CN215258181U CN202121172378.1U CN202121172378U CN215258181U CN 215258181 U CN215258181 U CN 215258181U CN 202121172378 U CN202121172378 U CN 202121172378U CN 215258181 U CN215258181 U CN 215258181U
Authority
CN
China
Prior art keywords
chemical
chemical pipeline
fixed
mounting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121172378.1U
Other languages
Chinese (zh)
Inventor
张元龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121172378.1U priority Critical patent/CN215258181U/en
Application granted granted Critical
Publication of CN215258181U publication Critical patent/CN215258181U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a chemical industry building pipeline installation construction platform, set up the fixed establishment in the base upper end including two symmetries, fixed establishment includes the stand, the stand top is provided with the mounting, the mounting includes the fixed plate, sets up the steadying plate at the fixed plate both ends, be provided with the screw hole on the steadying plate that is located the fixed plate both ends respectively, threaded hole is provided with the locking bolt, the tip of locking bolt is provided with the handle, the tip of arranging the interior locking bolt of steadying plate in is provided with the fixed block. The utility model discloses set up the mounting, conveniently fix the chemical pipeline of placing inside the mounting, conveniently adjust the chemical pipeline joint simultaneously, use manpower sparingly, improved the efficiency of construction of chemical pipeline installation; set up the rubber pad, increased the frictional force between fixed block and the chemical pipeline, improved the stability between chemical pipeline and the fixed block, avoid the chemical pipeline to skid, influence the efficiency of construction of welding chemical pipeline.

Description

Chemical building pipeline installation construction platform
Technical Field
The utility model belongs to the technical field of building pipeline erection equipment, especially, relate to a chemical industry building piping erection construction platform.
Background
When a chemical pipeline joint is welded, the chemical pipeline joint is adjusted and aligned manually by using the existing platform for chemical pipeline installation construction; because the chemical pipeline is heavy, the adjustment can be completed only by simultaneously operating a plurality of people, and the labor is wasted in the adjustment process and time, so that the construction efficiency of chemical pipeline installation is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a chemical industry building piping erection construction platform to the manual work that exists among the solution prior art carries out the problem that chemical industry pipe joint adjustment is inefficient.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a chemical building pipeline installation construction platform, includes that two symmetries set up the fixed establishment in the base upper end, fixed establishment includes the stand, the stand top is provided with the mounting, the mounting includes the fixed plate, sets up the steadying plate at the fixed plate both ends, be provided with the screw hole on the steadying plate respectively, threaded hole is provided with the locking bolt, the tip of locking bolt is provided with the handle, the tip of arranging the locking bolt in the steadying plate is provided with the fixed block.
The top of stand is provided with the rotary disk, the bottom of fixed plate and the upper end of rotary disk evenly are provided with a plurality of screw holes respectively, the upper end of rotary disk is connected with the fixed plate through the bolt, the lower extreme and the stand of rotary disk are connected.
The fixed block is arc-shaped, and a rubber pad is arranged on the fixed block.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses set up the mounting, conveniently fix and place at the inside chemical pipeline of mounting, conveniently adjust the chemical pipeline joint simultaneously, use manpower sparingly, improved chemical pipeline installation's efficiency of construction.
2. The utility model discloses set up the rotary disk, be convenient for adjust the direction of mounting, make things convenient for the workman to place the chemical pipeline from the angle of difference.
3. The utility model discloses set up the rubber pad, increased the frictional force between fixed block and the chemical pipeline, improved the stability between chemical pipeline and the fixed block, avoid the chemical pipeline to skid, influence the efficiency of construction of welding chemical pipeline.
Drawings
FIG. 1 is a schematic view of the apparatus of the present invention;
fig. 2 is a relation matching diagram of the rotating disk, the upright post and the fixing plate of the present invention.
In the figure: the device comprises a base 1, supporting legs 1-1, fixing members 2, a fixing plate 2-1, a stabilizing plate 2-2, fixing blocks 3, a rubber pad 3-1, a handle 4, locking bolts 5, upright columns 6, a rotating disk 7 and bolts 8.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in figure 1, the chemical building pipeline installation construction platform comprises two fixing mechanisms symmetrically arranged at the upper end of a base 1, each fixing mechanism comprises a stand column 6, a fixing piece 2 is arranged at the top end of each stand column 6, each fixing piece 2 comprises a fixing plate 2-1 and stabilizing plates 2-2 arranged at two ends of the fixing plate 2-1, threaded holes are formed in the stabilizing plates 2-2 respectively, locking bolts 5 are arranged in the threaded holes, handles 4 are arranged at the end portions of the locking bolts 5, and fixing blocks 3 are arranged at the end portions of the locking bolts 5 arranged in the stabilizing plates 2-2.
In the embodiment, during actual installation, the lower end of the base 1 is provided with a supporting leg 1-1, the upright post 6 is connected with the base 1 by welding, and the fixed plate 2-1 and the stabilizing plate 2-2 are integrally formed; set up mounting 2, the chemical pipeline of placing in mounting 2 inside is conveniently fixed, and the adjustment chemical pipeline that conveniently aligns simultaneously connects, uses manpower sparingly, has improved chemical pipeline installation's efficiency of construction.
As shown in fig. 2, in this embodiment, a rotating disc 7 is disposed at the top end of the upright 6, a plurality of threaded holes are uniformly disposed at the bottom of the fixing plate 2-1 and the upper end of the rotating disc 7, respectively, and the upper end of the rotating disc 7 is connected to the fixing plate 2-1 through a bolt 8, and the lower end of the rotating disc 7 is connected to the upright 6.
In this embodiment, during actual installation, rotary disk 7 passes through welded connection with stand 6, sets up rotary disk 7, and the direction of the adjustment mounting of being convenient for makes things convenient for the workman to place the chemical pipeline from the angle of difference, transfers the chemical pipeline to a straight line through rotary disk 7. .
In this embodiment, the fixing block 3 is arc-shaped, and a rubber pad 3-1 is arranged on the fixing block 3.
In the embodiment, during actual installation, the rubber pad 3-1 and the fixed block 3 are bonded and fixed through glue; the rubber pad 3-1 is arranged, so that the friction force between the fixing block 3 and the chemical pipeline is increased, the stability between the chemical pipeline and the fixing block 3 is improved, and the chemical pipeline is prevented from slipping to influence the construction efficiency of welding the chemical pipeline.
When the utility model is used, the construction platform is installed in the construction area, the chemical pipeline is placed in the fixing part 2, the handle 4 is held to rotate and is arranged on the stabilizing plate 2-2 to tighten the locking bolt 5, and then the fixing block 3 arranged at the end part of the locking bolt 5 is driven to extrude towards the inside of the stabilizing plate 2-2, so as to fix the chemical pipeline; when the joints of the two chemical pipelines are adjusted in the same way, the rotating disc 7 arranged on the upright post 6 is used for adjusting, and when the joints of the two chemical pipelines are not aligned, the fixing block 3 which is properly adjusted and arranged on the stabilizing plate 2-2 simultaneously drives the chemical pipelines to swing left and right until the joints of the two chemical pipelines are aligned, and the chemical pipelines are fixed through the fixing block 3.
The utility model is provided with the fixing part 2, the chemical pipeline arranged inside the fixing part 2 can be conveniently fixed, and meanwhile, the chemical pipeline joint can be conveniently adjusted, thereby saving labor and improving the construction efficiency of chemical pipeline installation; the rotating disc 7 is arranged, so that the direction of the fixing piece 2 can be conveniently adjusted, and workers can conveniently place chemical pipelines from different angles; the rubber pad 3-1 is arranged, so that the friction force between the fixing block 3 and the chemical pipeline is increased, the stability between the chemical pipeline and the fixing block 3 is improved, and the chemical pipeline is prevented from slipping to influence the construction efficiency of welding the chemical pipeline.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.

Claims (3)

1. The utility model provides a chemical industry building piping erection construction platform, its characterized in that includes that two symmetries set up the fixed establishment in base (1) upper end, fixed establishment includes stand (6), stand (6) top is provided with mounting (2), mounting (2) include fixed plate (2-1), set up steadying plate (2-2) at fixed plate (2-1) both ends, be provided with the screw hole on steadying plate (2-2) respectively, threaded hole is provided with locking bolt (5), the one end of locking bolt (5) is provided with handle (4), the other end of locking bolt (5) is provided with fixed block (3), steadying plate (2-2) are arranged in to fixed block (3).
2. The chemical building pipeline installation and construction platform of claim 1, characterized in that: the top end of the upright post (6) is provided with a rotating disc (7), and the fixed plate (2-1) is in threaded connection with the rotating disc (7).
3. The chemical building pipeline installation and construction platform of claim 1, characterized in that: the fixing block (3) is arc-shaped, and a rubber pad (3-1) is arranged on the fixing block (3).
CN202121172378.1U 2021-05-28 2021-05-28 Chemical building pipeline installation construction platform Expired - Fee Related CN215258181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121172378.1U CN215258181U (en) 2021-05-28 2021-05-28 Chemical building pipeline installation construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121172378.1U CN215258181U (en) 2021-05-28 2021-05-28 Chemical building pipeline installation construction platform

Publications (1)

Publication Number Publication Date
CN215258181U true CN215258181U (en) 2021-12-21

Family

ID=79474182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121172378.1U Expired - Fee Related CN215258181U (en) 2021-05-28 2021-05-28 Chemical building pipeline installation construction platform

Country Status (1)

Country Link
CN (1) CN215258181U (en)

Similar Documents

Publication Publication Date Title
CN206571159U (en) A kind of beam forms support unit and support frame
CN211102477U (en) Pipeline aligning device
CN211438761U (en) Novel steel pipe welding is supplementary device
CN215258181U (en) Chemical building pipeline installation construction platform
CN209976009U (en) Steel structure connecting piece for building
CN210282032U (en) Pressure pipeline component clamping device
WO2018152968A1 (en) Drilling tool automatic transfer apparatus of drill used for continental scientific drilling
CN218061306U (en) Construction frame reinforcing apparatus
CN206987392U (en) A kind of vertical pump line props up attached fixing device
CN214738756U (en) Steel construction building connecting device
CN210549489U (en) Square steel pipe is mouth of pipe cutting device for multi-angle welding
WO2019068228A1 (en) Formwork adjustment tool for railway bridge formwork
CN211949708U (en) Railing is prevented to building engineering instrument formula stair
CN219233833U (en) Reinforcing steel bar connection tool
CN219638116U (en) Stable steel structure engineering support
CN220223265U (en) Petrochemical industry pipeline hoist and mount protection device
CN220098430U (en) Auxiliary device for pipeline installation
CN219296958U (en) Pipeline installation lifting device for building installation engineering
CN205604755U (en) A telesopic support pile for building field
CN220470994U (en) Inner and outer pipe laminating device for pipeline restoration
CN216380689U (en) Reinforcing fixture for repairing ancient buildings
CN217815340U (en) Strutting arrangement is used in job site piping erection
CN218208132U (en) Novel water pipe support convenient to installation
CN216632661U (en) Pipeline BOSS head drilling positioning fixture
CN218311820U (en) Chemical building pipeline installation construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221