CN212562753U - Safety barrier is used in civil engineering construction - Google Patents
Safety barrier is used in civil engineering construction Download PDFInfo
- Publication number
- CN212562753U CN212562753U CN202020576665.8U CN202020576665U CN212562753U CN 212562753 U CN212562753 U CN 212562753U CN 202020576665 U CN202020576665 U CN 202020576665U CN 212562753 U CN212562753 U CN 212562753U
- Authority
- CN
- China
- Prior art keywords
- civil engineering
- engineering construction
- holes
- groove
- stair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a safety barrier for civil engineering construction, which comprises end posts and intermediate posts arranged between the end posts, wherein the end posts are provided with rotary grooves, one ends of cross rods are symmetrically provided with rotating shafts, the rotating shafts are rotationally connected with the rotary grooves, the intermediate posts are welded and connected with clamping pipes, one ends of the clamping pipes are provided with clamping grooves, the cross rods are inserted in the clamping grooves in a sliding way, one ends of the cross rods are provided with through holes, through holes are symmetrically arranged in the clamping grooves, bolts are inserted in the through holes and the through holes, when the barrier is placed on the stair, the end posts at two sides are only needed to be placed on the slope surface of the stair, the intermediate posts are placed in the middle, the rotating shaft at one ends of the cross rods rotates in the rotary grooves, an expansion screw is used for penetrating into the interior of the stair, the barrier is stably placed on the side of the stair, when the barrier is removed, the bolt is taken out after the nut is screwed out, the cross rod is taken, the transportation and the reuse of the guardrail are convenient.
Description
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to safety barrier is used in civil engineering construction.
Background
Civil engineering construction refers to human activities such as construction, maintenance, exploration and the like on the ground or underground in land construction engineering, and almost all human living places, workplaces, traffic facilities and social infrastructure in the society at present are the construction range of civil engineering buildings.
During civil engineering construction, especially important constructor's safety protection, the constructor can carry out the safety action to constructor and explain, for constructor configuration facilities such as safety helmet, emergency support and safety rope, during the construction, constructor can place a plurality of safety barrier at the construction area and carry out personnel vehicle isolation and safety protection, but the weak point that exists has: when stair construction, because the form of stair is the stairstepping structure, there is vertical fall in the tread from top to bottom, when leading to place safety barrier on stair, safety barrier base and tread contact are incomplete, and safety barrier exists puts unstable problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a safety barrier is used in civil engineering construction to solve safety barrier and place unstable problem on stair among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a safety barrier is used in civil engineering construction, includes the end post and installs the intermediate prop between the end post, movable groove has been laid along vertical to end post one side, movable groove's both sides are equipped with the rotary groove, the interpolation of movable groove is equipped with the horizontal pole, the pivot has been installed to the symmetry on the horizontal pole, the rotary shaft rotates connects the rotary groove.
Preferably, the clamping pipes are vertically arranged on two sides of the middle column, a clamping groove is formed in one end of each clamping pipe, one end of each cross rod is inserted into the corresponding clamping groove, penetrating openings are formed in the cross rods, through holes are symmetrically formed in the clamping grooves, bolts penetrate through the penetrating openings and the through holes, and nuts are connected to one sections of the bolts penetrating through the clamping pipes through threads.
Preferably, the lower ends of the middle column and the end column are provided with bases, and screw holes are formed in the bases.
Preferably, the clamping groove is of a U-shaped groove structure.
Preferably, the base is of a cuboid structure.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a safety barrier for civil engineering construction puts on stair through the end post with both sides, puts the interlude in the centre, and the pivot of horizontal pole one end makes whole guardrail steadily put on stair at the rotary trough internal rotation, and reuse inflation screw in screw hole squeezes into the fixed orifices of beating in advance on stair, can make safety barrier place the avris at stair firmly.
The utility model provides a safety barrier for civil engineering construction when demolising the guardrail, only need to back out the bolt with the nut, take out the bolt and wear mouth and through-hole, take out the horizontal pole and press from both sides the groove, can accomplish dismantling of guardrail, the transportation and the reuse of the guardrail of also being convenient for simultaneously.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a partially cut-away front view of the present invention;
fig. 3 is a top view partially cut-away schematic view of the present invention;
fig. 4 is an enlarged schematic view of the structure at a position of the present invention;
fig. 5 is an enlarged schematic view of the structure at the position b of the present invention.
In the figure: 1 end column, 2 middle column, 3 movable groove, 4 rotary groove, 5 cross bar, 6 rotary shaft, 7 clamp pipe, 8 clamp groove, 9 through hole, 10 through hole, 11 bolt, 12 nut, 13 base, 14 screw hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, the safety barrier for civil engineering construction comprises end posts 1 and intermediate posts 2 arranged between the end posts 1, wherein a movable groove 3 is vertically distributed on one side of each end post 1, the movable groove is of a U-shaped groove structure, rotary grooves 4 are arranged on two sides of each movable groove 3, a cross rod 5 is inserted into each movable groove 3, rotary shafts 6 are symmetrically welded on the cross rods 5, and the rotary shafts 6 are rotatably connected with the rotary grooves 4.
Referring to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5, there are clamp pipes 7 on both sides of the middle column 2 along vertical welded connection, one end of each clamp pipe 7 is provided with a clamp groove 8, each clamp groove 8 is of a U-shaped groove structure, one end of each cross rod 5 is slidably inserted into each clamp groove 8, each cross rod 5 is provided with a through hole 9, through holes 10 are symmetrically arranged in each clamp groove 8, bolts 11 are inserted into the through holes 9 and the through holes 10, one section of each bolt 11 penetrating out of each clamp pipe 7 is connected with a nut 12 through a thread, the lower ends of the middle column 2 and the end column 1 are all welded connection with a base 13, each base 13 is of a cuboid structure, each base 13 is provided with screw holes.
When the guardrail is installed, only need to put the end post 1 of both sides on the domatic of stair, put middle prop 2 in the centre, the pivot 6 of 5 one ends of horizontal pole is at the internal rotation of rotary slot 4, make horizontal pole 5 move about in the activity groove 3, make the steady putting of whole guardrail on stair, and wear out screw hole 14 with the inflation screw, squeeze into the fixed orifices of beating in advance on the stair, make the guardrail place the avris at stair firmly, when demolising the guardrail, with the manual screw bolt 11 that spirals of nut 12, take out run-through 9 and through-hole 10 with bolt 11, take out double-layered groove 8 with horizontal pole 5, screw hole 14 with the inflation screw with the take-up silk ware, demolish the guardrail, be convenient for the transportation and the reuse of later stage guardrail.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a safety barrier is used in civil engineering construction, includes end post (1) and installs intermediate pillar (2) between end post (1), its characterized in that: the end post is characterized in that a movable groove (3) is vertically distributed on one side of the end post (1), rotary grooves (4) are formed in two sides of the movable groove (3), a cross rod (5) is inserted into the movable groove (3), a rotary shaft (6) is arranged on the cross rod (5), and the rotary shaft (6) is rotatably connected with the rotary grooves (4).
2. The safety fence for civil engineering construction according to claim 1, characterized in that: the clamp tube (7) is vertically arranged on two sides of the middle column (2), a clamp groove (8) is formed in one end of the clamp tube (7), one end of the cross rod (5) is inserted into the clamp groove (8), a penetrating opening (9) is formed in the cross rod (5), through holes (10) are symmetrically formed in the clamp groove (8), bolts (11) are inserted into the penetrating opening (9) and the through holes (10), and one section of the bolt (11) penetrating through the clamp tube (7) is connected with a nut (12) through threads.
3. The safety fence for civil engineering construction according to claim 2, characterized in that: the lower ends of the middle column (2) and the end column (1) are provided with bases (13), and screw holes (14) are formed in the bases (13).
4. The safety fence for civil engineering construction according to claim 2, characterized in that: the clamping groove (8) is of a U-shaped groove structure.
5. The safety fence for civil engineering construction according to claim 3, characterized in that: the base (13) is of a cuboid structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020576665.8U CN212562753U (en) | 2020-04-17 | 2020-04-17 | Safety barrier is used in civil engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020576665.8U CN212562753U (en) | 2020-04-17 | 2020-04-17 | Safety barrier is used in civil engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212562753U true CN212562753U (en) | 2021-02-19 |
Family
ID=74610877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020576665.8U Expired - Fee Related CN212562753U (en) | 2020-04-17 | 2020-04-17 | Safety barrier is used in civil engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212562753U (en) |
-
2020
- 2020-04-17 CN CN202020576665.8U patent/CN212562753U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212562753U (en) | Safety barrier is used in civil engineering construction | |
CN211450103U (en) | Large wide-angle security monitoring camera | |
CN215978575U (en) | Safety protection system for dismantling reinforced concrete water tower in limited space | |
CN205653084U (en) | Prevent regularization tower crane passageway crossed | |
CN213953502U (en) | Connecting structure of high pier people climbing ladder and pier column | |
CN214299163U (en) | Lifting type lifting frame for micro pipe jacking operation | |
CN210177919U (en) | Civil engineering construction support | |
CN212837823U (en) | Open cut tunnel side wall construction trolley | |
CN213015757U (en) | Safety warning device for foundation pit excavation | |
CN213087384U (en) | Can have enough to meet need telescopic step-down well water level observation platform | |
CN217269299U (en) | A board-like guardrail bar is prevented to turning over for sewage treatment plant part opens position | |
CN216840816U (en) | Shaft ladder cage safety channel | |
CN219691258U (en) | Protective fence | |
CN219910296U (en) | Folding device suitable for foundation pit excavation safety protection | |
CN218406843U (en) | Safety barrier of passageway is patrolled and examined at circular coal yard of thermal power factory in setting | |
CN220909052U (en) | High-strength steel structure supporting frame | |
CN220434433U (en) | Assembled protective railing structure | |
CN220686824U (en) | Large-span temporary-building board house anti-smashing protective shed | |
CN214462789U (en) | Reserved hole safety protection frame that stability is high | |
CN216040853U (en) | Guardrail bar of highway | |
CN221002254U (en) | Foundation pit protection guardrail | |
CN215485175U (en) | Safety protective guard for building site | |
CN218912194U (en) | Portable safe operation platform for elevator shaft of high-rise building | |
CN212773750U (en) | Combined type protective railing for periphery of foundation pit | |
JP3462341B2 (en) | How to install windproof snow fence posts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210219 |