CN212477336U - Construction surface compaction device for piping lane engineering - Google Patents
Construction surface compaction device for piping lane engineering Download PDFInfo
- Publication number
- CN212477336U CN212477336U CN202020244850.7U CN202020244850U CN212477336U CN 212477336 U CN212477336 U CN 212477336U CN 202020244850 U CN202020244850 U CN 202020244850U CN 212477336 U CN212477336 U CN 212477336U
- Authority
- CN
- China
- Prior art keywords
- pinch roller
- construction surface
- hole
- antifriction bearing
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Machines (AREA)
Abstract
The utility model discloses a piping lane engineering is with construction surface compaction device, including the construction surface pinch roller, the inside pinch roller connecting hole of having seted up of construction surface pinch roller, and the pinch roller connecting hole is countersunk structure, antifriction bearing is installed to the inside gomphosis of pinch roller connecting hole, and the inside screw thread blind hole of having seted up of antifriction bearing one end, antifriction bearing is "T" shape cylindric structure, and antifriction bearing's minor diameter end length equals the length of the little diameter end of pinch roller connecting hole, the inside many first extension rods that install through helicitic texture of screw thread blind hole, many first extension rod one end is installed through welded fastening and is connected the fixed plate, connect fixed plate inside and seted up the mounting hole. This construction surface compaction device for piping lane engineering can install on the pinch roller connecting rod of general road roller, conveniently carries out the compaction action to the corner of piping lane construction surface, the compaction blind area can not appear. So that the construction surface pressing wheel can not be interfered by the side wall of the pipe gallery when performing compaction action on the corner of the pipe gallery.
Description
Technical Field
The utility model relates to a piping lane construction equipment technical field specifically is a piping lane engineering is with construction surface compaction device.
Background
The pipe gallery, i.e. the corridor of pipes, and many pipes in chemical and related plants are collected together and arranged along the outside of the plant or plant, generally in the air, and supported by a support to form a similar appearance to the corridor. A few pipe galleries are also located underground, the urban comprehensive pipe gallery is a tunnel space built under the city, various engineering pipelines such as electric power, communication, heating power, water supply and the like are integrated, overground attachments are facilities such as an outlet, a ventilation opening and the like, the urban comprehensive pipe gallery is an important infrastructure and a 'life line' for guaranteeing urban operation, and a bottom construction surface needs to be compacted when the underground pipe gallery is constructed.
The pinch roller of devices such as current road roller all is connected through the pivot, and the junction of pivot and host computer body can extend to the pinch roller side outside to make the blind spot appear in the single compaction scope of road roller, in the time of carrying out underground pipe gallery road surface pressure, because of having blockking of piping lane lateral wall, the position of the nearly piping lane side in piping lane bottom surface is difficult to use the road roller to carry out the compaction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction face compaction device for piping lane engineering to solve the inconvenient problem of carrying out the compaction to the corner of piping lane construction face of devices such as road rollers on the existing market that above-mentioned background art provided.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a piping lane engineering is with construction face compaction device, includes the construction face pinch roller, the inside pinch roller connecting hole of having seted up of construction face pinch roller, and the pinch roller connecting hole is countersunk hole structure, antifriction bearing is installed to the inside gomphosis of pinch roller connecting hole, and the inside screw thread blind hole of having seted up of antifriction bearing one end, antifriction bearing is "T" shape cylindric structure, and antifriction bearing's minor diameter end length equals the length of pinch roller connecting hole minor diameter end, the inside many extension rods of installing through the helicitic texture of screw thread blind hole, many extension rod one end is installed the connection fixed plate through welded fastening, connection fixed plate internally seted up the installation through-hole.
Preferably, connect fixed plate inside evenly to be equipped with 4 at least installation through-holes, and the equal quantity distributes in many first extension rod both sides.
Preferably, many extension rods include horizontal connecting rod, longitudinal tie post and screw thread erection column, horizontal connecting rod and screw thread erection column pass through the both ends fixed connection of longitudinal tie post and are in the same place.
Preferably, the transverse connecting rod and the threaded mounting column are parallel to each other, and the transverse connecting rod and the threaded mounting column are perpendicular to the longitudinal connecting column.
Preferably, the threaded mounting column is of an external thread structure, the threaded blind hole is of an internal thread structure, and the length of the threaded mounting column is equal to that of the threaded blind hole.
Compared with the prior art, the beneficial effects of the utility model are that: this construction surface compaction device for piping lane engineering can install on the pinch roller connecting rod of general road roller, conveniently carries out the compaction action to the corner of piping lane construction surface, the compaction blind area can not appear. This piping lane engineering can be installed inside the pinch roller connecting hole of counter sink structure with construction face compaction device's antifriction bearing to make antifriction bearing can not stretch out in the side of construction face pinch roller, can not receive the interference of piping lane lateral wall when making construction face pinch roller to carry out the compaction action to piping lane corner.
Drawings
Fig. 1 is a schematic structural view of a construction surface compacting device for piping lane engineering of the present invention;
fig. 2 is a top view of the construction surface compacting device for piping lane engineering of the present invention;
FIG. 3 is a front view of the multi-element extension rod of the construction surface compacting device for piping lane engineering of the present invention;
figure 4 is the utility model discloses a piping lane is construction surface compaction device's for engineering connection mounting plate left side view.
In the figure: 1. connecting fixed plate, 2, installation through-hole, 3, many first extension rod, 301, transverse connection pole, 302, longitudinal direction spliced pole, 303, screw thread erection column, 4, construction face pinch roller, 5, pinch roller connecting hole, 6, screw thread blind hole, 7, antifriction bearing.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a construction surface compacting device for pipe gallery engineering comprises a construction surface pressing wheel 4, a pressing wheel connecting hole 5 is formed in the construction surface pressing wheel 4, the pressing wheel connecting hole 5 is of a countersunk hole structure, a rolling bearing 7 is installed in the pressing wheel connecting hole 5 in an embedded mode, a threaded blind hole 6 is formed in one end of the rolling bearing 7, the rolling bearing 7 is of a T-shaped cylindrical structure, the length of the small-diameter end of the rolling bearing 7 is equal to that of the small-diameter end of the pressing wheel connecting hole 5, the rolling bearing 7 cannot stretch out of the side face of the construction surface pressing wheel 4 due to the structure, the corner of the construction surface pressing wheel 4 cannot be interfered by the side wall of a pipe gallery when being compacted, a plurality of extension rods 3 are installed in the threaded blind hole 6 through a threaded structure, each plurality of extension rods 3 comprises a transverse connecting rod 301, a longitudinal connecting column 302 and a threaded mounting column 303, the transverse connecting rod 301 and, the transverse connecting rod 301 and the thread mounting column 303 are parallel to each other, the transverse connecting rod 301 and the thread mounting column 303 are perpendicular to the longitudinal connecting column 302, the structure enables the longitudinal connecting column 302 perpendicular to the thread mounting column 303 to stand on the left side surface of the construction surface pinch roller 4 to abut against the left side surface of the construction surface pinch roller 4, the construction surface pinch roller 4 is prevented from shaking left and right, the thread mounting column 303 is of an external thread structure, the thread blind hole 6 is of an internal thread structure, the length of the thread mounting column 303 is equal to that of the thread blind hole 6, the structure enables the thread mounting column 303 to completely extend into the thread blind hole 6, so that the left side surface of the construction surface pinch roller 4 can abut against the right side surface of the longitudinal connecting column 302, one end of the multi-element extension rod 3 is fixedly connected with the connecting fixing plate 1 through welding, at least 4 mounting through holes 2 are uniformly arranged in the connecting fixing plate 1, this structure makes the installer can be in the same place through 4 mounting hole 2 will connect that 1 both sides of fixed plate are even and stable with the installation of road roller bearing connecting rod to the marginal right angle position of compaction piping lane construction face connects fixed plate 1 inside and has seted up mounting hole 2.
The working principle is as follows: when using this construction face compaction device for piping lane engineering, at first insert the inside pinch roller connecting hole 5 of the construction face pinch roller 4 of suitable external diameter with antifriction bearing 7, then aim at screw blind hole 6 with the screw thread erection column 303 part of many first extension rod 3 again, rotatory antifriction bearing 7 can be in the same place with screw blind hole 6 complete erection fixation in order to make screw erection column 303, then will connect on the bearing connecting rod of fixed plate 1 laminating road roller again, it is in the same place to use set screw to be connected fixed plate 1 through mounting hole 2 and road roller connection, when using the road roller to press the piping lane construction face, construction face pinch roller 4 also can be rotatory along screw blind hole 6 outsides along with the walking of road roller, so that the corner that makes construction face pinch roller 4 can support at the piping lane construction face carries out the compaction action to the piping lane bottom surface, thereby accomplish a series of work.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (5)
1. The utility model provides a piping lane is construction face compaction device for engineering, includes construction face pinch roller (4), its characterized in that: construction face pinch roller (4) inside pinch roller connecting hole (5) have been seted up, and pinch roller connecting hole (5) are countersunk structure, antifriction bearing (7) are installed to inside gomphosis of pinch roller connecting hole (5), and inside screw thread blind hole (6) of seting up of antifriction bearing (7) one end, antifriction bearing (7) are "T" shape cylindric structure, and the minor diameter end length of antifriction bearing (7) equals the length of pinch roller connecting hole (5) minor diameter end, screw thread blind hole (6) are inside to be installed many first extension rod (3) through helicitic texture, many first extension rod (3) one end is installed through welded fastening and is connected fixed plate (1), connect fixed plate (1) internally seted up mounting hole (2).
2. The construction surface compacting device for pipe gallery engineering of claim 1, characterized in that: connect fixed plate (1) inside evenly to be equipped with 4 at least installation through-holes (2), and the equivalent distribution is in many first extension rod (3) both sides.
3. The construction surface compacting device for pipe gallery engineering of claim 1, characterized in that: the multi-element extension rod (3) comprises a transverse connecting rod (301), a longitudinal connecting column (302) and a thread mounting column (303), and the transverse connecting rod (301) and the thread mounting column (303) are fixedly connected together through two ends of the longitudinal connecting column (302).
4. The working surface compaction device for pipe gallery engineering of claim 3, wherein: the transverse connecting rod (301) and the threaded mounting column (303) are parallel to each other, and the transverse connecting rod (301) and the threaded mounting column (303) are perpendicular to the longitudinal connecting column (302).
5. The working surface compaction device for pipe gallery engineering of claim 4, wherein: the thread mounting column (303) is of an external thread structure, the thread blind hole (6) is of an internal thread structure, and the length of the thread mounting column (303) is equal to that of the thread blind hole (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020244850.7U CN212477336U (en) | 2020-03-03 | 2020-03-03 | Construction surface compaction device for piping lane engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020244850.7U CN212477336U (en) | 2020-03-03 | 2020-03-03 | Construction surface compaction device for piping lane engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212477336U true CN212477336U (en) | 2021-02-05 |
Family
ID=74415895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020244850.7U Active CN212477336U (en) | 2020-03-03 | 2020-03-03 | Construction surface compaction device for piping lane engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212477336U (en) |
-
2020
- 2020-03-03 CN CN202020244850.7U patent/CN212477336U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN212477336U (en) | Construction surface compaction device for piping lane engineering | |
CN211523483U (en) | Water storage type green plant energy-saving prefabricated balcony | |
CN216616490U (en) | Rope rail structure of ETFE membrane air lock steel cable | |
CN206754588U (en) | A kind of telescopic underground pipe gallery combined bracket | |
CN212336092U (en) | Underground pipe gallery | |
CN212175861U (en) | Town road utility tunnel | |
CN113623462A (en) | Comprehensive pipe gallery gas pipeline fixing device and method | |
CN218933467U (en) | Sealing waterproof structure of assembled building | |
CN221627137U (en) | Underground comprehensive pipe rack | |
CN217135083U (en) | Cable support device | |
CN218540771U (en) | Waterproof structure for structural joint of underground pipe gallery | |
CN219033224U (en) | Peripheral deep basal pit reinforced structure of municipal administration piping lane | |
CN213268024U (en) | Foundation ditch excavation braced system monitoring structure | |
CN219834986U (en) | Integrated ecological protection environment-friendly repairing device | |
CN219811927U (en) | Auxiliary positioning device for hydropower installation | |
CN211114905U (en) | Angle adjusting device for bent frame unit support stud | |
CN213271334U (en) | Pipe jacking construction plugging device | |
CN215331617U (en) | Concrete replacement reinforcing wall post maintenance device that catchments | |
CN215336082U (en) | Staple bolt formula solar energy integration lithium cell street lamp | |
CN213946927U (en) | Energy-saving cement pipe curing box | |
CN221095404U (en) | Through type assembly node structure of top beam | |
CN220167211U (en) | Sound insulation device for constructional engineering | |
CN217151534U (en) | Warning fence for construction site of constructional engineering | |
CN214841789U (en) | Heat pump unit of split type composite ground source heat pump heating and cooling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230620 Address after: 3901, Building 9, Huijinyuan, No. 380, Section 3, Furong Middle Road, Tianxin District, Changsha, 410000, Hunan Province Patentee after: Hunan Dingkun Construction Co.,Ltd. Address before: 268 Huangshi Avenue, Huangshi City, Hubei Province 435000 Patentee before: Jin Tao |