CN209025103U - For building the pile-column foundation structure of escape truck or emergency bridge - Google Patents

For building the pile-column foundation structure of escape truck or emergency bridge Download PDF

Info

Publication number
CN209025103U
CN209025103U CN201821790605.5U CN201821790605U CN209025103U CN 209025103 U CN209025103 U CN 209025103U CN 201821790605 U CN201821790605 U CN 201821790605U CN 209025103 U CN209025103 U CN 209025103U
Authority
CN
China
Prior art keywords
steel
pile
pipe pile
pipe
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821790605.5U
Other languages
Chinese (zh)
Inventor
熊桂开
冯永能
罗睿
姚博
胡奇
刘廷伟
谭双全
钟恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Survey Institute
Original Assignee
Chongqing Survey Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Survey Institute filed Critical Chongqing Survey Institute
Priority to CN201821790605.5U priority Critical patent/CN209025103U/en
Application granted granted Critical
Publication of CN209025103U publication Critical patent/CN209025103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of for building the pile-column foundation structure of escape truck or emergency bridge, be made of steel pipe support column, cross top panel, four steel-pipe piles, four pieces of connecting plates, girder, two auxiliary beams and four bar steel binders;The groove of radial perforation steel-pipe pile is provided on the upper surface of the steel-pipe pile;There are two claw, the spacing between two claws is matched with the outer diameter of steel-pipe pile for setting on the lower end surface of the connecting plate;Connecting plate is arranged in the groove of steel-pipe pile, and steel pipe pile protection between two claws, fix with steel-pipe pile sidewall weld by claw;Four steel-pipe piles press square profile, if the first steel-pipe pile and third steel-pipe pile are in diagonal distribution, the second steel-pipe pile and the 4th steel-pipe pile in diagonal distribution.The utility model is easy to assembly, can effectively improve channel and build efficiency, meanwhile, the load of structure is preferable, and bearing capacity can be adjusted according to demand.

Description

For building the pile-column foundation structure of escape truck or emergency bridge
Technical field
The utility model relates to a kind of emergency first-aid repair technologies, more particularly to one kind is for building escape truck or emergency bridge Pile-column foundation structure.
Background technique
After geological disaster or natural calamity occur, fast construction escape truck is most important to rescue and relief work;It is existing In technology, the means for building escape truck are varied, but mostly in the presence of construction is complicated, the period is long, bearing capacity is lower Defect.
Utility model content
For the problems in background technique, the utility model proposes a kind of for building escape truck or emergency bridge Pile-column foundation structure, structure are as follows: the pile-column foundation structure is by steel pipe support column, cross top panel, four steel pipes Stake, four pieces of connecting plates, girder, two auxiliary beams and four bar steel binders composition;
The groove of radial perforation steel-pipe pile is provided on the upper surface of the steel-pipe pile;It is set on the lower end surface of the connecting plate It sets there are two claw, the spacing between two claws is matched with the outer diameter of steel-pipe pile;Connecting plate is arranged in the groove of steel-pipe pile, Steel pipe pile protection between two claws, fix with steel-pipe pile sidewall weld by claw;
Four steel-pipe piles press square profile, if the first steel-pipe pile and third steel-pipe pile are in diagonal distribution, the second steel-pipe pile With the 4th steel-pipe pile in diagonal distribution;The both ends of the girder are separately positioned on the groove of the first steel-pipe pile and third steel-pipe pile Interior, the end of girder is bolted with corresponding connecting plate;The outer end of first auxiliary beam is arranged in the groove of the second steel-pipe pile, the It is bolted in the middle part of the inner end of one auxiliary beam and girder;The outer end of second auxiliary beam is arranged in the groove of the 4th steel-pipe pile, and second is auxiliary It is bolted in the middle part of the inner end of beam and girder;The outer end of auxiliary beam is bolted with corresponding connecting plate;Two auxiliary beams and girder structure Across structure, four bar steel binders are separately positioned in four gaps of cross-shaped structure, one end of steel binder and auxiliary beam Side wall is bolted, and the other end of steel binder and the side wall of girder are bolted;The cross top panel is placed on described ten On the upper surface of character form structure, four ends of cross top panel are connect with four end bolts of cross-shaped structure respectively; The steel pipe support column is arranged on the upper surface of cross top panel, and steel pipe support column is welded and fixed with cross top panel.
The utility model is spliced by multiple components, each component can pre-production deposit, when use, can be in the short time Interior completion assembling, can effectively improve the effect of building of escape truck, and the pile-column structural bearing of the utility model is preferable, and Structural bearing is adjustable: the utility model covers cross top panel, the end face of cross top panel on auxiliary beam and girder Larger, when the width of auxiliary beam and girder changes, cross top panel can form preferable support to steel pipe support column, when When bearing capacity demand is smaller, auxiliary beam and girder are all made of single I-steel, and are not provided with steel binder, when bearing capacity demand is larger When, auxiliary beam and girder are all made of double I-steel (two I-steel are axially close together in parallel).
Preferably, the lower part of the steel pipe support column outer wall is provided with the first ribbed stiffener of muti-piece, the lower end of the first ribbed stiffener It is welded and fixed with the upper surface of cross top panel.
Preferably, the lower part of the steel pipe support column outer wall is provided with the second ribbed stiffener of muti-piece, the lower end of the second ribbed stiffener It is fixedly connected with the upper surface of steel binder.
Preferably, injected hole is provided in the upper portion side wall of the steel-pipe pile.The purpose of injected hole is set also for making The bearing capacity of structure is adjustable, when bearing capacity demand is lower, can only be undertaken by steel-pipe pile, can when bearing capacity demand is larger After structure is put up, by injected hole to concrete perfusion inside steel-pipe pile, it is improved the bearing capacity of structure.
Preferably, injected hole is provided in the upper portion side wall of the steel pipe support column.Injected hole on steel pipe support column with Injected hole effect on steel-pipe pile is similar, can be after structure is put up, by injected hole to steel pipe when bearing capacity demand is larger Concrete perfusion inside support column, is improved the bearing capacity of structure.
The advantageous effects of the utility model are: proposing a kind of for building the pile of escape truck or emergency bridge Formula foundation structure, the structure is easy to assembly, can effectively improve channel and build efficiency, meanwhile, the load of structure is preferable, and carries Ability can be adjusted according to demand.
Detailed description of the invention
The side view of Fig. 1, the utility model;
The top view of Fig. 2, the utility model;
Fig. 3, connecting plate side view;
Title corresponding to each label is respectively as follows: steel pipe support column 1, cross top panel 2, steel-pipe pile 3, connection in figure Plate 4, girder 5, auxiliary beam 6, steel binder 7.
Specific embodiment
It is a kind of for building the pile-column foundation structure of escape truck or emergency bridge, structure are as follows: the pile-column base Plinth structure is by steel pipe support column 1,3, four pieces of the steel-pipe pile of cross top panel 2, four connecting plate 4, girder 5, two auxiliary beams 6 and four Bar steel binder 7 forms;
The groove of radial perforation steel-pipe pile 3 is provided on the upper surface of the steel-pipe pile 3;The lower end surface of the connecting plate 4 There are two claw 4-1, the spacing between two claw 4-1 is matched with the outer diameter of steel-pipe pile 3 for upper setting;Connecting plate 4 is arranged in steel In the groove of tubular pole 3,3 sets of steel-pipe pile between two claw 4-1, claw 4-1 is fixed with 3 sidewall weld of steel-pipe pile;
Four steel-pipe piles 3 press square profile, if the first steel-pipe pile 3 and third steel-pipe pile 3 are in diagonal distribution, the second steel pipe Stake 3 and the 4th steel-pipe pile 3 are in diagonal distribution;The both ends of the girder 5 are separately positioned on the first steel-pipe pile 3 and third steel-pipe pile 3 Groove in, the end of girder 5 is bolted with corresponding connecting plate 4;The outer end of first auxiliary beam 6 is arranged in the second steel-pipe pile 3 Groove in, be bolted in the middle part of the inner end of the first auxiliary beam 6 and girder 5;The outer end of second auxiliary beam 6 is arranged in the 4th steel-pipe pile 3 Groove in, be bolted in the middle part of the inner end of the second auxiliary beam 6 and girder 5;The outer end of auxiliary beam 6 connects with corresponding 4 bolt of connecting plate It connects;Two auxiliary beams 6 and girder 5 constitute cross-shaped structure, and four bar steel binders 7 are separately positioned on four gaps of cross-shaped structure In, one end of steel binder 7 and the side wall of auxiliary beam 6 are bolted, and the side wall of the other end and girder 5 of steel binder 7 is bolted;Institute It states cross top panel 2 to be placed on the upper surface of the cross-shaped structure, four ends of cross top panel 2 are respectively with ten Four end bolts of character form structure connect;The steel pipe support column 1 is arranged on the upper surface of cross top panel 2, steel pipe Support column 1 is welded and fixed with cross top panel 2.
Further, the lower part of 1 outer wall of steel pipe support column is provided with the first ribbed stiffener of muti-piece, under the first ribbed stiffener It holds and is welded and fixed with the upper surface of cross top panel 2.
Further, the lower part of 1 outer wall of steel pipe support column is provided with the second ribbed stiffener of muti-piece, under the second ribbed stiffener End is fixedly connected with the upper surface of steel binder 7.
Further, injected hole is provided in the upper portion side wall of the steel-pipe pile 3.
Further, injected hole is provided in the upper portion side wall of the steel pipe support column 1.
Spare, connecting plate 4, cross when it is implemented, steel pipe support column 1 and cross top panel 2 are welded as a whole in advance Equal multiple spiro keyhole positions of pre-production on shape top panel 2 and I-steel for making girder 5 (and auxiliary beam 6), this When making girder 5 (and auxiliary beam 6) for single I-steel with double I-steel, each component can be connected with each other.

Claims (7)

1. a kind of for building the pile-column foundation structure of escape truck or emergency bridge, it is characterised in that: the pile-column base Plinth structure is by steel pipe support column (1), cross top panel (2), four steel-pipe piles (3), four pieces of connecting plates (4), girder (5), two The auxiliary beam of item (6) and four bar steel binders (7) composition;
The groove of radial perforation steel-pipe pile (3) is provided on the upper surface of the steel-pipe pile (3);The lower end of the connecting plate (4) On face there are two settings claw (4-1), the spacing between two claws (4-1) is matched with the outer diameter of steel-pipe pile (3);Connecting plate (4) it is arranged in the groove of steel-pipe pile (3), steel-pipe pile (3) covers between two claws (4-1), claw (4-1) and steel-pipe pile (3) sidewall weld is fixed;
Four steel-pipe piles (3) press square profile, if the first steel-pipe pile (3) and third steel-pipe pile (3) are in diagonal distribution, the second steel Tubular pole (3) and the 4th steel-pipe pile (3) are in diagonal distribution;The both ends of the girder (5) are separately positioned on the first steel-pipe pile (3) and In the groove of three steel-pipe piles (3), the end of girder (5) is bolted with corresponding connecting plate (4);The outer end of first auxiliary beam (6) It is arranged in the groove of the second steel-pipe pile (3), is bolted in the middle part of the inner end of the first auxiliary beam (6) and girder (5);Second auxiliary beam (6) outer end is arranged in the groove of the 4th steel-pipe pile (3), is bolted in the middle part of the inner end of the second auxiliary beam (6) and girder (5); The outer end of auxiliary beam (6) is bolted with corresponding connecting plate (4);Two auxiliary beams (6) and girder (5) composition cross-shaped structure, four Bar steel binder (7) is separately positioned in four gaps of cross-shaped structure, one end of steel binder (7) and the side wall spiral shell of auxiliary beam (6) It tethers and connects, the side wall of the other end and girder (5) of steel binder (7) is bolted;The cross top panel (2) is placed on described On the upper surface of cross-shaped structure, four ends of cross top panel (2) respectively with four end bolts of cross-shaped structure Connection;The steel pipe support column (1) is arranged on the upper surface of cross top panel (2), steel pipe support column (1) and cross top Panel (2) is welded and fixed.
2. according to claim 1 for building the pile-column foundation structure of escape truck or emergency bridge, feature exists In: the lower part of steel pipe support column (1) outer wall is provided with the first ribbed stiffener of muti-piece, the lower end and cross top of the first ribbed stiffener The upper surface of panel (2) is welded and fixed.
3. according to claim 1 or 2 for building the pile-column foundation structure of escape truck or emergency bridge, feature Be: the lower part of steel pipe support column (1) outer wall is provided with the second ribbed stiffener of muti-piece, the lower end of the second ribbed stiffener and steel binder (7) upper surface is fixedly connected.
4. according to claim 1 or 2 for building the pile-column foundation structure of escape truck or emergency bridge, feature It is: is provided with injected hole in the upper portion side wall of the steel-pipe pile (3).
5. according to claim 3 for building the pile-column foundation structure of escape truck or emergency bridge, feature exists In: injected hole is provided in the upper portion side wall of the steel-pipe pile (3).
6. according to claim 1 or 2 for building the pile-column foundation structure of escape truck or emergency bridge, feature It is: is provided with injected hole in the upper portion side wall of the steel pipe support column (1).
7. according to claim 3 for building the pile-column foundation structure of escape truck or emergency bridge, feature exists In: injected hole is provided in the upper portion side wall of the steel pipe support column (1).
CN201821790605.5U 2018-11-01 2018-11-01 For building the pile-column foundation structure of escape truck or emergency bridge Active CN209025103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821790605.5U CN209025103U (en) 2018-11-01 2018-11-01 For building the pile-column foundation structure of escape truck or emergency bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821790605.5U CN209025103U (en) 2018-11-01 2018-11-01 For building the pile-column foundation structure of escape truck or emergency bridge

Publications (1)

Publication Number Publication Date
CN209025103U true CN209025103U (en) 2019-06-25

Family

ID=66908715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821790605.5U Active CN209025103U (en) 2018-11-01 2018-11-01 For building the pile-column foundation structure of escape truck or emergency bridge

Country Status (1)

Country Link
CN (1) CN209025103U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576466A (en) * 2020-05-26 2020-08-25 山东泉顺达装配式建筑有限公司 Pile beam foundation structure and construction method
CN111622124A (en) * 2020-06-10 2020-09-04 浙江交工金筑交通建设有限公司 Construction method and support system for large cantilever bent cap of soft foundation
CN112813848A (en) * 2021-02-18 2021-05-18 中交第二公路工程局有限公司 Supporting structure for platform erection based on steel pile foundation and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576466A (en) * 2020-05-26 2020-08-25 山东泉顺达装配式建筑有限公司 Pile beam foundation structure and construction method
CN111622124A (en) * 2020-06-10 2020-09-04 浙江交工金筑交通建设有限公司 Construction method and support system for large cantilever bent cap of soft foundation
CN112813848A (en) * 2021-02-18 2021-05-18 中交第二公路工程局有限公司 Supporting structure for platform erection based on steel pile foundation and construction method

Similar Documents

Publication Publication Date Title
CN103741832B (en) A kind of building truncated cylinder displacement shock isolating pedestal construction method and bracing or strutting arrangement
CN209025103U (en) For building the pile-column foundation structure of escape truck or emergency bridge
CN102704491B (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN203834682U (en) Exposed type column base with shear key
CN201896318U (en) Tower crane foundation section and steel latticed column connecting structure
CN102518050A (en) Operation platform for replacing support saddle of bridge
CN203684108U (en) Fully-precast assembly type reinforced concrete bridge assembling structure
CN102704492B (en) Connecting structure of section steel support and concrete support, and construction method
CN113309112A (en) Foundation pit combined profile steel supporting system
CN204626266U (en) Single column pier bridge exempts to build overturning or slip resistance analysis steel structure reinforcing device
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN108204039A (en) A kind of assembled architecture truss structure
CN111809654A (en) Assembled tower crane foundation structure
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN207905104U (en) A kind of assembled architecture truss structure
CN104164889A (en) Demountable tower crane foundation
CN216474595U (en) Rockfall protection shed tunnel
CN215857736U (en) Foundation pit combined profile steel supporting system
CN213978546U (en) Assembled bridge abutment structure and assembled bridge abutment using same
CN202346643U (en) Assembled tower crane base
CN104018586A (en) Connecting device for steel structure column and steel structure column
CN202152442U (en) Assembling type steel tube-vertical post system
CN211735418U (en) Fabricated foundation pit upright post underpinning structure
CN209443577U (en) A kind of steel structure member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant