CN212534958U - Quick installation mechanism of building curtain for assembly type structure - Google Patents

Quick installation mechanism of building curtain for assembly type structure Download PDF

Info

Publication number
CN212534958U
CN212534958U CN202020568280.7U CN202020568280U CN212534958U CN 212534958 U CN212534958 U CN 212534958U CN 202020568280 U CN202020568280 U CN 202020568280U CN 212534958 U CN212534958 U CN 212534958U
Authority
CN
China
Prior art keywords
plate
curtain wall
frame plate
bull stick
storehouse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020568280.7U
Other languages
Chinese (zh)
Inventor
郜刘杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chenglong Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020568280.7U priority Critical patent/CN212534958U/en
Application granted granted Critical
Publication of CN212534958U publication Critical patent/CN212534958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an assembly type building curtain wall quick installation mechanism for building, which comprises a frame plate, the top welding of frame plate has the dead lever, the bottom of first bull stick runs through two sets of lifter plates and extends to the lifter plate below, the left side of first bull stick is provided with the suction disc, and is two sets of the left end of lifter plate all with suction disc welded fastening, the right side on frame plate top is provided with the curtain wall frame, the collecting storage has been seted up on the right side of frame plate, the below of frame plate is provided with bears the weight of the storehouse, the inside of frame plate is provided with the roof, the top of telescopic link all with roof welded fastening, the bottom welding of roof has the movable plate, the middle part of bearing the weight of the storehouse rear side runs through the second bull stick, the gear has been cup jointed in the outside at second bull stick middle part, the outside welding of second bull stick rear end has the clamp. The utility model discloses application scope is wide, removes process convenient and fast moreover, and simple structure has very strong practicality.

Description

Quick installation mechanism of building curtain for assembly type structure
Technical Field
The utility model relates to a building curtain technical field specifically is a quick installation mechanism of building curtain for assembly type structure.
Background
With the development of the building engineering industry in China, the building curtain wall is more and more widely used, the building curtain wall is a light wall body with a decorative effect commonly used by modern large-scale and high-rise buildings, the industry has been rapidly developed in China for 20 years at present, China has become the largest curtain wall market in the world at present, about three thousand curtain wall professional companies exist in China at present, about ten million square meters of curtain wall are constructed every year, the development situation is sighed to the people, but in the installation process of the current building curtain wall, a user transports a glass plate to the side of an upright post, then the position of the glass plate needs to be fixed by cooperation of a plurality of workers, so that the glass plate is installed on the upright post, the process is very complicated and troublesome, the use of human resources is wasted, and the efficiency of the whole installation process is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick installation mechanism of building curtain for assembly type structure to need the cooperation of many workers to fix the glass board when solving the installation curtain that proposes in the above-mentioned background art, the problem that the installation is inefficient.
In order to achieve the above object, the utility model provides a following technical scheme: a building curtain wall quick mounting mechanism for an assembly type building comprises a frame plate, wherein a fixed rod is welded at the top end of the frame plate, two groups of lifting plates are sleeved outside the fixed rod, a connecting plate is welded at the top end of the fixed rod, the left side of the bottom end of the connecting plate is connected with a first rotating rod through an embedded bearing, the bottom end of the first rotating rod penetrates through the two groups of lifting plates and extends to the lower side of the lifting plates, a suction plate is arranged on the left side of the first rotating rod, the left ends of the two groups of lifting plates are welded and fixed with the suction plate, a curtain wall frame is arranged on the right side of the top end of the frame plate, a storage bin is arranged on the right side of the frame plate, a storage box is arranged inside the storage bin, a handle is welded at the right end of the storage box, a bearing bin is arranged below the frame plate, four groups of universal wheels are, bear the inside in storehouse and be provided with four telescopic links of group, four groups the bottom of telescopic link all with bear storehouse inner wall welded fastening, the inside of frame plate is provided with the roof, the top of telescopic link all with roof welded fastening, the bottom welding of roof has the movable plate, the middle part of bearing the weight of the storehouse rear side runs through there is the second bull stick, and the front end of second bull stick is connected with bearing the weight of the storehouse inner wall through embedded bearing, the gear has been cup jointed in the outside at second bull stick middle part, the outside welding of second bull stick rear end has the clamp plate, and the outside cover of clamp plate is equipped with the gland.
Preferably, the outer side of the first rotating rod is provided with an external thread, the surface of the first rotating rod, which is attached to the lifting plate, is provided with an internal thread, and the first rotating rod is connected with the lifting plate through a threaded structure.
Preferably, the sucking discs are uniformly welded on the left side of the sucking plate, and the number of the sucking discs is nine.
Preferably, the bottom of receiver is even embedded to have the ball, and the bottom surface of ball all laminates with the storage compartment inner wall mutually.
Preferably, gear teeth are uniformly welded on the left side of the moving plate, and the moving plate is meshed with the gear through the gear teeth.
Preferably, the bearing bin is provided with an external thread on the surface attached to the gland, the inner side of the gland is provided with an internal thread, and the bearing bin is connected with the gland through a threaded structure.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has wide application range, convenient and fast moving process, simple structure and strong practicability;
1. the glass plate fixing device is provided with the suction plate, the glass sucker is welded on the left side of the suction plate, the glass plate can be easily fixed without cooperation of multiple workers in the installation process of the glass plate, and meanwhile, a user can rotate the first rotating rod to enable the suction plate to move up and down to adapt to installation operation of building curtain walls with different heights, so that the glass plate fixing device is wide in application range, simple in structure and high in practicability;
2. the device is provided with the universal wheels, a user can hold the device by hand and push the device, and the universal wheels can move upwards by rotating the second rotating rod after the device reaches a destination, so that the device is supported and fixed by the bearing bin, the user can move the device more time and labor, the moving process is convenient and rapid, and the labor intensity of the user is reduced;
3. be provided with the receiver, the user can put the glass board that needs the installation on the curtain wall frame, need not the user and use other transportation modes in addition to transport the glass board, and the user also can stimulate the handle and take the receiver out to inside putting into the receiver with the gadget that the glass board of installation needs used, make the user more quick smooth and easy to the installation of glass board, thereby improved the efficiency of whole installation operation.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
fig. 2 is an enlarged schematic view of the structure at a in fig. 1 according to the present invention;
FIG. 3 is a schematic side view of the structure of the present invention;
fig. 4 is an enlarged schematic view of the structure at B in fig. 3 of the present invention;
fig. 5 is a schematic side view of the structure of the present invention.
In the figure: 1. a frame plate; 2. fixing the rod; 3. a lifting plate; 4. a connecting plate; 5. a first rotating lever; 6. sucking a plate; 7. a curtain wall frame; 8. a storage bin; 9. a storage box; 10. a handle; 11. a load bearing bin; 12. a universal wheel; 13. a telescopic rod; 14. a top plate; 15. moving the plate; 16. a second rotating rod; 17. a gear; 18. pressing a plate; 19. and (7) pressing the cover.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment:
a fast mounting mechanism for a building curtain wall for an assembly type building comprises a frame plate 1, wherein a fixed rod 2 is welded at the top end of the frame plate 1, two groups of lifting plates 3 are sleeved outside the fixed rod 2, a connecting plate 4 is welded at the top end of the fixed rod 2, the left side of the bottom end of the connecting plate 4 is connected with a first rotating rod 5 through an embedded bearing, the bottom end of the first rotating rod 5 penetrates through the two groups of lifting plates 3 and extends to the lower part of the lifting plates 3, external threads are arranged outside the first rotating rod 5, internal threads are arranged on the surface, which is jointed with the lifting plates 3, of the first rotating rod 5, the first rotating rod 5 is connected with the lifting plates 3 through a threaded structure, so that the lifting plates 3 can be driven to move up and down when the first rotating rod 5 rotates, a suction plate 6 is arranged on the left side of the first rotating rod 5, the left ends of the two groups of lifting plates 3 are all welded and, a user can support and fix the glass plate through the sucking disc, the right side of the top end of the frame plate 1 is provided with the curtain wall frame 7, the right side of the frame plate 1 is provided with the storage bin 8, the storage bin 9 is arranged inside the storage bin 8, balls are uniformly embedded in the bottom end of the storage bin 9, the bottom surfaces of the balls are all attached to the inner wall of the storage bin 8, the storage bin 9 is pulled to the outer side of the frame plate 1 by the user, the convenience and labor saving are realized, and the right end of the storage bin 9 is welded with the handle;
a bearing bin 11 is arranged below the frame plate 1, four groups of universal wheels 12 are welded at the bottom end of the frame plate 1, the bottom ends of the four groups of universal wheels 12 all penetrate through the bearing bin 11 and extend to the lower part of the bearing bin 11, four groups of telescopic rods 13 are arranged inside the bearing bin 11, the bottom ends of the four groups of telescopic rods 13 are all welded and fixed with the inner wall of the bearing bin 11, a top plate 14 is arranged inside the frame plate 1, the top ends of the telescopic rods 13 are all welded and fixed with the top plate 14, a moving plate 15 is welded at the bottom end of the top plate 14, a second rotating rod 16 penetrates through the middle part of the rear side of the bearing bin 11, the front end of the second rotating rod 16 is connected with the inner wall of the bearing bin 11 through an embedded bearing, a gear 17 is sleeved at the outer side of the middle part of the second rotating rod 16, gear teeth are uniformly welded at the left side of the moving plate 15, the moving plate 15, and the outside cover of clamp plate 18 is equipped with gland 19, is provided with the external screw thread on the face that bears storehouse 11 and gland 19 and laminates mutually, and the inboard of gland 19 is provided with the internal thread, bears storehouse 11 and gland 19 and is connected through the helicitic texture, makes gland 19 can press from both sides clamp plate 18 through the helicitic texture to fix the position of second bull stick 16.
The working principle is as follows: firstly, a user places a glass plate to be installed on the curtain wall frame 7, pulls the handle 10, pulls the storage box 9 to the outer side of the frame plate 1, and then places a small tool used in the installation process into the storage box 9;
after a user pushes the device to a target place, the second rotating rod 16 is rotated to drive the gear 17 to rotate, the moving plate 15 is driven to move upwards through gear tooth meshing, the moving plate 15 drives the top plate 14 to move upwards, the universal wheel 12 enters the interior of the bearing bin 11, the bearing bin 11 supports the device at the moment, the position of the device is fixed, then the user holds the gland 19 with a hand to rotate, the gland 19 drives the pressing plate 18 to move forwards, the second rotating rod 16 is fixed, and the second rotating rod 16 cannot rotate due to the action of gravity.
The user adsorbs the glass board in the left side of suction disc 6, then rotates the bottom of first bull stick 5 to make lifter plate 3 reciprocate, and drive suction disc 6 and reciprocate, dead lever 2 fixes lifter plate 3 this moment, makes lifter plate 3 can not be rotatory along with the rotation of first bull stick 5, then the user install the glass board can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a quick installation mechanism of building curtain wall for assembly type structure, includes frame plate (1), its characterized in that: the curtain wall frame is characterized in that a fixing rod (2) is welded at the top end of the frame plate (1), two groups of lifting plates (3) are sleeved on the outer side of the fixing rod (2), a connecting plate (4) is welded at the top end of the fixing rod (2), the left side of the bottom end of the connecting plate (4) is connected with a first rotating rod (5) through an embedded bearing, the bottom end of the first rotating rod (5) penetrates through the two groups of lifting plates (3) and extends to the lower portion of the lifting plates (3), a suction plate (6) is arranged on the left side of the first rotating rod (5), the left ends of the two groups of lifting plates (3) are fixedly welded with the suction plate (6), a curtain wall frame (7) is arranged on the right side of the top end of the frame plate (1), a storage bin (8) is arranged on the right side of the frame plate (1), a storage box (9) is arranged inside the storage box (8), a right handle (10) is, the bottom welding of frame plate (1) has four groups of universal wheels (12), and the bottom of four groups of universal wheels (12) all runs through and bears storehouse (11) and extend to and bear storehouse (11) below, the inside that bears storehouse (11) is provided with four groups of telescopic links (13), and the bottom of four groups of telescopic link (13) all with bear storehouse (11) inner wall welded fastening, the inside of frame plate (1) is provided with roof (14), the top of telescopic link (13) all with roof (14) welded fastening, the bottom welding of roof (14) has movable plate (15), the middle part of bearing the rear side of storehouse (11) runs through second bull stick (16), and the front end of second bull stick (16) is connected with bearing storehouse (11) inner wall through embedded bearing, the outside at second bull stick (16) middle part has cup jointed gear (17), the outside welding of second bull stick (16) rear end has clamp plate (18), and the outer side of the pressure plate (18) is sleeved with a gland (19).
2. The quick installation mechanism of building curtain wall for fabricated building as claimed in claim 1, wherein: the outer side of the first rotating rod (5) is provided with an external thread, the surface of the first rotating rod (5) which is attached to the lifting plate (3) is provided with an internal thread, and the first rotating rod (5) is connected with the lifting plate (3) through a thread structure.
3. The quick installation mechanism of building curtain wall for fabricated building as claimed in claim 1, wherein: sucking discs are uniformly welded on the left side of the sucking plate (6), and the number of the sucking discs is nine.
4. The quick installation mechanism of building curtain wall for fabricated building as claimed in claim 1, wherein: the bottom of receiver (9) is even embedded to have the ball, and the bottom surface of ball all laminates with collecting storage (8) inner wall mutually.
5. The quick installation mechanism of building curtain wall for fabricated building as claimed in claim 1, wherein: the left side of the moving plate (15) is uniformly welded with gear teeth, and the moving plate (15) is meshed with the gear (17) through the gear teeth.
6. The quick installation mechanism of building curtain wall for fabricated building as claimed in claim 1, wherein: the bearing bin (11) is provided with external threads on the surface attached to the gland (19), the inner side of the gland (19) is provided with internal threads, and the bearing bin (11) is connected with the gland (19) through a threaded structure.
CN202020568280.7U 2020-04-16 2020-04-16 Quick installation mechanism of building curtain for assembly type structure Active CN212534958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020568280.7U CN212534958U (en) 2020-04-16 2020-04-16 Quick installation mechanism of building curtain for assembly type structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020568280.7U CN212534958U (en) 2020-04-16 2020-04-16 Quick installation mechanism of building curtain for assembly type structure

Publications (1)

Publication Number Publication Date
CN212534958U true CN212534958U (en) 2021-02-12

Family

ID=74520391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020568280.7U Active CN212534958U (en) 2020-04-16 2020-04-16 Quick installation mechanism of building curtain for assembly type structure

Country Status (1)

Country Link
CN (1) CN212534958U (en)

Similar Documents

Publication Publication Date Title
CN206971586U (en) A kind of outdoor shading system
CN204892427U (en) Automatic change solar cell panel cleaning equipment
CN212534958U (en) Quick installation mechanism of building curtain for assembly type structure
CN202942021U (en) Self-service lift for cleaning of tall building outer wall surface
CN111632868B (en) Sampling detection device is used in energy-conserving building's heat preservation surface course furring brick production
CN218373486U (en) Safety warning frame is used in garden engineering construction
CN215730613U (en) Animation recreation display device
CN211453119U (en) Anti-pulling force testing device for connection of building curtain wall and main body structure
CN205290947U (en) Vacuum negative pressure sucking disc formula cylindrical coordinates robot tool hand
CN207350830U (en) A kind of deformable solar energy collectors
CN210051748U (en) Portable multi-environment-adaptive fixed atmospheric environmental pollution detector
CN208103054U (en) A kind of hand-held handling device of solar panel
CN108800621B (en) Balcony wall-mounted solar water heater
CN109650265B (en) Energy-saving crane convenient to drive goods to carry out translation
CN216415967U (en) Drying device is used in dry hot pepper production and processing
CN218296103U (en) Energy-conserving ventilation structure for building engineering
CN215348280U (en) Large-scale anti-reversing flashlight dual-purpose prayer wheel
CN216117466U (en) Energy-conserving building engineering construction quality inspection detection device
CN216783586U (en) Supporting device for green building decoration and finishing plate
CN207809582U (en) Suspension type bicycle parking frame
CN212991819U (en) Photovoltaic cable fixer
CN218091962U (en) Construction hanging flower basket quick fixation structure
CN214611382U (en) Hoisting frame for maintaining large-scale wind power equipment
CN214828395U (en) Crane motor shell blank carrying device
CN221577571U (en) Automatic cleaning robot for high-rise building glass curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220505

Address after: 322000 No. 669, Jichang Road, Beiyuan street, Yiwu City, Jinhua City, Zhejiang Province (self declaration)

Patentee after: CHENGLONG CONSTRUCTION GROUP Co.,Ltd.

Address before: No.45, gaowafangzhuang, Liuli village, sunting Town, Suixi County, Huaibei City, Anhui Province 235121

Patentee before: Gao Liuyang