CN212538136U - Building construction working face sprays dust fall heat sink - Google Patents

Building construction working face sprays dust fall heat sink Download PDF

Info

Publication number
CN212538136U
CN212538136U CN202021534279.9U CN202021534279U CN212538136U CN 212538136 U CN212538136 U CN 212538136U CN 202021534279 U CN202021534279 U CN 202021534279U CN 212538136 U CN212538136 U CN 212538136U
Authority
CN
China
Prior art keywords
water
water tank
working face
pipe
reducing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021534279.9U
Other languages
Chinese (zh)
Inventor
刘帅
张炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INNER MONGOLIA TECHNICAL COLLEGE OF CONSTRUCTION
Original Assignee
INNER MONGOLIA TECHNICAL COLLEGE OF CONSTRUCTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA TECHNICAL COLLEGE OF CONSTRUCTION filed Critical INNER MONGOLIA TECHNICAL COLLEGE OF CONSTRUCTION
Priority to CN202021534279.9U priority Critical patent/CN212538136U/en
Application granted granted Critical
Publication of CN212538136U publication Critical patent/CN212538136U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building construction operation face sprays dust fall heat sink, comprising a water tank, the observation window is installed to the one end of water tank, the inlet tube is installed to top one side of water tank, the both ends of water tank all are connected with the connecting block, the one end that the water tank was kept away from to the connecting block all is connected with elevating gear, two elevating gear's top is connected with atomizing spray set jointly, the top opposite side of water tank is connected with out the water hose, and goes out the top and the atomizing spray set fixed connection of water hose, elevating gear's lower extreme both sides all are connected with the universal wheel. The utility model discloses it is easy and simple to handle, through the elevating gear who sets up, can adjust atomizer's high position for atomizer's working range is wider, has improved whole device's practicality, and the atomizing spray set that sets up can adjust atomizer's work angle, makes whole device flexibility when using higher.

Description

Building construction working face sprays dust fall heat sink
Technical Field
The utility model relates to a building construction field specifically is a building construction working face sprays dust fall heat sink.
Background
Dust is inevitably generated in the building construction process, particularly the working efficiency of workers is reduced due to the influence of the dust and the influence of the weather in dry and hot weather, therefore, a spraying dust-reducing and temperature-reducing device is needed, and the structure of the spraying dust-reducing and temperature-reducing device used at present is too simple, when the devices are used, the height of the atomizing spray head is not convenient to adjust, so that the working range of the device is narrow, the practicability of the whole device is reduced, and the atomizing spray heads in these devices are inconvenient for adjusting the spraying angle, so that the flexibility of the whole device is not high, these devices do not filter water when water is fed, resulting in the devices being prone to clogging of the outlet pipes, the service life of the whole device is shortened, and for this reason, a spraying dust-settling cooling device for a building construction working face is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction working face sprays dust fall heat sink to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a spraying dust-reducing and cooling device for a building construction working face comprises a water tank, wherein an observation window is installed at one end of the water tank, a water inlet pipe is installed at one side of the top end of the water tank, connecting blocks are connected to two ends of the water tank, and a lifting device is connected to one end, away from the water tank, of each connecting block;
the lifting device comprises a lifting box, one end of the lifting box is fixedly connected with a connecting block, one end of the lifting box is movably connected with a cover plate, a hydraulic cylinder is arranged on the lower box wall of the lifting box, the top end of the hydraulic cylinder is connected with a hydraulic rod in a transmission manner, sliding groove plates are arranged on the box walls on the two sides of the lifting box, a moving plate is connected between the opposite surfaces of the two sliding groove plates in a sliding manner, the top end of the hydraulic rod is fixedly connected with the moving plate, the two sides of the top end of the moving plate are both connected with supporting rods, and the top ends of the two supporting rods are fixedly;
two elevating gear's top is connected with atomizing spray set jointly, the top opposite side of water tank is connected with out the water hose, and goes out the top and atomizing spray set fixed connection of water hose, elevating gear's lower extreme both sides all are connected with the universal wheel.
As a preferred technical scheme of the utility model, the top of backup pad is connected with the bottom plate, the top of bottom plate is connected with the dead lever, the movable rod has been cup jointed on the top of dead lever, open the one end of movable rod has a plurality of locating hole, the one end of dead lever is provided with the fastening bolt that the cooperation locating hole used.
As a preferred technical scheme of the utility model, the water tank includes the box, be connected with the baffle between the upper and lower inner wall of box, be connected with the filter screen between the one end of baffle and one side inner wall of box, install the suction pump on the lower inner wall of box, the one end of suction pump is connected with the drinking-water pipe, and the one end of drinking-water pipe runs through the baffle, the top of suction pump is connected with the outlet pipe, and outlet pipe top and play water hose fixed connection, the one end swing joint of box has the door plant.
As a preferred technical scheme of the utility model, atomizing spray set includes the riser, the lower extreme of riser all is connected with the buckle, two all be connected with the pivot on the opposite face of riser, and be connected with the water service pipe between the opposite face of two pivots, the one end of water service pipe is connected with a plurality of atomizer, and the lower extreme and the play water hose fixed connection of water service pipe.
As an optimized technical scheme of the utility model, the draw-in groove that the cooperation buckle used is opened on the top of movable rod.
As a preferred technical scheme of the utility model, the lower extreme and the box of inlet tube are linked together, and the inlet tube is located the filter screen directly over.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up elevating gear, wherein under the cooperation of pneumatic cylinder in the fixed box and chute board used, can make the backup pad drive atomizer and carry out the adjustment of high position to the movable rod also can stretch out and draw back in the dead lever, makes atomizer can carry out the altitude mixture control once more under the effect of movable rod, makes atomizer's working range wider, has improved the practicality of whole device.
2. Through setting up atomizing spray set, two pivot wherein can drive atomizer and carry out operating angle's regulation, are favorable to further enlarging atomizer's working range, have improved the flexibility of whole device when using.
3. Through set up the filter screen in the water tank, can filter the impurity in the moisture that adds into the water tank, avoid outlet pipe or atomizer to appear the condition of blockking up at the during operation, improved the life of whole device.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the lifting device and a sectional view of the lifting box of the present invention;
FIG. 3 is a sectional view of the water tank of the present invention;
fig. 4 is a schematic view of the atomization spraying device of the present invention.
In the figure: 1. a water tank; 2. a lifting device; 3. an atomizing spray device; 4. an observation window; 5. connecting blocks; 6. a universal wheel; 7. a water inlet pipe; 8. a water outlet hose; 11. a box body; 12. a water pumping pipe; 13. a partition plate; 14. a water pump; 15. a water outlet pipe; 16. a filter screen; 17. a door panel; 21. a lifting box; 22. a cover plate; 23. a base plate; 24. a movable rod; 25. positioning holes; 26. fixing the rod; 211. a hydraulic cylinder; 212. a chute plate; 213. a hydraulic lever; 214. moving the plate; 215. a support bar; 216. a support plate; 31. a vertical plate; 32. buckling; 33. an atomizing spray head; 34. a water pipe; 35. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a spraying dust-reducing and temperature-reducing device for a building construction working face comprises a water tank 1, wherein an observation window 4 is installed at one end of the water tank 1, a water inlet pipe 7 is installed at one side of the top end of the water tank 1, connecting blocks 5 are connected to two ends of the water tank 1, a lifting device 2 is connected to one end, far away from the water tank 1, of each connecting block 5, each lifting device 2 comprises a lifting box 21, one end of each lifting box 21 is fixedly connected with the corresponding connecting block 5, a cover plate 22 is movably connected to one end of each lifting box 21, a hydraulic cylinder 211 is installed on the lower box wall of each lifting box 21, a hydraulic rod 213 is connected to the top end of each hydraulic cylinder 211 in a transmission manner, sliding groove plates 212 are installed on the box walls on two sides of each lifting box 21, a movable plate 214 is slidably connected between the opposite surfaces of the two sliding groove plates 212, the top ends, two elevating gear 2's top is connected with atomizing spray set 3 jointly, the top opposite side of water tank 1 is connected with out water hose 8, and the top and the atomizing spray set 3 fixed connection of play water hose 8, elevating gear 2's lower extreme both sides all are connected with universal wheel 6, during the use, earlier remove whole device to appointed work area through universal wheel 6, when needs adjust atomizing spray set 3's high position, can open earlier the apron 22 of 21 one ends of lift-box among elevating gear 2, and start pneumatic cylinder 211 in it and make hydraulic stem 213 drive movable plate 214 reciprocate in spout plate 212, make bracing piece 215 drive backup pad 216 reciprocate, thereby make backup pad 216 drive atomizing spray set 3 carry out the adjustment of high position.
Referring to fig. 1-4, a bottom plate 23 is connected to the top end of the supporting plate 216, a fixed rod 26 is connected to the top end of the bottom plate 23, a movable rod 24 is sleeved on the top end of the fixed rod 26, a plurality of positioning holes 25 are formed in one end of the movable rod 24, a fastening bolt used in cooperation with the positioning holes 25 is arranged at one end of the fixed rod 26, when the lifting box 21 cannot meet the requirement of the atomization spraying device 3 on height adjustment, the fastening bolt at one end of the fixed rod 26 can be unscrewed, the movable rod 24 can extend and retract in the fixed rod 26, the movable rod 24 can drive the atomization spraying device 3 to adjust the height position, and after the position of the movable rod 24 is determined, the fastening bolt penetrates through the fixed rod 26 and penetrates into the corresponding positioning hole 25 in the movable rod.
Referring to fig. 1-4, a water tank 1 includes a tank body 11, a partition 13 is connected between an upper inner wall and a lower inner wall of the tank body 11, a filter screen 16 is connected between one end of the partition 13 and one side inner wall of the tank body 11, a water pump 14 is installed on the lower inner wall of the tank body 11, one end of the water pump 14 is connected with a water pumping pipe 12, one end of the water pumping pipe 12 penetrates through the partition 13, a water outlet pipe 15 is connected to a top end of the water pumping pump 14, a top end of the water outlet pipe 15 is fixedly connected with a water outlet hose 8, one end of the tank body 11 is movably connected with a door panel 17, when a worker observes that water in the water tank 1 is insufficient through an observation window 4 at one end of the water tank 1 and needs to be supplemented with water, water can be added into the tank body 11 through a water inlet pipe 7, the water entering the water tank 1 can be, water pumped by the pumping pipe 12 enters the water outlet hose 8 from the water outlet pipe 15.
Referring to fig. 1-4, the atomizing sprayer 3 includes vertical plates 31, buckles 32 connected to the lower ends of the vertical plates 31, rotating shafts 35 connected to the opposite surfaces of the two vertical plates 31, and a water pipe 34 is connected between the opposite surfaces of the two rotating shafts 35, one end of the water pipe 34 is connected with a plurality of atomizing nozzles 33, and the lower end of the water pipe 34 is fixedly connected with the water outlet hose 8, the water entering the water outlet hose 8 flows into the water pipe 34 in the atomization spraying device 3, finally enters a plurality of atomizing nozzles 33 and is sprayed out of the atomizing nozzles 33 to perform dust fall and temperature reduction on dust in the air, when the working angle of the atomizer 33 needs to be adjusted, the two rotating shafts 35 connected with the two vertical plates 31 can be directly rotated, so that the water pipe 34 drives the atomizer 33 to adjust the angle, and the buckle 32 at the lower end of the vertical plate 31 can facilitate the worker to take off the atomization spray device 3 from the two lifting devices 2.
Referring to fig. 1-4, the top end of the movable rod 24 is provided with a slot for engaging with the fastener 32, so that the atomizing sprayer 3 can be taken off from the lifting device 2.
Referring to fig. 1 to 4, the lower end of the water inlet pipe 7 is communicated with the tank 11, and the water inlet pipe 7 is positioned right above the filter screen 16, so that the filter screen 16 can filter the moisture added into the tank 11.
The working principle is as follows: when the device is used, the whole device is moved to a designated working area through the universal wheel 6, when the height position of the atomization spraying device 3 needs to be adjusted, the cover plate 22 at one end of the lifting box 21 in the lifting device 2 can be opened firstly, the hydraulic cylinder 211 in the lifting device is started, the hydraulic rod 213 drives the moving plate 214 to move up and down in the sliding groove plate 212, the supporting rod 215 drives the supporting plate 216 to move up and down, the supporting plate 216 drives the atomization spraying device 3 to adjust the height position, when the lifting box 21 cannot meet the requirement of the atomization spraying device 3 on height adjustment, the fastening bolt at one end of the fixed rod 26 can be unscrewed, the movable rod 24 is made to extend and retract in the fixed rod 26, the movable rod 24 drives the atomization spraying device 3 to adjust the height position, after the position of the movable rod 24 is determined, the fastening bolt penetrates through the fixed rod 26 and penetrates into the corresponding positioning hole 25 on the movable rod 24, when a worker observes that water in the water tank 1 is insufficient through the observation window 4 at one end of the water tank 1 and needs to be supplemented with water, water can be added into the tank body 11 through the water inlet pipe 7, the water entering the water tank 1 can be firstly filtered by the filter screen 16, then the door panel 17 at one end of the water tank 1 is opened and the water suction pump 14 in the water suction pipe is started, so that the water suction pipe 12 starts to pump water, the water pumped by the water suction pipe 12 enters the water outlet hose 8 from the water outlet pipe 15, the water entering the water outlet hose 8 flows into the water through pipe 34 in the atomizing spray device 3, finally enters the plurality of atomizing spray heads 33 and is sprayed out of the atomizing spray heads 33 to perform dust reduction and temperature reduction on dust in the air, and when the working angle of the atomizing spray heads 33 needs to be adjusted, the two rotating shafts 35 connected with the two vertical plates 31 can be directly rotated, so that the water through pipe 34 drives the atomizing spray heads 33 to perform angle adjustment, and the buckle 32 at the lower end of the vertical plate 31 can facilitate the worker to take off the atomization spray device 3 from the two lifting devices 2.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building construction working face sprays dust fall heat sink, includes water tank (1), its characterized in that: an observation window (4) is installed at one end of the water tank (1), a water inlet pipe (7) is installed at one side of the top end of the water tank (1), two ends of the water tank (1) are both connected with connecting blocks (5), and one end, far away from the water tank (1), of each connecting block (5) is connected with a lifting device (2);
the lifting device (2) comprises a lifting box (21), one end of the lifting box (21) is fixedly connected with the connecting block (5), one end of the lifting box (21) is movably connected with a cover plate (22), a hydraulic cylinder (211) is installed on the lower box wall of the lifting box (21), the top end of the hydraulic cylinder (211) is in transmission connection with a hydraulic rod (213), the box walls on the two sides of the lifting box (21) are respectively provided with a sliding groove plate (212), a moving plate (214) is in sliding connection between the opposite surfaces of the two sliding groove plates (212), the top end of the hydraulic rod (213) is fixedly connected with the moving plate (214), the two sides of the top end of the moving plate (214) are respectively connected with a supporting rod (215), and the top ends of the two supporting rods (215) are jointly and fixedly connected with a supporting;
two the top of elevating gear (2) is connected with atomizing spray set (3) jointly, the top opposite side of water tank (1) is connected with out water hose (8), and goes out the top and atomizing spray set (3) fixed connection of water hose (8), the lower extreme both sides of elevating gear (2) all are connected with universal wheel (6).
2. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, which is characterized in that: the top of backup pad (216) is connected with bottom plate (23), the top of bottom plate (23) is connected with dead lever (26), movable rod (24) have been cup jointed on the top of dead lever (26), open the one end of movable rod (24) has a plurality of locating hole (25), the one end of dead lever (26) is provided with the fastening bolt that cooperation locating hole (25) used.
3. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, which is characterized in that: the water tank (1) comprises a tank body (11), a partition plate (13) is connected between the upper inner wall and the lower inner wall of the tank body (11), a filter screen (16) is connected between one end of the partition plate (13) and one side inner wall of the tank body (11), a water suction pump (14) is installed on the lower inner wall of the tank body (11), one end of the water suction pump (14) is connected with a water suction pipe (12), one end of the water suction pipe (12) penetrates through the partition plate (13), the top end of the water suction pump (14) is connected with a water outlet pipe (15), the top end of the water outlet pipe (15) is fixedly connected with a water outlet hose (8), and one end of the tank body (11).
4. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 1, which is characterized in that: atomizing spray set (3) include riser (31), the lower extreme of riser (31) all is connected with buckle (32), two all be connected with pivot (35) on the opposite face of riser (31), and be connected with water service pipe (34) between the opposite face of two pivot (35), the one end of water service pipe (34) is connected with a plurality of atomizer (33), and the lower extreme and play water hose (8) fixed connection of water service pipe (34).
5. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 2, which is characterized in that: the top end of the movable rod (24) is provided with a clamping groove used in cooperation with the buckle (32).
6. The spraying dust-reducing and temperature-reducing device for the construction working face of claim 3, which is characterized in that: the lower end of the water inlet pipe (7) is communicated with the box body (11), and the water inlet pipe (7) is positioned right above the filter screen (16).
CN202021534279.9U 2020-07-29 2020-07-29 Building construction working face sprays dust fall heat sink Expired - Fee Related CN212538136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021534279.9U CN212538136U (en) 2020-07-29 2020-07-29 Building construction working face sprays dust fall heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021534279.9U CN212538136U (en) 2020-07-29 2020-07-29 Building construction working face sprays dust fall heat sink

Publications (1)

Publication Number Publication Date
CN212538136U true CN212538136U (en) 2021-02-12

Family

ID=74517238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021534279.9U Expired - Fee Related CN212538136U (en) 2020-07-29 2020-07-29 Building construction working face sprays dust fall heat sink

Country Status (1)

Country Link
CN (1) CN212538136U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112998575A (en) * 2021-02-25 2021-06-22 焦作大学 Informationized building construction is with portable cooling dust device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112998575A (en) * 2021-02-25 2021-06-22 焦作大学 Informationized building construction is with portable cooling dust device
CN112998575B (en) * 2021-02-25 2022-04-19 焦作大学 Informationized building construction is with portable cooling dust device

Similar Documents

Publication Publication Date Title
CN212538136U (en) Building construction working face sprays dust fall heat sink
CN205650381U (en) Water -curtain -type multi -angle automatic painting machine)
CN211818057U (en) Spray cooling and dust settling equipment for building construction
CN114288796B (en) Environment-friendly construction dust fall equipment
CN210699320U (en) Dust collecting equipment for building construction site is built in room
CN213625411U (en) Building construction working face sprays dust fall heat sink
CN111616029A (en) Municipal afforestation maintenance device
CN216703823U (en) Dust device for building engineering
CN213980851U (en) Dust device is used in tunnel construction with high-efficient dust removal function
CN212971097U (en) Water-saving spraying equipment
CN212348132U (en) Dust device for green building
CN213790625U (en) Dust device for building
CN210238404U (en) Building construction working face sprays dust fall heat sink
CN107138317B (en) A kind of dust removing sprayer
CN219647049U (en) Water-saving dust settling device
CN216170927U (en) Dust collector for green building construction that work efficiency is high
CN219815701U (en) Dust collector in job site
CN206844034U (en) A kind of civil engineering depositing dust spray system
CN216617042U (en) Green energy-saving steel structure factory building
CN217940544U (en) Heatstroke prevention spraying device for building roof construction
CN218880704U (en) Dust device for construction
CN216136923U (en) Energy-concerving and environment-protective green construction land for use dust fall equipment
CN213927349U (en) Wall watering humidifying equipment for finishing work
CN212561346U (en) Annular atomizing water spraying structure of watering lorry
CN213571710U (en) Construction that facilitates use is with maintaining device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212