CN212469872U - Drilling equipment for high-altitude operation of building - Google Patents

Drilling equipment for high-altitude operation of building Download PDF

Info

Publication number
CN212469872U
CN212469872U CN202021147760.2U CN202021147760U CN212469872U CN 212469872 U CN212469872 U CN 212469872U CN 202021147760 U CN202021147760 U CN 202021147760U CN 212469872 U CN212469872 U CN 212469872U
Authority
CN
China
Prior art keywords
rod
drilling
electric drill
auxiliary
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021147760.2U
Other languages
Chinese (zh)
Inventor
刘宝生
卢恩成
白艳
王帅胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202021147760.2U priority Critical patent/CN212469872U/en
Application granted granted Critical
Publication of CN212469872U publication Critical patent/CN212469872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a drilling device for high-altitude operation of buildings, which comprises a vertical rod and a lifting rod which are arranged in parallel and in a staggered way, wherein an operating rod and an auxiliary rod which are arranged in parallel are arranged between the vertical rod and the lifting rod, and the vertical rod, the lifting rod, the operating rod and the auxiliary rod are mutually connected to form a movable parallelogram structure; the electric drill is fixedly arranged at the upper end part of one side, far away from the upright rod, of the lifting rod; the auxiliary rod is arranged on one side close to the electric drill; the auxiliary rod is arranged on one side far away from the electric drill; through fixing the pole setting is adjusted the action bars is in order to adjust the lifter drives the electric drill reciprocates. The utility model discloses drilling equipment replaces to have now to set up scaffold frame operation platform on ground or to come the drilling with the help of the lift, simple structure, easily operation and safe and reliable, and drilling quality is good and drilling efficiency is high, and is highly irrelevant with the floor, and the popularization is wide, low in production cost.

Description

Drilling equipment for high-altitude operation of building
Technical Field
The utility model belongs to the technical field of the construction auxiliary device, especially, relate to a drilling equipment is used in building aerial work.
Background
In the field of public construction and construction, before secondary structure construction, drilling holes and bar planting are needed at the bottoms of beams and floor slabs. The floors of public buildings are higher, generally 2.8-6.0 m, and some floors can be even higher, and the traditional drilling and bar planting method needs to set up a scaffold operation platform on the ground or realize high-altitude drilling and bar planting by means of a lifter. The traditional construction method has low construction efficiency, is influenced by the high-altitude operation environment and has certain safety risk to operators; and the construction needs to set up a scaffold platform, so that the construction cost is higher.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building drilling equipment for eminence operation has solved the technical problem that prior art efficiency of construction is low, the safe risk is big and manufacturing cost is high, the utility model provides a drilling equipment replaces and sets up scaffold frame operation platform or drill with the help of the lift in the current, not only simple structure, easily operation and safe and reliable, single can operate drilling, and drilling quality is good and drilling efficiency is high, and is highly irrelevant with the floor, and the popularization nature is wide, low in production cost.
In order to solve the technical problem, the utility model discloses a technical scheme is:
a drilling device for high-altitude operation of buildings comprises an upright post and a lifting rod which are arranged in parallel and staggered, wherein an operating rod and an auxiliary rod which are arranged in parallel are arranged between the upright post and the lifting rod, and the upright post, the lifting rod, the operating rod and the auxiliary rod are mutually connected to form a movable parallelogram structure; the electric drill is fixedly arranged at the upper end part of one side, far away from the upright rod, of the lifting rod; the auxiliary rod is arranged on one side close to the electric drill; the auxiliary rod is arranged on one side far away from the electric drill; through fixing the pole setting is adjusted the action bars is in order to adjust the lifter drives the electric drill reciprocates.
Further, the length of the operating rod is greater than that of the auxiliary rod.
Furthermore, one end of the operating rod is connected with one end, far away from the electric drill, of the lifting rod; the other end of the operating rod is far away from one side of the upright rod and is arranged in a suspended mode.
Furthermore, the length of one end, close to the operating rod, of the vertical rod is greater than the length of one end, close to the operating rod, of the lifting rod.
Furthermore, the length of the end, close to the auxiliary rod, of the vertical rod is smaller than the length of the end, close to the auxiliary rod, of the lifting rod.
Furthermore, the two ends of the auxiliary rod are respectively connected with the vertical rod and the lifting rod.
Further, the width distance between the upright rod and the lifting rod is 400-800 mm.
Further, the width distance between the operating rod and the auxiliary rod is 800-1600 mm.
Further, the upright rod, the lifting rod, the operating rod and the auxiliary rod are connected through bolts.
Compared with the prior art, the utility model discloses a drilling equipment, simple structure not only, easily operation and safe and reliable, single can operate drilling, and drilling quality is good and drilling efficiency is high, and is highly irrelevant with the floor, and the universality is wide, low in production cost.
The utility model discloses drilling equipment has utilized lever balance and plane geometry principle can carry out drilling operation to building high-rise building roof or wall body, and during operation, when high altitude such as frame roof beam needs to drill, aim at the drilling position with the drill bit of electric drill at first, the pole setting supports subaerial, and the operation workman holds the pole setting with one hand, and the operating rod is held with the other hand, starts the electric drill through pulling flexible piece nylon rope, and while drilling, through exerting oneself to push down the operating rod, provide ascending power for the lifter, and then promote the drill bit to drill; when the drilling depth reaches the preset depth, the drill bit can be screwed out by slowly lifting the operating rod upwards, and the electric drill can be closed by pulling the flexible piece downwards, so that the high-altitude drilling operation is completed.
Drawings
Fig. 1 is a schematic structural diagram of a drilling device according to an embodiment of the present invention;
fig. 2 is a schematic diagram illustrating the operation of the drilling device according to an embodiment of the present invention during drilling.
In the figure:
10. upright rod 20, lifting rod 30 and operating rod
40. Auxiliary rod 50, bolt 60 and electric drill
70. Flexible member
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
The embodiment provides a drilling device for high-altitude operation of buildings, as shown in fig. 1, which comprises an upright rod 10 and a lifting rod 20 which are arranged in parallel and in a staggered manner, wherein an operating rod 30 and an auxiliary rod 40 which are arranged in parallel are arranged between the upright rod 10 and the lifting rod 20, and the upright rod 10, the lifting rod 20, the operating rod 30 and the auxiliary rod 40 are connected with each other to form a movable parallelogram structure. The electric drill 60 is fixedly arranged at the upper end part of one side of the lifting rod 20 far away from the vertical rod 10, and the electric drill 60 can be fixed on the lifting rod 20 through an iron wire or other safe fixing modes; the auxiliary rod 40 is disposed on a side close to the electric drill 60; the auxiliary rod 40 is disposed on a side away from the drill 60. By fixing the end of the vertical rod 10 away from the electric drill and immobilizing the vertical rod 10, the operation rod 30 is pressed or lifted to adjust the lifting rod 20 and make the lifting rod 20 move the electric drill 60 upward or downward.
Specifically, the length of the operating rod 30 is greater than that of the auxiliary rod 40, the operating rod 30 is located below, that is, on the side away from the electric drill 60, the operating rod 30 is connected with the vertical rod 10 and the lifting rod 20, one end of the operating rod 30 is connected with the end of the lifting rod 20 away from the electric drill 60, and the other end of the operating rod 30 is suspended on the side away from the vertical rod 10. The auxiliary rod 40 is located right above the operation rod 30, and both ends of the auxiliary rod 40 are respectively connected with the vertical rod 10 and the lifting rod 20. The operating rod 30 and the auxiliary rod 40 are connected with the vertical rod 10 and the lifting rod 20 by bolts 50, but the connection is not fixed, and it is required to ensure that the quadrangle formed by the vertical rod 10, the lifting rod 20, the operating rod 30 and the auxiliary rod 40 is movable, that is, an adjustable parallelogram is formed according to four movable connection points.
Further, the length of the end of the upright rod 10 close to the operating rod 30 is greater than the length of the end of the lifting rod 20 close to the operating rod 30; and the length of the vertical rod 10 near the end of the auxiliary rod 40 is less than that of the lifting rod 20 near the end of the auxiliary rod 40.
In the embodiment, the upright 10, the lifting rod 20, the operating rod 30 and the auxiliary rod 40 are all made of wood on the existing construction site, and the length of the upright 10 is 1.5-3.0m, the length of the lifting rod 20 is 1.5-3.5m, the length of the operating rod 30 is 1.0-1.5m and the length of the auxiliary rod is 0.6-1m according to the conventional height of the floor of the existing building. Preferably, the width distance between the upright rod 10 and the lifting rod 20 is 400-800 mm; the width distance between the operation rod 30 and the auxiliary rod 40 is 800-1600 mm. With this length configuration, the drilling apparatus of this embodiment can be operated on the ground, i.e., the drill head of the drill 60 can be brought into contact with the roof. Electric drill 60 is fixed to be set up in the upper end that pole setting 10 one side was kept away from to lifter 20 to be connected with the switch department of electric drill 60 through flexible 70 one end, the vertical extension of the other end is close to the unsettled setting in action bars 30 one side to lifter 20, and wherein flexible 70 is the nylon rope, can open smoothly or close electric drill 60 through the nylon rope.
The utility model relates to a drilling equipment, utilized lever balance and plane geometry principle can carry out drilling operation to building high-rise building roof or wall body, during operation, as shown in fig. 2, when the eminence needs drilling such as frame roof beam, at first aim at the drilling position with the drill bit of electric drill 60, pole setting 10 supports subaerial, operation workman holds pole setting 10 in one hand, operating rod 30 is held in the other hand, start the electric drill through pulling flexible 70 nylon rope, drill, while through exerting oneself pushing down operating rod 30, provide ascending power for lifter 20, and then promote the drill bit to drill; when the drilling depth reaches a predetermined depth, the drill bit can be unscrewed by slowly lifting the operating rod 30 upward, and the electric drill 60 can be turned off by pulling the flexible member 70 downward, thereby completing the high drilling operation.
A method of operating a drilling apparatus for high up operations in a building, comprising a drilling apparatus as claimed in any one of the preceding claims, the steps comprising:
s1: and manufacturing the drilling device by adopting the wood beam on the construction site.
S2: electric drill 60 is fixed to be set up in the upper end that pole setting 10 one side was kept away from to lifter 20 to be connected with the switch department of electric drill 60 through flexible 70 one end, the vertical extension of the other end is close to the unsettled setting in action bars 30 one side to lifter 20, and wherein flexible 70 is the nylon rope, can open smoothly or close electric drill 60 through the nylon rope.
S3: determining the positions of the constructional columns according to design requirements according to ink lines on the wall of the floor, and marking the positions of the reinforcing steel bars of the constructional columns on the floor; and marking the positions of the constructional columns and the steel bars at the bottom of the beam or the floor slab by using a laser demarcation device, namely determining the position of the drilled hole.
S4: the operation rod 30 is operated to be pressed downwards to adjust the height of the lifting rod 20 by vertically placing the end, far away from the electric drill 60, of the upright rod 10 on the ground, and the electric drill 60 is adjusted to be aligned with the mark position; pulling the flexible member 70 activates the drill 60 to drill a hole.
S5: according to the depth marking preset on the drill bit of the electric drill 60, when the drilling depth reaches the predetermined marking depth, the drill bit of the electric drill 60 is unscrewed by slowly lifting the operating lever 30 upward, and the electric drill is closed by pulling the flexible member 70 downward.
1. The structure and the method have the advantages of simple operation, flexible application, high construction efficiency and easy control of drilling depth.
2. Work efficiency is high, need not set up operation platform, and a workman holds one set of equipment handheld and stands alright construction operation on the floor, has improved work efficiency greatly. Compared with the traditional method, the method has the advantage that the construction efficiency can be improved by more than 3 times.
3. The drilling device has the advantages of simple structure, convenient manufacturing and material selection and lower cost. The device selects high-quality square timber at the job site, carries out simple intercepting, punches after confirming bolt shaft position, accomplishes the equipment, and low in manufacturing cost.
4. Compared with the traditional method, the construction quality is easier to guarantee, the personnel investment is reduced, the labor efficiency is improved, the construction progress is accelerated, and the safety of operation workers is guaranteed.
The embodiments of the present invention have been described in detail, and the description is only for the preferred embodiments of the present invention, and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (9)

1. A drilling device for high-altitude operation of buildings is characterized by comprising an upright post and a lifting rod which are arranged in parallel and staggered, wherein an operating rod and an auxiliary rod which are arranged in parallel are arranged between the upright post and the lifting rod, and the upright post, the lifting rod, the operating rod and the auxiliary rod are mutually connected to form a movable parallelogram structure; the electric drill is fixedly arranged at the upper end part of one side, far away from the upright rod, of the lifting rod; the auxiliary rod is arranged on one side close to the electric drill; the auxiliary rod is arranged on one side far away from the electric drill; through fixing the pole setting is adjusted the action bars is in order to adjust the lifter drives the electric drill reciprocates.
2. A drilling assembly for high above building operations according to claim 1 wherein the operating rod length is greater than the auxiliary rod length.
3. A drilling apparatus for high rise operations in a building as claimed in claim 1 or claim 2, wherein the operating rod is connected at one end to the end of the lifting rod remote from the electric drill; the other end of the operating rod is far away from one side of the upright rod and is arranged in a suspended mode.
4. A drilling assembly according to claim 3, wherein the length of the end of the mast adjacent the operating rod is greater than the length of the end of the lifting rod adjacent the operating rod.
5. A drilling assembly according to claim 4, wherein the length of the end of the upright adjacent the auxiliary rod is less than the length of the end of the lifting rod adjacent the auxiliary rod.
6. A drilling device for high building operation according to any one of claims 1-2 and 4-5, wherein the two ends of the auxiliary rod are respectively connected with the vertical rod and the lifting rod.
7. A boring device for high altitude construction according to claim 6, wherein the width distance between the upright and the lifting rod is 400-800 mm.
8. A drilling assembly according to claim 7, wherein the width of the operating rod is 800-1600mm from the auxiliary rod.
9. A drilling apparatus for high rise operations in buildings according to any one of claims 1 to 2, 4 to 5 and 7 to 8 wherein the vertical rod, the lifting rod, the operating rod and the auxiliary rod are connected by bolts.
CN202021147760.2U 2020-06-19 2020-06-19 Drilling equipment for high-altitude operation of building Active CN212469872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021147760.2U CN212469872U (en) 2020-06-19 2020-06-19 Drilling equipment for high-altitude operation of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021147760.2U CN212469872U (en) 2020-06-19 2020-06-19 Drilling equipment for high-altitude operation of building

Publications (1)

Publication Number Publication Date
CN212469872U true CN212469872U (en) 2021-02-05

Family

ID=74413406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021147760.2U Active CN212469872U (en) 2020-06-19 2020-06-19 Drilling equipment for high-altitude operation of building

Country Status (1)

Country Link
CN (1) CN212469872U (en)

Similar Documents

Publication Publication Date Title
CN111702220A (en) Drilling device for high-altitude operation of building and operation method thereof
CN207681545U (en) Movable telescopic bar planting drilling equipment
CN108678423B (en) Vertical conversion supporting structure is demolishd in reverse direction to reinforced concrete structure
CN209703989U (en) A kind of non-perpendicular elevation construction of building hangs blue device
CN203635997U (en) Lifting drilling equipment
CN202850498U (en) Hydraulic support system used for elevator shaft mold
CN102962494A (en) Face-up impacting and drilling device for ceiling
CN201679218U (en) Top plate drilling device for ceiling construction inside building
CN111395184A (en) System and method for constructing high pier with gradually-changed section by using electric bridge type scaffold platform
CN212469872U (en) Drilling equipment for high-altitude operation of building
CN205165973U (en) Top bar planting dowelling jig hole strutting arrangement
CN206972169U (en) Drilling equipment
CN111319011A (en) Operation device for concrete structure bar planting and bar planting drilling method
CN101304164B (en) Installation apparatus for 35Kv isolating switch controlling mechanism
CN102691404B (en) Percussion drill support for overhead drilling construction
CN204912844U (en) A bracket for roof drilling
CN206174441U (en) Elevator shaft operation platform
CN212687304U (en) Device for safely loading and unloading manual hole digging pile into well
CN216129981U (en) Integrated integral multifunctional construction platform for pier and towering structure
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN204024078U (en) For the rig falsework of bar planting bottom beam slab
CN211114849U (en) Device for controlling lifting of cast-in-place wet joint bottom die of precast beam
CN202391338U (en) Device for quickly punching ceiling
CN202921967U (en) Ceiling faceup impacting and drilling device
CN219548287U (en) Ground remote control drilling bar planting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant