CN212535118U - Long-span truss construction sliding support self-dispersion auxiliary device - Google Patents
Long-span truss construction sliding support self-dispersion auxiliary device Download PDFInfo
- Publication number
- CN212535118U CN212535118U CN201921479687.6U CN201921479687U CN212535118U CN 212535118 U CN212535118 U CN 212535118U CN 201921479687 U CN201921479687 U CN 201921479687U CN 212535118 U CN212535118 U CN 212535118U
- Authority
- CN
- China
- Prior art keywords
- short column
- truss
- circular
- splice plate
- steel sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model belongs to large-span structure construction auxiliary member field relates to a large-span truss construction is slided and is supported from auxiliary device that looses, include: two semi-circular short columns, short column splicing plates, circular steel plates, bolts and rubber gaskets; two semicircle short columns pass through short column splice plate, bolted connection constitution a circle short column, dismantle after the truss support is accomplished to circle short column, can directly unload a semicircle short column of slip direction one side after demolising the bolt, unload behind a semicircle short column, the truss does not use jack jacking alright directly slide, the top of circle short column is the circular arc steel sheet, passes through welded connection between circular arc steel sheet and the circle short column, circular arc steel sheet top is fixed with the rubber packing piece. The device dismouting is convenient, easy operation construction convenience, and simultaneously, the rubber gasket can effectually play the guard action to the japanning on truss surface when being under construction, can avoid causing the mar to the truss surface at installation and the in-process that slides, is favorable to the protection of truss surface anticorrosive coating.
Description
Technical Field
The utility model belongs to large-span structure construction auxiliary component field especially relates to a long-span truss construction is slided and is supported from auxiliary device that looses.
Background
In the construction process of the large-span complex steel structure, although the steel truss has the characteristic of high strength, buckling is easy to occur if the steel truss does not have the effect of a supporting structure in the assembling process. In order to ensure the structural integrity of the truss, the truss must be supported temporarily and permanently in the assembling and positioning process and after positioning, and the temporary support has the function of ensuring that the truss can bear the dead weight, wind load during construction and other temporary construction loads. With the progress of the technology, patent CN208310248U proposes an adjustable assembling jig, which can adjust the supporting height to adapt to trusses of different shapes and sizes, but does not consider the influence of the direct contact with the trusses when the steel pipe short column is supported on the assembling process.
The traditional mode of large-span truss construction is that the contact part of the assembled jig frame column top and the truss adopts a steel pipe short column to directly contact with the lower chord of the truss, the steel pipe short column is an arc-shaped notch, and the lower chord of the truss is directly placed on the steel pipe short column. In the process of assembling the truss, although the traditional steel pipe short column can support the truss, the truss can slide after being assembled by using a jack, and a space is reserved for placing the jack before the truss is assembled, so that time and labor are wasted, and the construction cost is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can be convenient for the truss assemble accomplish the back and directly slide to reinforcing contact site frictional force reduces the big truss construction of bearing structure steel quantity simultaneously and slides and support from loosing auxiliary device.
The technical scheme of the utility model: the device is by the side semicircle short column that slides, the sideslip side semicircle short column that does not slide, the side short column splice plate that slides, sideslip short column splice plate, the circular arc steel sheet, the bolt, the rubber gasket is constituteed, all leave the bolt hole on the side short column splice plate that slides and the sideslip short column splice plate that does not slide, side short column that slides and sideslip side semicircle short column pass through the side short column splice plate that slides and sideslip short column splice plate, a circular short column is constituteed to bolted connection, the circular arc steel sheet is in order to seal the upper portion opening in circular short column top circular arc incision department welding circular arc steel sheet, fix the rubber gasket on the circular arc steel sheet simultaneously. The circular short column is disassembled after the truss support is completed, the sliding side semi-circular short column can be directly disassembled after the bolt is disassembled, and the truss can directly slide without jacking by using a jack.
Preferably, after the semi-circular short column at the sliding side is detached, the truss can directly slide without being jacked up by a jack, and the non-sliding short column at the sliding side does not influence sliding and can not be detached.
Preferably, the length of the disassembled sliding side short column splice plate is greater than that of the non-disassembled non-sliding side short column splice plate.
Preferably, the auxiliary device is capable of reducing the calculated length of the support structure and improving its stability, while reducing the amount of steel used for the columns and the support structure.
The utility model has the advantages that: the circular short column is disassembled after the truss support is completed, the sliding side semi-circular short column can be directly disassembled after the bolt is disassembled, the sliding side semi-circular short column is disassembled, the truss can be directly slid without being jacked by a jack, the operation is simple, the construction is convenient, meanwhile, the rubber gasket can effectively play a role in protecting the painting on the surface of the truss during construction, scratches and extrusion damage to the surface of the truss can be avoided in the installation and sliding processes, and the protection of an anticorrosive coating on the surface of the truss is facilitated.
Drawings
Fig. 1 is a schematic plan view of the device of the present invention.
Fig. 2 is an exploded plan view of the device of the present invention.
Fig. 3 is a schematic side sectional view of the device of the present invention.
Fig. 4 is the utility model discloses the whole sketch map of device construction that slides.
Detailed Description
The invention will be further explained by the embodiments with reference to the drawings.
Examples
As shown in fig. 4, the overall schematic diagram of the sliding construction of the device of the present invention includes a truss a, a sliding track B, a concrete column C, a splicing platform D, and a large-span truss construction sliding support self-dispersing auxiliary device E; a self-dispersing auxiliary device for sliding support in large-span truss construction comprises a rubber gasket 1, an arc steel plate 2, a non-sliding side semi-arc short column 3, a sliding side semi-arc short column 4, a non-sliding side short column splice plate 5, a sliding side short column splice plate 6 and a bolt 7; holes are reserved on the non-slip side short-circular-arc short column splicing plates 5 and the slip side short-circular-arc short columns 6, and the non-slip side half-circular-arc short columns 3 and the slip side half-circular-arc short columns 4 are connected into a circular short column through bolts 7; welding an arc steel plate 2 at the arc notch to seal the upper opening of the circular short column; a rubber gasket 1 is fixed on the arc steel plate 2.
Claims (3)
1. The utility model provides a stride truss construction greatly support of sliding from auxiliary device that looses which characterized in that: the device is by the side semicircle short column that slides, the sideslip side semicircle short column that does not slide, the side short column splice plate that slides, sideslip short column splice plate, the circular arc steel sheet, the bolt, the rubber gasket is constituteed, all leave the bolt hole on the side short column splice plate that slides and the sideslip short column splice plate that does not slide, side short column that slides and sideslip side semicircle short column are through the side short column splice plate that slides and the sideslip short column splice plate that does not slide, a circular short column is constituteed to bolted connection, the circular arc steel sheet is placed at the top of circular short column, seal its breach, pass through welded connection between circular arc steel sheet and the circular short column, the circular arc steel sheet top is fixed with the rubber gasket.
2. The long-span truss construction slippage supporting self-dispersing auxiliary device as claimed in claim 1, wherein: the circular short column is disassembled after the truss is supported, after the sliding side semi-circular short column is disassembled, the truss can directly slide without being jacked up by a jack, and the sliding of the non-sliding side semi-circular short column is not influenced and can not be disassembled.
3. The long-span truss construction slippage supporting self-dispersing auxiliary device as claimed in claim 1, wherein: the length of the disassembled short column splice plate on the sliding side is larger than that of the undetached short column splice plate on the non-sliding side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921479687.6U CN212535118U (en) | 2019-09-06 | 2019-09-06 | Long-span truss construction sliding support self-dispersion auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921479687.6U CN212535118U (en) | 2019-09-06 | 2019-09-06 | Long-span truss construction sliding support self-dispersion auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212535118U true CN212535118U (en) | 2021-02-12 |
Family
ID=74525053
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921479687.6U Active CN212535118U (en) | 2019-09-06 | 2019-09-06 | Long-span truss construction sliding support self-dispersion auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212535118U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565968A (en) * | 2019-09-06 | 2019-12-13 | 青岛理工大学 | Long-span truss construction sliding support self-dispersion auxiliary device |
-
2019
- 2019-09-06 CN CN201921479687.6U patent/CN212535118U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565968A (en) * | 2019-09-06 | 2019-12-13 | 青岛理工大学 | Long-span truss construction sliding support self-dispersion auxiliary device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821087B (en) | Prefabricated bridge Steel Space pipe concrete truss combination beams and construction method | |
CN108342982B (en) | Self-anchoring structure at bearing cable beam end of cable crane of cable stayed bridge of mixed composite beam | |
CN214291685U (en) | Anti-deformation jig frame for slidable track | |
CN212535118U (en) | Long-span truss construction sliding support self-dispersion auxiliary device | |
CN209025103U (en) | For building the pile-column foundation structure of escape truck or emergency bridge | |
CN208815426U (en) | Steel construction combined platform suitable for Single column pier bearing replacement | |
CN214834720U (en) | Tool type unilateral formwork system | |
CN110565968A (en) | Long-span truss construction sliding support self-dispersion auxiliary device | |
CN112523090B (en) | Initial internode installation mode of steel truss girder cable-stayed bridge | |
CN110258294A (en) | Steel truss arch bridge installs system and its construction method | |
CN215880502U (en) | Be used for welded frock of pipeline valves boss | |
CN205976396U (en) | Portable operation platform that indoor construction and installation used | |
CN212224666U (en) | Steel truss assembling system | |
CN212475766U (en) | Plate hoisting equipment | |
CN207211778U (en) | A kind of steel platform | |
CN212835413U (en) | Foundation pit horizontal supporting system | |
CN110318344B (en) | Novel steel box girder No. 0 block support and No. 0 block erection construction method | |
CN103498559A (en) | Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction | |
CN205976403U (en) | Removal operation platform that indoor long corridor was used | |
CN208056592U (en) | A kind of tool-type inspection platform | |
CN108411805B (en) | Quick-laying helicopter apron unit and apron | |
RU172673U1 (en) | COMPONENT STAND OF THE PLANE SUPPORT OF THE REM-500 METAL STRUCTURE | |
CN206740523U (en) | A kind of T steel pipe node tension experimental provision | |
CN115075530B (en) | Cantilever structure and construction method thereof | |
CN216948720U (en) | Steel construction building device with rain-resistant and wind-proof uncovering functions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |