CN212530983U - Bulk material handling device - Google Patents
Bulk material handling device Download PDFInfo
- Publication number
- CN212530983U CN212530983U CN202021337344.9U CN202021337344U CN212530983U CN 212530983 U CN212530983 U CN 212530983U CN 202021337344 U CN202021337344 U CN 202021337344U CN 212530983 U CN212530983 U CN 212530983U
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- connecting rod
- hole
- sleeve
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
The utility model discloses a blocky material handling device, which comprises a first clamp plate and a second clamp plate which are vertically opposite, wherein a horizontal first connecting rod is connected between the first clamp plate and the second clamp plate, one end of the first connecting rod is rotationally connected with the first clamp plate, the other end of the first connecting rod is vertically and fixedly connected with the second clamp plate, a first force transmission rod which is horizontally arranged is also fixedly connected on the first clamp plate, and the first force transmission rod is arranged above the first connecting rod in parallel and is positioned on the same side of the first clamp plate as the first connecting rod; including vertical just right third splint and fourth splint, be connected with the horizontally second connecting rod between third splint and the fourth splint, the one end and the third splint of second connecting rod rotate to be connected, the other end and the perpendicular fixed connection of fourth splint, go back the second dowel steel that fixed connection has the level to set up on the third splint. The device does not need to keep the hand-holding posture for a long time, can reduce the fatigue degree of workers, can also have better carrying effect on other irregular block materials, and improves the universality.
Description
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a cubic material handling device.
Background
In the building engineering, the development of cities, the construction of new rural areas, residences and the construction of enclosing walls can not be separated from the use of bricks, and hollow or solid structure bricks are mostly adopted. Because the brick structure is generally more firm, weight is great, for raising the efficiency, once carry polylith brick more, this physical strength consumption is big to the workman, and because the condition under the foot can not be seen when the both hands are carried, it is unexpected probably to appear, consequently the appearance of brick clamp is very welcome, traditional brick clamp adopts the grip of hand to make the brick press from both sides tightly, nevertheless keep holding the hand gesture for a long time, make workman's hand sour and tired, can directly lead to the brick clamp not tightly drop easily, and traditional brick clamp adopts two just splint to press from both sides tight brick more, it is not good to press from both sides tight effect to other anomalous bulk materials such as stone, be unfavorable for the transport, the commonality is lower.
SUMMERY OF THE UTILITY MODEL
To the not enough of above-mentioned prior art, the utility model aims to solve the technical problem that: how to provide a bulk material conveying device which does not need to keep a hand-holding posture for a long time, can reduce the hand soreness and fatigue degree of workers, has better conveying effect on other irregular bulk materials and improves the universality.
In order to solve the technical problem, the utility model discloses a following technical scheme:
a blocky material handling device comprises a first clamping plate and a second clamping plate which are vertically opposite, a horizontal first connecting rod is connected between the first clamping plate and the second clamping plate, one end of the first connecting rod is rotatably connected with the first clamping plate, the other end of the first connecting rod is vertically and fixedly connected with the second clamping plate, a first force transmission rod which is horizontally arranged is also fixedly connected onto the first clamping plate, and the first force transmission rod is arranged right above the first connecting rod in parallel and is positioned at the same side of the first clamping plate with the first force transmission rod;
the device comprises a third clamping plate and a fourth clamping plate which are vertically opposite, a horizontal second connecting rod is connected between the third clamping plate and the fourth clamping plate, one end of the second connecting rod is rotatably connected with the third clamping plate, the other end of the second connecting rod is vertically and fixedly connected with the fourth clamping plate, a second force transmission rod which is horizontally arranged is also fixedly connected onto the third clamping plate, and the second force transmission rod is arranged right above the second connecting rod in parallel and is positioned on the same side of the third clamping plate as the second connecting rod;
first dowel bar and second dowel bar mutually perpendicular, the equal fixed connection of the non-stiff end of first dowel bar and the non-stiff end of second dowel bar is on the third dowel bar of a vertical setting, the handle that the level set up is connected with on third dowel bar top.
The first sleeve is connected with the first clamping plate in a rotating mode, one end of the first connecting rod is inserted into the first sleeve, the other end of the first connecting rod is vertically and fixedly connected with the second clamping plate, the top surface of the first sleeve is provided with a threaded through hole, and the first sleeve is fixedly connected with the first connecting rod in a mode that a screw penetrates through the threaded through hole and is fixedly propped against the first connecting rod.
The second sleeve is connected with the third clamping plate in a rotating mode, one end of the second connecting rod is inserted into the second sleeve, the other end of the second connecting rod is fixedly connected with the fourth clamping plate in a vertical mode, a threaded through hole is formed in the top surface of the second sleeve, and the second sleeve is fixedly connected with the second connecting rod in a mode that a screw penetrates through the threaded through hole and is fixedly supported on the second connecting rod.
As optimization, the first sleeve pipe is a square steel pipe, a first through hole is formed in the side face, close to one end of the first clamping plate, of the first sleeve pipe in the width direction of the first sleeve pipe, two first connecting plates are perpendicularly arranged at the position, corresponding to the position of the first sleeve pipe, of the first clamping plate, the two first connecting plates are vertically opposite, a second through hole corresponding to the position of the first through hole is formed in the two first connecting plates, the first sleeve pipe is clamped between the two first connecting plates, and the first sleeve pipe is rotatably connected with the first clamping plate in a mode that the bolt fastener penetrates through the first through hole and the second through hole.
As optimization, the second sleeve pipe is the square steel pipe, and the third through-hole has been seted up along second sleeve pipe width direction to the side that is close to the one end of third splint in the second sleeve pipe, correspond the department with second sleeve pipe position on the third splint and be provided with two second connecting plates perpendicularly, two second connecting plates are vertical just right, and set up the fourth through-hole that corresponds with third through-hole position on two second connecting plates, second sleeve pipe card is gone into between two second connecting plates to pass the mode of third through-hole and fourth through-hole through bolt fastener and be connected with the rotation of third splint.
Compared with the prior art, the utility model following beneficial effect has: this device is through first, the second, third and fourth splint, the enclosure of clamp block form material is treated in the formation, cubic material all is pressed from both sides tightly by splint all around, compare in traditional two just to splint clamp tightly, also can provide fine clamping effect to some non-regular cubic materials when improving clamping stability, and because first dowel steel and second dowel steel set up respectively in head rod and second connecting rod top, during the workman operates, lift the handle, need not keep holding the tight gesture always like traditional device, can reduce the fatigue degree of workman's arm by a wide margin, and the carrying efficiency is improved.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
In the specific implementation: referring to fig. 1, a bulk material handling device comprises a first clamping plate 1 and a second clamping plate 2 which are vertically opposite, a horizontal first connecting rod 3 is connected between the first clamping plate and the second clamping plate, one end of the first connecting rod is rotatably connected with the first clamping plate, the other end of the first connecting rod is vertically and fixedly connected with the second clamping plate, a first transmission rod 4 which is horizontally arranged is also fixedly connected on the first clamping plate, and the first transmission rod is arranged right above the first connecting rod in parallel and is positioned at the same side of the first clamping plate;
the clamping device comprises a third clamping plate 5 and a fourth clamping plate 6 which are vertically opposite, a horizontal second connecting rod 7 is connected between the third clamping plate and the fourth clamping plate, one end of the second connecting rod is rotatably connected with the third clamping plate, the other end of the second connecting rod is vertically and fixedly connected with the fourth clamping plate, a second force transmission rod 8 which is horizontally arranged is also fixedly connected on the third clamping plate, and the second force transmission rod is arranged right above the second connecting rod in parallel and is positioned at the same side of the third clamping plate with the second force transmission rod;
first dowel bar and second dowel bar mutually perpendicular, the equal fixed connection of the non-stiff end of first dowel bar and the non-stiff end of second dowel bar is on the third dowel bar 9 of a vertical setting, the handle 10 of level setting is connected to third dowel bar top.
Therefore, this device is through first, the second, third and fourth splint, the enclosure of treating the chunky material is formed, cubic material all is pressed from both sides tightly by splint all around, compare in traditional two tight to splint clamp, also can provide fine tight effect of clamp to some non-regular cubic materials when improving clamp stability, and because first dowel steel and second dowel steel set up respectively in head rod and second connecting rod top, during the workman operates, lift the handle, need not keep holding the tight gesture always like traditional device, can reduce the fatigue degree of workman's arm by a wide margin, improve handling efficiency. When the clamp is used, the fixing point of the first connecting rod and the second clamping plate is positioned on the central axis of the second clamping plate, and the fixing point of the second connecting rod and the fourth clamping plate is positioned on the central axis of the fourth clamping plate.
Preferably, the connecting device comprises a first sleeve 11 rotatably connected with the first clamping plate, one end of a first connecting rod is inserted into the first sleeve, the other end of the first connecting rod is vertically and fixedly connected with the second clamping plate, a threaded through hole is formed in the top surface of the first sleeve, and the first sleeve is fixedly connected with the first connecting rod in a mode that a screw 12 penetrates through the threaded through hole and is fixedly propped against the first connecting rod.
Therefore, through the arrangement of the first sleeve, the first connecting rod is inserted into the first sleeve, the distance between the first clamping plate and the second clamping plate is adjustable, the length of the first clamping plate and the second clamping plate can be adjusted according to different block materials, the practicability of the clamping device is improved, the clamping device is tightly pressed through the screw after the clamping device is adjusted, and the fixing mode is simple, efficient and stable.
As an optimization, the connecting device comprises a second sleeve 13 which is rotatably connected with a third splint, one end of a second connecting rod is inserted into the second sleeve, the other end of the second connecting rod is vertically and fixedly connected with a fourth splint, a threaded through hole is formed in the top surface of the second sleeve, and the second sleeve is fixedly connected with the second connecting rod in a mode that a screw 12 penetrates through the threaded through hole and is fixedly supported on the second connecting rod.
Therefore, through the arrangement of the second sleeve, the second connecting rod is inserted into the second sleeve, the distance between the third clamping plate and the fourth clamping plate is adjustable, the third clamping plate and the fourth clamping plate can be adjusted according to the width of different block materials, the practicability is improved, the third clamping plate and the fourth clamping plate are tightly pushed through screws after being adjusted, and the fixing mode is simple, efficient and stable.
As optimization, the first sleeve pipe is a square steel pipe, a first through hole is formed in the side face, close to one end of the first clamping plate, of the first sleeve pipe in the width direction of the first sleeve pipe, two first connecting plates 14 are vertically arranged at the position, corresponding to the position of the first sleeve pipe, of the first clamping plate, the two first connecting plates are right opposite to each other, a second through hole corresponding to the position of the first through hole is formed in the two first connecting plates, the first sleeve pipe is clamped between the two first connecting plates, and the first sleeve pipe is rotatably connected with the first clamping plate in a mode that the bolt fastener 15 penetrates through the first through hole and the second through hole.
Therefore, the two first connecting plates are arranged, the first connecting plates and the first sleeve are connected through the bolt fasteners, the first sleeve can rotate relative to the first clamping plate, when the handle is lifted up conveniently, the first clamping plate rotates inwards through the actuation of the first force transmission rod and the third force transmission rod, the first clamping plate is matched with the second clamping plate to clamp the block materials placed in the first clamping plate, and workers can carry the materials conveniently.
As optimization, the second sleeve pipe is square steel pipe, and the third through-hole has been seted up along second sleeve pipe width direction to the side that is close to the one end of third splint in the second sleeve pipe, correspond the department with second sleeve pipe position on the third splint and be provided with two second connecting plates 16 perpendicularly, two second connecting plates are vertical just right, and set up the fourth through-hole that corresponds with third through-hole position on two second connecting plates, second sleeve pipe card is gone into between two second connecting plates to the mode that passes third through-hole and fourth through-hole through bolt fastener 15 rotates with the third splint to be connected.
Therefore, the two second connecting plates are arranged, the second connecting plates and the second sleeve are connected through the bolt fasteners, the second sleeve can rotate relative to the third clamping plate, when the handle is lifted up conveniently, the third clamping plate rotates inwards through the actuation of the second dowel bar and the third dowel bar, the third clamping plate is matched with the fourth clamping plate to clamp the massive materials placed in the third clamping plate, and the materials are convenient for workers to carry.
During actual operation, firstly the screw is loosened, the length of the first connecting rod inserted into the first sleeve and the length of the second connecting rod inserted into the second sleeve are adjusted, the distance between the first clamping plate and the second clamping plate and the distance between the third clamping plate and the fourth clamping plate are adjusted to proper positions, so that blocky materials to be carried, such as a stack of bricks, are just arranged in an area surrounded by the first clamping plate, the second clamping plate, the third clamping plate and the fourth clamping plate, the screw is tightened, a handle is lifted by a worker, the first clamping plate and the third clamping plate are enabled to rotate inwards through the actuation of the third force transmission rod and the first force transmission rod and the second force transmission rod, the blocky materials are clamped tightly by matching with the second clamping plate and the fourth clamping plate, and the materials are continuously transported.
While embodiments of the present invention have been shown and described, it will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents, and thus the embodiments of the invention are intended only as illustrative examples of the invention and no matter how the embodiments of the invention may be seen in any way limit the scope of the invention.
Claims (5)
1. A bulk material handling apparatus, characterized in that: the clamping device comprises a first clamping plate and a second clamping plate which are vertically opposite, a horizontal first connecting rod is connected between the first clamping plate and the second clamping plate, one end of the first connecting rod is rotatably connected with the first clamping plate, the other end of the first connecting rod is vertically and fixedly connected with the second clamping plate, a first transmission rod which is horizontally arranged is also fixedly connected onto the first clamping plate, and the first transmission rod is arranged right above the first connecting rod in parallel and is positioned at the same side of the first clamping plate with the first transmission rod;
the device comprises a third clamping plate and a fourth clamping plate which are vertically opposite, a horizontal second connecting rod is connected between the third clamping plate and the fourth clamping plate, one end of the second connecting rod is rotatably connected with the third clamping plate, the other end of the second connecting rod is vertically and fixedly connected with the fourth clamping plate, a second force transmission rod which is horizontally arranged is also fixedly connected onto the third clamping plate, and the second force transmission rod is arranged right above the second connecting rod in parallel and is positioned on the same side of the third clamping plate as the second connecting rod;
first dowel bar and second dowel bar mutually perpendicular, the equal fixed connection of the non-stiff end of first dowel bar and the non-stiff end of second dowel bar is on the third dowel bar of a vertical setting, the handle that the level set up is connected with on third dowel bar top.
2. The bulk materials handling device of claim 1, wherein: the connecting device comprises a first sleeve rotatably connected with a first clamping plate, one end of a first connecting rod is inserted into the first sleeve, the other end of the first connecting rod is vertically and fixedly connected with a second clamping plate, a threaded through hole is formed in the top surface of the first sleeve, and the first sleeve is fixedly connected with the first connecting rod in a mode that a screw penetrates through the threaded through hole and is fixedly supported on the first connecting rod.
3. The bulk materials handling device of claim 1, wherein: the connecting device comprises a second sleeve which is rotatably connected with a third clamping plate, one end of a second connecting rod is inserted into the second sleeve, the other end of the second connecting rod is fixedly connected with a fourth clamping plate in a vertical mode, a threaded through hole is formed in the top surface of the second sleeve, and the second sleeve penetrates through the threaded through hole through a screw and is fixedly connected with the second connecting rod in a jacking mode.
4. The bulk materials handling device of claim 2, wherein: the first sleeve pipe is a square steel pipe, a first through hole is formed in the side face, close to one end of the first clamping plate, of the first sleeve pipe in the width direction of the first sleeve pipe, two first connecting plates are perpendicularly arranged at the position, corresponding to the position of the first sleeve pipe, of the first clamping plate, the two first connecting plates are vertical and right opposite to each other, a second through hole corresponding to the position of the first through hole is formed in the two first connecting plates, the first sleeve pipe is clamped between the two first connecting plates, and the first sleeve pipe is rotatably connected with the first clamping plate in a mode that the bolt fastener penetrates through the first through hole and the second through hole.
5. The bulk materials handling device of claim 3, wherein: the second sleeve pipe is the square steel pipe, and the third through-hole has been seted up along second sleeve pipe width direction to the side that is close to the one end of third splint in the second sleeve pipe, correspond the department with second sleeve pipe position on the third splint and be provided with two second connecting plates perpendicularly, two second connecting plates are vertical just right, and set up the fourth through-hole that corresponds with third through-hole position on two second connecting plates, and second sleeve pipe card is gone into between two second connecting plates to the mode that passes third through-hole and fourth through-hole through bolt fastener rotates with the third splint to be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021337344.9U CN212530983U (en) | 2020-07-09 | 2020-07-09 | Bulk material handling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021337344.9U CN212530983U (en) | 2020-07-09 | 2020-07-09 | Bulk material handling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212530983U true CN212530983U (en) | 2021-02-12 |
Family
ID=74522609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021337344.9U Active CN212530983U (en) | 2020-07-09 | 2020-07-09 | Bulk material handling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212530983U (en) |
-
2020
- 2020-07-09 CN CN202021337344.9U patent/CN212530983U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212530983U (en) | Bulk material handling device | |
CN113120748A (en) | Lifting adjusting device for lifting silicon carbide glass reinforced plastic pipe | |
CN210162611U (en) | Panel hand-held device | |
CN219807394U (en) | Granite processing panel turnover machine | |
CN209110748U (en) | A kind of glass grinding device | |
CN219469456U (en) | Socket joint formula reinforced concrete pipe hoist | |
CN209736690U (en) | Clamp for processing inner hole of roller | |
CN206615522U (en) | Square box body fixing and conveying device | |
CN214217062U (en) | Manual template carrying device | |
CN213567922U (en) | Steel plate portable clamp | |
CN213768372U (en) | Discharge tube positioning device for solid crushed material transport vehicle | |
CN210557198U (en) | A clamping device for building brick | |
CN214368894U (en) | Portable municipal works measuring apparatu support frame | |
CN212866677U (en) | Ash bucket device is put in slope roofing ridge tile construction | |
CN213268344U (en) | Ready-package steel construction | |
CN210819110U (en) | Workpiece clamping hanger of high-speed roller grinder | |
CN108483244B (en) | A kind of efficient Plate transporter | |
CN209795544U (en) | civil engineering pipe fitting rack | |
CN209903034U (en) | Quick positioner of return bend | |
CN206264168U (en) | A kind of ceramic tile, stone chamfering apparatus | |
CN220413448U (en) | Heat treatment processing fixing device convenient to adjust | |
CN220885994U (en) | Insulating tube poling conveyor | |
CN211439924U (en) | Electric power maintenance tool car convenient to loading and unloading | |
CN216334476U (en) | Light article carrying clamp | |
CN215258181U (en) | Chemical building pipeline installation construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |