are sliding connection.
4. A building template fixing device for the infrastructure of a substation according to claim 1, characterized in that: the diameter of the first insertion hole is larger than that of the insertion rod (6).
5. A building template fixing device for the infrastructure of a substation according to claim 1, characterized in that: the transverse rods (5) are provided with a plurality of groups, and the transverse rods (5) are arranged in parallel.
CN202020652072.5U 2020-04-26 2020-04-26 A building templates fixing device for transformer substation's capital construction Active CN212642131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020652072.5U CN212642131U (en) 2020-04-26 2020-04-26 A building templates fixing device for transformer substation's capital construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020652072.5U CN212642131U (en) 2020-04-26 2020-04-26 A building templates fixing device for transformer substation's capital construction

Publications (1)

Publication Number Publication Date
CN212642131U true CN212642131U (en) 2021-03-02

Family

ID=74794797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020652072.5U Active CN212642131U (en) 2020-04-26 2020-04-26 A building templates fixing device for transformer substation's capital construction

Country Status (1)

Country Link
CN (1) CN212642131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033166A (en) * 2021-10-13 2022-02-11 中国建筑第七工程局有限公司 Anchor clamps and supporting instrument are consolidated to anti-bank in water room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033166A (en) * 2021-10-13 2022-02-11 中国建筑第七工程局有限公司 Anchor clamps and supporting instrument are consolidated to anti-bank in water room

Similar Documents

Publication Publication Date Title
CN212642131U (en) A building templates fixing device for transformer substation's capital construction
CN208347268U (en) Assembled template sets up device
CN215830184U (en) Warning fence for construction site of constructional engineering
CN218857302U (en) Movable prefabricated box culvert reinforcement jig frame
CN219509283U (en) Be used for rack to assemble standardized bearing structure
CN218509172U (en) Electric power tower convenient to personnel install fast
CN217326076U (en) Energy-conserving steel construction assembled wallboard
CN220522235U (en) Communication tower protective structure
CN204899218U (en) Superimposed sheet support frame
CN218668736U (en) Integrated assembly type comprehensive energy station
CN216553132U (en) Foundation bolt fixture for solar cell panel support stub foundation construction
CN219826059U (en) Operation platform for building external construction
CN212633932U (en) Arc-shaped stress framework processing device
CN216664493U (en) Assembled equipment room
CN214195304U (en) Building envelope of building engineering
CN220928463U (en) Detachable combined step for electric room
CN220954542U (en) Can dismantle scalable elevator shaft operation platform structure
CN219671643U (en) Detachable movable house
CN219451411U (en) Frame device is chosen in construction
CN217759866U (en) Portable detachable cyclic utilization double-limb column type assembling jig frame
CN212801967U (en) Steel structure net rack
CN220889064U (en) Light steel wall convenient to installation
CN218148896U (en) Three-dimensional combined house structure
CN215978762U (en) Supporting rod for tent and tent
CN214588345U (en) Large-scale transformer regulating equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant