CN212561077U - Road and bridge crack repairing and fixing structure - Google Patents

Road and bridge crack repairing and fixing structure Download PDF

Info

Publication number
CN212561077U
CN212561077U CN202020884677.7U CN202020884677U CN212561077U CN 212561077 U CN212561077 U CN 212561077U CN 202020884677 U CN202020884677 U CN 202020884677U CN 212561077 U CN212561077 U CN 212561077U
Authority
CN
China
Prior art keywords
fixedly connected
road
pipe
air pipe
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020884677.7U
Other languages
Chinese (zh)
Inventor
李玉涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020884677.7U priority Critical patent/CN212561077U/en
Application granted granted Critical
Publication of CN212561077U publication Critical patent/CN212561077U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses a road and bridge crack repair fixed knot constructs, including support frame, bracing piece, dead lever, spring, ten thousand elephant wheels, connection loop bars, connecting rod, dwang, press cylinder, glue liquid case, fluid infusion pipe, screw cap, liquid restriction valve, flow pipe, play liquid mouth, installation shell, battery, fan, joint wind pipe, gaseous restriction valve, air cock, L shape joint wind pipe and handle. The utility model has the advantages that: this device is rational in infrastructure, and convenient to use promotes this device through the staff and fills the pouring sealant to the crack on the road, fills the repair through the pouring sealant to the crack, and when the pouring sealant was filled, can press down the strickle to the pouring sealant through the structure of flattening for the pouring sealant solidifies the back and levels more, and this device has except that the foreign matter structure, can get rid of the tiny dust foreign matter in the crack before the filling sealant fills through removing the foreign matter structure, makes the filling effect of pouring sealant better.

Description

Road and bridge crack repairing and fixing structure
Technical Field
The utility model relates to a repair fixed knot and construct specifically is a road and bridge crack repair fixed knot constructs belongs to crack repair fixed knot and constructs application technical field.
Background
The road and bridge generally comprises a plurality of parts such as a roadbed, a road surface, a bridge, tunnel engineering, traffic engineering facilities and the like, along with the development of traffic industry, the number of high-grade roads mainly comprising expressways and first-grade roads is increased year by year, and the highway industry of China starts to enter a new stage with the construction of the high-grade roads as key points.
When tiny crack appears on the road and bridge, adopt the filling compound to fill the crack and repair fixedly usually, the filling compound is when using, probably because there are more dust and tiny foreign matter in the crack to lead to the repair effect not good, the filling compound forms the difference in height after solidifying probably and between the road surface simultaneously, forms little arch, influences the road surface vehicle and traveles. Therefore, a road and bridge crack repairing and fixing structure is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a road and bridge crack repair fixed knot constructs just in order to solve above-mentioned problem.
The utility model realizes the purpose through the following technical proposal, a road and bridge crack repairing and fixing structure, which comprises a supporting frame, a glue box, a storage battery, a flattening structure and a foreign matter removing structure;
the lower surface of the support frame is fixedly connected with one end of a support rod, the other end of the support rod is fixedly provided with a universal wheel, the support frame is fixedly provided with a glue solution box, the bottom wall of the inner cavity of the glue solution box is fixedly connected with one end of a liquid flow pipe, the other end of the liquid flow pipe is fixedly connected with a liquid outlet nozzle, the support rod is fixedly provided with a flattening structure, the flattening structure comprises a fixed rod, a spring, connecting sleeve rods, a connecting rod, a rotating rod and a pressing roller, the side wall of the support rod is fixedly connected with the fixed rod, the fixed rod is fixedly connected with two connecting sleeve rods, the inner cavities of the two connecting sleeve rods are respectively and slidably connected with the connecting rod, one ends of the two connecting rods are respectively and fixedly connected with the spring, the other ends of the two springs are fixedly connected to the inner cavity wall of the, a pressing roller is fixedly connected to the arc-shaped wall of the rotating rod;
the utility model discloses a support frame, including support frame, fixed surface department fixedly connected with installation shell, fixed mounting has the battery in the inner chamber of installation shell, the lower surface department fixed mounting of support frame has except that the foreign matter structure, it includes fan, connecting air duct, air cock and L shape connecting air duct to remove the foreign matter structure, the lower surface department fixed mounting of support frame has the fan, the one end of the air outlet fixedly connected with connecting air duct of fan, the one end of the lateral wall department fixedly connected with L shape connecting air duct of connecting air duct, communicate each other between the inner chamber of L shape connecting air duct and connecting air duct, the equal fixed mounting in department of connecting air duct and L shape connecting air duct has the air cock.
Preferably, the bracing piece is total four, four the bracing piece is fixed connection respectively in the lower surface four corners department of support frame, four the equal fixed mounting in bottom of bracing piece has the universal wheel.
Preferably, the inner cavity upper wall department fixedly connected with fluid infusion pipe of glue case, the upside arc wall department threaded connection of fluid infusion pipe has the screw cap.
Preferably, a liquid flow-limiting valve is fixedly arranged on the liquid flow pipe.
Preferably, the connecting air pipe and the L-shaped connecting air pipe are both fixedly provided with a gas flow limiting valve, and the two air nozzles are respectively positioned at two sides of the liquid outlet nozzle.
Preferably, the storage battery is electrically connected with the fan.
Preferably, handles are fixedly connected to both ends of the upper surface side wall of the support frame.
The utility model has the advantages that:
1. this device is rational in infrastructure, and convenient to use promotes this device through the staff and fills the filling compound to the crack on the road, fills the repair through the filling compound to the crack, and when the filling compound was filled, can press the striking off to the filling compound through flattening the structure for the filling compound solidifies the back and levels more.
2. This device has and removes the foreign matter structure, can get rid of the tiny dust foreign matter in the crack before filling the gluey packing through removing the foreign matter structure for filling gluey filling effect is better, and the quick set of blowing is simultaneously filled floating pouring glue, makes filling effect better, is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
FIG. 1 is a schematic view of the internal structure of the present invention;
FIG. 2 is a schematic view of a side connection structure of the flattening structure of the present invention;
fig. 3 is a schematic view of a side connection structure of the handle of the present invention.
In the figure: 1. the support frame, 2, the bracing piece, 3, the dead lever, 4, the spring, 5, the universal wheel, 6, connect loop bar, 7, the connecting rod, 8, the dwang, 9, press the cylinder, 10, the glue solution case, 11, fluid infusion pipe, 12, the screw thread lid, 13, liquid restriction valve, 14, the flow tube, 15, the liquid outlet nozzle, 16, the installation shell, 17, the battery, 18, the fan, 19, the connecting air pipe, 20, gaseous restriction valve, 21, the air cock, 22, L shape connecting air pipe, 23, the handle.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the embodiments described below are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-3, a road and bridge crack repairing and fixing structure includes a support frame 1, a glue solution box 10, a storage battery 17, a flattening structure and a foreign matter removing structure;
the lower surface of the support frame 1 is fixedly connected with one end of a support rod 2, the other end of the support rod 2 is fixedly provided with a universal wheel 5, the support frame 1 is fixedly provided with a glue solution box 10, the inner cavity bottom wall of the glue solution box 10 is fixedly connected with one end of a liquid flow pipe 14, the other end of the liquid flow pipe 14 is fixedly connected with a liquid outlet 15, the support rod 2 is fixedly provided with a flattening structure, the flattening structure comprises a fixed rod 3, a spring 4, a connecting sleeve rod 6, a connecting rod 7, a rotating rod 8 and a pressing roller 9, the side wall of the support rod 2 is fixedly connected with the fixed rod 3, the fixed rod 3 is fixedly connected with two connecting sleeve rods 6, the inner cavities of the two connecting sleeve rods 6 are respectively and slidably connected with the connecting rod 7, one end of the two connecting rods 7 is respectively and fixedly connected with the spring 4, and the other end of the spring 4, a rotating rod 8 is rotatably connected between the bottom ends of the two connecting rods 7, and a pressing roller 9 is fixedly connected to the arc-shaped wall of the rotating rod 8;
the upper surface department fixedly connected with installation shell 16 of support frame 1, fixed mounting has battery 17 in the inner chamber of installation shell 16, the lower surface department fixed mounting of support frame 1 has except that the foreign matter structure, it includes fan 18, connecting air duct 19, air cock 21 and L shape connecting air duct 22 to remove the foreign matter structure, the lower surface department fixed mounting of support frame 1 has fan 18, the one end of air outlet fixedly connected with connecting air duct 19 of fan 18, the one end of connecting air duct 19's lateral wall department fixedly connected with L shape connecting air duct 22 of connecting air duct 19, communicate each other between the inner chamber of L shape connecting air duct 22 and connecting air duct 19, the equal fixed mounting of bottom department of connecting air duct 19 and L shape connecting air duct 22 has air cock 21.
The number of the support rods 2 is four, the four support rods 2 are respectively and fixedly connected to four corners of the lower surface of the support frame 1, and universal wheels 5 are fixedly mounted at the bottom ends of the four support rods 2; a liquid replenishing pipe 11 is fixedly connected to the upper wall of the inner cavity of the glue box 10, and a threaded cover 12 is in threaded connection with the arc-shaped wall of the upper side of the liquid replenishing pipe 11; a liquid flow-limiting valve 13 is fixedly arranged on the liquid flow pipe 14; the connecting air pipe 19 and the L-shaped connecting air pipe 22 are both fixedly provided with a gas flow-limiting valve 20, and the two air nozzles 21 are respectively positioned at two sides of the liquid outlet nozzle 15; the storage battery 17 is electrically connected with the fan 18; the two ends of the upper surface side wall of the support frame 1 are fixedly connected with handles 23.
When the utility model is used, firstly, the screw cap 12 is rotated to separate the screw cap 12 from the liquid supplementing pipe 11, the filling glue is filled in the inner cavity of the glue solution box 10 through the liquid supplementing pipe 11, after the filling is finished, the screw cap 12 is screwed again, the device is moved by pushing the handle 23 by the staff, the downflow speed of the filling glue is adjusted by rotating the liquid flow limiting valve 13, the filling glue flows to the crack of the road through the liquid flow pipe 14 and the liquid outlet nozzle 15, the device is pushed by the staff to move along the crack, simultaneously, the switch of the fan 18 is opened, the two gas flow limiting valves 20 are rotated, the air flow is blown to the air tap 21 connected with the bottom end of the air pipe 19 through the work of the fan 18, the air tap 21 connected with the bottom end of the air pipe 19 is blown to the crack, the dust in the crack is blown out by the fine impurities, the filling glue flows into the crack after being cleaned, make the effect of filling better, extension through the spring 4 in the structure that flattens drives connecting rod 7 and removes, and then make and press cylinder 9 to compress tightly on the road surface, flatten troweling the filling adhesive through the removal of pressing cylinder 9, make the filling adhesive fill more evenly, make and level more after solidifying, the air current that fan 18 blew out blows to the filling adhesive department after troweling through the air cock 21 of L shape connecting air pipe 22 bottom, air-dry the solidification with higher speed to the filling adhesive, reduce the time that the filling adhesive solidifies, and the work efficiency is improved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (7)

1. The utility model provides a fixed knot constructs is restoreed to road and bridge crack which characterized in that: comprises a support frame (1), a glue solution box (10), a storage battery (17), a flattening structure and a foreign matter removing structure;
the lower surface of the support frame (1) is fixedly connected with one end of a support rod (2), the other end of the support rod (2) is fixedly provided with a universal wheel (5), the support frame (1) is fixedly provided with a glue box (10), the inner cavity bottom wall of the glue box (10) is fixedly connected with one end of a liquid flow pipe (14), the other end of the liquid flow pipe (14) is fixedly connected with a liquid outlet (15), the support rod (2) is fixedly provided with a flattening structure, the flattening structure comprises a fixed rod (3), a spring (4), connecting sleeve rods (6), connecting rods (7), a rotating rod (8) and a pressing roller (9), the side wall of the support rod (2) is fixedly connected with the fixed rod (3), the fixed rod (3) is fixedly connected with two connecting sleeve rods (6), and the connecting rods (7) are all slidably connected in the inner cavities of the two connecting sleeve rods (6), one end of each of the two connecting rods (7) is fixedly connected with a spring (4), the other end of each of the two springs (4) is fixedly connected to the inner cavity wall of the connecting sleeve rod (6), a rotating rod (8) is rotatably connected between the bottom ends of the two connecting rods (7), and a pressing roller (9) is fixedly connected to the arc-shaped wall of the rotating rod (8);
the upper surface of the supporting frame (1) is fixedly connected with a mounting shell (16), a storage battery (17) is fixedly arranged in the inner cavity of the mounting shell (16), the lower surface of the support frame (1) is fixedly provided with a foreign matter removing structure which comprises a fan (18), a connecting air pipe (19), an air tap (21) and an L-shaped connecting air pipe (22), a fan (18) is fixedly arranged on the lower surface of the support frame (1), an air outlet of the fan (18) is fixedly connected with one end of a connecting air pipe (19), one end of an L-shaped connecting air pipe (22) is fixedly connected with the side wall of the connecting air pipe (19), the L-shaped connecting air pipe (22) is communicated with the inner cavity of the connecting air pipe (19), and air nozzles (21) are fixedly arranged at the bottom ends of the connecting air pipe (19) and the L-shaped connecting air pipe (22).
2. The road and bridge crack repair fixation structure of claim 1, wherein: the supporting rods (2) are four in number, four the supporting rods (2) are fixedly connected to four corners of the lower surface of the supporting frame (1) respectively, and four universal wheels (5) are fixedly mounted at the bottom ends of the supporting rods (2).
3. The road and bridge crack repair fixation structure of claim 1, wherein: the glue box is characterized in that a liquid replenishing pipe (11) is fixedly connected to the upper wall of the inner cavity of the glue box (10), and a threaded cover (12) is in threaded connection with the upper arc-shaped wall of the liquid replenishing pipe (11).
4. The road and bridge crack repair fixation structure of claim 1, wherein: and a liquid flow limiting valve (13) is fixedly arranged on the liquid flow pipe (14).
5. The road and bridge crack repair fixation structure of claim 1, wherein: and the connecting air pipe (19) and the L-shaped connecting air pipe (22) are fixedly provided with air flow limiting valves (20), and the air nozzles (21) are respectively positioned at two sides of the liquid outlet nozzle (15).
6. The road and bridge crack repair fixation structure of claim 1, wherein: the storage battery (17) is electrically connected with the fan (18).
7. The road and bridge crack repair fixation structure of claim 1, wherein: both ends of the upper surface side wall of the support frame (1) are fixedly connected with handles (23).
CN202020884677.7U 2020-05-24 2020-05-24 Road and bridge crack repairing and fixing structure Expired - Fee Related CN212561077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020884677.7U CN212561077U (en) 2020-05-24 2020-05-24 Road and bridge crack repairing and fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020884677.7U CN212561077U (en) 2020-05-24 2020-05-24 Road and bridge crack repairing and fixing structure

Publications (1)

Publication Number Publication Date
CN212561077U true CN212561077U (en) 2021-02-19

Family

ID=74632675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020884677.7U Expired - Fee Related CN212561077U (en) 2020-05-24 2020-05-24 Road and bridge crack repairing and fixing structure

Country Status (1)

Country Link
CN (1) CN212561077U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878215A (en) * 2021-04-12 2021-06-01 济南金曰公路工程有限公司 Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878215A (en) * 2021-04-12 2021-06-01 济南金曰公路工程有限公司 Bridge engineering bridge floor leveling layer hollowing filling equipment and construction method

Similar Documents

Publication Publication Date Title
CN212561077U (en) Road and bridge crack repairing and fixing structure
CN206874030U (en) A kind of road and bridge construction monitoring mounting bracket with height adjusting function
CN209680547U (en) A kind of machine-made sand wind power removes powder equipment
CN215482190U (en) Civil engineering construction road surface flattening maintenance device
CN212983547U (en) Highway construction curing means
CN206143606U (en) Highway subgrade maintenance road surface cementation of fissures device
CN207363250U (en) One kind pours wall template for foam soil
CN208792128U (en) A kind of town road road surface grinding device
CN214882846U (en) Crack filling equipment for highway maintenance
CN105018167A (en) Multifunctional high-pressure gas safety purifier
CN211772695U (en) Embedment equipment that highway engineering was used
CN216042767U (en) Building concrete engineering curing means
CN221255161U (en) Road and bridge pavement repairing device
CN220413933U (en) Semi-automatic roadbed sealing layer concrete surface collecting device
CN215482182U (en) Temporary hole sealing and slurry leakage collecting device for road grouting
CN211772951U (en) Road and bridge crack repairing and fixing structure
CN215051926U (en) Highway maintenance cementation of fissures device
CN218203802U (en) Highway crack repairing device
CN215561792U (en) Road cementation of fissures device for municipal works
CN216304377U (en) Road cementation of fissures device for municipal works
CN211897767U (en) Building road crack repair tool
CN211191900U (en) Mould is used in automobile wheel hub preparation
CN214939118U (en) Roadbed construction maintenance device
CN219430491U (en) Road construction scriber
CN219280431U (en) Maintenance vehicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219