CN212507276U - Aluminum alloy container mounting truss walking board assembly - Google Patents
Aluminum alloy container mounting truss walking board assembly Download PDFInfo
- Publication number
- CN212507276U CN212507276U CN202022127476.5U CN202022127476U CN212507276U CN 212507276 U CN212507276 U CN 212507276U CN 202022127476 U CN202022127476 U CN 202022127476U CN 212507276 U CN212507276 U CN 212507276U
- Authority
- CN
- China
- Prior art keywords
- assembly
- walking board
- deck
- truss
- aluminum alloy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model belongs to the technical field of the assembly, a aluminum alloy container installation truss is walked on stage subassembly is disclosed, aims at changing original production mode, reduces artifical intensity of labour, guarantees workman high altitude construction's safety simultaneously, finally reaches improvement production efficiency, reduces the effect of cost of labor. The truss walking board assembly comprises two movable walking board assemblies and two fixed walking board assemblies, wherein the two movable walking board assemblies and the two fixed walking board assemblies are enclosed around a container and are symmetrically arranged respectively, and the two movable walking board assemblies are opened and closed respectively when the end parts of the two same sides of the two fixed walking board assemblies are opened and closed respectively. The truss assembly ensures the safety of workers working at high altitude; meanwhile, a fixed station is set, so that the time is saved, the production beat is accelerated, and the container production pipelining is realized, thereby improving the production efficiency of a workshop.
Description
Technical Field
The utility model belongs to the technical field of the assembly, concretely relates to aluminum alloy container installation truss walks subassembly.
Background
A plurality of movable cat ladders are put around container assembly station, both sides, and the workman carries out the assembly operation of container top crossbeam, top covering on the cat ladder, and when the container changes the preface, will remove the cat ladder and change to next process, and portable cat ladder can not save the working tool, needs the workman to carry the instrument climbing, and workman intensity of labour is great and production efficiency is low. The movable ladder stand structure is unstable, and is easy to rock during climbing, so that potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing an aluminum alloy container installation truss walks platform subassembly aims at changing original production mode, reduces artifical intensity of labour, guarantees workman high altitude construction's safety simultaneously, finally reaches improvement production efficiency, reduces the effect of cost of labor.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides an aluminum alloy container installation truss walks a subassembly, including enclosing fit the container around and be two portable assembly and two fixed assembly of walking of symmetrical arrangement respectively, two fixed opening and close of walking of two homonymy tip of assembly of walking by two portable assembly of walking respectively open and shut.
Further, the movable walking board assembly consists of a truss, a suspension arm, a first walking board, a power device and a track, wherein the track is arranged on the truss, and the suspension arm is connected to the track through the power device; the suspension arm is provided with a first walking board.
Further, the number of the suspension arms is two.
Furthermore, the track adopts a double-guide-rail structure.
Furthermore, the fixed walking board assembly consists of a frame, a second walking board and a step ladder, wherein the second walking board and the step ladder communicated with the second walking board are arranged on the frame.
Further, the first walking board and the second walking board have the same horizontal height.
Further, a guide rail type hoist is arranged between the two movable walking platform assemblies.
Furthermore, the two movable walking board assemblies and the two fixed walking board assemblies are made of high-strength aluminum alloy materials.
The utility model has the advantages that: the truss assembly ensures the safety of workers working at high altitude; meanwhile, a fixed station is set, so that the time is saved, the production beat is accelerated, and the container production pipelining is realized, thereby improving the production efficiency of a workshop.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages of the invention may be realized and attained by the means of the instrumentalities and/or combinations particularly pointed out in the appended claims.
Drawings
For the purposes of promoting a better understanding of the objects, features and advantages of the invention, reference will now be made to the following detailed description taken in conjunction with the accompanying drawings in which:
fig. 1 is a schematic overall structure diagram of the truss walking board assembly.
Fig. 2 is a schematic structural view of the movable walking board assembly of the truss walking board assembly.
Fig. 3 is a schematic structural view of a fixed walking board assembly of the truss walking board assembly.
And (3) labeling of the graph: the device comprises a movable walking platform assembly 1, a fixed walking platform assembly 2, a container 3 and a transfer vehicle 4; the device comprises a truss 11, a boom 12, a first walking platform 13, a power device 14 and a track 15; a frame 21, a second tread 22, a ladder 23.
Detailed Description
The present invention will be further described with reference to the following embodiments. Wherein the showings are for the purpose of illustration only and are shown by way of illustration only and not in actual form, and are not to be construed as limiting the present patent; for a better understanding of the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
As shown in fig. 1 to 3, the truss installation walking board assembly for an aluminum alloy container according to the present embodiment includes two movable walking board assemblies 1 and two fixed walking board assemblies 2 which are enclosed around a container 3 and are symmetrically arranged, and two ends of the two fixed walking board assemblies 2 on the same side are opened and closed by the two movable walking board assemblies 1.
Specifically, the movable walking board assembly 1 is composed of a truss 11, a suspension arm 12, a first walking board 13, a power device 14 and a track 15, wherein the track 15 is installed on the truss 11, the suspension arm 12 is connected with the track through the power device 14, the first walking board 13 is installed on the suspension arm 12, the design of the truss ensures that the whole structure is stable, such as an inclined support, an auxiliary supporting leg and the like, the suspension arm bearing the first walking board can be supported, the first walking board can walk stably and safely, and the power device can transversely move on the track on a top beam of the truss, so that the first walking board transversely moves relative to the fixed walking board assembly. Fixed assembly of walking on stage comprises frame 21, second walking on stage 22, step 23, sets up the second on the frame 21 and walks on stage 22 and the step 23 of 23 intercommunications with this second, and the step can make things convenient for the workman from top to bottom, and the frame is used for supporting whole second and walks on stage and step, guarantees overall structure stable. The first walking platform and the second walking platform with the guardrails not only ensure the safety of workers in high-altitude operation, but also can store and use tools. By adopting the scheme, the truss assembly ensures the safety of workers working at high altitude; meanwhile, a fixed station is set, so that the time is saved, the production beat is accelerated, and the container production pipelining is realized, thereby improving the production efficiency of a workshop.
The following describes the working process of the truss walking board assembly in detail:
the truss walking board assembly is matched with a container production line and a circulation vehicle 4 of a container 3 for use, the assembly position of the truss walking board assembly is set as a container assembly fixing station, before the container circulation vehicle clamps a container to be transferred to the fixing station, a suspension arm on a movable walking board assembly at the front end enables a first walking board to transversely move under the action of a power device, a front neutral gear of two fixed walking board assemblies is arranged, then the container circulation vehicle enters the fixing station from the front neutral gear, then the first walking board is reset to form a closed annular working platform with the two fixed walking board assemblies, and a container top beam and a top skin are installed on the first walking board assembly by a worker; after the corresponding work is finished, the upper suspension arm of the movable walking platform assembly at the rear end enables the first walking platform on the upper suspension arm to move transversely under the action of the power device, so that the rear ends of the two fixed walking platform assemblies are out of the neutral position, and then the container transfer trolley moves the container out of the fixed station from the rear end neutral position and enters the next working procedure. This container motorcycle type of truss deck subassembly multiple width of adaptation, if: a small gooseneck container, a large gooseneck container, a container with the length less than 15.6 meters and the width of 2.6 meters to 3 meters, and the like.
In another embodiment the boom 12 is provided in two, and the corresponding first carriages are also provided in two. Compared with the unilateral movement of the single suspension arm, the double suspension arm can move towards the left and the right on the truss, and a neutral gear with the width of 3.2 meters is reserved in a sliding mode, so that the front neutral gear or the rear neutral gear of the two fixed walking board assemblies can be opened quickly.
The rail 15 in this embodiment adopts a double rail structure. Has stable structure, and ensures that the first walking platform can walk safely.
The first and second walking boards 13 and 22 in this embodiment have the same level. Is convenient for workers to walk and work.
A rail-type hoist (not shown) is arranged between the two movable walking board assemblies 1 in the embodiment. The lifting device can be used for conveniently lifting accessories by workers, avoiding occupying large lifting equipment in the frame, saving the assembly time and improving the assembly efficiency.
The two movable walking board assemblies 1 and the two fixed walking board assemblies 2 in the embodiment are made of high-strength aluminum alloy materials, such as 3 series aluminum alloy, and can meet the requirements of strength and rigidity in use.
Finally, the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all of them should be covered by the scope of the claims of the present invention.
Claims (8)
1. The utility model provides an aluminum alloy container installation truss assembly of walking on stage, its characterized in that, includes encloses fit container (3) around and be two portable assembly of walking on stage (1) and two fixed assembly of walking on stage (2) of symmetrical arrangement respectively, two fixed assembly of walking on stage open and close by two portable assembly of walking on stage respectively of two homonymy tip of assembly of walking on stage.
2. The aluminum alloy container mounting truss deck assembly of claim 1, wherein the mobile deck assembly is composed of a truss (11), a boom (12), a first deck (13), a power device (14), and a track (15), the track is arranged on the truss, and the boom is connected with the track through the power device; the suspension arm is provided with a first walking board.
3. The aluminum alloy container mounting truss deck assembly of claim 2, wherein the boom arm is provided in two.
4. The aluminum alloy container mounting truss deck assembly of claim 2 wherein the rails are of a dual rail construction.
5. An aluminium alloy container mounting truss deck assembly as claimed in any one of claims 2 to 4 wherein the fixed deck assembly comprises a frame (21), a second deck (22) and a step (23), the frame having the second deck and the step communicating with the second deck.
6. The aluminum alloy container mounting truss deck assembly of claim 5, wherein the first deck and the second deck are level.
7. The aluminum alloy container mounting truss deck assembly of claim 1, wherein a rail hoist is disposed between the two mobile deck assemblies.
8. The aluminum alloy container mounting truss deck assembly of claim 1, wherein the two movable deck assemblies and the two fixed deck assemblies are made of a high strength aluminum alloy material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022127476.5U CN212507276U (en) | 2020-09-24 | 2020-09-24 | Aluminum alloy container mounting truss walking board assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022127476.5U CN212507276U (en) | 2020-09-24 | 2020-09-24 | Aluminum alloy container mounting truss walking board assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212507276U true CN212507276U (en) | 2021-02-09 |
Family
ID=74389879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022127476.5U Active CN212507276U (en) | 2020-09-24 | 2020-09-24 | Aluminum alloy container mounting truss walking board assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212507276U (en) |
-
2020
- 2020-09-24 CN CN202022127476.5U patent/CN212507276U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202245820U (en) | Small-sized electric sling cart | |
CN210286610U (en) | Material hoisting device for building safety | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN104986171A (en) | Through operation platform for railway engineering truck | |
CN203924745U (en) | Movable building engineering construction sunshade | |
CN103074829A (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN212507276U (en) | Aluminum alloy container mounting truss walking board assembly | |
CN112049392A (en) | Aluminum alloy container mounting truss walking board assembly | |
CN202333531U (en) | Hydraulic elevating type tool car | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN217264706U (en) | Electric power installation and maintenance platform | |
CN102386576A (en) | Hydraulic lift-type maintenance car | |
CN213168353U (en) | Aluminum alloy container assembly line | |
CN212834989U (en) | Motor-driven automatic walking section beam installation full-coverage pocket bottom protection platform | |
CN210712584U (en) | Movable supporting bracket for road and bridge construction | |
CN202787930U (en) | Hanging basket for high-place operations | |
CN103573176B (en) | Power system Rapid Combination ascending tool | |
CN204416844U (en) | A kind of auxiliary device of building hoist | |
CN208369081U (en) | A kind of height-adjustable safety inspection frame of power equipment | |
CN203402829U (en) | Frame of lifting machine for portable transformer | |
CN208308371U (en) | A kind of subway tunnel busbar connector installation trolley | |
CN203948008U (en) | Power system Rapid Combination ascending tool | |
CN204867957U (en) | Lift operation panel of visitor car roof skeleton welding frock | |
CN207312996U (en) | A kind of high aerial rail road lifting gear | |
CN215706294U (en) | Auxiliary construction device for electrified railway construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |