CN212427101U - Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner - Google Patents

Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner Download PDF

Info

Publication number
CN212427101U
CN212427101U CN202021060119.5U CN202021060119U CN212427101U CN 212427101 U CN212427101 U CN 212427101U CN 202021060119 U CN202021060119 U CN 202021060119U CN 212427101 U CN212427101 U CN 212427101U
Authority
CN
China
Prior art keywords
square frame
cross
pile foundation
steel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021060119.5U
Other languages
Chinese (zh)
Inventor
刘可
郑春雨
母旭彪
韩卯
李文伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202021060119.5U priority Critical patent/CN212427101U/en
Application granted granted Critical
Publication of CN212427101U publication Critical patent/CN212427101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to a bridge pile foundation steel protects a construction measurement positioner comprises the bolt, and a square frame's upper end is equipped with the cross bracket, and the lower extreme off-plate end portion of cross bracket is fixed as an organic whole with the middle part of the square frame four sides that correspond respectively, is equipped with the bolt that supplies the prism to connect usefulness on the central point of cross bracket. The lower parts of the four outer side ends of the cross-shaped bracket are respectively welded at the middle points of the four sides of the square frame. The axis of the bolt for connecting the prism is superposed with the axis of the steel casing. The utility model discloses can protect a section of thick bamboo upper end center at the steel with measuring prism accurate positioning, the accuracy and the straightness that hangs down that a section of thick bamboo position was protected to the steel are guaranteed in the real-time tracking measurement, have simple structure, cost of manufacture low, labour saving and time saving uses safe and reliable and excellent in use effect's advantage.

Description

Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner
Technical Field
The utility model belongs to a bridge pile foundation steel protects a construction measurement positioner.
Background
The construction of underwater pile foundations in highway bridges and wiring engineering adopts the erection of a fixed underwater platform, the long steel casing is arranged to ensure the stability of drilling, and rotary drilling is selected for use to form holes. When pile foundation steel protects a section of thick bamboo and transfers installation and squeeze into, require the steel to protect a section of thick bamboo center and pile foundation design center and keep vertical coincidence, especially aquatic pile foundation construction, the steel protects a section of thick bamboo and sets up and need many times to lengthen when following, and owing to need the pilot hole construction, needs real-time tracking to measure the steel and protects a section of thick bamboo coordinate position, otherwise easily causes the steel to protect a skew pile foundation design center, needs rework, influences construction speed and work efficiency. Therefore, the measurer frequently climbs the upper end of the steel casing to set points for measurement, which wastes labor and effort, and has the disadvantages of workload, poor accuracy of fixed points and low working efficiency.
Disclosure of Invention
The utility model aims at designing a bridge pile foundation steel protects a construction measurement positioner, can protect a section of thick bamboo upper end center at the steel with measuring prism accurate positioning, the real-time tracking is measured, guarantees that the steel protects the accuracy and the straightness that hangs down of a section of thick bamboo position, has simple structure, cost of manufacture low, labour saving and time saving, uses safe and reliable and excellent in use effect's advantage.
Therefore, the utility model discloses constitute by the bolt, a square frame's upper end is equipped with the cross bracket, and the lower extreme off-plate end portion of cross bracket is fixed as an organic whole with the middle part of the square frame four sides that correspond respectively, is equipped with the bolt that supplies the prism to connect usefulness on the central point of cross bracket.
The lower parts of the four outer side ends of the cross-shaped bracket are respectively welded at the middle points of the four sides of the square frame.
The axis of the bolt for connecting the prism is superposed with the axis of the steel casing.
The middle part of the inner side edge of the square frame is clamped on the outer wall of the upper end of the steel casing. The length of the inner side edge of the square frame is the same, and the length of each side of the cross-shaped bracket is the same.
Above-mentioned structural design has reached the utility model discloses a purpose.
The utility model discloses can protect a section of thick bamboo upper end center at the steel with measuring prism accurate positioning, the steel of trailing in real time protects a section of thick bamboo and measures, guarantees that the steel protects the accuracy and the straightness that hangs down of a position, has simple structure, cost of manufacture low, labour saving and time saving, uses safe and reliable and excellent in use effect's advantage.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
As shown in figure 1, the measuring and positioning device for the construction of the bridge pile foundation steel casing consists of bolts, a cross-shaped bracket 1 is arranged at the upper end of a square frame 2, the outer end part of the lower end surface of the cross-shaped bracket is respectively fixed with the middle parts of four sides of the corresponding square frame into a whole, and a bolt 3 for connecting a prism is arranged at the central point of the cross-shaped bracket.
The lower parts of the four outer side ends of the cross-shaped bracket are respectively welded at the middle points of the four sides of the square frame.
The axis of the bolt for connecting the prism is superposed with the axis of the steel casing. The middle part of the inner side edge of the square frame is clamped on the outer wall of the upper end of the steel casing. The length of the inner side edge of the square frame is the same, and the length of each side of the cross-shaped bracket is the same. The square frame and the cross-shaped bracket can be made of square edge wood or square steel pipes.
When the device is used, a prism for measurement is arranged on a bolt at the central point of the cross-shaped bracket, and then the inner frame edge of the square frame is clamped and fixed on the outer wall at the upper end of the steel casing. Actually measuring the center position of the steel casing to ensure that the center of the prism is superposed with the center of the steel casing; when the steel casing is put down and driven in, the central coordinate value of the steel casing represented by the prism is tracked and measured in real time, the central coordinate value is compared with the design coordinate of the pile foundation center to calculate a deviation value, and the position of the steel casing is adjusted according to the deviation value; after the steel casing is driven into the steel casing, the coordinates of the central point of the steel casing are rechecked again, and the installation precision of the steel casing is guaranteed to meet the requirement of tolerance. After use, the utility model is detached and can be used repeatedly.
In a word, the utility model discloses can protect a center in a steel with measuring prism accurate positioning, the accuracy and the straightness that hangs down that a steel protected a position are measured in real-time tracking, have simple structure, cost of manufacture low, labour saving and time saving uses safe and reliable and excellent in use effect's advantage. Can be popularized and used.

Claims (5)

1. The utility model provides a bridge pile foundation steel protects a section of thick bamboo construction and measures positioner, comprises the bolt, its characterized in that: the upper end of one square frame is provided with a cross-shaped bracket, the outer end part of the lower end surface of the cross-shaped bracket is respectively fixed with the middle parts of four sides of the corresponding square frame into a whole, and the central point of the cross-shaped bracket is provided with a bolt for connecting the prism.
2. The bridge pile foundation steel casing construction measuring and positioning device according to claim 1, characterized in that: the lower parts of the four outer side ends of the cross-shaped bracket are respectively welded at the middle points of the four sides of the square frame.
3. The bridge pile foundation steel casing construction measuring and positioning device according to claim 1, characterized in that: the axis of the bolt for connecting the prism is superposed with the axis of the steel casing.
4. The bridge pile foundation steel casing construction measuring and positioning device according to claim 1, characterized in that: the middle part of the inner side edge of the square frame is clamped on the outer wall of the upper end of the steel casing.
5. The bridge pile foundation steel casing construction measuring and positioning device according to claim 1, characterized in that: the length of the inner side edge of the square frame is the same, and the length of each side of the cross-shaped bracket is the same.
CN202021060119.5U 2020-06-11 2020-06-11 Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner Active CN212427101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021060119.5U CN212427101U (en) 2020-06-11 2020-06-11 Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021060119.5U CN212427101U (en) 2020-06-11 2020-06-11 Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner

Publications (1)

Publication Number Publication Date
CN212427101U true CN212427101U (en) 2021-01-29

Family

ID=74273244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021060119.5U Active CN212427101U (en) 2020-06-11 2020-06-11 Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner

Country Status (1)

Country Link
CN (1) CN212427101U (en)

Similar Documents

Publication Publication Date Title
CN205663444U (en) Assembled shaft section of jurisdiction structure
CN103993597A (en) High-precision vertical column pile construction method
CN210426480U (en) Positioning frame for measuring, correcting and positioning tubular column
CN211505523U (en) Device for automatically measuring soil erosion thickness and measuring soil loss by measuring and monitoring method
CN212427101U (en) Bridge pile foundation steel protects a section of thick bamboo construction and measures positioner
CN108729904A (en) A kind of novel fixation type inclinometer monitoring unit and implementation method
CN107905108B (en) Tubular arch bolted web member hole group's accuracy control method
CN112284362A (en) Measuring device and method for verticality of steel casing in deep water area
CN210507148U (en) Positioning and adjusting device for main tower cable guide pipe of cable-stayed bridge
CN202954365U (en) Prefabricated detachable foundation pit ladder rest platform and diaphragm wall connection structure
CN212688958U (en) Auxiliary pile capable of being turned over for water drilling platform
CN104964674A (en) Control net used for large structure building size
CN207622756U (en) A kind of cylinder pier measurement and positioning frame
CN102926555B (en) Prefabricated detachable foundation pit ladder rest platform and diaphragm wall connection structure
CN205805532U (en) A kind of pore-forming metering-orifice device
CN210946870U (en) Vertical and horizontal positioner of lattice column
CN204435926U (en) A kind of chemistry plants the locating template of large diameter bolt group
CN208686372U (en) A kind of novel fixation type inclinometer monitoring unit
CN203684226U (en) Improved vertical control device for top-down steel pipe column
CN202865849U (en) Counter-guiding control device for one-column-one-pile perpendicularity in frame reverse building method
CN108955497B (en) Device and method for inspecting through opening of secondary truss in space pipe truss
CN203879026U (en) Aerial calibration adjuster for super high-rise steel structure box-shaped steel column
CN108930271B (en) Engineering pile guiding device in piling construction
CN112212837A (en) Inspection well center coordinate measuring method and tool
CN204780985U (en) Special double -deck hi -Fix crown plate of large -scale rag bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant