CN206458166U - One kind construction divider wall - Google Patents

One kind construction divider wall Download PDF

Info

Publication number
CN206458166U
CN206458166U CN201720132810.1U CN201720132810U CN206458166U CN 206458166 U CN206458166 U CN 206458166U CN 201720132810 U CN201720132810 U CN 201720132810U CN 206458166 U CN206458166 U CN 206458166U
Authority
CN
China
Prior art keywords
flaggy
stratum reticulare
divider wall
construction
spongy layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720132810.1U
Other languages
Chinese (zh)
Inventor
靳鹏伟
何永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Engineering
Original Assignee
Hunan University of Science and Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Engineering filed Critical Hunan University of Science and Engineering
Priority to CN201720132810.1U priority Critical patent/CN206458166U/en
Application granted granted Critical
Publication of CN206458166U publication Critical patent/CN206458166U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model is related to Construction of Civil Engineering safety device field, more particularly to a kind of construction divider wall, including flaggy(1), stratum reticulare(2)And spongy layer(3), stratum reticulare(2)For la m, flaggy(1)For outer layer, spongy layer(3)Positioned at flaggy(1)With stratum reticulare(2)Between, flaggy(1)With stratum reticulare(2)Pass through connector(4)Connection;Construction divider wall described in the utility model, without power consumption, with preferable pick-up performance, and is moved easily, stability is good.

Description

One kind construction divider wall
Technical field
The utility model is related to Construction of Civil Engineering safety device field, more particularly to a kind of construction divider wall.
Background technology
Construction divider wall is the safeguard that people are commonly used in construction activity, for protecting the life of resident to pacify Entirely, while avoiding construction from influenceing urban, it is《Construction safety specification》The safety protective tools of middle compulsive requirement.
Traditional construction divider wall majority is made of, using iron sheet or rubber slab, only to play a part of isolating pedestrian, to applying Workshop in the dust that produces be difficult to play only grey effect;For the deficiency of traditional construction divider wall, disclosed in patented technology One kind can dust suction Urban Building Construction partition wall(Patent No. 201420318350.8), including Side fascia and lining, exterior wall Connected between plate and the lining by some dowels, top links into an integrated entity, if being additionally provided with lining and Side fascia Detachable dust suction part is provided with dry through hole, partition wall body, the opposite fan of wind direction, fan two-by-two are additionally provided with partition wall body It is connected to by being laid on the intrinsic transmission line of electricity of partition wall and is located at the solar panel of partition wall bodies top.This kind construction every The weak point of wall is the complicated duty of divider wall, and need to be powered power consumption.
The content of the invention
Technical problem to be solved in the utility model is:The construction divider wall with dust-absorbing function need to lead in the prior art Power consumption energy, and it is complicated.
For solve technical scheme that its technical problem the utility model used for:One kind construction divider wall, is characterised by: Including flaggy 1, stratum reticulare 2 and spongy layer 3, stratum reticulare 2 is la m, and flaggy 1 is outer layer, and spongy layer 3 is located at flaggy 1 and stratum reticulare 2 Between, flaggy 1 is connected with stratum reticulare 2 by connector 4.
As further specific optimization, the bottom of the flaggy 1 and stratum reticulare 2 is provided with jet pipe cabinet 5, flaggy 1 and stratum reticulare 2 It is fixed on jet pipe cabinet 5.
As further specific optimization, the flaggy 1 is parallel with stratum reticulare 2, upper zone and the lower region uniform thickness of spongy layer 3 Degree.
As further specific optimization, the angle of the flaggy 1 and stratum reticulare 2 is 5 to 15 °, the lower region thickness of spongy layer 3 More than upper zone thickness.Using this kind of structure, after spongy layer 3 absorbs water, center of gravity is relatively low, with preferable stability.
As further specific optimization, two sides of the flaggy 1 are respectively arranged with latch 11 and slot 12.Using this kind It can be realized and connected by latch 11 and jack 12 between structure, adjacent plies 1.
As further specific optimization, the top of spongy layer 3 is provided with tank 31, and the bottom of tank 31 is provided with leaking hole 32. Using this kind of structure, the moisturizing and cleaning to spongy layer 3 can be realized by being added water to tank;Current flow through sponge from top to bottom Layer 3, the dust in sponge is taken out of.
As further specific optimization, the connector 4 is bolt;It is bolted, it is easy to disassemble.
As further specific optimization, the connector 4 is rivet.
Operation principle:Construction divider wall described in the utility model, in use, spraying into a certain amount of water to spongy layer 3, makes Its saturation that absorbs water, the spongy layer 3 after water suction has larger weight, with preferable stability, meanwhile, the spongy layer after water suction 3 have preferable pick-up performance.
Beneficial effect:Construction divider wall described in the utility model, without power consumption, is moved with preferable pick-up performance, and conveniently Dynamic, stability is good.
Brief description of the drawings
Fig. 1 is the side structure schematic view of the utility model scheme one;
Fig. 2 is the positive structure diagram of the utility model scheme one;
Fig. 3 is the side structure schematic view of the utility model scheme two;
Fig. 4 is the side structure schematic view of the utility model scheme three;
In figure:1 be flaggy, 11 be latch, 12 be slot, 2 be stratum reticulare, 3 be spongy layer, 31 be tank, 32 be leaking hole, 4 it is connector, 5 is jet pipe cabinet.
Embodiment
Further illustrate referring to the drawings and realize embodiment of the present utility model:
Scheme one(As depicted in figs. 1 and 2):
One kind construction divider wall, including flaggy 1, stratum reticulare 2 and spongy layer 3, stratum reticulare 2 are la m, and flaggy 1 is outer layer, Spongy layer 3 is located between flaggy 1 and stratum reticulare 2, and flaggy 1 is connected with stratum reticulare 2 by connector 4, and the connector 4 is bolt;
The bottom of the flaggy 1 and stratum reticulare 2 is provided with jet pipe cabinet 5, and flaggy 1 and stratum reticulare 2 are fixed on jet pipe cabinet 5;
The flaggy 1 is parallel with stratum reticulare 2, upper zone and the lower region equal thickness of spongy layer 3;
Two sides of the flaggy 1 are respectively arranged with latch 11 and slot 12.
Scheme two(As shown in Figure 3):
It is with the difference of scheme one:The angle of the flaggy 1 and stratum reticulare 2 is 15 °, the lower region thickness of spongy layer 3 More than upper zone thickness.
Using this kind of structure, after spongy layer 3 absorbs water, center of gravity is relatively low, with preferable stability.
Scheme three(As shown in Figure 4):
It is with the difference of scheme one:The top of spongy layer 3 is provided with tank 31, and the bottom of tank 31 is provided with leak Hole 32.Using this kind of structure, the moisturizing and cleaning to spongy layer 3 can be realized by being added water to tank;Current are flowed through from top to bottom Spongy layer 3, the dust in sponge is taken out of.

Claims (8)

1. one kind construction divider wall, it is characterised in that:Including flaggy(1), stratum reticulare(2)And spongy layer(3), stratum reticulare(2)For inner side Layer, flaggy(1)For outer layer, spongy layer(3)Positioned at flaggy(1)With stratum reticulare(2)Between, flaggy(1)With stratum reticulare(2)Pass through connection Part(4)Connection.
2. construction divider wall according to claim 1, it is characterised in that:The flaggy(1)And stratum reticulare(2)Bottom set There is jet pipe cabinet(5), flaggy(1)And stratum reticulare(2)It is fixed on jet pipe cabinet(5)On.
3. construction divider wall according to claim 1, it is characterised in that:The flaggy(1)With stratum reticulare(2)It is parallel, sponge Layer(3)Upper zone and lower region equal thickness.
4. construction divider wall according to claim 1, it is characterised in that:The flaggy(1)With stratum reticulare(2)Angle be 5 To 15 °, spongy layer(3)Lower region thickness be more than upper zone thickness.
5. construction divider wall according to claim 1, it is characterised in that:The flaggy(1)Two sides be respectively arranged with Latch(11)And slot(12).
6. construction divider wall according to claim 1, it is characterised in that:Spongy layer(3)Top is provided with tank(31), water Groove(31)Bottom is provided with leaking hole(32).
7. construction divider wall according to claim 1, it is characterised in that:The connector(4)For bolt;Connected by bolt Connect, it is easy to disassemble.
8. construction divider wall according to claim 1, it is characterised in that:The connector(4)For rivet.
CN201720132810.1U 2017-02-14 2017-02-14 One kind construction divider wall Expired - Fee Related CN206458166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720132810.1U CN206458166U (en) 2017-02-14 2017-02-14 One kind construction divider wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720132810.1U CN206458166U (en) 2017-02-14 2017-02-14 One kind construction divider wall

Publications (1)

Publication Number Publication Date
CN206458166U true CN206458166U (en) 2017-09-01

Family

ID=59695374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720132810.1U Expired - Fee Related CN206458166U (en) 2017-02-14 2017-02-14 One kind construction divider wall

Country Status (1)

Country Link
CN (1) CN206458166U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625665A (en) * 2018-05-10 2018-10-09 东阳市天杨建筑工程设计有限公司 The dust-proof guardrail on construction ground
CN110158512A (en) * 2019-06-11 2019-08-23 周国英 Road construction fence

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625665A (en) * 2018-05-10 2018-10-09 东阳市天杨建筑工程设计有限公司 The dust-proof guardrail on construction ground
CN110158512A (en) * 2019-06-11 2019-08-23 周国英 Road construction fence

Similar Documents

Publication Publication Date Title
CN206693404U (en) A kind of sound insulation light wall board
CN203834772U (en) Sound insulation and shock absorption floating platform
CN206458166U (en) One kind construction divider wall
CN206911022U (en) One kind is used for dust on construction site and collects environmental-protection box
CN206722206U (en) A kind of urban architecture assembled plate construction
CN206503252U (en) The external heated board apparatus of civil building engineering wall
CN105544791B (en) A kind of integrated heat-insulation wall plate of orthogonal layers building blocks
CN206752959U (en) Damping assembled floor-board
CN203347100U (en) Composite wallboard, hanging connection unit between composite wallboard and cross beam and connecting structure between composite wallboard and cross beam
CN203669197U (en) Calcium silicate composite sandwich wallboard
CN105369916A (en) Fixing method for inorganic outer wall insulation board
CN209227785U (en) A kind of exterior wall and square tubular column T shape connection structure
CN208718204U (en) A kind of prefabricated board with antiskid function
CN206667876U (en) T-shaped frcition damper
CN203160474U (en) Double-layer heat-insulating glass curtain wall fixed by base
CN205855723U (en) At the bottom of a kind of embedded sedan-chair of lower whorl beam
CN203296632U (en) Water retaining gate for land
CN207863543U (en) A kind of noise reduction building structure of equipment machine room
CN205935227U (en) Novel resistance to plucking spare
CN202390937U (en) External wall thermal insulation structure
CN109091989A (en) A kind of construction site dust-extraction unit
CN207331988U (en) Rapid connection plate structure and its connector
CN206144012U (en) Cement prefabricated plate of wide type door top or window top beam
CN207878774U (en) A kind of building heat preservation brick with function of seismic resistance
CN211143856U (en) Color steel combined type temporary board house for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170901

Termination date: 20180214