CN212452268U - Connecting structure of prefabricated cylinder and pile foundation - Google Patents

Connecting structure of prefabricated cylinder and pile foundation Download PDF

Info

Publication number
CN212452268U
CN212452268U CN202021090330.1U CN202021090330U CN212452268U CN 212452268 U CN212452268 U CN 212452268U CN 202021090330 U CN202021090330 U CN 202021090330U CN 212452268 U CN212452268 U CN 212452268U
Authority
CN
China
Prior art keywords
pile foundation
tenon
cylinder
connecting structure
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021090330.1U
Other languages
Chinese (zh)
Inventor
裴建家
张涛
姚辉瑞
张曦
马卫建
王凤鸣
赵学
初存杰
朱长华
林鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Original Assignee
Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Communications Planning and Design Institute Co Ltd filed Critical Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority to CN202021090330.1U priority Critical patent/CN212452268U/en
Application granted granted Critical
Publication of CN212452268U publication Critical patent/CN212452268U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a connecting structure of a prefabricated cylinder and a pile foundation, which comprises two pile foundations which are oppositely arranged, wherein the top of the pile foundation is connected with the prefabricated cylinder, and the prefabricated cylinders at the top of the two pile foundations are connected through a cast-in-place tie beam; the pile foundation top sets up the recess, and prefabricated cylinder bottom is equipped with the tenon, and in the tenon embedding recess, the recess lateral part set up first corrugated steel pipe, and second corrugated steel pipe is established to tenon bottom outside cover, sets up the grout between first corrugated steel pipe and the second corrugated steel pipe and pours the piece.

Description

Connecting structure of prefabricated cylinder and pile foundation
Technical Field
The utility model belongs to the technical field of the bridge, concretely relates to connection structure of prefabricated cylinder and pile foundation.
Background
The statements herein merely provide background related to the present disclosure and may not necessarily constitute prior art.
The assembly type construction is widely applied in the field of buildings, and has the outstanding advantages of saving the construction period to a great extent and improving the construction quality. Due to the characteristic of strip distribution of highway engineering, the working sites are in the open air, and the prefabrication and assembly construction of the lower part of the bridge is not applied to the highway engineering in a large scale.
In recent years, some projects have been applied to the prefabrication and assembly of bridge substructure exploratory. In the engineering applications, various connection methods between the prefabricated pier stud and the foundation poured in place exist, but the inventor finds that the connection methods have the defects of long joint construction time, long temporary supporting system occupation time, increased component size or pouring operation platform at the joint, insufficient reliability of connection modes, insufficient test and theoretical research support and the like.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a connection structure of prefabricated cylinder and pile foundation, pour the piece through corrugated steel pipe and grout between this connection structure's cylinder and pile foundation and realized the strong connection, can guarantee the reliability that the stake is connected.
In order to achieve the above purpose, the present invention is realized by the following technical solution:
in a first aspect, an embodiment of the utility model provides a connection structure of a prefabricated cylinder and a pile foundation, which comprises two pile foundations which are oppositely arranged, wherein the tops of the pile foundations are connected with the prefabricated cylinder, and the prefabricated cylinders at the tops of the two pile foundations are connected through a cast-in-place tie beam; the pile foundation top sets up the recess, and prefabricated cylinder bottom is equipped with the tenon, and in the tenon embedding recess, the recess lateral part set up first corrugated steel pipe, and second corrugated steel pipe is established to tenon bottom outside cover, sets up the grout between first corrugated steel pipe and the second corrugated steel pipe and pours the piece.
As further technical scheme, along vertical pile foundation owner muscle that sets up in the pile foundation, along vertical cylinder owner muscle, cylinder owner muscle and pile foundation owner muscle fixed connection in the prefabricated cylinder.
As a further technical scheme, pile foundation owner muscle top sets up extends the end, extends the end and extends the pile foundation top, and the end slope that extends of pile foundation owner muscle sets up, and the top of pile foundation owner muscle is close to the pile foundation axis setting for the bottom.
As a further technical scheme, the bottom of the main cylindrical rib is provided with an extension end, the extension end extends out of the bottom of the prefabricated cylinder, the extension end of the main cylindrical rib is obliquely arranged, and the bottom end of the main cylindrical rib is far away from the axis of the pile foundation relative to the top end.
As a further technical scheme, a steel cushion block is arranged between the groove at the top of the pile foundation and the bottom end of the tenon of the prefabricated cylinder.
As a further technical scheme, a reinforcement cage is arranged in the tenon of the prefabricated cylinder.
As a further technical scheme, a steel bar net piece is arranged at the end head of the bottom of the tenon.
As a further technical scheme, a plurality of preformed holes are formed in the periphery of the tenon of the prefabricated cylinder, and PVC pipes are arranged in the preformed holes.
As a further technical scheme, the length of the tenon is larger than the depth of the groove, and a post-cast concrete part is arranged between the outer side of the tenon and the top of the pile foundation.
In a second aspect, the embodiment of the present invention further provides a method for connecting a prefabricated cylinder and a pile foundation, including the following steps:
pouring to form a pile foundation, forming a groove in the top of the pile foundation, arranging a first corrugated steel pipe on the side part of the groove, arranging a pile foundation main rib in the pile foundation, and extending the pile foundation main rib out of the top of the pile foundation;
prefabricating a prefabricated cylinder, arranging a second corrugated steel pipe outside the bottom of a tenon of the prefabricated cylinder, arranging a reinforcement cage in the tenon, arranging a reinforcement net piece at the end of the tenon, arranging a reserved hole on the periphery of the tenon, arranging main cylindrical ribs in the prefabricated cylinder, and extending the main cylindrical ribs out of the bottom of the prefabricated cylinder;
placing a steel cushion block in the groove, hoisting the prefabricated cylinder to enable the tenon to be embedded into the groove, and arranging a jack support system at the reserved hole on the peripheral side of the prefabricated cylinder to adjust the vertical degree of the prefabricated cylinder;
pouring high-strength shrinkage-free grouting material into the gap between the groove and the tenon, withdrawing the hoisting equipment and the jack support system, welding the pile foundation main rib and the cylinder main rib, pouring post-cast concrete between the prefabricated cylinder and the pile foundation, and pouring the cast-in-situ tie beam between the oppositely arranged prefabricated cylinders.
Above-mentioned the utility model discloses an embodiment's beneficial effect as follows:
the utility model discloses a connection structure sets up the recess at the pile foundation, sets up the tenon at the cylinder, by tenon and recess scarf joint to set up corrugated steel pipe in the junction of pile foundation and cylinder, fill the grout material, can reliably and realize cylindrical temporary fixation fast, the reduction of erection time greatly reduces the time cost and the material cost of temporary fixation structure system.
The utility model discloses a connection structure adopts main muscle welded mode to carry out final connection between pile foundation and the cylinder, can reliably realize pile foundation and cylindrical strong connection, has promoted the reliability of stake connection.
Drawings
The accompanying drawings, which form a part of the specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without unduly limiting the scope of the invention.
Fig. 1 is a schematic view of a column to pile foundation connection according to one or more embodiments of the present invention;
fig. 2 is a schematic diagram of a pile foundation according to one or more embodiments of the present invention;
FIG. 3 is a schematic view of a pre-fabricated cylinder according to one or more embodiments of the present disclosure;
fig. 4 is a schematic diagram of fine tuning of the verticality of a column using a jack support system in a column-pile foundation connection method according to one or more embodiments of the present invention;
fig. 5 is a schematic view of a jack support system according to one or more embodiments of the present disclosure;
in the figure: 1-pile foundation; 2-prefabricating a cylinder; 3-grouting and pouring the parts; 4-post-pouring concrete pieces; 5, casting a tie beam in situ; 6-pile foundation main reinforcement; 7-cylindrical main ribs; 8-longitudinal ribs of the tenons; 9-steel bellows; 10-steel bellows; 11-steel bar mesh; 12-steel spacer blocks; 13-PVC pipe; 14-a jack; 15-20b I-steel; 16-phi 40 steel bars, 17 grooves and 18 tenons.
The spacing or dimensions between each other are exaggerated to show the location of the various parts, and the illustration is for illustrative purposes only.
Detailed Description
It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the invention. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments in accordance with the invention. As used herein, the singular forms "a", "an", and/or "the" are intended to include the plural forms as well, unless the invention expressly state otherwise, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof;
for convenience of description, the words "upper", "lower", "left" and "right" in the present application, if any, merely indicate correspondence with the upper, lower, left and right directions of the drawings themselves, and do not limit the structure, but merely facilitate the description of the present invention and simplify the description, rather than indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
The terms "mounted", "connected", "fixed", etc. in the present invention should be understood in a broad sense, for example, they may be fixedly connected, detachably connected, or integrated; the two components can be connected mechanically or electrically, directly or indirectly through an intermediate medium, or connected internally or in an interaction relationship, and specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Just as the background art introduces, exist not enoughly among the prior art, in order to solve above technical problem, the utility model provides a connection structure of prefabricated cylinder and pile foundation.
The utility model discloses an among the typical embodiment, as shown in FIG. 1, provide a connection structure of prefabricated cylinder and pile foundation, pile foundation 1 including two relative settings, the pile foundation adopts and pours into the formation on the spot, and pile foundation 1 top is connected with prefabricated cylinder 2, connects through cast-in-place straining 5 between the prefabricated cylinder 2 at two pile foundation tops.
The prefabricated cylinder is a circular pier column.
Along vertical pile foundation owner muscle 6 that sets up in pile foundation 1, 6 tops of pile foundation owner muscle set up the extension end, and the extension end extends 1 tops of pile foundation, and the extension end slope of pile foundation owner muscle sets up, and the top of pile foundation owner muscle is close to the pile foundation axis setting for the bottom.
The top of pile foundation 1 sets up the recess, as shown in fig. 2, the recess has the depth of settlement, and the recess inboard sets up corrugated steel pipe 9, and corrugated steel pipe 9 inside wall sets up grout and pours a 3, and grout is poured and is pour and form by the shrink-free grout that excels in.
Follow vertical cylinder owner muscle 7 that sets up in the precast cylinder 2, cylinder owner muscle 7 bottom sets up extends the end, extends the end and extends the precast cylinder bottom, and the extension end slope of cylinder owner muscle sets up, and pile foundation axis setting is kept away from for the top in the bottom of cylinder owner muscle.
The cylindrical main reinforcement 7 and the pile foundation main reinforcement 6 are fixedly connected, and the cylindrical main reinforcement and the pile foundation main reinforcement are fixedly connected by welding in the embodiment. Specifically, the cylindrical main reinforcement 7 and the extension end of the pile foundation main reinforcement 6 are welded and connected.
The tenon is arranged at the bottom of the prefabricated cylinder 2, the tenon is embedded into the groove of the pile foundation 1, the steel corrugated pipe 10 is sleeved outside the bottom of the tenon, the steel corrugated pipe 10 is identical to the steel corrugated pipe 9 in structure, the outer side wall of the steel corrugated pipe 10 is connected with the grouting pouring piece 3, and the grouting material is poured between the steel corrugated pipe 10 and the steel corrugated pipe 9 to form the grouting pouring piece during specific implementation.
And a steel cushion block 12 is arranged between the groove at the top of the pile foundation 1 and the bottom end of the tenon of the precast cylinder 2.
A reinforcement cage is arranged in the tenon of the prefabricated cylinder 2, the reinforcement cage is composed of tenon longitudinal ribs 8 and spiral stirrups, the tenon longitudinal ribs 8 are vertically arranged, and the spiral stirrups are arranged between the tenon longitudinal ribs; the tenon bottom end department sets up reinforcing bar net piece 11, and reinforcing bar net piece specification satisfies the requirement of design standard to local pressure-bearing member, adopts four layers D10 reinforcing bar net piece in this embodiment, and the vertical interval of net piece is 8 cm.
A plurality of preformed holes are arranged on the periphery of the tenon of the prefabricated cylinder 2, and PVC pipes 13 are arranged in the preformed holes.
The length of the tenon of the prefabricated cylinder is larger than the depth of the groove of the pile foundation, a post-cast concrete part 4 is arranged between the outer side of the prefabricated cylinder tenon and the top of the pile foundation, and the post-cast concrete part 4 and the cast-in-place tie beam 5 are formed by casting reinforced concrete in place.
The utility model discloses set up corrugated steel pipe in the junction of pile foundation and cylinder to fill grout material, and connect by the main muscle between cylinder and pile foundation, reliably realize pile foundation and cylindrical strong connection, guarantee the reliability and the acceptance of stake column connection.
The utility model discloses still provide a method for connecting prefabricated cylinder and pile foundation, specific step process is:
pouring the pile foundation 1 in situ according to a design drawing;
after the cast-in-place pile foundation concrete reaches the design strength, the pile head is downwards broken to a position h1+ h2 below the design elevation of the pile top, and a fresh contact surface is exposed to form a groove; building a steel mould on site, laying the steel corrugated pipe 9 on the inner side of the groove and the design stirrups of the pile foundation, and pouring concrete to a position h1 below the elevation of the pile top, as shown in fig. 2;
when the pile foundation 1 is constructed, prefabrication and maintenance of the prefabricated cylinder 2 are completed in a prefabrication field. Note that roughening treatment is carried out within the length range of the prefabricated cylindrical tenon end h1, wherein the h1 is the height of a tie beam, and the diameter of the tie beam is not less than 20 times of the diameter of the cylindrical main rib 7 when the tie beam is not tied; the length range of h2 is provided with the steel corrugated pipe 10, and h2 can be half of the diameter D1 of the cylinder; a reinforcement cage is required to be arranged in the tenon and consists of a longitudinal tenon rib 8 and a spiral stirrup, the length h3 of the reinforcement cage extending upwards is not less than the standard anchoring length of the longitudinal tenon rib 8, four layers of reinforcement meshes 11 are arranged at the end of the tenon, the specifications of the reinforcement meshes meet the requirements of design specifications on local pressure-bearing members, four layers of D10 reinforcement meshes can be adopted, and the vertical distance between the meshes is 8 cm; four jack support positions are uniformly arranged on the periphery of the tenon, and an upper hole and a lower hole are reserved in each position by using a phi 50PVC pipe 13;
transporting the prefabricated column 2 to a construction site;
placing a D200 x 20mm circular steel cushion block 12 in the center of the groove of the pile foundation; hoisting the prefabricated cylinder 2 to enable the tenon to be inserted into the groove of the pile foundation, and adjusting and positioning the plane position of the pier stud according to the made standard line; four jacks are arranged around the prefabricated cylinder, and the vertical degree of the prefabricated cylinder is finely adjusted to meet the requirements of relevant acceptance regulations; the temporary supporting system consisting of the four jacks consists of the jacks 14, 20b I-steel 15 and phi 40 steel bars 16, wherein the phi 40 steel bars are inserted into the PVC pipes 13 of the preformed holes of the prefabricated cylinder 2, and the 20b I-steel 15 and the phi 40 steel bars are welded to form a supporting framework; pouring high-strength shrinkage-free grouting material into a gap between the pile foundation groove and the prefabricated cylindrical tenon; after the strength of the grouting material reaches 40MPa, removing the hoisting equipment of the prefabricated cylinder 2 and the four jacks at the bottom of the cylinder; the grouting material blocks eight holes reserved on the cylindrical tenon; welding the pile foundation main reinforcement 6 and the cylindrical main reinforcement 7 by adopting single-side welding, wherein the welding length is not less than 10 d; arranging connecting section stirrups and tie beam reinforcing steel bars (if any), pouring concrete after formwork pouring and casting a tie beam 5 in situ, and adopting a small-diameter vibrating rod to vibrate and compact; and (5) after-casting concrete (the strength of the after-cast concrete is consistent with the requirement of the cylinder), when the after-cast concrete reaches the designed strength, removing the template, and filling the soil to restore the original ground line.
The connecting method enables the assembly type construction of the bridge pier column to be applied to engineering, and compared with the construction method of cast-in-place, the assembly type construction shortens the construction time of the pile column joint, can greatly shorten the construction period, improves the construction quality of a component, can reduce environmental pollution at the same time, and eliminates the danger of high support construction on site.
The method of adopting the large-diameter corrugated pipe for grouting serves as short-term support in the construction stage, and the occupied time of hoisting equipment and a jack is shortened due to the characteristics of good workability and early strength of grouting materials. The method for grouting the large-diameter corrugated pipe is only used for short-term support in the construction stage, and compared with the traditional socket type connection method, the method can save at least 50% of high-strength grouting material, reduce the manufacturing cost, reduce the using amount of special materials and improve the economy.
The utility model discloses use in the stake formula pier that highway bridge is commonly used, need not change the component size or pour operation platform such as little cushion cap specially for realizing connecting, kept the external dimension the same with cast-in-place scheme, both guaranteed pleasing to the eye, also practiced thrift the material.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A connecting structure of a prefabricated column and a pile foundation is characterized by comprising two pile foundations which are oppositely arranged, wherein the tops of the pile foundations are connected with the prefabricated column, and the prefabricated columns at the tops of the two pile foundations are connected through a cast-in-place tie beam; the pile foundation top sets up the recess, and prefabricated cylinder bottom is equipped with the tenon, and in the tenon embedding recess, the recess lateral part set up first corrugated steel pipe, and second corrugated steel pipe is established to tenon bottom outside cover, sets up the grout between first corrugated steel pipe and the second corrugated steel pipe and pours the piece.
2. The connecting structure of the precast cylinder and the pile foundation as claimed in claim 1, wherein the pile foundation main reinforcement is vertically disposed in the pile foundation, the column main reinforcement is vertically disposed in the precast cylinder, and the column main reinforcement is fixedly connected with the pile foundation main reinforcement.
3. The precast column and pile foundation connecting structure according to claim 2, wherein the pile foundation main rib is provided at a top portion thereof with an extension portion extending out of the pile foundation top portion, the extension portion of the pile foundation main rib is inclined, and a top end of the pile foundation main rib is disposed close to the pile foundation axis with respect to a bottom end thereof.
4. A precast cylinder and pile foundation connection structure as claimed in claim 2, wherein the bottom of the main cylindrical rib is provided with an extension end which extends out of the bottom of the precast cylinder, the extension end of the main cylindrical rib is inclined, and the bottom end of the main cylindrical rib is arranged away from the axis of the pile foundation relative to the top end.
5. A precast cylinder and pile foundation connecting structure according to claim 1, wherein a steel spacer is provided between the groove at the top of the pile foundation and the bottom end of the tenon of the precast cylinder.
6. A precast cylinder and pile foundation connecting structure according to claim 1, wherein a reinforcement cage is provided in the tenon of the precast cylinder.
7. A precast cylinder to pile foundation connection structure according to claim 1, wherein a reinforcing mesh is provided at the bottom end of the tenon.
8. The connecting structure of a precast cylinder and a pile foundation according to claim 1, wherein a plurality of prepared holes are formed around the tenon of the precast cylinder, and PVC pipes are provided in the prepared holes.
9. A precast cylinder-pile foundation connecting structure according to claim 1, wherein the length of the tenon is greater than the depth of the groove.
10. A precast cylinder to pile foundation connecting structure according to claim 9, wherein a post-cast concrete member is provided between the outer side of the tenon and the top of the pile foundation.
CN202021090330.1U 2020-06-11 2020-06-11 Connecting structure of prefabricated cylinder and pile foundation Active CN212452268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021090330.1U CN212452268U (en) 2020-06-11 2020-06-11 Connecting structure of prefabricated cylinder and pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021090330.1U CN212452268U (en) 2020-06-11 2020-06-11 Connecting structure of prefabricated cylinder and pile foundation

Publications (1)

Publication Number Publication Date
CN212452268U true CN212452268U (en) 2021-02-02

Family

ID=74469737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021090330.1U Active CN212452268U (en) 2020-06-11 2020-06-11 Connecting structure of prefabricated cylinder and pile foundation

Country Status (1)

Country Link
CN (1) CN212452268U (en)

Similar Documents

Publication Publication Date Title
CN209722702U (en) Pipe pier and cushion cap connection structure
CN109853363A (en) Pipe pier and cushion cap connection structure and construction method
KR102166504B1 (en) Landing pier structure and its construction method
CN111364352A (en) Prefabricated pipe pier and cast-in-place pile connecting structure and construction method
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN108729544B (en) Dry-and wet-type composite joint pin-connected panel construction
CN213741571U (en) Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation
CN210459769U (en) Prefabricated hollow column and assembled concrete column
CN112030720A (en) Prefabricated bent cap and pier stud socket type connecting structure and construction method
CN111733691A (en) Connecting structure and method for prefabricated cylinder and pile foundation
CN111764299A (en) Pile-column integrated assembling type bridge cap beam elevation control equipment and control method
CN212452268U (en) Connecting structure of prefabricated cylinder and pile foundation
CN106978816B (en) A kind of Integral tower post case type computer room basis and its construction method and signal of communication tower
CN216193970U (en) Rigid consolidation structure for ramp steel box girder and concrete vase pier
CN213682184U (en) Bolted precast concrete hollow slab bearing platform template
CN114753350A (en) Assembled pile cap for composite foundation
CN209836781U (en) Connecting structure of precast concrete pier stud and bearing platform
CN211074115U (en) Prefabricated cushion cap structure of double-column type mound
CN109898540B (en) Wet joint structure among bridge pier, bearing platform and pile foundation and construction process thereof
CN209443572U (en) A kind of assembled beam-column structure
CN113293872A (en) Prefabricated concrete beam column node of concrete prefabricated rectangular pipe pile
CN200952138Y (en) Concrete bottom seal, drum (tubular) piler with pile cap and pile wing hole forming device
CN220394515U (en) Combined pile system suitable for prestressed pipe pile with undulating bearing layer and cast-in-place pile
CN215252255U (en) Pile-beam integrated fully-prefabricated assembled bridge substructure and bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: Shandong transportation planning and Design Institute Group Co.,Ltd.

Address before: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: Shandong transportation planning and Design Institute Co.,Ltd.