CN212478795U - Reinforcing structure behind large-span protection railing - Google Patents

Reinforcing structure behind large-span protection railing Download PDF

Info

Publication number
CN212478795U
CN212478795U CN202020631924.2U CN202020631924U CN212478795U CN 212478795 U CN212478795 U CN 212478795U CN 202020631924 U CN202020631924 U CN 202020631924U CN 212478795 U CN212478795 U CN 212478795U
Authority
CN
China
Prior art keywords
built
pipe
square concrete
reinforcing
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020631924.2U
Other languages
Chinese (zh)
Inventor
文学明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Yuguan Composite Material Co ltd
Original Assignee
Huai'an Huierbang Enterprise Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huai'an Huierbang Enterprise Management Co Ltd filed Critical Huai'an Huierbang Enterprise Management Co Ltd
Priority to CN202020631924.2U priority Critical patent/CN212478795U/en
Application granted granted Critical
Publication of CN212478795U publication Critical patent/CN212478795U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a large-span protective barrier rear reinforcing structure, wherein two ends of a barrier are provided with stand columns, the bottom ends of the stand columns penetrate 500mm below a terrace layer, square concrete foundations are poured at the bottom ends of the stand columns, the bottom ends of the stand columns are welded with anchoring steel plates in the square concrete foundations, upper rails and lower rails are welded between adjacent stand columns, and separating columns are uniformly distributed between the upper rails and the lower rails; the utility model discloses a horizontal rail of concrete structure, including horizontal rail, bottom rail middle part below, the reinforcing subassembly is equipped with, this reinforcing subassembly includes built-in screw thread reinforcing pipe, external screwed pipe, U type dop, the reference column, built-in screw thread reinforcing pipe lower extreme gos deep into terrace layer below 500mm and built-in screw thread reinforcing pipe lower extreme has also pour square concrete foundation, built-in screw thread reinforcing pipe upper end is higher than terrace layer top surface 30-50mm, this built-in screw thread reinforcing pipe upper end screw in has external screwed pipe, U type dop bottom surface is equipped with the reference column, this reference column is inserted in external screwed pipe upper end and is made U type dop to support in horizontal rail bottom through.

Description

Reinforcing structure behind large-span protection railing
Technical Field
The utility model relates to an outdoor engineering field especially relates to a reinforcing structure behind large-span protection railing.
Background
The guard rail who has iron art or stainless steel material often in parks, square etc. these railings are because self rigidity is better for constructor span is great when the installation, but the later stage is equipped with the discovery part people and can tramples on the railing, thereby makes the railing suffer destruction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a reinforcing structure behind large-span protection railing, this reinforcing structure behind large-span protection railing has increased substantially the steadiness and the bearing capacity of railing to effectively avoid the railing to suffer destruction.
In order to achieve the above object, the utility model adopts the following technical scheme: a large-span guard rail rear reinforcing structure comprises a rail, a terrace layer, a square concrete foundation, an anchoring steel plate and a reinforcing assembly; two ends of the handrail are provided with upright columns, the bottom ends of the upright columns penetrate 500mm below the terrace layer, and square concrete foundations are poured at the bottom ends of the upright columns; the bottom end of the upright post is welded with an anchoring steel plate in the square concrete foundation; the top ends of the upright columns are 900-1500mm higher than the surface of the terrace layer, and an upper transverse bar and a lower transverse bar are welded between the adjacent upright columns; the upper horizontal rail and the lower horizontal rail are uniformly distributed with separation columns; a reinforcing component is arranged below the middle part of the lower rail and comprises an internal threaded reinforcing pipe, an external threaded pipe, a U-shaped clamping head and a positioning column; the lower end of the built-in thread reinforced pipe extends 500mm deep below the terrace layer, and a square concrete foundation is also poured at the lower end of the built-in thread reinforced pipe; the bottom end of the built-in thread reinforced pipe is also welded with an anchoring steel plate in the square concrete foundation; the upper end of the built-in thread reinforced pipe is 30-50mm higher than the top surface of the terrace layer, and the upper end of the built-in thread reinforced pipe is screwed with an external thread pipe; the U type dop bottom surface is equipped with the reference column, and this reference column is inserted in external screwed pipe upper end and makes U type dop support in lower rail bottom through screwing out external screwed pipe.
Preferably, the square concrete foundation has a side of 300mm and a height of 200mm in cross section.
The utility model has the advantages that: this reinforcing structure behind large-span protection railing has increased substantially the steadiness and the bearing capacity of railing to effectively avoid the railing to suffer destruction.
Drawings
Fig. 1 is a schematic view of a large span guard rail post-reinforcement structure.
Wherein: the steel rail comprises a rail 1, a vertical column 11, an upper cross rail 12, a lower cross rail 13, a separation column 14, a terrace layer 2, a square concrete foundation 3, an anchoring steel plate 4, a reinforcing assembly 5, a built-in threaded reinforcing pipe 51, an external threaded pipe 52, a U-shaped clamping head 53 and a positioning column 54.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a large-span guard rail rear reinforcement structure comprises a rail 1, a terrace layer 2, a square concrete foundation 3, an anchoring steel plate 4 and a reinforcement assembly 5; two ends of the railing 1 are provided with upright posts 11, the bottom ends of the upright posts 11 penetrate into the lower part of the terrace layer 2 by 500mm, and square concrete foundations 3 are poured at the bottom ends of the upright posts 11; the bottom end of the upright post 11 is welded with an anchoring steel plate 4 in the square concrete foundation 3; the top ends of the upright columns 11 are higher than the surface of the terrace layer 2 by 900-1500mm, and an upper transverse bar 12 and a lower transverse bar 13 are welded between the adjacent upright columns 11; the upper horizontal rail 12 and the lower horizontal rail 13 are uniformly distributed with separating columns 14; a reinforcing component 5 is arranged below the middle part of the lower rail 13, and the reinforcing component 5 comprises an internal thread reinforcing pipe 51, an external thread pipe 52, a U-shaped clamping head 53 and a positioning column 54; the lower end of the built-in thread reinforced pipe 51 extends 500mm deep below the terrace layer 2, and a square concrete foundation 3 is also poured at the lower end of the built-in thread reinforced pipe 51; the bottom end of the built-in thread reinforced pipe 51 is also welded with an anchoring steel plate 4 in the square concrete foundation 3; the upper end of the built-in thread reinforced pipe 51 is 30-50mm higher than the top surface of the terrace layer 2, and the upper end of the built-in thread reinforced pipe 51 is screwed with an external thread pipe 52; the bottom surface of the U-shaped chuck 53 is provided with a positioning post 54, and the positioning post 54 is inserted into the upper end of the external threaded pipe 52 and supports the U-shaped chuck 53 at the bottom of the lower rail 13 by screwing out the external threaded pipe 52.
In specific implementation, the side length of the cross section of the square concrete foundation 3 is 300mm, and the height of the cross section is 200 mm.

Claims (2)

1. The utility model provides a reinforcing structure behind large-span protection railing which characterized in that: the steel plate reinforced concrete floor comprises a rail, a terrace layer, a square concrete foundation, an anchoring steel plate and a reinforcing assembly; two ends of the handrail are provided with upright columns, the bottom ends of the upright columns penetrate 500mm below the terrace layer, and square concrete foundations are poured at the bottom ends of the upright columns; the bottom end of the upright post is welded with an anchoring steel plate in the square concrete foundation; the top ends of the upright columns are 900-1500mm higher than the surface of the terrace layer, and an upper transverse bar and a lower transverse bar are welded between the adjacent upright columns; the upper horizontal rail and the lower horizontal rail are uniformly distributed with separation columns; a reinforcing component is arranged below the middle part of the lower rail and comprises an internal threaded reinforcing pipe, an external threaded pipe, a U-shaped clamping head and a positioning column; the lower end of the built-in thread reinforced pipe extends 500mm deep below the terrace layer, and a square concrete foundation is also poured at the lower end of the built-in thread reinforced pipe; the bottom end of the built-in thread reinforced pipe is also welded with an anchoring steel plate in the square concrete foundation; the upper end of the built-in thread reinforced pipe is 30-50mm higher than the top surface of the terrace layer, and the upper end of the built-in thread reinforced pipe is screwed with an external thread pipe; the U type dop bottom surface is equipped with the reference column, and this reference column is inserted in external screwed pipe upper end and makes U type dop support in lower rail bottom through screwing out external screwed pipe.
2. The large-span guard rail rear reinforcing structure of claim 1, wherein: the side length of the cross section of the square concrete foundation is 300mm, and the height of the cross section of the square concrete foundation is 200 mm.
CN202020631924.2U 2020-04-23 2020-04-23 Reinforcing structure behind large-span protection railing Expired - Fee Related CN212478795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020631924.2U CN212478795U (en) 2020-04-23 2020-04-23 Reinforcing structure behind large-span protection railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020631924.2U CN212478795U (en) 2020-04-23 2020-04-23 Reinforcing structure behind large-span protection railing

Publications (1)

Publication Number Publication Date
CN212478795U true CN212478795U (en) 2021-02-05

Family

ID=74450493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020631924.2U Expired - Fee Related CN212478795U (en) 2020-04-23 2020-04-23 Reinforcing structure behind large-span protection railing

Country Status (1)

Country Link
CN (1) CN212478795U (en)

Similar Documents

Publication Publication Date Title
CN109403456B (en) Steel corbel embedded structure and construction method thereof
CN113356551B (en) Cantilever frame structure
CN206607863U (en) A kind of post-cast strip temporary support structure
CN103321155A (en) Viaduct pier construction platform system and method for building system and pouring piers
CN212478795U (en) Reinforcing structure behind large-span protection railing
CN113958112A (en) Comprehensive scaffold construction method
CN213710299U (en) Modular two-layer elevartor shaft integral lifting bracing operation platform
CN214271689U (en) Firm type rail guard is used to road bridge engineering
KR101777746B1 (en) A support
CN212002270U (en) Reinforcing device for bottom template of stand oblique beam
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
CN213085392U (en) Self-climbing support stand column structure of frame body
CN212406336U (en) Bridge construction guardrail device
CN213174742U (en) Top bracing steel stand structure
CN214144117U (en) Steel construction foot post connecting piece
CN112942779A (en) Fine-adjustable cantilever formwork system device and construction method using same
CN216766929U (en) Photovoltaic bicycle shed capable of draining water quickly
CN211312861U (en) Railing and eave connection structure of ancient building
CN214362895U (en) Bridge rotation construction is with preventing system of toppling
CN217106264U (en) Balcony edge protection system
CN220618041U (en) Steel beam foundation structure of external construction elevator
CN220395153U (en) Attaching structure of attaching lifting scaffold
CN215595033U (en) Novel safety protection railing
CN217651844U (en) Overhanging type construction elevator concrete foundation structure
CN112963019B (en) Building engineering post-cast strip strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210927

Address after: 225500 No. 8, industrial concentration zone, Dalun Town, Jiangyan District, Taizhou City, Jiangsu Province

Patentee after: Taizhou Yuguan composite material Co.,Ltd.

Address before: 223400 Jiangsu Lianshui Huaian Xingang Xintiandi commercial A2-2 District 1060

Patentee before: Huai'an huierbang Enterprise Management Co., Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210205

Termination date: 20210423