CN212480355U - Pipeline erects and uses fixing bracket for indoor building - Google Patents

Pipeline erects and uses fixing bracket for indoor building Download PDF

Info

Publication number
CN212480355U
CN212480355U CN202020790687.4U CN202020790687U CN212480355U CN 212480355 U CN212480355 U CN 212480355U CN 202020790687 U CN202020790687 U CN 202020790687U CN 212480355 U CN212480355 U CN 212480355U
Authority
CN
China
Prior art keywords
pipeline
fixing groove
frame body
connecting rod
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020790687.4U
Other languages
Chinese (zh)
Inventor
姜伟民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongdu International Construction Co ltd
Original Assignee
Hefei Wufan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Wufan Construction Engineering Co ltd filed Critical Hefei Wufan Construction Engineering Co ltd
Priority to CN202020790687.4U priority Critical patent/CN212480355U/en
Application granted granted Critical
Publication of CN212480355U publication Critical patent/CN212480355U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline for interior architecture erects and uses mounting bracket, including the body frame body, second fixed slot and connecting rod, the one end of the body frame body is provided with first installation piece, second installation piece is installed to the other end of the body frame body, first fixed slot has been seted up to one side of the body frame body, and the body frame internal portion of first fixed slot both sides has all been seted up and has been put in the chamber. The utility model discloses a first installation piece and second installation piece, the design of slot is seted up in the cooperation for two sets of body frames body is in the installation, and the second installation piece is aimed at and is embedded in the slot and aim at two sets of first fixed slots, when can realizing fixing, makes the pipeline install in unified horizontally position, thereby makes to be parallel to each other between each pipeline, can effectively reduce the pipeline and take place chaotic condition at the in-process of erectting.

Description

Pipeline erects and uses fixing bracket for indoor building
Technical Field
The utility model relates to an interior construction equipment technical field specifically is a pipeline erects and uses fixing bracket for interior construction.
Background
The pipeline is the general name of various pipelines, electric wires, cables and the like, is mainly used for indoor buildings, and in the installation process of pipeline erection, each pipeline in the pipeline needs to be fixed through a fixing bracket.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline erects and uses mounting bracket for indoor building to propose in the middle of the installation process of erectting the pipeline in solving above-mentioned background art, need fix each in the middle of the pipeline with the pipeline through mounting bracket, and current pipeline erects the in-process pipeline and easily erects the confusion, and need erect the pipeline of different specifications, need purchase the mounting bracket of different specifications and install, use very inconvenient problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline for interior architecture erects and uses mounting bracket, includes the body frame body, second fixed slot and connecting rod, the one end of the body frame body is provided with first installation piece, second installation piece is installed to the other end of the body frame body, first fixed slot has been seted up to one side of the body frame body, and the body frame internal portion of first fixed slot both sides has all seted up built-in chamber, the regulation spout has all been seted up to the inner wall both sides in built-in chamber, and the inside of adjusting the spout is embedded to have an adjusting slider, reset spring and built-in intracavity wall connection are passed through to adjusting slider's one end, adjusting slider's the other end is provided with the connecting rod, and the connecting rod runs through built-in chamber and the body frame body in proper order, the one end and the second fixed slot fixed connection of its connecting rod.
Preferably, the surfaces of the first mounting block and the second mounting block are both provided with a reserved hole, and the inner wall of the reserved hole is provided with an internal thread.
Preferably, a slot matched with the second mounting block is formed in the surface of the first mounting block, and the slot is clamped with the second mounting block.
Preferably, the first fixing groove and the second fixing groove are both provided with semicircular grooves, and gaskets are pressed on the inner walls of the first fixing groove and the second fixing groove.
Preferably, the buffering assembly comprises a buffering spring and a rubber gasket, and the rubber gasket is connected to the middle position of the inner walls of the first fixing groove and the second fixing groove through the buffering spring.
Preferentially, the surface of the connecting rod is provided with scale marks, holes are formed in the surfaces of the main frame body and the built-in cavity, and locking bolts are embedded in the holes.
Compared with the prior art, the beneficial effects of the utility model are that: the fixing bracket for the pipeline frame for the indoor building is characterized in that the first mounting block and the second mounting block are matched to form a slot, so that two groups of main frame bodies are aligned and embedded into the slot and two groups of first fixing slots are aligned in the mounting process, pipelines can be mounted at the positions at the same level when the fixing is carried out, the pipelines are parallel to each other, the disordered condition of the pipelines in the erecting process can be effectively reduced, the first fixing slots and the second fixing slots are matched with the sliding action of the adjusting sliding blocks in the adjusting sliding slots through the self elasticity of the reset springs, the distance between the first fixing slots and the second fixing slots can be adjusted, the pipelines with different specifications can be conveniently adapted and clamped, the universality of the whole device during use is improved, and meanwhile, the stability of fixing the pipelines is improved through the design of the buffer assembly, meanwhile, the situation of extrusion damage in the pipeline installation process is reduced, the overall structure is simple and reasonable in design, the practicability is high, and the pipeline installation method is very suitable for popularization and application in practical application.
Drawings
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
FIG. 3 is a schematic sectional view of a front view of the buffering assembly of the present invention;
fig. 4 is an enlarged schematic view of a structure in fig. 1 according to the present invention.
In the figure: 1. a main frame body; 2. a first mounting block; 3. a second mounting block; 4. a slot; 5. A first fixing groove; 6. a second fixing groove; 7. a buffer assembly; 71. a buffer spring; 72. a rubber gasket; 8. a connecting rod; 9. locking the bolt; 10. adjusting the sliding block; 11. adjusting the sliding chute; 12. a return spring; 13. scale lines; 14. a cavity is arranged inside; 15. holes are reserved.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a fixing bracket for erecting pipelines for indoor buildings comprises a main frame body 1, a second fixing groove 6 and a connecting rod 8, wherein one end of the main frame body 1 is provided with a first installation block 2, the other end of the main frame body 1 is provided with a second installation block 3, the surfaces of the first installation block 2 and the second installation block 3 are both provided with a preformed hole 15, the inner wall of the preformed hole 15 is provided with internal threads, the surface of the first installation block 2 is provided with a slot 4 matched with the second installation block 3, the slot 4 is clamped with the second installation block 3, when the fixing bracket is prepared for installation, a worker can lay a group of main frame bodies 1 flatly according to the required installation position, align the second installation block 3 on one side of the other group of main frame bodies 1 and clamp the second installation block into the slot 4 on the surface of the first installation block 2 on one side of the group of main frame bodies 1, then, screws are sequentially screwed into the preformed holes 15, and the two groups of main frame bodies 1 are fixed, when enough realizing fixing, make the pipeline install in the position of uniform level to make and be parallel to each other between each pipeline, can effectively reduce the pipeline and erect the condition that the in-process takes place the confusion.
First fixed slot 5 has been seted up to one side of the body frame body 1, and built-in chamber 14 has all been seted up to the body frame body 1 inside of 5 both sides of first fixed slot, regulation spout 11 has all been seted up to the inner wall both sides in built-in chamber 14, and the inside of adjusting spout 11 is embedded to have adjusting block 10, adjusting block 10's one end is passed through reset spring 12 and is built-in intracavity 14 wall connection, adjusting block 10's the other end is provided with connecting rod 8, and connecting rod 8 runs through built-in chamber 14 and the body frame body 1 in proper order, its connecting rod 8's one end and 6 fixed connection of second fixed slot, the inner wall of second fixed slot 6 and first fixed slot 5 all is provided.
The first fixing groove 5 and the second fixing groove 6 are both provided with semicircular grooves, gaskets are pressed on the inner walls of the first fixing groove 5 and the second fixing groove 6, the buffer component 7 comprises a buffer spring 71 and a rubber gasket 72, the middle position of the inner walls of the first fixing groove 5 and the second fixing groove 6 is connected with the rubber gasket 72 through the buffer spring 71, the surface of the connecting rod 8 is provided with scale marks 13, the surfaces of the main frame body 1 and the built-in cavity 14 are provided with holes, a locking bolt 9 is embedded in the holes, the connecting rod 8 on two sides of the second fixing groove 6 slides in the adjusting sliding groove 11 through the adjusting slide block 10 and the self elastic action of the reset spring 12, a worker holds the second fixing groove 6 by hand and stirs outwards, so that the diameter size of a pipeline suitable for the second fixing groove 6 can be adjusted, after the pipeline to be installed is aligned and inserted between the first fixing groove 5 and the second fixing, the hand loosens second fixed slot 6, make second fixed slot 6 once more through reset spring 12's self elasticity effect, and rubber gasket 72 passes through under buffer spring 71's the cooperation of self elasticity, make second fixed slot 6 drive rubber gasket 72 tightly centre gripping pipeline surface, so that adapt to and the pipeline of the different specifications of centre gripping, commonality when increasing whole device use, and through the design of gasket, it mainly adopts the major ingredient to be that natural latex raw materials foaming forms, have the rubber characteristic, elasticity is fabulous, the resilience is good, can not warp, thereby make the contact surface between first fixed slot 5 and second fixed slot 6 and the pipeline have certain resilience, certain buffer has, the condition of taking place the extrusion damage in the effective pipeline installation process that reduces.
The working principle is as follows: when the main frame body is ready to be installed, a worker lays a group of main frame bodies 1 at the position required to be installed, aligns a second installation block 3 on one side of the other group of main frame bodies 1, clamps the main frame bodies into a slot 4 on the surface of a first installation block 2 on one side of one group of main frame bodies 1, screws are screwed into reserved holes 15 in sequence, and the two groups of main frame bodies 1 are fixed, at the moment, a connecting rod 8 on two sides of a second fixing groove 6 slides in an adjusting sliding groove 11 through an adjusting sliding block 10 and the self elastic action of a reset spring 12, the worker holds the second fixing groove 6 and stirs the second fixing groove 6 outwards, so that the diameter size of a proper pipeline can be adjusted by the second fixing groove 6, after the pipeline to be installed is aligned and inserted between the first fixing groove 5 and the second fixing groove 6, the hand loosens the second fixing groove 6, and the second fixing groove 6 passes through the self elastic action of, and rubber gasket 72 passes through under buffer spring 71's self elasticity cooperation for second fixed slot 6 drives rubber gasket 72 and tightly grasps the pipeline surface, and immediately, the staff observes the scale mark 13 on two sets of connecting rod 8 surfaces, makes after two sets of connecting rod 8 expose the same scale, again with locking bolt 9 rotatory screw up can, above be exactly the utility model discloses a theory of operation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a pipeline erects and uses fixing bracket for interior building, includes the body frame body (1), second fixed slot (6) and connecting rod (8), its characterized in that: one end of the main frame body (1) is provided with a first mounting block (2), the other end of the main frame body (1) is provided with a second mounting block (3), one side of the main frame body (1) is provided with a first fixing groove (5), and the main frame body (1) at the two sides of the first fixing groove (5) is internally provided with a built-in cavity (14), two sides of the inner wall of the built-in cavity (14) are both provided with adjusting sliding chutes (11), an adjusting slide block (10) is embedded in the adjusting sliding groove (11), one end of the adjusting slide block (10) is connected with the inner wall of the built-in cavity (14) through a return spring (12), the other end of the adjusting slide block (10) is provided with a connecting rod (8), and the connecting rod (8) penetrates through the built-in cavity (14) and the main frame body (1) in sequence, one end of the connecting rod (8) is fixedly connected with the second fixing groove (6), and the inner walls of the second fixing groove (6) and the first fixing groove (5) are provided with buffer components (7).
2. The fixing bracket for erecting the pipeline for the indoor building according to claim 1, wherein: preformed hole (15) have all been seted up on the surface of first installation piece (2) and second installation piece (3), and the inner wall of preformed hole (15) is provided with the internal thread.
3. The fixing bracket for erecting the pipeline for the indoor building according to claim 1, wherein: the surface of the first installation block (2) is provided with a slot (4) matched with the second installation block (3), and the slot (4) is clamped with the second installation block (3).
4. The fixing bracket for erecting the pipeline for the indoor building according to claim 1, wherein: the first fixing groove (5) and the second fixing groove (6) are both provided with semicircular grooves, and gaskets are pressed on the inner walls of the first fixing groove (5) and the second fixing groove (6).
5. The fixing bracket for erecting the pipeline for the indoor building according to claim 1, wherein: the buffer assembly (7) comprises a buffer spring (71) and a rubber gasket (72), and the rubber gasket (72) is connected to the middle positions of the inner walls of the first fixing groove (5) and the second fixing groove (6) through the buffer spring (71).
6. The fixing bracket for erecting the pipeline for the indoor building according to claim 1, wherein: the surface of connecting rod (8) is provided with scale mark (13), the hole has been seted up on the surface of body frame body (1) and built-in chamber (14), and the inside embedded locking bolt (9) that has of hole.
CN202020790687.4U 2020-05-13 2020-05-13 Pipeline erects and uses fixing bracket for indoor building Expired - Fee Related CN212480355U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020790687.4U CN212480355U (en) 2020-05-13 2020-05-13 Pipeline erects and uses fixing bracket for indoor building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020790687.4U CN212480355U (en) 2020-05-13 2020-05-13 Pipeline erects and uses fixing bracket for indoor building

Publications (1)

Publication Number Publication Date
CN212480355U true CN212480355U (en) 2021-02-05

Family

ID=74460593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020790687.4U Expired - Fee Related CN212480355U (en) 2020-05-13 2020-05-13 Pipeline erects and uses fixing bracket for indoor building

Country Status (1)

Country Link
CN (1) CN212480355U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982567A (en) * 2021-09-22 2022-01-28 西安洛科电子科技股份有限公司 Oil pipe pressure monitoring device for intelligent layered oil production and use method thereof
CN114017546A (en) * 2021-09-22 2022-02-08 西安洛科电子科技股份有限公司 Oil pipe fixing device for intelligent layered oil extraction and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982567A (en) * 2021-09-22 2022-01-28 西安洛科电子科技股份有限公司 Oil pipe pressure monitoring device for intelligent layered oil production and use method thereof
CN114017546A (en) * 2021-09-22 2022-02-08 西安洛科电子科技股份有限公司 Oil pipe fixing device for intelligent layered oil extraction and using method thereof

Similar Documents

Publication Publication Date Title
CN212480355U (en) Pipeline erects and uses fixing bracket for indoor building
CN206585287U (en) A kind of apparatus for fixing cord
CN202127205U (en) Rapidly-fixing clamp for cables
CN203434572U (en) Suspended wire clamp
CN217903981U (en) Cable protection pipe convenient to installation
CN108953944B (en) A fixed mounting base for outdoor camera
CN210927877U (en) Distribution frame for communication engineering construction
CN208207035U (en) A kind of three-phase multifunctional electric instrument
CN207475082U (en) A kind of power cable cord holder
CN219788182U (en) Auxiliary wrench for connecting grounding wires
CN220732317U (en) Bus duct tapping unit
CN216530283U (en) Portable wire clamp for electric power engineering
CN209919780U (en) Spool mounting tool of being convenient for
CN219739888U (en) Bus duct convenient to butt joint
CN221171199U (en) Sealed water pipe joint
CN219833541U (en) Portable insulating rod
CN216289048U (en) Lightning-proof overhead power grounding wire
CN218070924U (en) Line connection equipment for electrical engineering
CN219351237U (en) Spiral adjusting plate for power line
CN205004456U (en) Frock is connected to quick reliable ground in elevator job site
CN220754295U (en) Bus-bar clamp of power transmission and transformation equipment
CN220601748U (en) Pier type central air conditioner copper pipe hanging bracket
CN214429209U (en) Join in marriage special fast-assembling fastener of net live-line low-voltage operation
CN220285113U (en) Glass curtain wall connecting device at external corner position
CN213009430U (en) Anion generator receiver

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210812

Address after: 100071 room 406, 4th floor, building 1, yard 1, Shuanglin East Road, Fengtai District, Beijing

Patentee after: Beijing Zhongdu International Construction Co.,Ltd.

Address before: 231600 room S101, building 103, area a, East China International Building Materials Center, HEMA Road, CuO Town, Feidong County, Hefei City, Anhui Province

Patentee before: HEFEI WUFAN CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210205

CF01 Termination of patent right due to non-payment of annual fee