CN212478121U - Based on green connecting device for building engineering - Google Patents
Based on green connecting device for building engineering Download PDFInfo
- Publication number
- CN212478121U CN212478121U CN202020802581.1U CN202020802581U CN212478121U CN 212478121 U CN212478121 U CN 212478121U CN 202020802581 U CN202020802581 U CN 202020802581U CN 212478121 U CN212478121 U CN 212478121U
- Authority
- CN
- China
- Prior art keywords
- arc
- plate
- connecting plate
- connecting piece
- limiting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims description 7
- 238000010030 laminating Methods 0.000 abstract description 4
- 238000005096 rolling process Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 230000000694 effects Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a based on green connecting device for building engineering relates to the building engineering field, including first connecting piece and second connecting piece, the first connecting plate of one end fixedly connected with of first connecting piece, the one end fixedly connected with second connecting plate of second connecting piece, first connecting plate is connected with the laminating of second connecting plate, and states that the middle part of first connecting plate and second connecting plate passes through rolling disc swing joint, first connecting plate is passed through spacing subassembly with the one end of second connecting plate and is connected. The utility model discloses a be provided with first connecting piece and second connecting piece, first connecting piece and second connecting piece set up to the structure of angularly adjustable for this device can adjust certain angle as required, and through be provided with spacing subassembly on first connecting plate and second connecting plate, spacing subassembly can be with first connecting piece and the spacing fixed of second connecting piece, has improved the stability of this device work.
Description
Technical Field
The utility model relates to a building engineering field, in particular to based on connecting device for green building engineering.
Background
The steel construction connecting piece is a fixed part who is used as the building trade specially in building engineering, its main effect is exactly with support or steel pipe on the building together fixed, so that the better work of steel pipe, building fastener kind and size in the existing market are various, but building fastener on the market also has some weak points, for example, the aperture size of connecting piece is certain, can not fix not equidimension steel pipe or support, if meet that the building material diameter that will fix is less, just can not fix it, the function is more single, the mesh has the inconvenient regulation rotation of fastener on the market yet, can't make up or dismantle, can't rotate suitable use scheme according to the environment of difference, it is inconvenient to use. Therefore, it is necessary to invent a connection device for green construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a based on connecting device for green building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a based on connecting device for green building engineering, includes first connecting piece and second connecting piece, the first connecting plate of one end fixedly connected with of first connecting piece, the one end fixedly connected with second connecting plate of second connecting piece, first connecting plate is connected with the laminating of second connecting plate, and states the middle part of first connecting plate and second connecting plate and pass through rolling disc swing joint, first connecting plate is connected through spacing subassembly with the one end of second connecting plate, first connecting piece and second connecting piece all include arc fixed plate and arc fly leaf, round pin axle swing joint is passed through to the one end of arc fixed plate and arc fly leaf, the equal fixedly connected with extension plate of the other end of arc fixed plate and arc fly leaf, two adjacent extension plate laminating are connected, and two extension plates pass through locking bolt fixed connection.
Preferably, the inner arc sides of the arc-shaped fixed plate and the arc-shaped movable plate are both provided with pressing plates, the two pressing plates are symmetrically arranged, and the two pressing plates are both arranged to be of arc-shaped structures.
Preferably, one side of each pressing plate, which is far away from each other, is respectively connected with the arc-shaped fixed plate and the arc-shaped movable plate through the pressing spring, and one side of each pressing plate, which is close to each other, is provided with the elastic connection layer.
Preferably, the limiting assembly comprises a through groove formed in one end of the first connecting plate, a limiting column penetrates through the through groove, and a limiting groove matched with the limiting column is formed in the second connecting plate.
Preferably, the limiting groove is provided with a plurality of, and a plurality of limiting grooves are equidistant arc and distribute, and a plurality of limiting grooves all with spacing post looks adaptation.
Preferably, an annular empty groove is formed in the middle of the through groove, an annular convex block is fixedly connected to the outer side of the middle of the limiting column, the annular convex block is located in the annular empty groove, one end of the annular convex block is connected with the side wall of the annular empty groove through a reset spring, and the reset spring is sleeved on the outer side of the limiting column.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a be provided with first connecting piece and second connecting piece, first connecting piece and second connecting piece set up to the angularly adjustable structure for this device can adjust certain angle as required, and through be provided with spacing subassembly on first connecting plate and second connecting plate, spacing subassembly can be with first connecting piece and second connecting piece spacing fixed, improved the stability of this device work;
2. the utility model discloses a be provided with the pressure strip on arc fixed plate and arc fly leaf, two pressure strip cooperation pressure spring can play steel pipe or support and compress tightly spacing effect for this device can spacing steel pipe or the support of different diameters size, has improved the work efficiency of this device, and elastic connection layer on the pressure strip has played certain guard action to steel pipe or support.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic diagram of the whole structure of the present invention after rotation.
Fig. 3 is a schematic structural sectional view of the first connecting member and the second connecting member of the present invention.
Fig. 4 is a schematic structural section view of the limiting assembly of the present invention.
In the figure: 1. a first connecting member; 2. a second connecting member; 3. a first connecting plate; 4. a second connecting plate; 5. rotating the disc; 6. a limiting component; 7. an arc-shaped fixing plate; 8. an arc-shaped movable plate; 9. an extension plate; 10. locking the bolt; 11. a compression plate; 12. a compression spring; 13. an elastic tie layer; 14. a through groove; 15. a limiting column; 16. a limiting groove; 17. an annular empty groove; 18. an annular projection; 19. a return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a connecting device for building engineering based on green as shown in fig. 1-4, as shown in fig. 1 and fig. 2, including first connecting piece 1 and second connecting piece 2, the first connecting plate 3 of one end fixedly connected with of first connecting piece 1, the one end fixedly connected with second connecting plate 4 of second connecting piece 2, first connecting plate 3 is connected with the laminating of second connecting plate 4, and states that the middle part of first connecting plate 3 and second connecting plate 4 passes through rolling disc 5 swing joint, and first connecting plate 3 is connected through spacing subassembly 6 with the one end of second connecting plate 4, and spacing subassembly 6 can be with first connecting plate 3 and the spacing fixed of second connecting plate 4.
As shown in fig. 3, each of the first connecting member 1 and the second connecting member 2 includes an arc-shaped fixed plate 7 and an arc-shaped movable plate 8, the arc-shaped fixed plate 7 and the arc-shaped movable plate 8 are matched with each other to limit the position of the steel pipe or the support, one end of the arc-shaped fixed plate 7 and one end of the arc-shaped movable plate 8 are movably connected by a pin shaft, the other end of the arc-shaped fixed plate 7 and the other end of the arc-shaped movable plate 8 are fixedly connected with extension plates 9, two adjacent extension plates 9 are connected in a fitting manner, the two extension plates 9 are fixedly connected by locking bolts 10, the inner arc sides of the arc-shaped fixed plate 7 and the arc-shaped movable plate 8 are respectively provided with a pressure plate 11, the two pressure plates 11 are symmetrically arranged, the two pressure plates 11 are arranged in an arc-shaped structure, the side of the two pressure plates 11 away from each other is, make this device can spacing steel pipe or the support of different diameters size, improved the work efficiency of this device, one side that two pressure strips 11 are close to each other all is provided with elastic connection layer 13, and elastic connection layer 13's setting has played certain guard action to steel pipe or support.
As shown in fig. 4, the limiting component 6 comprises a through groove 14 provided at one end of the first connecting plate 3, a limiting post 15 is connected in the through groove 14 in a penetrating manner, a plurality of limiting grooves 16 matched with the limiting post 15 are provided on the second connecting plate 4, the plurality of limiting grooves 16 are provided, the plurality of limiting grooves 16 are distributed in an arc shape with equal intervals, and the plurality of limiting grooves 16 are all matched with the limiting post 15, the plurality of limiting grooves 16 are provided to enable the first connecting piece 1 and the second connecting piece 2 to be limited and fixed after being adjusted to a certain angle, so as to improve the stability of the device, an annular hollow groove 17 is provided at the middle part of the through groove 14, an annular convex block 18 is fixedly connected to the outer side of the middle part of the limiting post 15, the annular convex block 18 is located in the annular hollow groove 17, one end of the annular convex block 18 is connected with the side wall of the annular hollow groove 17 through a return spring 19, the return spring 19 is sleeved at the outer side of the limiting post 15, the, the first connecting plate 3 and the second connecting plate 4 are fixed in a limiting mode, and then the first connecting piece 1 and the second connecting piece 2 are fixed in a limiting mode.
The utility model discloses the theory of operation:
when the device is installed, firstly, the angles of the first connecting piece 1 and the second connecting piece 2 are adjusted according to needs, at the same time, the limiting column 15 is pulled to separate the limiting column 15 from the limiting groove 16, at the same time, the limiting column 15 drives the annular lug 18 to move in the annular hollow groove 17, the reset spring 19 is compressed and stressed, when the first connecting piece 1 and the second connecting piece 2 rotate to corresponding angles, at the same time, the limiting column 15 is loosened, the limiting column 15 resets under the action of the reset spring 19, the limiting column 15 is inserted into the corresponding limiting groove 16, if the limiting column 15 does not correspond to the limiting groove 16, the first connecting piece 1 and the second connecting piece 2 are finely adjusted, so that the limiting column 15 is matched with the limiting groove 16, when the first connecting piece 1 and the second connecting piece 2 are adjusted, at the same time, the arc-shaped movable plate 8 is opened, and then a steel pipe or a support is placed on the inner arc side, then the arc-shaped movable plate 8 is closed to enable the two extension plates 9 to be attached and connected, then the two extension plates 9 are limited and fixed through the locking bolt 10, and at the moment, the steel pipe or the support is pressed and limited by the arc-shaped fixed plate 7 and the pressing plate 11 on the arc-shaped movable plate 8 under the action of the pressing spring 12.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (6)
1. The utility model provides a based on connecting device for green building engineering, includes first connecting piece (1) and second connecting piece (2), its characterized in that: one end of the first connecting piece (1) is fixedly connected with a first connecting plate (3), one end of the second connecting piece (2) is fixedly connected with a second connecting plate (4), the first connecting plate (3) is connected with the second connecting plate (4) in an attaching mode, the middle parts of the first connecting plate (3) and the second connecting plate (4) are movably connected through a rotating disc (5), one end of the first connecting plate (3) and one end of the second connecting plate (4) are connected through a limiting assembly (6), the first connecting piece (1) and the second connecting piece (2) both comprise an arc-shaped fixed plate (7) and an arc-shaped movable plate (8), one ends of the arc-shaped fixed plate (7) and the arc-shaped movable plate (8) are movably connected through a pin shaft, the other ends of the arc-shaped fixed plate (7) and the arc-shaped movable plate (8) are both fixedly connected with an extending plate (9), and two adjacent extending plates (9), and the two extension plates (9) are fixedly connected through a locking bolt (10).
2. The connecting device for green-based construction engineering according to claim 1, wherein: the inner arc side of the arc-shaped fixed plate (7) and the arc-shaped movable plate (8) is provided with a pressing plate (11), the two pressing plates (11) are symmetrically arranged, and the two pressing plates (11) are both arranged to be arc-shaped structures.
3. The connecting device for green-based construction engineering according to claim 2, wherein: one side, far away from each other, of the two pressing plates (11) is connected with the arc-shaped fixed plate (7) and the arc-shaped movable plate (8) through pressing springs (12), and one side, close to each other, of the two pressing plates (11) is provided with an elastic connecting layer (13).
4. The connecting device for green-based construction engineering according to claim 1, wherein: the limiting assembly (6) comprises a through groove (14) formed in one end of the first connecting plate (3), a limiting column (15) penetrates through the through groove (14), and a limiting groove (16) matched with the limiting column (15) is formed in the second connecting plate (4).
5. The connecting device for green-based construction engineering according to claim 4, wherein: the limiting grooves (16) are arranged in a plurality of shapes, the limiting grooves (16) are distributed in an arc shape at equal intervals, and the limiting grooves (16) are matched with the limiting columns (15).
6. The connecting device for green-based construction engineering according to claim 4, wherein: annular dead slot (17) have been seted up at the middle part of logical groove (14), the middle part outside fixedly connected with annular lug (18) of spacing post (15), annular lug (18) are located annular dead slot (17), and the one end of annular lug (18) is passed through reset spring (19) and is connected with the lateral wall of annular dead slot (17), reset spring (19) cup joint in the outside of spacing post (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020802581.1U CN212478121U (en) | 2020-05-14 | 2020-05-14 | Based on green connecting device for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020802581.1U CN212478121U (en) | 2020-05-14 | 2020-05-14 | Based on green connecting device for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212478121U true CN212478121U (en) | 2021-02-05 |
Family
ID=74460858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020802581.1U Expired - Fee Related CN212478121U (en) | 2020-05-14 | 2020-05-14 | Based on green connecting device for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212478121U (en) |
-
2020
- 2020-05-14 CN CN202020802581.1U patent/CN212478121U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101890244A (en) | Assembly toy | |
CN212478121U (en) | Based on green connecting device for building engineering | |
CN218970344U (en) | Assembled building wall connecting device | |
CN201939648U (en) | Ball joint clamping device for operation table | |
CN108571069B (en) | Frame column connecting node suitable for prefabricated assembly building | |
CN215290166U (en) | Honeycomb protection network of waterproof soil loss | |
CN215948578U (en) | Assembled steel construction outer wall | |
CN214423668U (en) | Assembly type building structure | |
CN208329249U (en) | A kind of replaceable insertion early warning type mild steel damper | |
CN111779012B (en) | Assembled foundation structure | |
CN211473084U (en) | Steel bar positioning die | |
CN209413311U (en) | A kind of aluminum alloy pattern plate disassembly pulling-on piece | |
CN220928796U (en) | Construction safety hanging structure | |
CN207228099U (en) | A kind of ground-connecting-wall connector | |
CN218092613U (en) | Rotating shaft structure | |
CN114645584B (en) | Rotary friction self-resetting damper | |
CN212376070U (en) | Assembled steel construction outer wall | |
CN210178004U (en) | Building reinforced structure | |
CN219298596U (en) | Road bridge construction steel bar connection structure | |
CN219411512U (en) | Reinforced steel reinforced concrete column | |
CN212224230U (en) | Fast-assembling steel structure | |
CN214789087U (en) | But high leakproofness ability butterfly valve of fast assembly dismantlement | |
CN216948755U (en) | Self-resetting connecting device for engineering bamboo beam column | |
CN215671516U (en) | Enclose fender convenient to equipment usefulness is dismantled in gardens construction | |
CN214530625U (en) | Rotary fastener for telescopic reinforcement cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210205 |
|
CF01 | Termination of patent right due to non-payment of annual fee |