CN212503655U - Stand reinforcing apparatus for building engineering hoist - Google Patents
Stand reinforcing apparatus for building engineering hoist Download PDFInfo
- Publication number
- CN212503655U CN212503655U CN202020970964.XU CN202020970964U CN212503655U CN 212503655 U CN212503655 U CN 212503655U CN 202020970964 U CN202020970964 U CN 202020970964U CN 212503655 U CN212503655 U CN 212503655U
- Authority
- CN
- China
- Prior art keywords
- buckle
- fixedly connected
- reinforcing apparatus
- hoist
- buffer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a building engineering is stand reinforcing apparatus for hoist, including first buckle, inserted bar and fixed plate, the left side one end fixedly connected with hinge of first buckle, the opposite side fixedly connected with second buckle of hinge, fixed jack has been seted up to the upper end of first buckle and second buckle, the surperficial intermediate position fixedly connected with connecting block of first buckle and second buckle, the one end of connecting block is seted up flutedly. Make it closed through the hinge through the first buckle that sets up and second buckle to wrap up the pole setting on the hoist, then fix first buckle and second buckle through fixture block and draw-in groove, thereby make its better wrap up the hoist stand, then can be better through the bracing piece make first buckle and second buckle more stable, thereby bracing piece fixed connection makes the whole lifting surface area increase of device on the steadying plate in addition, thereby prevent that the hoist from taking place the slope.
Description
Technical Field
The utility model belongs to the technical field of the building engineering hoist, especially, relate to a building engineering is stand reinforcing apparatus for hoist.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and the place of the construction operation is called a building construction site or a construction site.
The stand of the building engineering crane in the prior art is fixed by the foundation bolts at the bottom, the base at the bottom of the stand is small in contact area with the ground, the stability is small, powerful supporting force cannot be provided, and the crane is prevented from falling.
SUMMERY OF THE UTILITY MODEL
The problem to prior art exists, the utility model provides a building engineering is stand reinforcing apparatus for hoist, first buckle and second buckle through the setting make it carry out the closure through the hinge, thereby wrap up the pole setting on the hoist, then fix first buckle and second buckle through fixture block and draw-in groove, thereby make its better wrap up the hoist stand, then can be better make first buckle and second buckle more stable through the bracing piece, thereby bracing piece fixed connection makes the whole lifting surface area increase of device on the steadying plate in addition, thereby prevent that the hoist from taking place the slope.
The utility model discloses a realize like this, including first buckle, inserted bar and fixed plate, the left side one end fixedly connected with hinge of first buckle, the opposite side fixedly connected with second buckle of hinge, fixed jack has been seted up to the upper end of first buckle and second buckle, the surperficial intermediate position fixedly connected with connecting block of first buckle and second buckle, the one end of connecting block is seted up flutedly, swing joint has first connection pivot in the recess, first connection pivot is cup jointed the bracing piece.
As the utility model discloses it is preferred, the right side one end fixedly connected with fixture block of first buckle, the draw-in groove has been seted up to the right side one end of second buckle.
As the utility model discloses it is preferred, the spread groove has been seted up to the upper surface both sides of fixed plate, the fixing bolt hole has been seted up on the next door of spread groove.
As the utility model discloses it is preferred, the lower extreme of inserted bar is provided with the dashpot, the pivot is connected to the second has been cup jointed to the one end of dashpot, the buffer beam has been cup jointed in the pivot is connected to the second, the bottom fixedly connected with buffer spring of dashpot, buffer spring's the other end and buffer beam fixed connection.
As the utility model discloses it is preferred, the bracing piece respectively evenly is provided with two and carries out the joint with the spread groove on first buckle and second buckle.
Preferably, the size of the insertion rod is slightly smaller than that of the insertion hole.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a fixture block and the draw-in groove that set up, can be better fix first buckle and second buckle to better wrap up fixedly to the hoist stand.
2. The utility model discloses a spread groove and the fixing bolt hole that set up, can be better fix the fixed plate on ground to fix the bracing piece on first buckle and the second buckle.
3. The utility model discloses a pivot, buffer beam and buffer spring are connected to dashpot, second that sets up, can be better make the buffer beam shrink when inserting the inserted bar, thereby pop out through buffer spring and make and fix better with ground when then making it insert ground through the jack to better fix the stand.
4. The utility model discloses a bracing piece and spread groove that set up, can be better support first buckle and second buckle, through bracing piece and spread groove joint to convey the fixed plate with the power that the stand received on through the bracing piece, thereby make the hoist stand more stable.
5. The utility model discloses an inserted bar and jack that set up, thereby can be better insert the jack through the inserted bar in to its better fixed.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a top view of the structure provided by the embodiment of the present invention;
fig. 3 is a partial enlarged view of a in fig. 1 according to an embodiment of the present invention;
fig. 4 is a cross-sectional view of an insert rod according to an embodiment of the present invention.
In the figure: 1. a first buckle; 2. a second buckle; 3. a hinge; 4. a jack; 5. connecting blocks; 6. a support bar; 7. a fixing plate; 8. connecting grooves; 9. fixing bolt holes; 10. a card slot; 11. a groove; 12. a first connecting rotating shaft; 13. inserting a rod; 14. a buffer tank; 15. a second connecting rotating shaft; 16. a buffer rod; 17. a buffer spring; 18. and (7) clamping blocks.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the embodiment of the utility model provides a pair of building engineering is stand reinforcing apparatus for hoist, including first buckle 1, inserted bar 13 and fixed plate 7, left side one end fixedly connected with hinge 3 of first buckle 1, opposite side fixedly connected with second buckle 2 of hinge 3, fixing hole 4 has been seted up to the upper end of first buckle 1 and second buckle 2, the surperficial intermediate position fixedly connected with connecting block 5 of first buckle 1 and second buckle 2, connecting block 5's one end is seted up flutedly 11, swing joint has first connecting pivot 12 in the recess 11, first connecting pivot 12 has cup jointed bracing piece 6.
Referring to fig. 1 and 2, a clamping block 18 is fixedly connected to one end of the right side of the first buckle 1, and a clamping groove 10 is formed in one end of the right side of the second buckle 2.
Adopt above-mentioned scheme: through the fixture block 18 and the clamping groove 10, the first buckle 1 and the second buckle 2 can be better fixed, so that the crane upright is better wrapped and fixed.
Referring to fig. 1 and 2, two sides of the upper surface of the fixing plate 7 are provided with connecting grooves 8, and fixing bolt holes 9 are provided beside the connecting grooves 8.
Adopt above-mentioned scheme: through the spread groove 8 and the fixing bolt hole 9 that set up, can be better fix fixed plate 7 on ground to fix bracing piece 6 on first buckle 1 and the second buckle 2.
Referring to fig. 4, a buffer groove 14 is provided at the lower end of the insert rod 13, one end of the buffer groove 14 is sleeved with a second connecting rotating shaft 15, the second connecting rotating shaft 15 is sleeved with a buffer rod 16, a buffer spring 17 is fixedly connected to the bottom of the buffer groove 14, and the other end of the buffer spring 17 is fixedly connected to the buffer rod 16.
Adopt above-mentioned scheme: through the buffer slot 14 that sets up, second connection pivot 15, buffer beam 16 and buffer spring 17, make buffer beam 16 shrink when inserting to inserted bar 13 that can be better, then make it pop out through buffer spring 17 when inserting ground through jack 4 and make with the better fixed on ground to better fix the stand.
Referring to fig. 1 and 2, the two support rods 6 are respectively and uniformly arranged on the first buckle 1 and the second buckle 2 and are clamped with the connecting groove 8.
Adopt above-mentioned scheme: through bracing piece 6 and the spread groove 8 that sets up, can be better support first buckle 1 and second buckle 2, through bracing piece 6 and spread groove 8 joint to convey the power that the stand received on fixed plate 7 through bracing piece 6, thereby make the hoist stand more stable.
Referring to fig. 1, 2 and 4, the size of the plunger 13 is slightly smaller than that of the receptacle 4.
Adopt above-mentioned scheme: through the inserted bar 13 and the jack 4 that set up, thereby can be better fix it better in inserting the jack 4 through inserted bar 13.
The utility model discloses a theory of operation:
when using, at first open first buckle 1 and second buckle 2 through hinge 3, then with the hoist stand parcel in first buckle 1 and second buckle 2, then through the draw-in groove 10 that is equipped with on the fixture block 18 that is equipped with on the first buckle 1 and the second buckle 2 with first buckle 1 and second buckle 2 fixed closure, then make its spread groove 8 with on the fixed plate 7 carry out the joint through rotating the bracing piece 6, then fix through fixing bolt hole 9, make its and ground contact, then insert inserted bar 13 through jack 4 of first buckle 1 and 2 upper ends of second buckle, thereby insert inserted bar 13 in the ground, thereby better fix it, thereby make the lifting surface increase through the fixed plate 7 that sets up, thereby make its stability more.
In summary, the following steps: this building engineering is stand reinforcing apparatus for hoist, first buckle 1 through setting up, second buckle 2, hinge 3, jack 4, connecting block 5, bracing piece 6, fixed plate 7, spread groove 8, fixing bolt hole 9, draw-in groove 10, recess 11, first connecting pivot 12, inserted bar 13, dashpot 14, pivot 15 is connected to the second, dashpot 16, buffer spring 17 and fixture block 18's cooperation is used, the stand of having solved the building engineering hoist among the prior art all has the rag bolt of bottom fixed, the base and the ground area of contact of stand bottom are little, and stability can little, can not provide powerful holding power, prevent that the hoist from appearing the problem of empting.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building engineering is stand reinforcing apparatus for hoist, includes first buckle (1), inserted bar (13) and fixed plate (7), its characterized in that: the utility model discloses a buckle, including first buckle (1), left side one end fixedly connected with hinge (3), opposite side fixedly connected with second buckle (2) of hinge (3), jack (4) have been seted up to the upper end of first buckle (1) and second buckle (2), the surperficial intermediate position fixedly connected with connecting block (5) of first buckle (1) and second buckle (2), the one end of connecting block (5) is seted up flutedly (11), swing joint has first connection pivot (12) in recess (11), bracing piece (6) have been cup jointed in first connection pivot (12).
2. The column reinforcing apparatus for a construction crane according to claim 1, wherein: the right side one end fixedly connected with fixture block (18) of first buckle (1), draw-in groove (10) have been seted up to the right side one end of second buckle (2).
3. The column reinforcing apparatus for a construction crane according to claim 1, wherein: connecting grooves (8) are formed in two sides of the upper surface of the fixing plate (7), and fixing bolt holes (9) are formed beside the connecting grooves (8).
4. The column reinforcing apparatus for a construction crane according to claim 1, wherein: the lower extreme of inserted bar (13) is provided with buffer slot (14), pivot (15) are connected to the second has been cup jointed to the one end of buffer slot (14), pivot (15) are connected to the second have cup jointed buffer beam (16), the bottom fixedly connected with buffer spring (17) of buffer slot (14), the other end and buffer beam (16) fixed connection of buffer spring (17).
5. The column reinforcing apparatus for a construction crane according to claim 1, wherein: bracing piece (6) respectively evenly are provided with two and carry out the joint with spread groove (8) on first buckle (1) and second buckle (2).
6. The column reinforcing apparatus for a construction crane according to claim 1, wherein: the size of the inserted rod (13) is slightly smaller than that of the insertion hole (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020970964.XU CN212503655U (en) | 2020-06-01 | 2020-06-01 | Stand reinforcing apparatus for building engineering hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020970964.XU CN212503655U (en) | 2020-06-01 | 2020-06-01 | Stand reinforcing apparatus for building engineering hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212503655U true CN212503655U (en) | 2021-02-09 |
Family
ID=74391126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020970964.XU Expired - Fee Related CN212503655U (en) | 2020-06-01 | 2020-06-01 | Stand reinforcing apparatus for building engineering hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212503655U (en) |
-
2020
- 2020-06-01 CN CN202020970964.XU patent/CN212503655U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212503655U (en) | Stand reinforcing apparatus for building engineering hoist | |
CN213741714U (en) | Steel construction anti-wind device | |
CN210713865U (en) | Prefabricated concrete enclosure of assembled transport mounting tool | |
CN211116422U (en) | Mounting base of wind power generation equipment | |
CN212151413U (en) | Quick self-mounting tower crane | |
CN212271693U (en) | Strutting arrangement is used in building engineering construction | |
CN209892984U (en) | Electromechanical mounting device convenient to place instrument | |
CN217872662U (en) | Stability support body device based on rig | |
CN212421722U (en) | Tool for supporting concrete prefabricated part | |
CN206166319U (en) | Can enlarge application range's office furniture supporting mechanism | |
CN206166318U (en) | Office furniture braced system with locking function | |
CN213837741U (en) | Novel template for building construction | |
CN216596701U (en) | Urban and rural planning land reclamation device | |
CN220664557U (en) | Tool capable of rapidly accommodating and extracting thick cable | |
CN219030536U (en) | Concrete hanging pot | |
CN221372920U (en) | Building engineering template fixing device | |
CN213656068U (en) | Heavy machinery rack is used in engineering construction | |
CN214531812U (en) | Safety platform structure for chimney construction | |
CN220705140U (en) | Building construction platform | |
CN217053964U (en) | Conversion structure for connecting roof truss | |
CN214143319U (en) | Support connecting structure of cast-in-place box girder | |
CN215484534U (en) | Window platform erects strutting arrangement for construction | |
CN215168297U (en) | Drain pipe network operation and maintenance device | |
CN211691384U (en) | Overhanging scaffold for construction engineering | |
CN219567328U (en) | Road bridge portal crane fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210209 |