CN212582906U - Quick fixed mounting structure of pre-buried board on shock insulation support for building - Google Patents

Quick fixed mounting structure of pre-buried board on shock insulation support for building Download PDF

Info

Publication number
CN212582906U
CN212582906U CN202021004570.5U CN202021004570U CN212582906U CN 212582906 U CN212582906 U CN 212582906U CN 202021004570 U CN202021004570 U CN 202021004570U CN 212582906 U CN212582906 U CN 212582906U
Authority
CN
China
Prior art keywords
main part
plate main
connecting plate
limiting
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021004570.5U
Other languages
Chinese (zh)
Inventor
张成瑞
叶娟
周生银
王磊
赵猛
崔文禄
张玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING CO LTD
Original Assignee
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING CO LTD filed Critical SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING CO LTD
Priority to CN202021004570.5U priority Critical patent/CN212582906U/en
Application granted granted Critical
Publication of CN212582906U publication Critical patent/CN212582906U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a quick fixed mounting structure of built-in plate on isolation bearing for building, including isolation bearing main part, connecting plate main part, built-in plate main part and channel-section steel, the welding of isolation bearing main part top has the connecting plate main part, the built-in plate main part is installed on connecting plate main part top, the welding of built-in plate main part top has the channel-section steel, connecting plate main part top is provided with stop device, the inside fixing device that is provided with of connecting plate main part. The utility model discloses a laminating built-in panel main part left end in the limiting plate can promote the installation effectiveness of built-in panel main part above-mentioned device, the built-in panel quick fixed mounting structure on having solved present shock insulation support for building uses the bolt more to install, but it is comparatively inconvenient when aliging screw hole and bolt, the problem of the installation effectiveness of device has been reduced, through aliging the device fast, thereby the efficiency of hoisting device when the installation, the simple operation, high durability and convenient use has promoted the practicality of device.

Description

Quick fixed mounting structure of pre-buried board on shock insulation support for building
Technical Field
The utility model relates to a fixed mounting structure technical field specifically is quick fixed mounting structure of built-in plate on shock insulation support for building.
Background
With the continuous improvement and improvement of building technology, new achievements are continuously obtained in the house building earthquake-resistant technology. The traditional anti-seismic technology consumes a large amount of building materials by increasing or thickening reinforcing steel bars, load-bearing columns and the like through the anti-seismic technology of hard-to-hard collision, occupies too much use space of a building, and has the defects of high energy consumption and the like. The shock insulation support has the advantages of small volume, obvious shock insulation effect and the like, and becomes a popular new shock insulation technology, so that the existing shock insulation support for the building basically meets the requirements of people, but still has some problems.
The quick fixed mounting structure of pre-buried board on present shock insulation support for building uses the bolt to install more, but it is comparatively inconvenient when aliging screw hole and bolt, has reduced the installation effectiveness of device, therefore needs the quick fixed mounting structure of pre-buried board on the shock insulation support for building to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick fixed mounting structure of pre-buried board on shock insulation support for building to solve the lower problem of efficiency when the installation of the traditional device that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a quick fixed mounting structure for an embedded plate on a shock insulation support for a building comprises a shock insulation support main body, a connecting plate main body, an embedded plate main body and channel steel, the top end of the shock insulation support main body is welded with a connecting plate main body, the top end of the connecting plate main body is provided with a pre-embedded plate main body, the top end of the embedded plate main body is welded with channel steel, the top end of the connecting plate main body is provided with a limiting device, the connecting plate main body is internally provided with a fixing device, the limiting device comprises a fixing ring, a threaded rod, a handle, a cavity, a limiting plate, a chute and a slide block, the bottom end of the connecting plate main body is fixedly connected with a fixing ring, the inner part of the fixing ring is connected with a threaded rod through threads, the bottom end of the threaded rod is fixedly connected with a handle, a cavity is arranged in the connecting plate main body, and the threaded rod is embedded in the cavity, the top end bearing of the threaded rod is connected with a limiting plate, and the limiting plate is embedded in the cavity.
Preferably, the inside spout of having seted up of cavity, the inside embedded slider that has of spout, and the one end fixed connection that the spout was kept away from to the slider in the limiting plate.
Preferably, fixing device includes fixed slot, fixing bolt, rubber circle, gag lever post, spacing groove and sealed the pad, the fixed slot has been seted up to channel-section steel inside, fixed slot inside threaded connection has fixing bolt, and fixing bolt runs through in connecting plate main part and pre-buried board main part, pre-buried board main part bottom fixedly connected with gag lever post, the inside gag lever post of having seted up of connecting plate main part, and the gag lever post is embedded in the spacing groove.
Preferably, the outer wall of the fixing bolt is sleeved with a rubber ring, and the top end of the rubber ring is attached to the outer wall of the bottom end of the connecting plate main body.
Preferably, the shape of the limiting rod and the shape of the limiting groove are both set to be regular hexagons, and the shape of the limiting rod and the shape of the limiting groove are matched with each other.
Preferably, a sealing gasket is glued inside the limiting groove, and the specific material of the sealing gasket is rubber.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this quick fixed mounting structure of built-in plate on shock insulation support for building is provided with solid fixed ring, the threaded rod, the handle, the cavity, the limiting plate, spout and slider, when needing to install the built-in plate main part, laminating built-in plate main part left end in the limiting plate can promote the installation effectiveness of built-in plate main part, after the installation, the counter-rotating handle, drive the inside that the limiting plate got into the cavity, can not cause the influence to the normal use of device, above-mentioned device, the built-in plate quick fixed mounting structure of built-in plate on having solved present shock insulation support for building uses the bolt more to install, but it is comparatively inconvenient when aliging screw hole and bolt, the problem of the installation effectiveness of device has been reduced, through aliging the device fast when the installation, thereby the efficiency of hoisting device when the installation, high convenience in operation, high durability and.
2. This quick fixed mounting structure of pre-buried plate on shock insulation support for building is provided with the fixed slot, fixing bolt, the rubber circle, the gag lever post, spacing groove and sealed pad, during the installation, it is rotatory after running through connecting plate main part and pre-buried plate main part with fixing bolt, effect through fixing bolt and fixed slot threaded connection, can accomplish the installation, effect through gag lever post and spacing groove, can further guarantee the stability of device, avoid the device to take place the aversion phenomenon when the bolt is installed, above-mentioned device, guaranteed that the device can not shift when the installation, and further promoted the stability of device after the installation.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic front view of the cross-sectional structure of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 2 according to the present invention;
fig. 4 is an enlarged schematic structural view of the utility model at the position B in fig. 2;
fig. 5 is an enlarged schematic structural diagram of the position C in fig. 2 according to the present invention.
In the figure: 1. a seismic isolation bearing body; 2. a connection plate main body; 3. a pre-buried plate main body; 4. channel steel; 511. a fixing ring; 512. a threaded rod; 513. a handle; 514. a chamber; 515. a limiting plate; 516. a chute; 517. a slider; 611. fixing grooves; 612. fixing the bolt; 613. A rubber ring; 614. a limiting rod; 615. a limiting groove; 616. and a gasket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a quick fixed mounting structure for a pre-buried plate on a building seismic isolation support comprises a seismic isolation support body 1, a connecting plate body 2, a pre-buried plate body 3 and channel steel 4, wherein the connecting plate body 2 is welded at the top end of the seismic isolation support body 1, the pre-buried plate body 3 is mounted at the top end of the connecting plate body 2, the channel steel 4 is welded at the top end of the pre-buried plate body 3, a limiting device is arranged at the top end of the connecting plate body 2, a fixing device is arranged inside the connecting plate body 2 and comprises a fixing ring 511, a threaded rod 512, a handle 513, a chamber 514, a limiting plate 515, a sliding groove 516 and a sliding block 517, the fixing ring 511 is fixedly connected with the fixing ring 511 through threads, the handle 513 is fixedly connected at the bottom end of the threaded rod 512, the chamber 514 is, and limiting plate 515 is embedded in cavity 514, spout 516 has been seted up inside cavity 514, spout 516 is embedded to have inside slider 517, and slider 517 keeps away from the one end fixed connection of spout 516 in limiting plate 515, through slider 517 in the inside gliding effect of spout 516, the stability of limiting plate 515 when removing has further been promoted, it has solved the quick fixed mounting structure of pre-buried board on present shock insulation support for building and has used the bolt more to install, but it is comparatively inconvenient when aliging screw hole and bolt, the problem of the installation effectiveness of device has been reduced, through aliging the device fast, thereby the efficiency of hoisting device when the installation, and is convenient for operation, and is simple to use, and the practicality of device has been promoted.
The fixing device comprises a fixing groove 611, a fixing bolt 612, a rubber ring 613, a limiting rod 614, a limiting groove 615 and a sealing gasket 616, the fixing groove 611 is formed in the channel steel 4, the fixing bolt 612 is connected to the fixing groove 611 through threads, the fixing bolt 612 penetrates through the connecting plate main body 2 and the embedded plate main body 3, the limiting rod 614 is fixedly connected to the bottom end of the embedded plate main body 3, the limiting groove 615 is formed in the connecting plate main body 2, the limiting rod 614 is embedded in the limiting groove 615, the rubber ring 613 is sleeved on the outer wall of the fixing bolt 612, the top end of the rubber ring 613 is attached to the outer wall of the bottom end of the connecting plate main body 2, the sealing performance of the device after installation is further guaranteed, the stability of the device is improved, the shape of the limiting rod 614 and the shape of the limiting groove 615 are both regular hexagons, the shape of the limiting rod 614 and the shape, the stability of hoisting device, the inside glue of spacing groove 615 has sealed the pad 616, and sealed the concrete material of pad 616 is the rubber material, through the effect of sealed pad 616, guarantees the leakproofness of gag lever post 614 after getting into spacing groove 615, has promoted the sealed effect of device.
The working principle is as follows: when needing to install pre-buried board main part 3, rotatory handle 513, effect through threaded rod 512 and chamber 514 bearing connection, it is rotatory to drive threaded rod 512, effect through threaded rod 512 and solid fixed ring 511 threaded connection, drive threaded rod 512 rebound, thereby drive limiting plate 515 rebound, laminate pre-buried board main part 3 left end in limiting plate 515 can promote the installation effectiveness of pre-buried board main part 3, after the installation, reverse rotation handle 513, drive limiting plate 515 and get into the inside of chamber 514, it is rotatory to run through connecting plate main part 2 and pre-buried board main part 3 back with fixing bolt 612, effect through fixing bolt 612 and fixed slot 611 threaded connection, can accomplish the installation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. Quick fixed mounting structure of pre-buried board on shock insulation support for building, including shock insulation support main part (1), connecting plate main part (2), pre-buried board main part (3) and channel-section steel (4), shock insulation support main part (1) top welding has connecting plate main part (2), pre-buried board main part (3) are installed on connecting plate main part (2) top, channel-section steel (4) are welded on pre-buried board main part (3) top, connecting plate main part (2) top is provided with stop device, inside fixing device, its characterized in that of being provided with of connecting plate main part (2): stop device is including solid fixed ring (511), threaded rod (512), handle (513), cavity (514), limiting plate (515), spout (516) and slider (517), gu fixed ring (511) of connecting plate main part (2) bottom fixedly connected with, gu fixed ring (511) internal thread is connected with threaded rod (512), threaded rod (512) bottom fixedly connected with handle (513), cavity (514) has been seted up to connecting plate main part (2) inside, and threaded rod (512) are embedded in cavity (514), threaded rod (512) top bearing is connected with limiting plate (515), and limiting plate (515) are embedded in cavity (514).
2. The quick fixed mounting structure of pre-buried plate on isolation bearing for building of claim 1, characterized by that: the cavity (514) is internally provided with a sliding groove (516), a sliding block (517) is embedded in the sliding groove (516), and one end, far away from the sliding groove (516), of the sliding block (517) is fixedly connected to the limiting plate (515).
3. The quick fixed mounting structure of pre-buried plate on isolation bearing for building of claim 1, characterized by that: the fixing device comprises a fixing groove (611), a fixing bolt (612), a rubber ring (613), a limiting rod (614), a limiting groove (615) and a sealing gasket (616), the fixing groove (611) is formed in the channel steel (4), the fixing groove (611) is connected with the fixing bolt (612) through internal threads, the fixing bolt (612) penetrates through the connecting plate main body (2) and the embedded plate main body (3), the limiting rod (614) is fixedly connected to the bottom end of the embedded plate main body (3), the limiting groove (615) is formed in the connecting plate main body (2), and the limiting rod (614) is embedded in the limiting groove (615).
4. The quick fixed mounting structure of pre-buried plate on isolation bearing for building of claim 3, characterized in that: the outer wall of the fixing bolt (612) is sleeved with a rubber ring (613), and the top end of the rubber ring (613) is attached to the outer wall of the bottom end of the connecting plate main body (2).
5. The quick fixed mounting structure of pre-buried plate on isolation bearing for building of claim 3, characterized in that: the shape of the limiting rod (614) and the shape of the limiting groove (615) are both set to be regular hexagons, and the shape of the limiting rod (614) and the shape of the limiting groove (615) are matched with each other.
6. The quick fixed mounting structure of pre-buried plate on isolation bearing for building of claim 3, characterized in that: the inside glue of spacing groove (615) has sealed pad (616), and sealed pad (616) concrete material is the rubber material.
CN202021004570.5U 2020-06-04 2020-06-04 Quick fixed mounting structure of pre-buried board on shock insulation support for building Expired - Fee Related CN212582906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021004570.5U CN212582906U (en) 2020-06-04 2020-06-04 Quick fixed mounting structure of pre-buried board on shock insulation support for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021004570.5U CN212582906U (en) 2020-06-04 2020-06-04 Quick fixed mounting structure of pre-buried board on shock insulation support for building

Publications (1)

Publication Number Publication Date
CN212582906U true CN212582906U (en) 2021-02-23

Family

ID=74643675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021004570.5U Expired - Fee Related CN212582906U (en) 2020-06-04 2020-06-04 Quick fixed mounting structure of pre-buried board on shock insulation support for building

Country Status (1)

Country Link
CN (1) CN212582906U (en)

Similar Documents

Publication Publication Date Title
CN206289795U (en) A kind of assembled architecture wallboard
CN112376936A (en) Assembly type structure wall crown internal corner reinforcing device
CN212582906U (en) Quick fixed mounting structure of pre-buried board on shock insulation support for building
CN211172827U (en) Effectual indoor panel gives sound insulation
CN111945912A (en) Integral replacement type U-shaped damper with waveform energy dissipation part
CN206458166U (en) One kind construction divider wall
CN207538395U (en) A kind of aluminium honeycomb raised flooring system
CN201843333U (en) Moulding plate with door frame used for concrete casting wall body
CN201991110U (en) Assembly-type building enveloping and filling energy-saving wallboard system
CN211080243U (en) Deep foundation pit support pile
CN211037372U (en) Reusable assembly type building attachment support
CN209741890U (en) Composite pile foundation for soft soil building foundation
CN207296558U (en) A kind of environment-friendly type earthquake-resistant structure
CN107740520B (en) High strength curtain bearing structure for building
CN201704828U (en) Fixed installation structure of partition board and structural roof board or beam
CN214040057U (en) Multifunctional line pendant for building construction
CN2391938Y (en) Light wt., energy saving compound wall plate
CN110886527A (en) Half-cycle friction damper
CN214615740U (en) Elastic anti-seismic structure of energy-saving assembled steel structure house
CN214152440U (en) Energy-saving and noise-reducing device for building construction site
CN211080657U (en) High-strength concrete wall
CN213143601U (en) Light steel keel for assembled wallboard
CN219060581U (en) Environment-friendly building sound insulation wallboard structure
CN214220697U (en) Assembly type structure wall crown internal corner reinforcing device
CN218714065U (en) Anti-seismic structure of detachable composite wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210223

CF01 Termination of patent right due to non-payment of annual fee