CN212613668U - Hanging flower basket for construction - Google Patents

Hanging flower basket for construction Download PDF

Info

Publication number
CN212613668U
CN212613668U CN202021001620.4U CN202021001620U CN212613668U CN 212613668 U CN212613668 U CN 212613668U CN 202021001620 U CN202021001620 U CN 202021001620U CN 212613668 U CN212613668 U CN 212613668U
Authority
CN
China
Prior art keywords
guardrail
connecting piece
bottom plate
hole
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021001620.4U
Other languages
Chinese (zh)
Inventor
卢岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021001620.4U priority Critical patent/CN212613668U/en
Application granted granted Critical
Publication of CN212613668U publication Critical patent/CN212613668U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a hanging flower basket for construction, comprising a base plate, bottom plate upper surface one end is connected and is equipped with the vertical connecting piece of placing, the connecting piece middle part is equipped with logical groove, the bilateral symmetry that leads to the groove is equipped with the through-hole, the upper surface downward runs through the through-hole of connecting piece and is equipped with the locating hole, the bottom plate upper surface other end is equipped with the vertical guardrail of placing one, the sleeve pipe one and the solid post one that are equipped with crisscross placing from bottom to top are all connected to both sides around guardrail one, one side that guardrail one was kept away from to the connecting piece is equipped with guardrail two, both sides are all connected and are equipped with crisscross placing solid post two and sleeve pipe two from bottom to top around guardrail two, the slot that sets up between mistake on the bottom plate, the plug-in slot. Compared with the prior art, the utility model the advantage lie in: the hanging basket can be changed in space according to use requirements, and the hanging basket is simple to operate and convenient to use.

Description

Hanging flower basket for construction
Technical Field
The utility model relates to a construction auxiliary assembly field specifically indicates a hanging flower basket for construction.
Background
When the outer wall of a high-rise building or even a super high-rise building is transformed, because the outer wall of the building is already put into use, it is difficult to build an outer frame such as a scaffold to perform various construction operations on the outer wall of the building. Therefore, when constructing the outer wall of a building, a basket is often used for the work.
The existing hanging basket has fixed structure and fixed space, is not easy to place longer articles, and can not well adapt to application requirements.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome above technical defect, provide a can change hanging flower basket for construction of hanging flower basket space size as required.
In order to solve the technical problem, the utility model provides a technical scheme does: a hanging basket for building construction comprises a bottom plate, wherein one end of the upper surface of the bottom plate is connected with a vertically placed connecting piece, the middle part of the connecting piece is provided with a through groove, through holes are symmetrically formed in two sides of the through groove, a positioning hole is formed in the through hole in a downward penetrating manner on the upper surface of the connecting piece, the other end of the upper surface of the bottom plate is provided with a vertically placed guardrail I, a sleeve I and a solid post I which are alternately placed from bottom to top are connected to the front side and the rear side of the guardrail I, a guardrail II is arranged on one side, away from the guardrail I, of the connecting piece, a solid post II and a sleeve II are alternately placed from bottom to top, the sleeve I, the solid post II, the solid post I and the sleeve II are matched and sleeved, the solid post II and the sleeve II are connected with the sleeve I and the solid post II through the, the positioning round hole corresponds to the positioning hole and is inserted with the positioning column, the bottom plate is provided with slots which are arranged in a staggered mode, supporting columns are inserted in the slots, the other ends of the supporting columns are connected with the bottoms of the two guardrails, the supporting columns are provided with fixing holes, and the bottom of the bottom plate corresponds to the connecting piece and is provided with fixing bolts matched with the fixing holes.
Compared with the prior art, the utility model the advantage lie in: through the wrong slot cooperation support column on the bottom plate, support column end connection's guardrail two, and set up cup joint on the guardrail two and match the solid post two and the sleeve pipe two of sleeve pipe one and solid post one on the guardrail one, make and peg graft and adjust hanging flower basket space size, the space of extending passes through the connecting piece and connects, support through reference column and fixing bolt, and link up the space through leading to the groove in the middle of the connecting piece, thereby make things convenient for placing object article more, solid post and sleeve pipe are crisscross to be arranged in addition, can guarantee the structural stability in original hanging flower basket space and the hanging flower basket space that extends, hanging flower basket space adjustment easy operation, the structure is firm.
As an improvement, the first guardrail and the connecting piece are fixedly connected to the bottom plate, and the stability of the hanging basket is guaranteed.
As an improvement, the upper surfaces of the first guardrail, the connecting piece and the second guardrail are respectively provided with a hanging ring in a connecting mode, so that a hanging rope can be conveniently connected, and high-altitude operation can be realized.
As the improvement, the inside that corresponds sleeve pipe one on the guardrail one is equipped with the recess, and when the solid post cup joints in sleeve pipe one, the location is placed in the recess, increases the whole steadiness of hanging flower basket.
As an improvement, the first guardrail is located on the outer side of the first solid column and is provided with an annular groove, and when the sleeve is sleeved outside the first solid column, the sleeve is positioned in the annular groove, so that the overall stability of the hanging basket is improved.
Drawings
Fig. 1 is the utility model relates to a hanging flower basket for construction structure sketch map.
Fig. 2 is the utility model relates to a hanging flower basket connecting piece for construction structure sketch map.
Fig. 3 is the utility model relates to a two joint support post structural sketch of basket guardrail for construction.
As shown in the figure: 1. the novel guardrail comprises a bottom plate, 2, a connecting piece, 3, a through groove, 4, a through hole, 5, a positioning hole, 6, a guardrail I, 7, a sleeve I, 8, a solid column I, 9, a guardrail II, 10, a solid column II, 11, a sleeve II, 12, a positioning round hole, 13, a positioning column, 14, a slot, 15, a supporting column, 16, a fixing hole, 17, a fixing bolt, 18, a hanging ring, 19, a groove, 20 and an annular groove.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1-3, a hanging basket for building construction comprises a bottom plate 1, a connecting piece 2 vertically placed is connected to one end of the upper surface of the bottom plate 1, a through groove 3 is formed in the middle of the connecting piece 2, through holes 4 are symmetrically formed in two sides of the through groove 3, a positioning hole 5 is formed in the through hole 4, the upper surface of the connecting piece 2 penetrates downwards, a first guardrail 6 vertically placed is arranged at the other end of the upper surface of the bottom plate 1, a first sleeve 7 and a first solid column 8 which are alternately placed from bottom to top are connected to the front side and the rear side of the first guardrail 6, a second guardrail 9 is arranged on one side, away from the first guardrail 6, of the connecting piece 2, a second solid column 10 and a second sleeve 11 which are alternately placed from bottom to top are connected to the front side and the rear side of the second guardrail 9, the first sleeve 7 and the second solid column 10, the first solid column 8 and the second sleeve 11 are matched and sleeved, the, be equipped with the location round hole 12 that matches locating hole 5 on the second 10 of solid post and the second 11 of sleeve pipe, location round hole 12 corresponds locating hole 5 and pegs graft reference column 13, the slot 14 that sets up between being equipped with on the bottom plate 1 by mistake, the interpolation in slot 14 is equipped with support column 15, the other end and the second 9 bottoms of guardrail of support column 15 are connected, be equipped with fixed orifices 16 on the support column 15, the bottom of bottom plate 1 corresponds connecting piece 2 and is equipped with the fixing bolt 17 that matches fixed orifices 16.
The first guardrail 6 and the connecting piece 2 are fixedly connected to the bottom plate 1, the upper surfaces of the first guardrail 6, the connecting piece 2 and the second guardrail 9 are connected with lifting rings 18, grooves 19 are formed in the first guardrail 6 corresponding to the first sleeve 7, and annular grooves 20 are formed in the first guardrail 6 and located outside the first solid column 8.
The utility model discloses when concrete implementation, need extend the space during use, lift fixing bolt 17 off, then through pulling two guardrail 9, make two 9 outside extensions of guardrail, make location round hole 12 on two 9 of guardrail correspond locating hole 5, then peg graft fixedly through reference column 13, later be fixed in the fixed orifices 16 with bottom fixing bolt 17 and strengthen fixedly again, when not needing the extension space, lift fixing bolt 17 and reference column 13 off, then impel two 9 of guardrail, make to peg graft and stabilize the back and fix again through reference column 13 and fixing bolt 17.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (5)

1. The utility model provides a hanging flower basket for construction, includes bottom plate (1), its characterized in that: the connecting piece (2) which is vertically placed is connected to one end of the upper surface of the base plate (1), a through groove (3) is formed in the middle of the connecting piece (2), through holes (4) are symmetrically formed in two sides of the through groove (3), a positioning hole (5) is formed in the upper surface of the connecting piece (2) in a mode that the through hole (4) penetrates downwards, a first vertically placed guardrail (6) is arranged at the other end of the upper surface of the base plate (1), a first sleeve pipe (7) and a first solid column (8) which are staggered from bottom to top are connected to the front side and the rear side of the first guardrail (6), a second guardrail (9) is arranged on one side, away from the first guardrail (6), of the connecting piece (2), a second solid column (10) and a second sleeve pipe (11) which are staggered from bottom to top are connected to the front side and the rear side of the second guardrail (9), the first sleeve pipe (7) and the, solid post two (10) and sleeve pipe two (11) run through-hole (4) adapter sleeve one (7) and solid post two (10), be equipped with location round hole (12) that match locating hole (5) on solid post two (10) and sleeve pipe two (11), location round hole (12) correspond locating hole (5) and peg graft reference column (13), slot (14) that the mistake set up between being equipped with on bottom plate (1), the interpolation is equipped with support column (15) in slot (14), the other end and the guardrail two (9) bottom of support column (15) are connected, be equipped with fixed orifices (16) on support column (15), the bottom of bottom plate (1) corresponds connecting piece (2) and is equipped with fixing bolt (17) that match fixed orifices (16).
2. The cradle for construction according to claim 1, wherein: the first guardrail (6) and the connecting piece (2) are fixedly connected to the bottom plate (1).
3. The cradle for construction according to claim 1, wherein: and the upper surfaces of the first guardrail (6), the connecting piece (2) and the second guardrail (9) are all connected with lifting rings (18).
4. The cradle for construction according to claim 1, wherein: and a groove (19) is formed in the guardrail I (6) corresponding to the sleeve I (7).
5. The cradle for construction according to claim 1, wherein: and an annular groove (20) is formed in the first guardrail (6) and positioned outside the first solid column (8).
CN202021001620.4U 2020-06-04 2020-06-04 Hanging flower basket for construction Active CN212613668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021001620.4U CN212613668U (en) 2020-06-04 2020-06-04 Hanging flower basket for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021001620.4U CN212613668U (en) 2020-06-04 2020-06-04 Hanging flower basket for construction

Publications (1)

Publication Number Publication Date
CN212613668U true CN212613668U (en) 2021-02-26

Family

ID=74721472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021001620.4U Active CN212613668U (en) 2020-06-04 2020-06-04 Hanging flower basket for construction

Country Status (1)

Country Link
CN (1) CN212613668U (en)

Similar Documents

Publication Publication Date Title
WO2017045625A1 (en) Pile frame and method of using and mounting same
CN204071054U (en) A kind of free splicing work in combination platform
CN212613668U (en) Hanging flower basket for construction
CN211171996U (en) High-strength supporting foundation
CN106284264A (en) A kind of detachable truss leg
CN211447681U (en) Scaffold for building construction
CN211704136U (en) Cantilever type goods shelf
CN210976521U (en) Building platform for outdoor building and indoor decoration
CN210887997U (en) Building scaffold with adjustable height
CN210828323U (en) Exempt from to tear open mould cement template with support frame of locking
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN211048690U (en) Command stand for engineering management
CN210152204U (en) Building scaffold adjusts backup pad
CN204126232U (en) The collapsible scaffold of a kind of building iron structure
CN212755055U (en) Mounting structure of three-dimensional goods shelf for stacker
CN216238996U (en) High-strength supporting steel member
CN214531877U (en) Building template for shear wall concrete construction
CN212866769U (en) Firm type construction scaffolding
CN218714858U (en) Scaffold frame of construction usefulness is taken
CN210828303U (en) Novel scaffold board for attached lifting foot support
CN216690490U (en) Support for civil engineering construction
CN204899218U (en) Superimposed sheet support frame
CN212271542U (en) Construction hoisting construction scaffold
CN213572897U (en) Support frame that building installation engineering used
CN215331411U (en) Lower joint of vertical rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant