CN212563276U - Bury formula waterstop fixing device in tunnel secondary lining - Google Patents

Bury formula waterstop fixing device in tunnel secondary lining Download PDF

Info

Publication number
CN212563276U
CN212563276U CN202022197036.7U CN202022197036U CN212563276U CN 212563276 U CN212563276 U CN 212563276U CN 202022197036 U CN202022197036 U CN 202022197036U CN 212563276 U CN212563276 U CN 212563276U
Authority
CN
China
Prior art keywords
section
waterstop
water stop
fixing device
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022197036.7U
Other languages
Chinese (zh)
Inventor
盛怀猛
张卫卫
张瑞龙
张玉山
刘长林
王云鹏
朱毓芳
邵万斌
张权威
苟祝
茆云云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN202022197036.7U priority Critical patent/CN212563276U/en
Application granted granted Critical
Publication of CN212563276U publication Critical patent/CN212563276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a bury formula waterstop fixing device in tunnel secondary lining, including first spacing section and the spacing section of second and two fixed parts, first spacing section is the open loop configuration, first spacing section one end is connected one is connected to the one end of the spacing section of second, the other end one the fixed part, another is connected to the spacing section other end of second the fixed part, the fixed part is used for connecting the end template. Through fixing device can directly cooperate the end template to carry on spacingly to the waterstop after bending, and can be indirect will the waterstop is fixed at the end template inboard, makes the pre-buried work progress of waterstop, need not to divide into the installation of two halves in order to adapt to the rubber waterstop with the end template, and then need not to divide half processing to the end template, has avoided installing respectively and has consolidated the end template after dividing half, can reduce the process and the step of the pre-buried construction of waterstop, makes the pre-buried construction of waterstop simpler.

Description

Bury formula waterstop fixing device in tunnel secondary lining
Technical Field
The utility model relates to a tunnel excavation is strutted construction technical field, especially a bury formula waterstop fixing device in tunnel secondary lining.
Background
The excavation construction of the mountain expressway tunnel mostly adopts a mining method for excavation, and adopts different mining method excavation modes according to different surrounding rock types, for example, the I, II and III-grade surrounding rocks have better stability, and full-section excavation is adopted; and IV, V grade surrounding rock stability is relatively poor, adopt the mode of mechanical excavation or local blasting mostly, for example: excavating by adopting a mode of an upper step method, a lower step method, a three-step method and the like.
In the tunnel construction process, different lining types are designed according to different surrounding rocks, and in order to ensure the safety of tunnel excavation supporting operation, the secondary lining construction of the tunnel must meet the safety step distance required by the specification, and the secondary lining concrete must be constructed next to the tunnel face. The tunnel secondary lining construction is conducted along the longitudinal direction of the tunnel in a segmented mode, a middle-buried water stop belt needs to be arranged between two adjacent segments of secondary linings, the width direction of the middle-buried water stop belt is consistent along the longitudinal direction of the tunnel, and the two segments of secondary linings respectively occupy half of the width. If the width of the embedded rubber water stop is 300mm, the width of the embedded section is 150mm, and the width of the exposed section is 150mm, the current section of the secondary lining end template must be divided, installed and reinforced due to the exposed section, as shown in fig. 1: the end template 1 is a template for plugging the end of the current section, and is arranged along the annular direction of the primary support surface 3, the end template 1 is divided into a first end template 11 and a second end template 12, so that the water stop 2 can penetrate out from a gap between the first end template 11 and the second end template 12, but the first end template 11 and the second end template 12 of the construction method need to be installed and reinforced respectively, and the construction is very complex and tedious.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: aiming at the prior art, the method comprises the following steps: in the secondary lining operation process of the tunnel, because the embedded middle-embedded rubber waterstop needs to embed a half width at the end part of the current tunnel secondary lining, the end template of the tunnel secondary lining needs to be divided into two halves to adapt to the installation of the rubber waterstop, so that the end template needs to be processed in half, and the half-divided end templates need to be respectively installed and reinforced, so that the problem of complicated construction is solved; the bent water stop can be limited and fixed to the inner side of the end template through the fixing device, so that the end template does not need to be divided into two halves to adapt to installation of the rubber water stop in the water stop pre-embedding construction process, the end template does not need to be processed into two halves, the half-divided end template is prevented from being respectively installed and reinforced, the procedures and steps of water stop pre-embedding construction can be reduced, and the water stop pre-embedding construction is simpler; and the fixing device is adopted to fix the bent water stop, so that the condition that the water stop is damaged during fixing of the water stop is avoided, and the water stop function of the water stop is ensured.
In order to realize the purpose, the utility model discloses a technical scheme be:
the utility model provides a bury formula waterstop fixing device in tunnel secondary lining, includes first spacing section and the spacing section of second and two fixed parts, first spacing section is the open loop structure, first spacing section one end is connected one is connected to the one end of the spacing section of second, the other end the fixed part, another is connected to the spacing section other end of second the fixed part, the fixed part is used for connecting the end template, the spacing section of second is used for restricting the waterstop and pastes the section that exposes in one side of end template tightly, first spacing section is used for the restriction the pre-buried section of waterstop makes pre-buried section is located pre-buried position.
The first limiting section is used for limiting the embedded section and is of an open-loop structure, and the open-loop structure is provided with an opening, so that the open-loop structure can be sleeved outside the embedded section and limit two sides of the embedded section; the second limiting section is used for limiting the bent exposed section, can be pressed on one side of the exposed section, which is far away from the end socket template, clamps the exposed section together with the end socket template, and limits the exposed section by matching with the inner side of the end socket template; the fixing device is connected with the end socket template through fixing parts respectively connected to the first limiting section and the second limiting section; after the two fixing parts are connected with the end template, the end template and the fixing device form an L-shaped closed loop, and then the bent water stop belt is nested inside the closed loop to form limiting, so that the bending state of the bent water stop belt is guaranteed. The fixing device can be directly matched with the end template to limit the bent water stop and can indirectly fix the water stop on the inner side of the end template, so that the end template does not need to be divided into two halves to adapt to the installation of the rubber water stop in the pre-embedding construction process of the water stop, the half-dividing processing of the end template is further not needed, the installation and the reinforcement of the end template after the half-dividing is avoided, the procedures and steps of the pre-embedding construction of the water stop can be reduced, and the pre-embedding construction of the water stop is simpler; and the fixing device is adopted to fix the bent water stop, so that the condition that the water stop is damaged during fixing of the water stop is avoided, and the water stop function of the water stop is ensured.
Preferably, one side of the first limiting section and/or the second limiting section, which is used for contacting the water stop, is provided with a plurality of recesses, and the recesses are used for being matched with the protrusions on the water stop. The surface of the water stop belt is a surface with bulges, and the surface of the water stop belt comprises the bulges caused by the middle hole and the bulges positioned on two sides of the middle hole.
The middle hole is a through hole in the middle of the water stop belt, the middle hole is generally located at a settlement joint of a building when the water stop belt is installed, the scheme refers to that the middle hole can play a role in adjusting deformation of contraction, expansion, compression and tension at the joint of two adjacent lining sections, and the surface of the water stop belt can form a semi-cylindrical bulge due to the middle hole. The first limiting section and the second limiting section are provided with the depressions, the number of the depressions is determined according to the bulges of the water stop, and the depressions are adapted to the corresponding bulges on the water stop, so that limiting protection can be formed on the water stop.
Preferably, the fixing device is a reinforcing steel bar member.
The round steel bar leftover material is bent, so that the installation is convenient.
Preferably, the diameter of the steel bar member is 6-10mm, so that the strength of the fixing device can be met, and meanwhile, the damage to the wood formwork can be greatly reduced.
Preferably, the length direction of the fixing part is matched with the arrangement direction of the embedded section, and the fixing part can penetrate through the gap of the end template and is bent to be tightly attached to the outer side of the end template.
The end template comprises a plurality of wooden templates distributed along the arch-shaped annular direction of the tunnel, and gaps are formed between every two adjacent wooden templates.
Through inciting somebody to action the length direction of fixed part with pre-buried section set up the direction adaptation, make the fixed part can pass the clearance between the adjacent plank sheathing, and then adopts the fixed part to buckle to the mode of pasting tight plank sheathing lateral surface and fix the waterstop, this kind of fixed mode is simple swift, and the later stage end template of being convenient for demolish, can reduce the construction degree of difficulty afterwards.
A method for embedding a buried water stop in a tunnel secondary lining comprises the following steps:
A. installing a second lining template of a current section second lining; wherein the two lining templates comprise end templates;
B. bending the exposed section of the water stop belt to a preset position tightly attached to the inner side of the end template and temporarily fixing the exposed section, and fixing the embedded section of the water stop belt to the embedded position and fixing the exposed section at the preset position through a fixing device;
C. pouring concrete on the current segment;
D. and after the preset strength is reached, removing the two lining templates, releasing the exposed section and completing the pre-embedding of the water stop.
The two-lining template refers to a template for constructing two lining segments, and can be matched with an existing structure to form a pouring space, wherein the existing structure is as follows: the second lining template comprises an end template which is used for sealing the longitudinal end face of the second lining tunnel before the second lining is poured. The buried water stop is used for water stop products arranged inside concrete such as concrete deformation joints, expansion joints and the like, and has the capability of adapting to the concrete expansion deformation by using the elasticity and the structural form of rubber materials. Through bending the waterstop from the middle part of width to it is fixed through fixing device, fixing device here can be an overall structure, also can be a plurality of monomer structures, through bending and fixed, fixing device can guarantee the bending state of the waterstop after being bent, need make promptly to expose the section and paste the inboard in the end template, makes the embedded section be fixed in pre-buried position, if: the fixing device can realize the fixation of the water stop by adopting the modes of bolts, gaskets and the like, after the fixation, the other side of the water stop is perpendicular to the end head template and is fixed on the end head template, and the bending state is kept; the pre-buried position is that the pre-buried section is buried in the position of the secondary lining of the tunnel, and the pre-buried section is arranged along the longitudinal direction of the tunnel; the exposed section is arranged along the transverse direction of the tunnel, and the exposed section is exposed at the end part of the second lining of the current section after the construction of the second lining of the current section is finished. Through the mode, the whole water stop belt can be arranged inside the two-lining template of the current section and fixed on the end template, after concrete is poured into a pouring space in the two-lining template of the current section, the embedded section can be pre-embedded in the concrete of the two linings, after the two-lining template is disassembled, the connection between the fixing device and the end template is disconnected, and through simple treatment, if the concrete around the exposed section is cleaned, the bent exposed section can be reversely bent, so that the embedded construction of the embedded section can be completed by straightening the water stop belt. By adopting the embedding method, the water stop is bent, the bent exposed section is fixed on the inner side of the end template, and the exposed section is reversely bent after pouring to realize the restoration of the water stop, so that the end template is prevented from being divided into two halves to be processed due to the installation of the water stop, the two halves of the end template are prevented from being respectively installed and supported when the end template is installed, the construction procedures of the end template are reduced, and the construction method is simpler.
Preferably, the fixing device comprises a first limiting section, a second limiting section and two fixing parts, the first limiting section is of an open-loop structure, one end of the first limiting section is connected with one end of the second limiting section, the other end of the first limiting section is connected with one fixing part, and the other end of the second limiting section is connected with the other fixing part;
the step B comprises the following steps:
b1: the exposed section is attached to a preset position on the inner side of the end socket template and temporarily fixed;
b2: and enabling the opening of the first limiting section to face the end head template and be sleeved outside the embedded section, installing the second limiting section corresponding to the exposed section, and then respectively connecting the two fixing parts to the end head template.
The fixing device can be an integral structure, and the whole water stop belt is directly limited and fixed through the integral structure; the water stop belt can also be limited and fixed by a plurality of small components at multiple points. The first limiting section is used for limiting the embedded section of the water stop belt and is of an open-loop structure, a gap of the open-loop structure is an opening, when the embedded section is limited through the open-loop structure, the opening of the open-loop structure faces to the end template, the embedded section is sleeved on the outer surface of the embedded section, and the embedded section can be sleeved on the outer side of the embedded section and limited; the second limiting section is used for limiting the exposed section and can be matched with the end socket template to be attached to the exposed section of the end socket template for limiting. The bent water stop belt can be limited through the first limiting section and the second limiting section, the bending state of the bent water stop belt is guaranteed, and then the fixing device is connected with the end head template through the fixing parts which are respectively connected to the first limiting section and the second limiting section. Through fixing device can cooperate the end template directly to carry on spacingly to the waterstop after bending to can be indirect will bend the waterstop is fixed on the end template, avoided directly will destroy the emergence of the condition of waterstop when the waterstop is fixed to the end template, if: the bolt penetrates through the water stop belt to be fixed and the like, so that the water stop function of the water stop belt is further guaranteed.
Preferably, the first limiting section and the second limiting section are provided with a plurality of recesses on one side for contacting the water stop, and the recesses are used for being matched with the protrusions on the water stop;
the step B comprises the following steps: the embedded section is installed on the first limiting section in a matched mode, then the exposed section is bent until the protrusion of the exposed section is matched with the recess of the second limiting section, and then the two fixing portions are fixed on the end head template.
The first limiting section and the second limiting section are processed according to the state of the bent water stop, the embedded section is installed in the first limiting section firstly, then the exposed section is bent, the first limiting section can limit the embedded section, the exposed section is convenient to bend, whether the bending angle is suitable or not can be judged according to whether the matching of the bent exposed section and the second limiting section reaches the expected value or not, so that the bending accuracy can be improved, the water stop is more accurately installed, and the water stop is favorable for using.
Preferably, the end formwork comprises a plurality of wood formworks distributed along the arch ring direction of the tunnel, gaps are formed between every two adjacent wood formworks, the fixing device is a steel bar member, and each gap is fixed by the steel bar member.
Preferably, the step of fixing the water stop by using the steel bar member at each gap sequentially comprises:
b2 a: the opening of the first limiting section of the steel bar component faces the end head template and is sleeved on the embedded section, and the second limiting section of the steel bar component is pressed on one side of the exposed section, which is far away from the end head template, so that the two fixing parts of the steel bar component penetrate through the same gap;
B2B: bending the two fixing parts to enable the two fixing parts to be tightly attached to the outer side of the end socket template;
b2 c: and plugging the gap.
When the end formworks are formed by connecting a plurality of wood formworks, the wood formworks are distributed along the arch-shaped annular direction of the tunnel, the number of the wood formworks is determined according to actual construction conditions, a gap exists between every two adjacent wood formworks, the passing of reinforcing steel bars can be guaranteed, and the size of the reinforcing steel bars is also determined according to the size of the gap between every two adjacent wood formworks. Each waterstop needs to be spacing and fixed through the fixing device of a plurality of reinforcing bar processing, through processing with the reinforcing bar fixing device, its processing is convenient, is convenient for process out the fixing device who adapts to the waterstop after bending. Meanwhile, the fixing part of the fixing device can penetrate out from the inner side of the end die to the outer side of the end die by means of the gap between the adjacent wood die plates, and the bent water stop belt is tightly pressed on the inner side of the end die plate by bending the fixing part, so that the bent water stop belt is limited and fixed, and the bent water stop belt is kept in a bent state. In this way, can avoid fixing device destroys end template and waterstop are convenient for fix the waterstop after bending on the end template, the split of end template and waterstop when being convenient for demolish the mould simultaneously. And every clearance department all will buckle the waterstop and adopt fixing device to fix, can strengthen the waterstop with joint strength between the end template guarantees the stability of waterstop state when concreting, and then improves the degree of accuracy after the installation of waterstop is accomplished. After reinforcing steel bars penetrate through gaps between the wood formworks, the gaps can generate a slurry leakage phenomenon, and the gaps between two adjacent wood formworks are subjected to leakage stoppage, so that the gaps can be filled for leakage stoppage, for example, leakage stoppage glue is adopted; the outer cover can also be used for plugging, and plugging can be carried out from the outer side of the end template. The gap between two adjacent wooden templates on the end template is plugged, so that slurry leakage during later-stage concrete pouring can be avoided, connection between the fixing part and the end template can be increased, and the construction quality of the two lining segments can be guaranteed.
Preferably, in the step B, the waterstop is sequentially bent from two sides to the middle along an arch-shaped ring of the tunnel, and the bent position of the waterstop is fixed in time by the fixing device.
The construction of waterstop divides a plurality of fixed points to be under construction, and every fixed point department needs to bend and fix the waterstop part that this fixed point corresponds, bends and fixes the waterstop through the fixed point of tunnel arch both sides earlier, realizes the preliminary installation and the fixed of whole waterstop, is convenient for construct the corresponding waterstop part in tunnel arch middle part fixed point. The mode of progressively being under construction in the middle of the adoption is followed tunnel arch both sides side, and after fixing device fixed waterstop was adopted to both sides, can provide stable installation environment for the fixed point of next waterstop, can make things convenient for the installation of the corresponding waterstop part of next fixed point, accelerate the installation rate of waterstop greatly. Meanwhile, after the water stop corresponding to each fixing point is bent to be in an appointed state, the fixing point is fixed immediately, the initial state of the bent water stop part corresponding to the fixing point can be protected, the installation accuracy of the water stop part corresponding to the fixing point is improved, and the installation accuracy of the whole water stop is further improved.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. bury formula waterstop fixing device in tunnel secondary lining, through first spacing section with the spacing section cooperation end template of second can carry on spacingly to the waterstop after bending, guarantees the state of bending of the waterstop after bending, then through connect respectively in first spacing section with fixed part in the spacing section of second realizes fixing device with the connection of end template. The fixing device can be matched with the end template to directly limit the bent water stop belt and indirectly fix the bent water stop belt on the inner side of the end template, so that the end template does not need to be divided into two halves to adapt to the installation of the rubber water stop belt in the water stop belt embedding construction process, the end template does not need to be divided into two halves for processing, the half-divided end templates are prevented from being respectively installed and reinforced, the procedures and steps of water stop belt embedding construction can be reduced, and the water stop belt embedding construction is simpler; and the fixing device is adopted to fix the bent water stop, so that the condition that the water stop is damaged during fixing of the water stop is avoided, and the water stop function of the water stop is ensured.
2. When the end template adopts a plurality of plank formworks to connect and form, the utility model provides a fixing device adopts the reinforcing bar component. Each the waterstop needs to be spacing and fixed through the fixing device of a plurality of reinforcing bar processing, through processing with the reinforcing bar fixing device, its processing is convenient, is convenient for process out the fixing device of the waterstop after the adaptation is bent, and fixing device's fixed part can wear out to the end mould outside from the end mould inboard with the help of the clearance between the adjacent plank sheathing simultaneously to through this fixed part of bending, the waterstop after will bending compresses tightly in the end template inboard, realizes that the spacing of the waterstop after bending is fixed promptly, keeps the state of bending of the waterstop after bending. In this way, can avoid fixing device destroys end template and waterstop are convenient for fix the waterstop after bending on the end template, the split of end template and waterstop when being convenient for demolish the mould simultaneously.
Drawings
FIG. 1 is a schematic view of a prior art waterstop installation;
FIG. 1 illustrates: 1-end template; 11-a first end template; 12-a second end template; 2-water stop belt; 3-initial support surface.
FIG. 2 is a first schematic view of the fixing device according to embodiment 1;
FIG. 3 is a second schematic view of the fixing device according to embodiment 1;
FIG. 4 is a schematic view of one side of the waterstop being installed in the first limit segment of the fixture;
FIG. 5 is a schematic view of the waterstop after bending;
FIG. 6 is a schematic view of the securing device after the waterstop has been restrained;
fig. 7 is a schematic view of the water stop being fixed by the fixing device.
FIGS. 2-7 illustrate: 1-end template; 2-water stop belt; 21-embedding a section; 22-an exposed section; 3-initial support surface; 4-dishing; 51-a first spacing section; 52-a second restraint section; 53-fixed part.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Example 1
See fig. 2-7, wherein: 6-7 are top views of the left side of the tunnel showing the end forms 1 above the inner side of the two-lined form, below the outer side of the two-lined form and to the left the initial support surface 3;
the embodiment provides a bury formula waterstop fixing device in tunnel secondary lining, refer to fig. 2-7, including first spacing section 51 and the spacing section 52 of second and two fixed parts 53, first spacing section 51 is the open loop configuration, first spacing section 51 one end is connected one is connected to the one end of the spacing section 52 of second, the other end fixed part 53, another is connected to the spacing section 52 other end of second fixed part 53, fixed part 53 is used for connecting end template 1, the spacing section 52 of second is used for restricting waterstop 2 and pastes tightly in the section 22 that exposes of one side of end template 1, first spacing section 51 is used for the restriction the embedded section 21 of waterstop 2 makes the embedded section 21 is located pre-buried position.
The fixing device is used for fixing the bent water stop 2 on the end head template 1, the fixing device can be of an integral structure, and the whole water stop 2 is directly limited and fixed through the integral structure; the water stop 2 can also be limited and fixed by a plurality of small components at multiple points.
Specifically, the fixing device is manufactured by bending common round bar leftover materials with the diameter of 8-10 mm. The first limiting section 51 and/or the second limiting section 52 are provided with a plurality of recesses 4 on one side contacting the water stop 2, and the recesses 4 are used for being matched with the bulges on the water stop 2; as shown in fig. 2, the first position-limiting section 51 and the second position-limiting section 52 are both provided with a recess 4; or as shown in fig. 3, the first position-limiting section 51 is provided with a recess 4. The joint of the first limiting section 51 and the second limiting section 52 is an arc-shaped structure, and the joint of the second limiting section 52 and the fixing part 53 is an arc-shaped structure; the joint of the first limiting section 51 and the fixing part 53 is of an arc-shaped structure.
And the length direction of the fixing part 53 is matched with the arrangement direction of the embedded section 21, and the fixing part 53 can penetrate through the gap of the end template 1 and is bent to be tightly attached to the outer side of the end template 1.
In this embodiment, when end template 1 adopts a plurality of plank formworks to connect and forms, the utility model provides a fixing device adopts the reinforcing bar component. Each waterstop 2 needs to be spacing and fixed through the fixing device of a plurality of reinforcing bar processing, through processing with the reinforcing bar fixing device, its processing is convenient, is convenient for process out the fixing device who is adapted in waterstop 2 after bending, and fixing device's fixed part 53 can wear out to the end mould outside from the end mould inboard with the help of the clearance between the adjacent plank sheathing simultaneously to through this fixed part 53 of bending, waterstop 2 after will bending compresses tightly in end template 1 inboard, realizes that the spacing of waterstop 2 after bending is fixed promptly, keeps the state of bending of waterstop 2 after bending. In this way, can avoid fixing device destroys end template 1 and waterstop 2 are convenient for fix the waterstop 2 after bending on end template 1, the split of end template 1 and waterstop 2 when being convenient for demolish the mould simultaneously.
The fixing device can be directly matched with the end template 1 to limit the bent water stop belt 2, and can indirectly fix the water stop belt 2 on the inner side of the end template 1, so that the end template 1 does not need to be divided into two halves to adapt to the installation of the rubber water stop belt 2 in the pre-embedding construction process of the water stop belt 2, the half-dividing processing of the end template 1 is further avoided, the installation and the reinforcement of the end template 1 after the half-dividing are respectively avoided, the procedures and steps of the pre-embedding construction of the water stop belt 2 can be reduced, and the pre-embedding construction of the water stop belt 2 is simpler; and the fixing device is used for fixing the bent water stop 2, so that the condition that the water stop 2 is damaged when the water stop 2 is fixed is avoided, and the water stop function of the water stop 2 is ensured.
Example 2
The embodiment provides a method for embedding a buried water stop in a tunnel secondary lining, which comprises the following steps of:
a: installing a second lining template of a current section second lining; wherein the second lining template comprises an end template 1 of the current section of the second lining;
the two-lining template is a template for constructing two-lining sections, and the two-lining template for installing the current section of the two-lining is not only the installation of the two-lining template, but also the installation of steel bars and steel frames in the two-lining template. Wherein, end template 1 can adopt steel form or plank sheathing, has because of the plank sheathing: the method has the advantages that temporary processing is easier in a construction site, transportation is convenient, and the like, in the embodiment, the wood formworks are taken as an example for explanation, the end formworks 1 are a plurality of wood formworks distributed along the arch-shaped circumference of the tunnel, when the end formworks 1 are formed by connecting a plurality of wood formworks, the wood formworks are distributed along the circumference of the arch-shaped circumference of the tunnel, the number of the wood formworks is determined according to actual construction conditions, and a gap exists between every two adjacent wood formworks; in the embodiment, when the wood formwork is installed, each wood formwork does not need to be cut into two halves in order to adapt to the mode that the water stop belts 2 are longitudinally arranged along the tunnel in the construction method in the prior art, and then the two halves of the divided wood formwork are prevented from being installed and supported respectively.
After the end formwork 1 is installed, executing the following steps: bending the water stop 2 from the middle of the width to a preset position where the exposed section 22 is attached to the inner side of the end head template 1 and temporarily fixing the water stop, fixing the embedded section 21 to the embedded position through a fixing device, and fixing the exposed section 22 to the preset position;
the fixing device is the tunnel secondary lining buried water stop fixing device in embodiment 1; the embedded section 21 is half of the width of the water stop 2 pre-embedded in the two lining sections, and the setting direction of the embedded section is the longitudinal direction of the tunnel; the pre-buried position refers to the position where the pre-buried section 21 is buried in the two lining sections; the exposed section 22 is a half of the water stop 2 which needs to be exposed out of the end part of the two lining sections after the construction of the two lining sections is finished; the preset positions are as follows: under the condition that the embedded section 21 is located at the embedded position, the exposed section 22 is bent to enable the exposed section 22 to be attached to the inner side of the end socket template 1.
And the implementation mode of the step B is determined according to the actual construction condition, in the embodiment, the water stop belt 2 is sequentially bent from two sides to the middle part along the arch-shaped annular direction of the tunnel, and the bent position of the water stop belt 2 is fixed by the fixing device in time. The construction of waterstop 2 is divided into a plurality of fixed points and is under construction, and every fixed point department needs to bend and fix the 2 parts of waterstop that this fixed point corresponds, bends and fixes waterstop 2 through the fixed point of tunnel arch both sides earlier, realizes the preliminary installation and the fixed of whole waterstop 2, is convenient for construct the corresponding 2 parts of waterstop of tunnel arch middle part fixed point. The mode of progressively being under construction in the middle of the adoption is followed tunnel arch both sides side direction, and both sides adopt fixing device to fix 2 backs of waterstop, can provide stable installation environment for the fixed point of next waterstop 2, can make things convenient for the installation of the corresponding waterstop 2 parts of next fixed point, accelerate the installation rate of waterstop 2 greatly. Meanwhile, after the water stop 2 corresponding to each fixed point is bent to be in an appointed state, the fixed point is fixed immediately, the initial state of the bent part of the water stop 2 corresponding to the fixed point can be protected, the installation accuracy of the part of the water stop 2 corresponding to the fixed point is improved, and the installation accuracy of the whole water stop 2 is further improved.
In this embodiment, fixing device adopts little component to carry out the multiple spot spacing and fixed to waterstop 2, and is specific, fixing device is the reinforcing bar component, and the size of reinforcing bar also is according to the definite of the size in clearance between two adjacent plank formworks, and this embodiment uses ordinary phi 8 round reinforcement leftover bits to bend the preparation fixing device. Specifically, the step B specifically includes the following steps:
b1: bending the water stop 2 from the middle of the width to a preset position where the exposed section 22 is attached to the inner side of the end head template 1 and temporarily fixing the water stop;
b2: the opening of the first limiting section 51 faces the end head template 1 and is sleeved on the embedded section 21, the second limiting section 52 is installed corresponding to the exposed section 22, and then the two fixing parts 53 are respectively connected to the end head template 1.
In this embodiment, each gap is fixed to the water stop 2 by the reinforcing steel member. And the method for fixing the water stop band 2 by adopting the steel bar component at each gap comprises the following steps:
b2 a: facing the opening of the first limiting section 51 of the steel bar component to the end head template 1 and sleeving the embedded section 21, and pressing the second limiting section 52 of the steel bar component on one side of the exposed section 22 far away from the end head template, so that the two fixing parts 53 of the steel bar component penetrate through the same gap;
B2B: bending the two fixing parts 53 to enable the fixing parts to be tightly attached to the outer side of the end head template 1;
b2 c: and plugging the gap.
Each waterstop 2 needs to be limited and fixed through a fixing device processed by a plurality of steel bars, the fixing device is processed by the steel bars, the fixing device is convenient to process and is adaptive to the bent waterstop 2, meanwhile, a fixing part 53 of the fixing device can penetrate out from the inner side of an end die to the outer side of the end die by means of a gap between two adjacent wood templates, the bent waterstop 2 is tightly pressed on the inner side of an end die plate 1 by bending the fixing part 53, the spacing of the bent waterstop 2 is fixed, and the bending state of the bent waterstop 2 is kept. In this way, can avoid fixing device destroys end template 1 and waterstop 2 are convenient for fix the waterstop 2 after bending on end template 1, the split of end template 1 and waterstop 2 when being convenient for demolish the mould simultaneously.
And every clearance department all will buckle waterstop 2 and adopt fixing device to fix, can strengthen waterstop 2 with joint strength between the end template 1 guarantees the stability of waterstop 2 state when concreting, and then improves the degree of accuracy after the installation of waterstop 2 is accomplished. After reinforcing steel bars penetrate through gaps between the wood formworks, the gaps can generate a slurry leakage phenomenon, and the gaps between two adjacent wood formworks are subjected to leakage stoppage, so that the gaps can be filled for leakage stoppage, for example, leakage stoppage glue is adopted; or plugging can be performed from the outer side of the end template 1 by adopting an outer covering. Through carrying out the leaking stoppage to the clearance between two adjacent plank formworks on the end template 1, can avoid leaking when later stage concreting, can increase the quality of being under construction of two liner segments simultaneously between fixed part 53 and the end template 1.
In this embodiment, the first position-limiting section 51 and/or the second position-limiting section 52 have a plurality of recesses 4 on one side contacting the water stop 2, and the recesses 4 are adapted to the protrusions on the water stop 2; as shown in fig. 2, the first position-limiting section 51 and the second position-limiting section 52 are both provided with a recess 4; as shown in fig. 3, the first position-limiting section 51 is provided with a recess 4. The step B may adopt a method of bending first and then fixing, and may also adopt the following steps: firstly, one side of the water stop 2 is mounted on the first limiting section 51 in an adaptive manner, as shown in fig. 4; then, the other side of the water stop 2 is bent until the bulge on the other side of the water stop 2 is matched with the recess 4 of the second limiting section 52, as shown in fig. 5; and then the two fixing portions 53 are fixed to the end head formwork 1, as shown in fig. 6 to 7. Because the first spacing section 51 with the spacing section 52 of second is according to the state processing after the waterstop 2 is bent, work as the spacing section 52 of second is equipped with when sunken 4, through earlier with install in the pre-buried section 21 of waterstop 2 in first spacing section 51, it is right again the waterstop 2 exposes section 22 and bends, first spacing section 51 can be right the pre-buried section 21 of waterstop 2 carries on spacingly, is convenient for expose section 22 of waterstop 2 and bends the processing, and can be according to expose section 22 after bending with whether the cooperation of the spacing section 52 of second has reached the expected value, judges whether the angle of bending is suitable, so can improve the accuracy of bending, makes the installation of waterstop 2 more accurate, is favorable to the use of waterstop 2.
And B, limiting and fixing the whole water stop belt 2 on the end head template 1 according to the construction in the step B, plugging the gap between two adjacent wood templates, and then implementing the step C: pouring concrete on the current segment; then step D is carried out: and (4) removing the two lining templates after the preset strength is reached, releasing the exposed section 22, and completing the pre-embedding of the water stop 2. When the two lining forms are removed, the end form 1 is also removed, so that not only the support of the end form 1 itself needs to be removed, but also the fixing part 53 of the fixing device needs to be bent back to the original state, so that the end form 1 can be removed.
And after the end template 1 is disassembled, releasing the exposed section 22 and straightening the water stop 2 to complete the pre-embedding of the water stop 2. When the exposed section 22 is released, because the exposed section 22 is inside the end formwork 1, the poured concrete can be condensed to the periphery of the exposed section 22, and therefore the periphery of the exposed section 22 needs to be simply cleaned and processed, the exposed section 22 can be released and bent until the exposed section 22 is straightened, the width direction of the exposed section 22 returns to the longitudinal direction of the tunnel again, and the pre-embedding of the water stop 2 is completed. The fixing device refers to a tunnel secondary lining middle-buried water stop fixing device.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. The utility model provides a bury formula waterstop fixing device in tunnel secondary lining, its characterized in that includes first spacing section (51) and spacing section (52) of second and two fixed part (53), first spacing section (51) are the open loop structure, first spacing section (51) one end is connected one is connected to one end, the other end of the spacing section (52) of second fixed part (53), another is connected to the spacing section (52) other end of second fixed part (53), fixed part (53) are used for connecting end template (1), spacing section (52) of second are used for restricting waterstop (2) and paste in exposing section (22) of one side of end template (1), first spacing section (51) are used for restricting pre-buried section (21) of waterstop (2) and make pre-buried section (21) are located pre-buried position.
2. The buried waterstop fixing device for tunnel secondary lining according to claim 1, wherein the side of the first limiting section (51) and/or the second limiting section (52) for contacting the waterstop (2) is provided with a plurality of depressions (4), and the depressions (4) are used for matching with the bulges on the waterstop (2).
3. The buried water stop fixing device for secondary lining of tunnel according to claim 1, wherein the joint of the first limiting section (51) and the second limiting section (52) is an arc-shaped structure, and the joint of the second limiting section (52) and the fixing part (53) is an arc-shaped structure; the joint of the first limiting section (51) and the fixing part (53) is of an arc-shaped structure.
4. The buried waterstop fixing device for tunnel secondary lining according to any one of claims 1 to 3, wherein the fixing device is a steel bar member.
5. The buried water stop fixing device in the secondary lining of the tunnel according to claim 4, wherein the length direction of the fixing portion (53) is matched with the arrangement direction of the embedded section (21), and the fixing portion (53) can penetrate through the gap of the end head template (1) and is bent to be tightly attached to the outer side of the end head template (1).
6. The buried waterstop fixing device for tunnel secondary lining of claim 4, wherein the diameter of the steel bar member is 6-10 mm.
CN202022197036.7U 2020-09-29 2020-09-29 Bury formula waterstop fixing device in tunnel secondary lining Active CN212563276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022197036.7U CN212563276U (en) 2020-09-29 2020-09-29 Bury formula waterstop fixing device in tunnel secondary lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022197036.7U CN212563276U (en) 2020-09-29 2020-09-29 Bury formula waterstop fixing device in tunnel secondary lining

Publications (1)

Publication Number Publication Date
CN212563276U true CN212563276U (en) 2021-02-19

Family

ID=74622002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022197036.7U Active CN212563276U (en) 2020-09-29 2020-09-29 Bury formula waterstop fixing device in tunnel secondary lining

Country Status (1)

Country Link
CN (1) CN212563276U (en)

Similar Documents

Publication Publication Date Title
CN112049667A (en) Embedding method and fixing device for tunnel secondary lining middle-buried water stop belt
US10544581B2 (en) Prestressed tube section structure and construction method thereof
GB2157344A (en) Method and apparatus for the production of underground pipelines
WO2001084037A1 (en) Duct repairing material, repairing structure, and repairing method
US10746022B2 (en) Helical segmental lining
JP7095997B2 (en) How to join concrete members
JP2003314197A (en) Conduit repairing method and conduit interior repairing structure
JP2014177766A (en) Method for constructing concrete precast floor slab for bridge
CN212563276U (en) Bury formula waterstop fixing device in tunnel secondary lining
RU2296833C2 (en) Method for culvert laying under road embankment
JP2004183273A (en) Tunnel structure
US4453862A (en) Method for ensuring mechanical continuity between two adjacent panels of a reinforced concrete wall cast in the ground
JP2002364289A (en) Device and propulsion pipe for preventing backing
JP2003106476A (en) Pipe connecting device in earthquake-resistant pipe restoration method
CN210421155U (en) Precast concrete base of corrugated steel plate comprehensive pipe gallery
KR100760292B1 (en) Sewage pipe non-excavation index and reinforcement method
KR100836512B1 (en) Duct repairing material, repairing structure, and repairing method
JP4833607B2 (en) Repair covering
JP2002266594A (en) Tunnel lining plate and method for mounting the same
CN216973655U (en) Ecological PC heavy-calibre drain pipe
JPH0251040B2 (en)
KR101268843B1 (en) Charging method for infill material using planar end panel
KR102016113B1 (en) Connection fixing means of reinforced earth retaining wall structure and construction method of reinforcing earth retaining wall structure using the same
JPH0197724A (en) Repairing of lining of horseshoe-shaped existing tunnel
JP2011032855A (en) Construction method for side ditch, and side ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant