CN212452766U - Municipal administration utility tunnel pipeline mount - Google Patents

Municipal administration utility tunnel pipeline mount Download PDF

Info

Publication number
CN212452766U
CN212452766U CN202020977850.8U CN202020977850U CN212452766U CN 212452766 U CN212452766 U CN 212452766U CN 202020977850 U CN202020977850 U CN 202020977850U CN 212452766 U CN212452766 U CN 212452766U
Authority
CN
China
Prior art keywords
upper plate
placing
utility tunnel
muscle
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020977850.8U
Other languages
Chinese (zh)
Inventor
温松涛
陈文理
魏继峰
李立灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Zhuoyi Construction Engineering Co Ltd
Original Assignee
Xiamen Zhuoyi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Zhuoyi Construction Engineering Co Ltd filed Critical Xiamen Zhuoyi Construction Engineering Co Ltd
Priority to CN202020977850.8U priority Critical patent/CN212452766U/en
Application granted granted Critical
Publication of CN212452766U publication Critical patent/CN212452766U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the technical field of the technique of construction and specifically relates to a municipal administration utility tunnel pipeline mount is related to, it includes upper plate, side chamber and places the board, the upside of placing the board is placed to the upper plate, fixed spacing subassembly that sets up between upper plate and the side chamber, spacing subassembly includes dowel steel and spacing frame, the vertical fixed setting of dowel steel is on the upper plate lower surface, and the fixed setting of spacing frame level is in the side chamber, the vertical grafting of dowel steel is in a plurality of spacing frames. The utility model discloses a municipal administration utility tunnel pipeline mount has the effect that conveniently places the upper plate.

Description

Municipal administration utility tunnel pipeline mount
Technical Field
The utility model belongs to the technical field of the technique of construction and specifically relates to a municipal administration utility tunnel pipe fixing frame is related to.
Background
The pipe gallery mainly has the function of gathering a gas pipeline, a water supply pipeline, a drainage pipeline, a reclaimed water pipeline, a heat supply pipeline, a communication cable and the like; its advantage does: and excavation is carried out once, centralized construction is carried out, and repeated excavation of the same road section is avoided. Present piping lane is the cast in situ and forms, and the piping lane is the cuboid structure.
The existing common method for constructing the pipe gallery is an open cut prefabrication and splicing method, is an advanced construction method, requires large-scale prefabrication plants and large-tonnage transportation and hoisting equipment, and has high construction technical requirements and engineering cost. Its advantages are high construction speed and easy control of construction quality.
The utility model provides a pipe gallery, includes mount and upper plate, and the mount is placed in the hole, and the mount includes the side chamber and places the board, and the side chamber is provided with two, places the board and places at two side chamber upsides, places board and two side chamber formation template mounts, is provided with many side muscle in the side chamber, and the upper plate after the factory production and processing is placed at the upside of placing the board, toward filling the concrete in the side chamber and forming the curb plate, and the curb plate combines with the upper plate and forms complete pipe gallery. But when placing the upper plate, the upper plate is heavier longer, needs the repeated lifting removal when placing, just can let the upper plate place on required position, and the process is troublesome, inconvenient accurate upper plate of placing.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, one of the purposes of the utility model is to provide a municipal administration utility tunnel pipeline fixing frame has the effect of conveniently placing the upper plate.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme: the utility model provides a municipal administration utility tunnel pipeline mount, includes upper plate, side chamber and places the board, the upside of placing the board is placed to the upper plate, the fixed spacing subassembly that sets up between upper plate and the side chamber, spacing subassembly includes dowel bar and spacing frame, the vertical fixed setting of dowel bar is on the upper plate lower surface, and spacing frame level is fixed to be set up in the side chamber, the vertical grafting of dowel bar is in a plurality of spacing frames.
Through adopting above-mentioned technical scheme, when placing at the upper plate, let earlier in the vertical spacing frame that inserts of dowel, spacing frame can prevent that the dowel from removing to reduce rocking of upper plate, reach the effect of conveniently placing the upper plate.
The present invention may be further configured in a preferred embodiment as: the limiting frame is provided with a plurality of limiting frames along the vertical direction of the side cavity, the limiting frames are sequentially reduced from top to bottom, and the dowel bars are sequentially inserted into the limiting frames.
Through adopting above-mentioned technical scheme, when the dowel is inserted, spacing frame constantly diminishes in proper order, lets rocking of dowel constantly diminish, gets into the spacing frame of downside at last, lets the upper plate no longer rock, reaches the effect that the upper plate was put to the convenience.
The present invention may be further configured in a preferred embodiment as: the limiting frame is formed by two longitudinal ribs and two transverse ribs in an enclosing mode, and the surfaces of the longitudinal ribs and the surfaces of the horizontal ribs are arc-shaped.
Through adopting above-mentioned technical scheme, indulge the surface of muscle and horizontal muscle and be the arcuation, when the dowel gets into, can let the grafting get into indulge the spacing frame that muscle and horizontal muscle enclose in, reach the effect that makes things convenient for the dowel to get into spacing frame.
The present invention may be further configured in a preferred embodiment as: the upper plate is fixedly provided with a placing rib, and the placing rib is placed on the placing plate.
Through adopting above-mentioned technical scheme, fixedly on the upper plate being provided with places the muscle, place the muscle and can support the upper plate, when the upper plate combines with side chamber cast concrete, be provided with and place the muscle and can make things convenient for the upper plate to combine with the side chamber, reach the effect that makes things convenient for the upper plate to combine on the side chamber.
The present invention may be further configured in a preferred embodiment as: the upper plate is fixedly provided with a fixing rib, and the fixing rib is perpendicular to the placing rib.
Through adopting above-mentioned technical scheme, when placing the muscle and placing on the upper plate, many fixed muscle can further support the upper plate, reach the effect of stable upper plate placing.
The present invention may be further configured in a preferred embodiment as: two supporting rods are fixedly arranged on the upper plate and are abutted against the lower sides of the fixing ribs.
Through adopting above-mentioned technical scheme, the bracing piece can support fixed muscle, when placing the upper plate, can prevent that fixed muscle from empting, reaches the effect that stable fixed muscle was placed.
The present invention may be further configured in a preferred embodiment as: and a connecting rod is fixedly arranged between each pair of supporting rods and is in contact with the fixed rib.
Through adopting above-mentioned technical scheme, fixedly connected with connecting rod between two spinal branch vaulting poles can make things convenient for and fixed muscle contact, reaches the effect of conveniently supporting fixed muscle.
The present invention may be further configured in a preferred embodiment as: the supporting rods are provided with a plurality of pairs along the length direction of the fixing ribs.
Through adopting above-mentioned technical scheme, the bracing piece is provided with many pairs on fixed muscle, can strengthen the bracing piece to fixed muscle and the support of upper plate, reaches the effect of further stable fixed muscle and upper plate.
To sum up, the utility model discloses a following at least one useful technological effect: when placing the upper plate, can let the dowel put into spacing frame, the upper plate constantly descends, lets the dowel constantly descend and gets into a plurality of spacing frames in proper order, and when the dowel got into during the spacing frame of below, the dowel could not remove to let placing in required position of upper plate accuracy, reach the effect of conveniently placing the upper plate.
Drawings
Fig. 1 is a schematic view of a structure in which an upper board is placed on a placing board.
Fig. 2 is a schematic structural view of the upper plate in this embodiment.
Fig. 3 is a schematic view of an installation structure of the limiting frame in the embodiment.
Fig. 4 is a schematic structural diagram of the large limiting frame, the middle limiting frame and the small limiting frame in this embodiment.
Fig. 5 is an enlarged schematic view of the support stick of fig. 2.
In the figure: 1. an upper plate; 2. placing the plate; 3. a lateral cavity; 4. side ribs; 5. a connecting portion; 6. a pouring section; 7. a support bar; 8. transverse ribs; 9. iron wires; 10. a connecting rod; 11. inserting ribs; 12. longitudinal ribs; 13. horizontal ribs; 14. a large limit frame; 15. a middle limit frame; 16. a small limit frame; 17. and (5) erecting the ribs.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 4, for the utility model discloses a municipal administration utility tunnel pipeline mount, including upper plate 1, side chamber 3 and place board 2, side chamber 3 is provided with two, places board 2 and sets up on two side chambers 3, places board 2 and two side chambers 3 and forms the template mount. The side cavity 3 is provided with a side rib 4. Be provided with spacing subassembly between upper plate 1 and two side chambeies 3, spacing subassembly includes dowel 11 and spacing frame, and the vertical fixed setting of dowel 11 is on 1 lower surface of upper plate, and spacing frame is enclosed by two vertical muscle 12 and two horizontal muscle 13.
Referring to fig. 2 and 3, specifically, the limiting frame includes a large limiting frame 14, a middle limiting frame 15 and a small limiting frame 16, the large limiting frame 14 is fixed on the uppermost side rib 4, the middle limiting frame 15 is fixedly arranged on the side rib 4 below the large limiting frame 14, and the small limiting frame 16 is fixedly arranged on the side rib 4 below the middle limiting frame 15. Big spacing frame 14, well spacing frame 15 and little spacing frame 16 all are square frames, indulge muscle 12 and horizontal muscle 13 surface and be the arcuation, make things convenient for joint bar 11 to get into in big spacing frame 14, well spacing frame 15, the little spacing frame 16, spacing subassembly is provided with a plurality ofly between upper plate 1 and two side chambeies 3. 14 bores of big spacing frame are great, can make things convenient for dowel 11 to insert when placing at upper plate 1, and 11 lower extremes of dowel get into big spacing frame 14 earlier, and when upper plate 1 constantly descends, during 11 downshifts of dowel get into spacing frame 15, get into little spacing frame 16 at last, when 11 gets into little spacing frame 16 at the dowel, upper plate 1 can't rock, and stable the placing is in the top of placing board 2, reaches the convenient effect of placing upper plate 1.
Referring to fig. 1 and 3, specifically, the upper plate 1 is fixed to be provided with and places the muscle, places muscle perpendicular to both sides chamber 3, places the muscle including joint portion (not shown in the figure), connecting portion 5, pouring portion 6, joint portion and upper plate 1 casting are located upper plate 1, pouring portion 6 is parallel with the joint portion, and pouring portion 6 places on placing plate 2, connecting portion 5 fixed connection is between joint portion and pouring portion 6, in this embodiment joint portion, connecting portion 5 and pouring portion 6 integrated into one piece. Place the muscle and be provided with many on the length direction of upper plate 1, when pouring portion 6 was placed on placing board 2, can tie up side muscle 4 with connecting portion 5 and pouring portion 6, prevent that upper plate 1 from removing, the concrete of pouring into again lets place muscle, side muscle 4, 1 casting moulding of upper plate. Set up upper plate 1 in advance in the mill, pour in advance in the upper plate 1 and place the muscle, rethread loop wheel machine places upper plate 1 in the top of placing board 2, lets place the muscle and places the contact of board 2, places the muscle and can let upper plate 1 and side chamber 3 stably combine together, reaches the effect that conveniently combines upper plate 1.
Referring to fig. 2 and 5, specifically, fixed muscle is provided with fixed muscle on the upper plate 1, and fixed muscle is perpendicular with placing the muscle, and fixed muscle is located between pouring portion 6 and upper plate 1, and fixed muscle includes horizontal muscle 8 and erects muscle 17, and horizontal muscle 8 is perpendicular with pouring portion 6, and horizontal muscle 8 perpendicular to pouring portion 6 simultaneously erects the fixed both ends that set up at horizontal muscle 8 of muscle 17, erects the lower extreme and the 1 casting moulding of upper plate of muscle 17, and fixed muscle is provided with many on upper plate 1. The place of horizontal muscle 8 and the contact of pouring part 6 is tied up through iron wire 9, and iron wire 9 can prevent that fixed muscle from removing, lets horizontal muscle 8 stable placing between pouring part 6 and upper plate 1. When placing the top of placing board 2 at upper plate 1, (combine figure 1) pouring part 6 with place board 2 contact, fixed muscle can support pouring part 6, further stably places the muscle and places, and fixed muscle can prevent that upper plate 1 from buckling towards the length both ends of upper plate 1 simultaneously, reaches the effect of stably placing upper plate 1.
Referring to fig. 2 and 5, specifically, fixed bracing piece 7 that is provided with on upper plate 1, two spinal branch vaulting poles 7 contradict at the downside of fixed muscle, the fixed connecting rod 10 that is provided with between the bracing piece 7, connecting rod 10 contacts with fixed muscle, and connecting rod 10 can let bracing piece 7 more abundant to horizontal muscle 8 supports, and pouring portion 6 places when placing 2 upsides of board, and bracing piece 7 can support fixed muscle, further stabilizes upper plate 1 and places. Also tighten through iron wire 9 between connecting rod 10 and the horizontal muscle 8, bracing piece 7 is provided with many pairs along the length direction of fixed muscle, when connecting rod 10 and horizontal muscle 8 contact, tighten through iron wire 9 and can prevent that connecting rod 10 from removing to let the stable support of bracing piece 7, be provided with and support upper plate 1 that can be abundant to bracing piece 7 many, reach the effect of stabilizing upper plate 1 and placing.
The implementation principle of the embodiment is as follows: when installing upper plate 1, during many dowel bars 11 on upper plate 1 inserted corresponding big spacing frame 14 respectively, at the in-process that upper plate 1 constantly descends, indulge muscle 12 and horizontal muscle 13 surface and be the arcuation, during dowel bar 11 gets into spacing frame 15, get into little spacing frame 16 at last, little spacing frame 16 can prevent that dowel bar 11 from removing to reach the effect of conveniently placing upper plate 1.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a municipal administration utility tunnel pipeline mount which characterized in that: including upper plate (1), side chamber (3) and place board (2), upper plate (1) is placed at the upside of placing board (2), the fixed spacing subassembly that sets up between upper plate (1) and side chamber (3), spacing subassembly includes dowel steel (11) and spacing frame, dowel steel (11) vertical fixed setting is on upper plate (1) lower surface, and spacing frame level is fixed to be set up in side chamber (3), vertical grafting of dowel steel (11) is in a plurality of spacing frames.
2. The municipal utility tunnel pipeline fixing frame according to claim 1, wherein: the limiting frame is arranged in a plurality of vertical directions along the side cavity (3), the limiting frame is sequentially reduced from top to bottom, and the dowel bars (11) are sequentially inserted into the limiting frame.
3. The municipal utility tunnel pipeline fixing frame according to claim 1, wherein: the limiting frame is defined by two longitudinal ribs (12) and two transverse ribs (8), and the surfaces of the longitudinal ribs (12) and the horizontal ribs (13) are arc-shaped.
4. The municipal utility tunnel pipeline fixing frame according to claim 1, wherein: the upper plate (1) is fixedly provided with a placing rib, and the placing rib is placed on the placing plate (2).
5. The municipal utility tunnel pipeline fixing frame according to claim 1, wherein: the upper plate (1) is fixedly provided with a fixing rib, and the fixing rib is perpendicular to the placing rib.
6. The municipal utility tunnel pipe mount of claim 3, wherein: two supporting rods (7) are fixedly arranged on the upper plate (1), and the two supporting rods (7) are abutted to the lower sides of the fixing ribs.
7. The municipal utility tunnel pipe mount of claim 5, wherein: a connecting rod (10) is fixedly arranged between each pair of supporting rods (7), and the connecting rod (10) is in contact with the fixed rib.
8. The municipal utility tunnel pipe mount of claim 7, wherein: the supporting rods (7) are provided with a plurality of pairs along the length direction of the fixing ribs.
CN202020977850.8U 2020-06-02 2020-06-02 Municipal administration utility tunnel pipeline mount Active CN212452766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020977850.8U CN212452766U (en) 2020-06-02 2020-06-02 Municipal administration utility tunnel pipeline mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020977850.8U CN212452766U (en) 2020-06-02 2020-06-02 Municipal administration utility tunnel pipeline mount

Publications (1)

Publication Number Publication Date
CN212452766U true CN212452766U (en) 2021-02-02

Family

ID=74477463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020977850.8U Active CN212452766U (en) 2020-06-02 2020-06-02 Municipal administration utility tunnel pipeline mount

Country Status (1)

Country Link
CN (1) CN212452766U (en)

Similar Documents

Publication Publication Date Title
CN104895092A (en) Method for using inner-support temporary latticed column as permanent structure column
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN212452766U (en) Municipal administration utility tunnel pipeline mount
CN207436490U (en) Wall post reinforcing apparatus
CN109837924B (en) Construction method for intersection part of lattice column and main body structure of foundation pit support
CN105946099A (en) Grouted fabricated concrete beam and construction method thereof
CN206840385U (en) A kind of prefab-form splicing frock of large volume tongue and groove box culvert
CN216007015U (en) Soft soil foundation brick bed die construction structures
CN210011144U (en) Construction site fence prefabricated foundation
CN113006133B (en) Construction method of middle plate hole suitable for assembly type station
CN115045505A (en) Device for pouring concrete platform on steel structure frame and construction method
CN110512609B (en) Riprap system jacket and construction process thereof
CN113756352A (en) Soft soil foundation brick moulding bed construction structure and construction method thereof
CN110306443B (en) Aquatic tie beam bracket device and corresponding construction method
CN114016533A (en) Construction structure and construction method of large-section bearing platform deep cup foundation
CN206941628U (en) A kind of construction site enclosing prefabricated foundation
JP4071981B2 (en) Construction method of large section box culvert
CN211080301U (en) Side wall template structure of subway station shield well
KR20090066562A (en) Vertically-prestressed precast retaining wall and construction method of the same
CN107119553B (en) Steel box girder precast slab and manufacturing method thereof
CN105297758A (en) Prestressed square pile and steel latticed column integrated stand column
CN114278019B (en) Assembled roof frame and preparation process and construction method thereof
CN214026253U (en) Precast concrete floor pours forming device
CN214696840U (en) Template system for foundation pit construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant