CN212584624U - Engineering cost progress management device - Google Patents

Engineering cost progress management device Download PDF

Info

Publication number
CN212584624U
CN212584624U CN202021438311.3U CN202021438311U CN212584624U CN 212584624 U CN212584624 U CN 212584624U CN 202021438311 U CN202021438311 U CN 202021438311U CN 212584624 U CN212584624 U CN 212584624U
Authority
CN
China
Prior art keywords
progress management
fixed frame
plate
protective cover
vertical direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021438311.3U
Other languages
Chinese (zh)
Inventor
刘小雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021438311.3U priority Critical patent/CN212584624U/en
Application granted granted Critical
Publication of CN212584624U publication Critical patent/CN212584624U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The utility model provides an engineering cost progress management device, which comprises a base, wherein the base is connected with a fixed frame through a height adjusting mechanism, the fixed frame is detachably provided with a progress management display board, the bottom of the fixed frame is provided with a positioning component matched with the progress management display board, the outer top of the fixed frame is provided with a protective cover, and a guide support is movably arranged in the protective cover; the guide support movably penetrates through the top of the fixed frame in the vertical direction, a limiting plate is arranged at the lower end of the guide support, and a limiting and adjusting assembly connected with the upper end of the guide support is arranged on the protective cover; the progress management display board is detachably connected with the fixed frame through the mutual matching of the positioning assembly, the guide bracket, the limiting plate and the limiting adjusting assembly; the utility model discloses compact structure can conveniently carry out the dismouting to the progress management show board and change, and the progress management show board of adaptable equidimension not facilitates the use simultaneously, and the result of use is better.

Description

Engineering cost progress management device
Technical Field
The utility model relates to a progress management device specifically is an engineering cost progress management device.
Background
The work process of forecasting, planning, controlling, accounting, analyzing and evaluating the engineering cost by comprehensively using knowledge and skills in the aspects of management, economics, engineering technology and the like is called engineering cost management. The prediction or determination of the construction cost and its constituent contents according to procedures, methods and bases prescribed by laws, regulations and standards, etc., is called project pricing, and the project pricing bases include project measurement pricing standards related to pricing contents, pricing methods and price standards, project pricing quotations and project cost information, etc.
In engineering cost progress management, need use progress management device, demonstrate the progress of engineering, however, current progress management device discovers in the use, and is inconvenient to change progress management show board to, unable fixed not equidimension show board, it is comparatively inconvenient to use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering cost progress management device to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a progress management device for engineering construction cost comprises a base, wherein a fixed frame is connected to the base through a height adjusting mechanism, a progress management display board is detachably arranged on the fixed frame, a positioning assembly matched with the progress management display board is arranged at the bottom of the fixed frame, a protective cover is arranged at the outer top of the fixed frame, and a guide support is movably arranged in the protective cover;
the guide support movably penetrates through the top of the fixed frame in the vertical direction, a limiting plate is arranged at the lower end of the guide support, and a limiting and adjusting assembly connected with the upper end of the guide support is arranged on the protective cover; progress management show board passes through locating component, guide bracket, limiting plate and spacing adjusting part's mutually supporting and can dismantle with fixed frame and be connected.
As a further aspect of the present invention: the height adjusting mechanism comprises a fixed cylinder which is arranged along the vertical direction, and the lower end of the fixed cylinder is connected with the base; the upper end near end of the fixed cylinder is provided with a fixed pin, and the telescopic rod is provided with a plurality of adjusting holes matched with the fixed pin at intervals along the length direction.
As a further aspect of the present invention: the fixed frame consists of a bottom plate connected with the height adjusting mechanism, a supporting plate arranged on the bottom plate along the vertical direction and a top plate arranged at the upper end of the supporting plate and symmetrical to the bottom plate; the positioning assembly is arranged on the bottom plate, and the protective cover is arranged on the top plate.
As a further aspect of the present invention: the locating component comprises a locating plate arranged on the fixing frame along the horizontal direction, a plurality of locating rods are arranged on the locating plate along the horizontal direction at intervals, and locating grooves corresponding to the locating rods one to one are arranged at the bottom of the progress management display board.
As a further aspect of the present invention: the guide support comprises a movable plate which is movably arranged in the protective cover and connected with the limiting and adjusting assembly, a plurality of connecting rods are arranged on the movable plate in parallel at intervals, guide sleeves which correspond to the connecting rods one to one are arranged on the fixed frame, and the connecting rods movably penetrate through the corresponding guide sleeves and the lower ends of the guide sleeves along the vertical direction and are connected with the limiting plate.
As a further aspect of the present invention: the limiting adjusting assembly comprises a threaded rod rotatably connected with the guide support, a nut matched with the threaded rod is arranged on the protective cover, the threaded rod penetrates through the nut in the vertical direction, and an adjusting handle is arranged at the upper end of the threaded rod.
Compared with the prior art, the beneficial effects of the utility model are that:
after the structure is adopted in the utility model, through the mutual matching of the positioning assembly, the guide bracket, the limiting plate and the limiting adjusting assembly, the progress management display board is detachably connected with the fixing frame through the mutual matching of the positioning assembly, the guide bracket, the limiting plate and the limiting adjusting assembly, the structure is compact, the operation is easy, the use is convenient, and the progress management display board can be quickly disassembled, assembled and replaced; moreover, the progress management display board can adapt to progress management display boards of different sizes, and is high in applicability and good in using effect.
Further, through mutually supporting of locating plate, locating lever and constant head tank among the locating component that sets up, can fix a position progress management show board, can prevent progress management show board horizontal migration simultaneously, stable in structure, the result of use is better. The utility model discloses compact structure can conveniently carry out the dismouting to the progress management show board and change, and the progress management show board of adaptable equidimension not facilitates the use simultaneously, and the result of use is better.
Drawings
Fig. 1 is a schematic structural view of a construction cost progress management apparatus.
Fig. 2 is a partially enlarged schematic view of a portion a in fig. 1.
Fig. 3 is a partially enlarged schematic view of a portion B in fig. 1.
In the figure: 1. a base; 2. a height adjustment mechanism; 201. a fixed cylinder; 202. a telescopic rod; 203. a fixing pin; 204. an adjustment hole; 3. a fixing frame; 301. a base plate; 302. a support plate; 303. a top plate; 4. a progress management display board; 5. a positioning assembly; 501. positioning a plate; 502. positioning a rod; 503. positioning a groove; 6. a protective cover; 7. a guide bracket; 701. a movable plate; 702. a connecting rod; 703. a guide sleeve; 8. a limiting plate; 9. a limit adjusting component; 901. a threaded rod; 902. a nut; 903. and adjusting the handle.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Referring to fig. 1-3, a construction cost progress management device comprises a base 1, wherein the base 1 is connected with a fixed frame 3 through a height adjusting mechanism 2, a progress management display plate 4 is detachably arranged on the fixed frame 3, a positioning assembly 5 matched with the progress management display plate 4 is arranged at the bottom of the fixed frame 3, a protective cover 6 is arranged at the outer top of the fixed frame 3, and a guide support 7 is movably arranged in the protective cover 6; the guide bracket 7 movably penetrates through the top of the fixed frame 3 along the vertical direction, a limiting plate 8 is arranged at the lower end of the guide bracket 7, and a limiting and adjusting assembly 9 connected with the upper end of the guide bracket 7 is arranged on the protective cover 6; the progress management display board 4 is detachably connected with the fixed frame 3 through the mutual matching of the positioning assembly 5, the guide bracket 7, the limiting plate 8 and the limiting adjusting assembly 9, the structure is compact, the operation is easy, the use is convenient, and the progress management display board 4 can be quickly disassembled, assembled and replaced; and, adaptable progress management show board 4 of equidimension not, the suitability is stronger, and the result of use is better.
The height adjusting mechanism 2 comprises a fixed cylinder 201 which is arranged along the vertical direction and the lower end of which is connected with the base 1, a telescopic rod 202 is arranged at the outer bottom of the fixed cylinder 201, and the lower end of the telescopic rod 202 movably extends into the fixed cylinder 201 along the vertical direction; a fixing pin 203 is provided at the proximal end of the upper end of the fixed cylinder 201, and a plurality of adjusting holes 204 corresponding to the fixing pin 203 are provided at intervals in the length direction in the extendable rod 202. Through mutually supporting of a fixed section of thick bamboo 201, telescopic link 202, fixed pin 203 and regulation hole 204, can adjust the height of progress management show board 4, simple structure, convenient to use as required.
Specifically, the fixed frame 3 is composed of a bottom plate 301 connected with the height adjusting mechanism 2, a support plate 302 vertically arranged on the bottom plate 301, and a top plate 303 arranged at the upper end of the support plate 302 and symmetrical to the bottom plate 301; the positioning assembly 5 is arranged on the bottom plate 301, the protective cover 6 is arranged on the top plate 303, and the positioning assembly is simple in structure and low in use cost.
Specifically, locating component 5 includes along the horizontal direction setting locating plate 501 on fixed frame 3, is equipped with a plurality of locating levers 502 along the horizontal direction interval on locating plate 501, is equipped with the constant head tank 503 with each locating lever 502 one-to-one in the bottom of progress management show board 4. Through mutually supporting of locating plate 501, locating lever 502 and constant head tank 503, can fix a position progress management show board 4, can prevent progress management show board 4 horizontal migration simultaneously, stable in structure, the result of use is better.
Further, the guide support 7 includes a movable plate 701 movably disposed in the protective cover 6 and connected to the limiting adjustment assembly 9, a plurality of connecting rods 702 are disposed on the movable plate 701 in parallel and at intervals, a guide sleeve 703 corresponding to each connecting rod 702 is disposed on the fixed frame 3, and each connecting rod 702 movably penetrates through the corresponding guide sleeve 703 along the vertical direction and the lower end of each connecting rod 702 is connected to the limiting plate 8. Through mutually supporting of fly leaf 701, connecting rod 702 and uide bushing 703, guide bracket 7 only removes along vertical direction, and stable in structure guarantees that limiting plate 8 can carry on spacingly to progress management show board 4, prevents progress management show board 4 vertical removal.
Specifically, the limiting and adjusting assembly 9 comprises a threaded rod 901 rotatably connected with the guide support 7, a nut 902 matched with the threaded rod 901 is arranged on the protective cover 6, the threaded rod 901 penetrates through the nut 902 along the vertical direction, and an adjusting handle 903 is arranged at the upper end of the threaded rod 901. Can adjust guide bracket 7 to adjust limiting plate 8, with the progress management show board 4 of adaptation equidimension not.
The utility model discloses a theory of operation is: the locating groove 503 at the bottom of the progress management display board 4 is sleeved on the locating rod 502, and then the top of the progress management display board 4 is limited through the mutual matching of the limiting adjusting component 9, the guiding support 7 and the limiting plate 8, so that the progress management display board 4 is fixed. Finally, the schedule management display board 4 is adjusted to an appropriate height by the height adjusting mechanism 2.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. A project cost progress management device comprises a base (1) and is characterized in that the base (1) is connected with a fixed frame (3) through a height adjusting mechanism (2), a progress management display board (4) is detachably arranged on the fixed frame (3), a positioning assembly (5) matched with the progress management display board (4) is arranged at the bottom of the fixed frame (3), a protective cover (6) is arranged at the outer top of the fixed frame (3), and a guide support (7) is movably arranged in the protective cover (6);
the guide support (7) movably penetrates through the top of the fixed frame (3) along the vertical direction, a limiting plate (8) is arranged at the lower end of the guide support (7), and a limiting and adjusting assembly (9) connected with the upper end of the guide support (7) is arranged on the protective cover (6); progress management show board (4) can be dismantled with fixed frame (3) and be connected through mutually supporting of locating component (5), guide bracket (7), limiting plate (8) and spacing adjusting part (9).
2. The construction cost progress management device according to claim 1, wherein the height adjusting mechanism (2) comprises a fixed cylinder (201) which is arranged along the vertical direction and the lower end of which is connected with the base (1), a telescopic rod (202) is arranged at the outer bottom of the fixed cylinder (201), and the lower end of the telescopic rod (202) movably extends into the fixed cylinder (201) along the vertical direction; the upper end near end of the fixed cylinder (201) is provided with a fixed pin (203), and the telescopic rod (202) is provided with a plurality of adjusting holes (204) which are matched with the fixed pin (203) at intervals along the length direction.
3. A construction cost progress management apparatus according to claim 1, wherein the fixing frame (3) is composed of a bottom plate (301) connected to the height adjusting mechanism (2), a support plate (302) provided on the bottom plate (301) in a vertical direction, and a top plate (303) provided on an upper end of the support plate (302) and symmetrical to the bottom plate (301); the positioning assembly (5) is arranged on the bottom plate (301), and the protective cover (6) is arranged on the top plate (303).
4. The construction cost progress management device according to claim 1, wherein the positioning assembly (5) comprises a positioning plate (501) horizontally arranged on the fixed frame (3), a plurality of positioning rods (502) are horizontally arranged on the positioning plate (501) at intervals, and positioning grooves (503) corresponding to the positioning rods (502) one by one are arranged at the bottom of the progress management display board (4).
5. The construction cost progress management device according to claim 1, wherein the guide support (7) comprises a movable plate (701) movably arranged in the protective cover (6) and connected with the limiting adjusting assembly (9), a plurality of connecting rods (702) are arranged on the movable plate (701) in parallel at intervals, guide sleeves (703) corresponding to the connecting rods (702) in a one-to-one manner are arranged on the fixed frame (3), each connecting rod (702) movably penetrates through the corresponding guide sleeve (703) along the vertical direction, and the lower end of each connecting rod is connected with the limiting plate (8).
6. A construction cost progress management device according to claim 1, wherein the limit adjusting assembly (9) comprises a threaded rod (901) rotatably connected with the guide bracket (7), a nut (902) matched with the threaded rod (901) is arranged on the protective cover (6), the threaded rod (901) penetrates through the nut (902) along the vertical direction, and an adjusting handle (903) is arranged at the upper end of the threaded rod (901).
CN202021438311.3U 2020-07-18 2020-07-18 Engineering cost progress management device Expired - Fee Related CN212584624U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021438311.3U CN212584624U (en) 2020-07-18 2020-07-18 Engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021438311.3U CN212584624U (en) 2020-07-18 2020-07-18 Engineering cost progress management device

Publications (1)

Publication Number Publication Date
CN212584624U true CN212584624U (en) 2021-02-23

Family

ID=74658504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021438311.3U Expired - Fee Related CN212584624U (en) 2020-07-18 2020-07-18 Engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN212584624U (en)

Similar Documents

Publication Publication Date Title
CN212584624U (en) Engineering cost progress management device
CN108665773B (en) Insulator ligature operation frame
CN213374933U (en) Synthesize sports teaching exercise equipment
CN215068869U (en) Epidural puncture simulation operation model for anesthesiologist
CN205284840U (en) A clamping platform for cuing open fish
CN213844429U (en) Educational management practical training experiment table mechanism
CN211124585U (en) Pie chart and line chart combined demonstration device
CN217750114U (en) Real welding frame of instructing of electron electrician
CN111536401A (en) Mounting structure for communication equipment casing
CN109126068B (en) Racket threading equipment of bent tension adjustable
CN220462392U (en) Hydraulic and hydroelectric engineering pipeline cutting device
CN205569673U (en) Badminton block frame
CN215503534U (en) Laboratory mouse fixing device
CN218946763U (en) Positioning tool for welding telescopic wall-attached stay bars of tower crane
CN111299911B (en) Labyrinth flow elimination terminal welding control device
CN211369752U (en) Vertical assembling device for angle steel tower
CN218054661U (en) Blackboard is used in music teaching of adjustable staff
CN220694681U (en) Business training is with declaring device
CN219221720U (en) Surveying and mapping device for urban construction engineering cost
CN211906660U (en) Adjustable display device is used in english teaching
CN214428261U (en) Engineering cost progress management device
CN214317598U (en) Concatenation formula meeting stand subassembly
CN212161202U (en) Employment data display device
CN219734914U (en) Instrument screen support
CN216818026U (en) Insulation support quick positioning assembly based on integrated mutual inductor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant