CN212523488U - Dust device that sprays that hotel's building construction operation face was used - Google Patents
Dust device that sprays that hotel's building construction operation face was used Download PDFInfo
- Publication number
- CN212523488U CN212523488U CN202021109461.XU CN202021109461U CN212523488U CN 212523488 U CN212523488 U CN 212523488U CN 202021109461 U CN202021109461 U CN 202021109461U CN 212523488 U CN212523488 U CN 212523488U
- Authority
- CN
- China
- Prior art keywords
- building construction
- lifting
- column
- construction operation
- hotel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a spraying dust-settling device for hotel building construction operation surface, in particular to the technical field of building construction, which comprises a base, wherein a stand column is fixedly arranged on the upper surface of the base, a lifting column is embedded and arranged at the top end of the stand column, and a lifting mechanism is arranged in the stand column and is used for driving the lifting column to reciprocate up and down; the top of lift post is provided with the crossbeam, the top of crossbeam is provided with the storage water tank, and one side of crossbeam is provided with the shower head. The utility model has the advantages of being scientific and reasonable in structure, convenient operation through the elevating system who sets up, can realize the up-and-down motion of lift post to drive the shower head through the crossbeam and carry out the operation of reciprocating and spraying from top to bottom, realize the dust fall work that sprays of co-altitude operation face, use manpower sparingly, effectively improve work efficiency, can realize the rotation of shower head through two works of motor that set up, reach the dust fall work that sprays of co-azimuth operation face.
Description
Technical Field
The utility model relates to a construction technical field specifically is a dust device sprays that hotel's building construction operation face was used.
Background
When the major structure of the hotel building engineering is constructed, the working face is mostly exposed to burning sun, and in hot summer, the temperature of the construction working face is very high and sometimes even exceeds 40 ℃, so that a spraying dust-reducing and temperature-reducing device is generally adopted to reduce the temperature of the working face in the field of building construction.
However, the spraying dust suppression device for the hotel building construction operation surface on the market is highly fixed in the actual use process, and can only spray the operation surface with the fixed height for dust suppression treatment, and because the spraying operation surface is large, the spraying operation can only be carried out at different heights and directions by manually and continuously adjusting the direction of the spray head in the spraying process, so that manpower is wasted, the working efficiency is low, and the practicability is poor. Therefore, the technical personnel in the field provide a spraying dust-settling device for a hotel building construction working face to solve the problems in the background technology.
Disclosure of Invention
In order to overcome the above defect of prior art, the embodiment of the utility model provides a dust device sprays that hotel's building construction operation face was used, through the elevating system who sets up for the device can realize the dust fall work that sprays of co-altitude operation face, uses manpower sparingly, effectively improves work efficiency, has solved the problem of proposing among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a spraying dust-settling device for a hotel building construction working surface comprises a base, wherein an upright post is fixedly installed on the upper surface of the base, a lifting column is embedded into the top end of the upright post, and a lifting mechanism is arranged inside the upright post and used for driving the lifting column to reciprocate up and down; a cross beam is arranged at the top end of the lifting column, a water storage tank is arranged at the top of the cross beam, and a spray header is arranged on one side of the cross beam; a water pump is arranged on one side of the water storage tank and is respectively communicated with the water storage tank and the cross beam through pipelines; a cavity is formed in the beam.
As a further aspect of the present invention: the lifting mechanism comprises a first motor fixedly arranged on one side of the upright post and a sliding plate arranged at the lower end of the lifting post, the output end of the first motor penetrates through the interior of the upright post and is provided with an eccentric wheel, and one side of the eccentric wheel is provided with a shaft rod; a rotating sleeve is arranged at one side of the upper surface of the sliding plate, is sleeved outside the shaft lever and is rotationally connected with the shaft lever; the inside of stand is provided with the guide bar, the sliding plate cover is equipped with the outside at the guide bar.
As a further aspect of the present invention: the sleeve is sleeved at the position, located on the outer side of the lifting column, of the top of the inner side of the upright column.
As a further aspect of the present invention: a second motor is embedded in the lifting column, and a rotating shaft is arranged at the top end of the second motor; the top end of the rotating shaft is fixedly connected with the cross beam.
As a further aspect of the present invention: a plurality of nozzles are uniformly distributed on one side of the spray header at equal intervals;
as a further aspect of the present invention: one side of the water storage tank is provided with a water filling port.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a lifting mechanism who sets up can realize the up-and-down motion of lift post to drive the shower head through the crossbeam and carry out the operation of reciprocating and spraying from top to bottom, realize the dust fall work that sprays of co-altitude operation face, solved current dust fall device that sprays and need carry out the problem of the operation that sprays in co-altitude and position with the help of artifical continuous adjustment shower nozzle direction, use manpower sparingly, effectively improve work efficiency.
2. The utility model discloses a two works of motor that set up can make the pivot drive the crossbeam and rotate to realize the rotation of shower head, realize its angular adjustment, reach the dust fall work that sprays of different position operation faces, have stronger practicality.
Drawings
FIG. 1 is a schematic structural view of a spraying dust-settling device for a construction working face of a hotel building;
FIG. 2 is a front view of a spray dust-settling device for a hotel construction working face;
FIG. 3 is a schematic structural diagram of a lifting mechanism in a spraying dust-settling device for a hotel building construction working face;
fig. 4 is a partially enlarged view of a spray dust falling device a for a hotel construction working face.
The reference signs are: 1. a base; 2. a column; 3. a lifting column; 4. a lifting mechanism; 41. a first motor; 42. an eccentric wheel; 43. a shaft lever; 44. a sliding plate; 45. rotating the sleeve; 46. a guide bar; 47. a sleeve; 5. a cross beam; 51. a cavity; 6. a water storage tank; 7. a shower head; 71. a nozzle; 8. a water pump; 9. a pipeline; 10. a second motor; 11. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the embodiment of the utility model, the spraying dust-settling device for the hotel building construction operation surface comprises a base 1, a stand column 2 is fixedly arranged on the upper surface of the base 1, a lifting column 3 is embedded in the top end of the stand column 2, a lifting mechanism 4 is arranged in the stand column 2, and the lifting mechanism 4 is used for driving the lifting column 3 to reciprocate up and down; a cross beam 5 is arranged at the top end of the lifting column 3, a water storage tank 6 is arranged at the top of the cross beam 5, and a spray header 7 is arranged on one side of the cross beam 5; a water pump 8 is arranged on one side of the water storage tank 6, and the water pump 8 is respectively communicated with the water storage tank 6 and the cross beam 5 through a pipeline 9; the beam 5 has a cavity 51 formed therein.
Referring to fig. 1 and 2, in the implementation process: the water in the water storage tank 6 is sent into the cavity 51 through the pipeline 9 by the operation of the arranged water pump 8, so that the spraying dust-settling operation of the operation surface is realized through the spraying of the spray head 7.
The lifting mechanism 4 comprises a first motor 41 fixedly arranged on one side of the upright post 2 and a sliding plate 44 arranged at the lower end of the lifting post 3, the output end of the first motor 41 penetrates through the interior of the upright post 2 and is provided with an eccentric wheel 42, and one side of the eccentric wheel 42 is provided with a shaft rod 43; a rotating sleeve 45 is arranged at one side of the upper surface of the sliding plate 44, the rotating sleeve 45 is sleeved on the outer side of the shaft lever 43, and the rotating sleeve 45 is rotatably connected with the shaft lever 43; the column 2 is provided with a guide bar 46 inside, and the sliding plate 44 is sleeved outside the guide bar 46.
The sleeve 47 is sleeved at the position, located on the outer side of the lifting column 3, of the top of the inner side of the upright column 2.
A plurality of nozzles 71 are uniformly distributed on one side of the spray header 7 at equal intervals;
one side of the water storage tank 6 is provided with a water filling port.
Referring to fig. 3, in the implementation: the up-and-down motion of lifting column 3 can be realized through elevating system 4 that sets up, thereby drive shower head 7 through crossbeam 5 and carry out the reciprocal circulation spray operation from top to bottom, realize the dust fall work that sprays of co-altitude operation face, the problem of the current spray dust device need carry out the operation that sprays of co-altitude and position with the help of artifical constantly adjusting shower nozzle direction has been solved, the manpower is saved, effectively improve work efficiency, in the use, through 41 work of motor, it rotates to drive eccentric wheel 42, thereby drive sliding plate 44 and slide from top to bottom along guide bar 46, and then drive lifting column 3 and slide from top to bottom along sleeve 47, thereby utilize crossbeam 5 to drive shower head 7 and reciprocate, reach the dust fall processing that sprays of co-altitude.
A second motor 10 is embedded in the lifting column 3, and a rotating shaft 11 is arranged at the top end of the second motor 10; the top end of the rotating shaft 11 is fixedly connected with the cross beam 5.
Referring to fig. 4, in the implementation: through the work of the second motor 10 who sets up, can make pivot 11 drive crossbeam 5 and rotate to realize the rotation of shower head 7, realize its angular adjustment, reach the dust fall work that sprays of different position operation faces, have stronger practicality.
The utility model discloses a theory of operation: in the actual use process, the water inside the water storage tank 6 is fed into the cavity 51 through the pipeline 9 by the operation of the arranged water pump 8, so that the spraying dust-settling operation of the operation surface is realized by the spraying of the spray head 7, further, in the spraying process, the first motor 41 works to drive the eccentric wheel 42 to rotate, so as to drive the sliding plate 44 to slide up and down along the guide rod 46, further drive the lifting column 3 to slide up and down along the sleeve 47, further drive the spray head 7 to move up and down by the cross beam 5, so as to achieve the spraying dust-settling treatment of different operation surfaces, the lifting column 3 can reciprocate up and down by the arranged lifting mechanism 4, so as to drive the spray head 7 to perform the reciprocating spraying operation up and down by the cross beam 5, so as to realize the spraying dust-settling operation of the operation surfaces with different heights, and further work by the arranged second motor 10, so as to enable, thereby realize the rotation of shower head 7, realize its angle modulation, reach the dust fall work that sprays of different position operation faces, have stronger practicality.
And finally: the above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a dust device sprays that hotel's building construction operation face was used, includes base (1), its characterized in that: the lifting device comprises a base (1), and is characterized in that an upright column (2) is fixedly mounted on the upper surface of the base (1), a lifting column (3) is embedded into the top end of the upright column (2), a lifting mechanism (4) is arranged inside the upright column (2), and the lifting mechanism (4) is used for driving the lifting column (3) to reciprocate up and down;
a cross beam (5) is arranged at the top end of the lifting column (3), a water storage tank (6) is arranged at the top of the cross beam (5), and a spray header (7) is arranged on one side of the cross beam (5);
a water pump (8) is arranged on one side of the water storage tank (6), and the water pump (8) is respectively communicated with the water storage tank (6) and the cross beam (5) through a pipeline (9);
a cavity (51) is formed in the beam (5).
2. The spraying dust-settling device for the hotel building construction operation surface according to claim 1, which is characterized in that: the lifting mechanism (4) comprises a first motor (41) fixedly installed on one side of the upright post (2) and a sliding plate (44) installed at the lower end of the lifting post (3), an eccentric wheel (42) is arranged at the output end of the first motor (41) in a way of penetrating through the interior of the upright post (2), and a shaft lever (43) is arranged on one side of the eccentric wheel (42);
a rotating sleeve (45) is arranged at one side of the upper surface of the sliding plate (44), the rotating sleeve (45) is sleeved on the outer side of the shaft lever (43), and the rotating sleeve (45) is rotatably connected with the shaft lever (43);
the inner part of the upright post (2) is provided with a guide rod (46), and the sliding plate (44) is sleeved on the outer side of the guide rod (46).
3. The spraying dust-settling device for the hotel building construction operation surface according to claim 2, which is characterized in that: the inner top of the upright post (2) is sleeved with a sleeve (47) at the outer side position of the lifting post (3).
4. The spraying dust-settling device for the hotel building construction operation surface according to claim 1, which is characterized in that: a second motor (10) is embedded into the lifting column (3), and a rotating shaft (11) is arranged at the top end of the second motor (10);
the top end of the rotating shaft (11) is fixedly connected with the cross beam (5).
5. The spraying dust-settling device for the hotel building construction operation surface according to claim 1, which is characterized in that: a plurality of nozzles (71) are uniformly distributed on one side of the spray header (7) at equal intervals.
6. The spraying dust-settling device for the hotel building construction operation surface according to claim 1, which is characterized in that: one side of the water storage tank (6) is provided with a water filling port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021109461.XU CN212523488U (en) | 2020-06-16 | 2020-06-16 | Dust device that sprays that hotel's building construction operation face was used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021109461.XU CN212523488U (en) | 2020-06-16 | 2020-06-16 | Dust device that sprays that hotel's building construction operation face was used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212523488U true CN212523488U (en) | 2021-02-12 |
Family
ID=74547514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021109461.XU Expired - Fee Related CN212523488U (en) | 2020-06-16 | 2020-06-16 | Dust device that sprays that hotel's building construction operation face was used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212523488U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113750700A (en) * | 2021-09-09 | 2021-12-07 | 青岛康太源建设集团有限公司 | Based on construction is with spraying dust fall heat sink |
-
2020
- 2020-06-16 CN CN202021109461.XU patent/CN212523488U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113750700A (en) * | 2021-09-09 | 2021-12-07 | 青岛康太源建设集团有限公司 | Based on construction is with spraying dust fall heat sink |
CN113750700B (en) * | 2021-09-09 | 2022-09-13 | 青岛康太源建设集团有限公司 | Based on construction is with spraying dust fall heat sink |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207854703U (en) | A kind of agricultural irrigation sprinkler of adjustable watering distance | |
CN216339263U (en) | Portable watering dust device for construction | |
CN212523488U (en) | Dust device that sprays that hotel's building construction operation face was used | |
CN112293225A (en) | Water supply and feeding device for green belt | |
CN216040923U (en) | Building construction working face sprays dust fall heat sink | |
CN212855086U (en) | Building construction environmental protection dust device | |
CN214194342U (en) | Building construction is on-spot with spraying curing means convenient to it is fixed | |
CN110710447A (en) | Irrigation equipment for garden planting | |
CN213625411U (en) | Building construction working face sprays dust fall heat sink | |
CN211430416U (en) | Automatic watering device is used in gardens flower planting | |
CN210302949U (en) | Intelligent building construction dust device | |
CN108914865B (en) | Rail mounted dust suppression device for construction site | |
CN221182138U (en) | Spraying dust settling machine | |
CN113463568A (en) | Ecological bank protection curing means of hydraulic engineering | |
CN214593375U (en) | Agricultural production is with irrigating apparatus | |
CN220558851U (en) | Dust fall device for environmental protection engineering | |
CN218042993U (en) | Garden kettle | |
CN219909810U (en) | Building construction material surface spraying device | |
CN221161017U (en) | Hand-operated lifting wall surface cutting machine | |
CN218392904U (en) | A earthwork dust device for building construction site | |
CN213533133U (en) | Curing device for prefabricated part | |
CN219741452U (en) | Water-saving irrigation device for landscaping engineering | |
CN216368498U (en) | But landscape who adjusts in a flexible way uses spray thrower | |
CN220990160U (en) | Dust fall device for civil engineering | |
CN212520297U (en) | Irrigation equipment of cabbage cultivation usefulness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210212 |
|
CF01 | Termination of patent right due to non-payment of annual fee |