CN212582450U - Platform is changed to bridge beam supports - Google Patents

Platform is changed to bridge beam supports Download PDF

Info

Publication number
CN212582450U
CN212582450U CN202020757616.4U CN202020757616U CN212582450U CN 212582450 U CN212582450 U CN 212582450U CN 202020757616 U CN202020757616 U CN 202020757616U CN 212582450 U CN212582450 U CN 212582450U
Authority
CN
China
Prior art keywords
fixing seat
fixing
hole
platform
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020757616.4U
Other languages
Chinese (zh)
Inventor
莫亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Hongye Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020757616.4U priority Critical patent/CN212582450U/en
Application granted granted Critical
Publication of CN212582450U publication Critical patent/CN212582450U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a platform is changed to bridge beam supports, including the device main part. The replacement platform and the pier can be connected with each other through the combined action of the first fixed seat, the second fixed seat, the first insertion rod, the first rope, the third fixed seat, the fourth fixed seat, the second insertion rod and the second rope, so that the stability of the replacement platform is enhanced, and the influence of strong wind weather on the stability of the replacement platform is reduced; the second handrail can be used for installing a safety belt and can also play a certain role in blocking the body of a constructor, the risk that a worker rolls off when the body of the worker is unstable on the platform plate is reduced, the first handrail can rotate to facilitate the worker to get on and off the platform plate, and the first handrail can also play the same role as the second handrail, so that the personal safety of the worker is guaranteed; the height of the platform plate can be adjusted through the telescopic effect of the electric telescopic rod, so that the device can replace supports for piers of different heights.

Description

Platform is changed to bridge beam supports
Technical Field
The utility model belongs to the technical field of the construction platform device, particularly, relate to a platform is changed to bridge beam supports.
Background
Generally, the service life of bridge supports is shorter than that of main bridge structures, and particularly, the rubber supports which are most adopted on the conventional bridges of highways and urban roads are adopted. Therefore, with the increasing of the number of the reserved bridges and the service life of the bridges in China, the replacement of the bridge support is often required. The jacking of the upper structure of the bridge is realized, and for the work of replacing the support, only the release of the old support is completed, the original damaged support needs to be removed, and the installation of a new bridge support in the original position is completed. This process is usually accomplished by replacing the platform with a bridge deck.
Because it belongs to high altitude construction to change bridge beam supports, so safe operation guarantee to constructor is especially important, current change platform, no matter be hanging flower basket or scaffold frame, all can produce easily when meeting with strong wind weather and rock, and then make constructor stand unstably on hanging flower basket or scaffold frame easily, and it does not enclose all around to keep off current scaffold frame, if the unstable condition of standing appears in the staff stands on it, roll from the scaffold frame easily, though there is safe the bringing to carry out safety guarantee, but when the health bumps with scaffold frame or pier when rolling, still can cause the damage, and the current height of changing the platform all is fixed, inconvenient construction operation carries out.
Consequently in order to solve above problem, the utility model provides a platform is changed to bridge beam supports.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a platform is changed to bridge beam supports to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a bridge support replacing platform comprises a device main body, wherein a bottom plate is fixedly installed at the bottom end of the device main body, first fixing seats are installed on two sides of the bottom plate, a second fixing seat is arranged at one end of the first fixing seat, the second fixing seat is fixedly connected with the side wall of the bottom plate, first insertion rods are installed on the first fixing seat and the second fixing seat in a penetrating mode, electric telescopic rods are fixedly installed at four corners of the top end of the bottom plate, a platform plate is installed at the top end of the electric telescopic rods, third fixing seats are installed on two sides of the platform plate, a fourth fixing seat is arranged at one end of the third fixing seat, the fourth fixing seat is fixedly connected with the side wall of the platform plate, second insertion rods are installed on the third fixing seat and the fourth fixing seat in a penetrating mode, and fixing columns are fixedly installed at four corners of the top end of the platform plate, the top of wherein three sides of landing slab all is equipped with the second railing, the both ends of second railing with fixed column fixed connection, the opposite side top of landing slab is equipped with first railing.
Further, the equal fixed mounting in bottom four corners department of bottom plate has the supporting leg, the bottom fixed mounting of supporting leg has the wheel mounting panel, the wheel is installed to the bottom of wheel mounting panel, wheel through connection installs first pivot, the both ends of first pivot with the both sides through connection of wheel mounting panel, just the service brake is installed to one side of wheel mounting panel.
Furthermore, a first through hole is formed in the first fixing seat, a second through hole is formed in the second fixing seat, and the first inserted rod is connected with the first through hole and the second through hole in a penetrating mode.
Further, be equipped with first storage bin in the first inserted bar, sliding connection installs first pull pole in the first storage bin, the one end fixed mounting of first pull pole has first connecting block, the top fixed mounting of first connecting block has first lantern ring, first lantern ring winding connection installs first rope.
Furthermore, a third through hole is formed in the third fixing seat, a fourth through hole is formed in the fourth fixing seat, and the second inserted rod is connected with the third through hole and the fourth through hole in a penetrating mode.
Furthermore, a second storage bin is arranged in the second insertion rod, a second pull rod is installed in the second storage bin in a sliding connection mode, a second connecting block is fixedly installed at one end of the second pull rod, a second lantern ring is installed at the top end of the second connecting block, and a second rope is installed on the second lantern ring in a winding connection mode.
Furthermore, one end of the first handrail is provided with a fifth fixing seat, the fifth fixing seat is fixedly connected with the fixing column, the fifth fixing seat is provided with a second rotating shaft in a penetrating connection manner, the second rotating shaft is connected with one end of the first handrail in a penetrating manner, the other end of the first handrail is provided with a positioning clamping seat, and the positioning clamping seat is fixedly connected with the other fixing column.
Further, an equipment box is installed on the top end of the platform plate.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses in, can be with this change platform and pier interconnect each other through the combined action of first fixing base, second fixing base, first inserted bar, first rope, third fixing base, fourth fixing base, second inserted bar, second rope to the stability of platform is changed in the reinforcing, reduces the influence of strong wind weather to change platform stability.
2. The utility model discloses in, the safety belt not only can be installed to the second railing of design, can also play certain arresting effect to constructor's health, can reduce the risk that the staff rolls off when the body unstability on the landing slab, and it can rotate of first railing of design, and the landing slab about the staff of being convenient for, and it also can play the same effect of second railing, and further the personal safety who is the staff strengthens the guarantee.
3. The utility model discloses in, the height of landing slab can be adjusted through electric telescopic handle's flexible effect for the support can both be changed to the pier of co-altitude not to the device.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a bottom structure view of the bottom plate of the present invention;
FIG. 3 is a plan view of the insertion rod of the present invention;
fig. 4 is a plan view of the first handrail of the present invention.
Reference numerals:
1. a device main body; 2. a base plate; 201. a first fixed seat; 202. a first through hole; 203. a second fixed seat; 204. a second through hole; 3. supporting legs; 301. a wheel mounting plate; 302. a wheel; 303. a first rotating shaft; 304. a foot brake; 4. an electric telescopic rod; 5. a first plunger; 501. a first storage bin; 502. a first drawing rod; 503. a first connection block; 504. a first collar; 6. a first rope; 7. a platform plate; 701. A third fixed seat; 702. a third through hole; 703. a fourth fixed seat; 704. a fourth through hole; 8. A second plunger; 801. a second storage bin; 802. a second drawing rod; 803. a second connecting block; 804. a second collar; 9. a second rope; 10. fixing a column; 1001. a fifth fixed seat; 1002. a second rotating shaft; 1003. A first rail; 1004. positioning the card holder; 11. a second rail; 12. an equipment box.
Detailed Description
The following, with reference to the drawings and the detailed description, further description of the present invention is made:
referring to fig. 1-4, a bridge beam supports replacing platform according to an embodiment of the present invention includes a device main body 1, a bottom plate 2 is fixedly installed at a bottom end of the device main body 1, first fixing seats 201 are installed at both sides of the bottom plate 2, a second fixing seat 203 is installed at one end of the first fixing seat 201, the second fixing seat 203 is fixedly connected to a side wall of the bottom plate 2, a first inserting rod 5 is installed through the first fixing seat 201 and the second fixing seat 203, an electric telescopic rod 4 is fixedly installed at four corners of a top end of the bottom plate 2, a platform plate 7 is installed at a top end of the electric telescopic rod 4, third fixing seats 701 are installed at both sides of the platform plate 7, a fourth fixing seat is installed at one end of the third fixing seat 701, and the fourth fixing seat 703 is fixedly connected to a side wall of the platform plate 7, third fixing base 701 with fourth fixing base 703 through connection installs second inserted bar 8, the equal fixed mounting in top four corners department of landing slab 7 has fixed column 10, the wherein three side tops of landing slab 7 all are equipped with second railing 11, the both ends of second railing 11 with fixed column 10 fixed connection, the opposite side top of landing slab 7 is equipped with first railing 1003.
Through the technical scheme of the utility model, the supporting legs 3 are fixedly installed at the four corners of the bottom end of the bottom plate 2, the wheel mounting plate 301 is fixedly installed at the bottom end of the supporting legs 3, the wheels 302 are installed at the bottom end of the wheel mounting plate 301, the wheels 302 are installed with the first rotating shaft 303 in a penetrating manner, the two ends of the first rotating shaft 303 are connected with the two sides of the wheel mounting plate 301 in a penetrating manner, and the foot brake 304 is installed at one side of the wheel mounting plate 301; a first through hole 202 is formed in the first fixing seat 201, a second through hole 204 is formed in the second fixing seat 203, and the first inserted link 5 is connected with the first through hole 202 and the second through hole 204 in a penetrating manner; a first storage bin 501 is arranged in the first inserted link 5, a first drawing rod 502 is slidably connected and mounted in the first storage bin 501, a first connecting block 503 is fixedly mounted at one end of the first drawing rod 502, a first lantern ring 504 is fixedly mounted at the top end of the first connecting block 503, and a first rope 6 is wound and connected and mounted on the first lantern ring 504; a third through hole 702 is formed in the third fixing seat 701, a fourth through hole 704 is formed in the fourth fixing seat 703, and the second inserted link 8 is connected with the third through hole 702 and the fourth through hole 704 in a penetrating manner; a second accommodating bin 801 is arranged in the second insert rod 8, a second pull rod 802 is slidably connected and installed in the second accommodating bin 801, a second connecting block 803 is fixedly installed at one end of the second pull rod 802, a second sleeve ring 804 is installed at the top end of the second connecting block 803, and a second rope 9 is wound and connected and installed on the second sleeve ring 804; a fifth fixing seat 1001 is arranged at one end of the first handrail 1003, the fifth fixing seat 1001 is fixedly connected with the fixing column 10, a second rotating shaft 1002 is installed in the fifth fixing seat 1001 in a penetrating manner, the second rotating shaft 1002 is connected with one end of the first handrail 1003 in a penetrating manner, a positioning clamping seat 1004 is arranged at the other end of the first handrail 1003, and the positioning clamping seat 1004 is fixedly connected with the other fixing column 10; an equipment box 12 is installed on the top end of the platform plate 7.
In specific application, the device main body 1 is moved to a designated section through the wheels 302, then the first inserting rod 5 is inserted on the first fixing seat 201 and the second fixing seat 203, the second inserting rod 8 is inserted on the third fixing seat 701 and the fourth fixing seat 703, if the width of a bridge pier is large, the first pulling rod 502 can be pulled out from the first accommodating cabin 501, the second pulling rod 802 is pulled out from the second accommodating cabin 801, then two ends of the first rope 6 are respectively wound on the two first lantern rings 504, two ends of the second rope 9 are respectively wound on the two second lantern rings 804, so that the device main body 1 can 'hold' the bridge pier, then a worker goes onto the platform plate 7, one end of the first railing 1003 is clamped on the positioning clamping seat 1004, one end of a safety belt is sleeved on any second railing 11, the height of the platform plate 7 is adjusted through the electric telescopic rod 4 according to the height of the bottom end of the support, the equipment box 12 is convenient for placing tools, and the placing tools drop from the platform plate 7, so that potential safety hazards are generated to the personnel below.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The bridge support replacing platform is characterized by comprising a device main body (1), a bottom plate (2) is fixedly mounted at the bottom end of the device main body (1), first fixing seats (201) are mounted on two sides of the bottom plate (2), a second fixing seat (203) is arranged at one end of the first fixing seat (201), the second fixing seat (203) is fixedly connected with the side wall of the bottom plate (2), a first inserting rod (5) is mounted on the first fixing seat (201) and the second fixing seat (203) in a penetrating connection mode, an electric telescopic rod (4) is fixedly mounted at four corners of the top end of the bottom plate (2), a platform plate (7) is mounted at the top end of the electric telescopic rod (4), third fixing seats (701) are mounted on two sides of the platform plate (7), and a fourth fixing seat (703) is arranged at one end of the third fixing seat (701), fourth fixing base (703) with the lateral wall fixed connection of landing slab (7), third fixing base (701) with fourth fixing base (703) through connection installs second inserted bar (8), the equal fixed mounting in top four corners department of landing slab (7) has fixed column (10), wherein three side tops of landing slab (7) all are equipped with second railing (11), the both ends of second railing (11) with fixed column (10) fixed connection, the opposite side top of landing slab (7) is equipped with first railing (1003).
2. The bridge pedestal replacing platform according to claim 1, wherein supporting legs (3) are fixedly mounted at four corners of the bottom end of the bottom plate (2), wheel mounting plates (301) are fixedly mounted at the bottom ends of the supporting legs (3), wheels (302) are mounted at the bottom ends of the wheel mounting plates (301), first rotating shafts (303) are mounted in the wheels (302) in a penetrating mode, two ends of the first rotating shafts (303) are connected with two sides of the wheel mounting plates (301) in a penetrating mode, and foot brakes (304) are mounted on one sides of the wheel mounting plates (301).
3. The bridge support replacing platform according to claim 1, wherein a first through hole (202) is formed in the first fixing seat (201), a second through hole (204) is formed in the second fixing seat (203), and the first insert rod (5) is connected with the first through hole (202) and the second through hole (204) in a penetrating manner.
4. The bridge bearer replacement platform according to claim 1, wherein a first storage bin (501) is arranged in the first insertion rod (5), a first drawing rod (502) is slidably connected and mounted in the first storage bin (501), a first connecting block (503) is fixedly mounted at one end of the first drawing rod (502), a first sleeve ring (504) is fixedly mounted at the top end of the first connecting block (503), and a first rope (6) is wound and connected and mounted on the first sleeve ring (504).
5. The bridge bearing replacing platform according to claim 1, wherein a third through hole (702) is formed in the third fixing seat (701), a fourth through hole (704) is formed in the fourth fixing seat (703), and the second insert rod (8) is connected with the third through hole (702) and the fourth through hole (704) in a penetrating manner.
6. The bridge support replacing platform according to claim 1, wherein a second storage bin (801) is arranged in the second inserting rod (8), a second drawing rod (802) is slidably connected and mounted in the second storage bin (801), a second connecting block (803) is fixedly mounted at one end of the second drawing rod (802), a second sleeve ring (804) is mounted at the top end of the second connecting block (803), and a second rope (9) is wound and connected and mounted on the second sleeve ring (804).
7. The bridge bearer replacement platform according to claim 1, wherein a fifth fixing seat (1001) is arranged at one end of the first railing (1003), the fifth fixing seat (1001) is fixedly connected with the fixing column (10), a second rotating shaft (1002) is installed on the fifth fixing seat (1001) in a penetrating manner, the second rotating shaft (1002) is connected with one end of the first railing (1003) in a penetrating manner, a positioning clamping seat (1004) is arranged at the other end of the first railing (1003), and the positioning clamping seat (1004) is fixedly connected with the other fixing column (10).
8. A bridge deck change platform according to claim 1, characterized in that an equipment box (12) is mounted on top of the deck plate (7).
CN202020757616.4U 2020-05-10 2020-05-10 Platform is changed to bridge beam supports Expired - Fee Related CN212582450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020757616.4U CN212582450U (en) 2020-05-10 2020-05-10 Platform is changed to bridge beam supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020757616.4U CN212582450U (en) 2020-05-10 2020-05-10 Platform is changed to bridge beam supports

Publications (1)

Publication Number Publication Date
CN212582450U true CN212582450U (en) 2021-02-23

Family

ID=74649105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020757616.4U Expired - Fee Related CN212582450U (en) 2020-05-10 2020-05-10 Platform is changed to bridge beam supports

Country Status (1)

Country Link
CN (1) CN212582450U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356078A (en) * 2021-07-07 2021-09-07 甘肃路桥建设集团有限公司 Bridge pier column reinforcement rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356078A (en) * 2021-07-07 2021-09-07 甘肃路桥建设集团有限公司 Bridge pier column reinforcement rack

Similar Documents

Publication Publication Date Title
CN212582450U (en) Platform is changed to bridge beam supports
CN210013468U (en) Template strutting arrangement for building engineering
CN111071295A (en) Bogie maintenance operation platform of straddle type monorail train
CN107181198B (en) Lift single pole crossing frame
CN114033295A (en) Electric power overhauls device
CN212583181U (en) Inclined lever type movable cantilever platform
CN210530715U (en) Crawling ladder for electric power laying
CN215255126U (en) Safety protective guard is used in road bridge construction
CN206806788U (en) A kind of lifting base for box-type substation
CN211466201U (en) Traction support mounting tool
CN211597633U (en) Scaffold for building engineering that can install fast
CN217268671U (en) Mobile maintenance platform
CN219060809U (en) Operating platform for overhauling railway vehicle
CN218029297U (en) Multi-functional removal factory building of lift concatenation formula
CN214739732U (en) Steel pipe lifting scaffold with steel mesh protection structure
CN217298630U (en) Integral type safety platform for construction of pad stone
CN215666688U (en) Hoisting equipment support
CN220521106U (en) Bridge girder erection machine rail guard
CN217681013U (en) Fender is enclosed in municipal administration
CN214462363U (en) Multifunctional foot rest for property maintenance
CN210880189U (en) Precast concrete T roof beam form removal device
CN210369824U (en) Multifunctional scaffold
CN212784536U (en) Auxiliary support for high-altitude cable laying
CN216295152U (en) Core bed is carried to pula
CN214741050U (en) Maintenance device for substation equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211022

Address after: Room 407, Jiaming Jingyuan, Xuancheng City, Anhui Province

Patentee after: Xuancheng Hongye Construction Co.,Ltd.

Address before: 545000 Bureau of housing and urban rural development, No.10 Jinglan Road, Liuzhou City, Yufeng District, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: Mo Yajun

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210223

CF01 Termination of patent right due to non-payment of annual fee