CN212688958U - Auxiliary pile capable of being turned over for water drilling platform - Google Patents

Auxiliary pile capable of being turned over for water drilling platform Download PDF

Info

Publication number
CN212688958U
CN212688958U CN202021325352.1U CN202021325352U CN212688958U CN 212688958 U CN212688958 U CN 212688958U CN 202021325352 U CN202021325352 U CN 202021325352U CN 212688958 U CN212688958 U CN 212688958U
Authority
CN
China
Prior art keywords
drilling platform
water
water drilling
auxiliary pile
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021325352.1U
Other languages
Chinese (zh)
Inventor
刘玥岩
廖良雄
于星
黄文明
凌峰
匡丕榜
任长睿
张海山
张勇刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202021325352.1U priority Critical patent/CN212688958U/en
Application granted granted Critical
Publication of CN212688958U publication Critical patent/CN212688958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a drilling platform on water can have enough to meet need supplementary stake, including four set nut, set nut welded fastening is on the drilling platform on water around the steel protects a section of thick bamboo, and four set nut are the cross and correspond the setting on the circumference that uses stake position center as the centre of a circle, and equal threaded connection has a bolt on each set nut, and horizontally connect has a location rope on two bolts that set up relatively, and two location ropes are cross-shaped, and its cross point coincides with stake position center. The utility model discloses only need with the nut welding on drilling platform on water, occupation space is very little, connect firm, difficult quilt destroy, its precision can not reduce along with the lapse of time, has avoided the problem that needs many times laying-outs, has improved the efficiency of construction, and the bolt can realize having enough to meet the need the use moreover, has greatly reduced construction cost.

Description

Auxiliary pile capable of being turned over for water drilling platform
Technical Field
The utility model relates to a pile foundation construction technical field, concretely relates to drilling platform on water can have enough to meet need supplementary stake.
Background
With the social progress, the transportation industry is developed vigorously, and the construction industry of domestic large-span bridges is on the rise. At present, in the field of bridge pile foundation construction, the rechecking and protection work of a pile foundation is not perfect enough, and the traditional method usually adopts modes of timber pile, painting and marking, concrete block matched with a steel bar head and the like as pile position rechecking auxiliary pile protection. However, when drilling platform construction on water, traditional auxiliary pile occupies construction platform because the volume is great, and is not high with drilling platform connection stability, is moved easily, has both influenced constructor's operation, is destroyed easily again, and in addition wooden pile etc. is easily corroded, and the wind blows the sun, and the time precision of having of a specified duration can reduce, and traditional auxiliary pile preparation processing is more complicated moreover, and construction cost also can increase when increasing construction process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drilling platform on water can have enough to meet need auxiliary pile to solve the above-mentioned technical problem among the background art.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
the utility model provides a drilling platform on water can have enough to meet need supplementary stake, includes four set nut, set nut welded fastening is on the drilling platform on water around the steel protects a section of thick bamboo, and four set nut are the cross and correspond the setting on the circumference that uses stake position center as the centre of a circle, and equal threaded connection has a bolt on each set nut, and horizontally connect has a location rope on two relative bolts that set up, and two location ropes are the cross form, and its cross point coincides with stake position center.
Preferably, the counter bore has been seted up on the drilling platform on water, set nut welded fastening is in the counter bore of drilling platform on water, and set nut and drilling platform top surface parallel and level on water prevent that set nut protrusion drilling platform on water from stumbling constructor, influencing constructor's normal operation.
Preferably, in order to provide a stable and reliable fulcrum for the measuring instrument when the pile position is rechecked, the auxiliary pile further comprises a centering supporting plate, the centering supporting plate is horizontally arranged below the positioning rope, bolt holes are formed in two ends of the centering supporting plate, and the bolts penetrate through the bolt holes in the end portion of the centering supporting plate to be fixed at two positioning nuts which are arranged oppositely.
Preferably, the centering pallet is made of lightweight and strong channel aluminum profiles.
Preferably, in order to facilitate the binding of the positioning rope, the length of the bolt is not less than 100 mm.
Preferably, the above-water drilling platform is poor in environment, and in order to prevent the components from being rusted, the positioning nuts and the bolts are made of stainless steel materials.
Preferably, in order to improve the connection stability of the positioning nut and the water drilling platform, the welding mode of the positioning nut and the water drilling platform is full welding.
Preferably, in order to facilitate the observation and positioning of a constructor, the positioning rope is made of a prominent red wide line.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the aspect of efficiency, the connection stability of the traditional auxiliary pile and the water drilling platform is poor, the traditional auxiliary pile is easy to damage, so that a measuring person needs to perform lofting for multiple times, and the workload of the measuring person is increased;
2. in the aspect of precision, firstly, the traditional auxiliary pile occupies a construction platform due to large volume, is easy to move, and is easy to corrode in addition to a wooden pile and the like, and the precision can be reduced after the auxiliary pile is blown by wind and exposed to the sun for a long time; secondly, when the pile position is rechecked after the pile position is formed, a measurer needs to hold the instrument by hand to align to a cross point to carry out measurement and recheck, the bottom of the instrument is in a suspended state at the moment, and the measurer is easy to cause the misalignment of the instrument and the cross point due to shaking in the rechecking process and influence the accuracy of the rechecking;
3. in the aspect of the cost, traditional auxiliary pile preparation processing is more complicated, and construction cost also can increase when increasing construction process, the utility model discloses auxiliary pile preparation material is easy, and processing step is simple, and bolt, centering layer board can realize having enough to meet the need the use, have greatly reduced construction cost.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic structural view of an installation state of a rotatable auxiliary pile of an overwater drilling platform, which is related by the utility model;
fig. 2 is a schematic structural view of a positioning nut and a bolt of an auxiliary pile embodiment 1 of a rotatable water drilling platform according to the present invention;
fig. 3 is the utility model relates to a but drilling platform on water has enough to meet need positioning nut and bolt's of supplementary stake embodiment 2 structural sketch.
Reference numerals: 1-positioning nut, 2-bolt, 3-positioning rope, 4-steel casing, 5-pile position center and 6-water drilling platform.
Detailed Description
Hereinafter, embodiments of a rotatable auxiliary pile for a water drilling platform according to the present invention will be described with reference to the accompanying drawings. The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
The principles and features of the present invention are described below in conjunction with the following drawings, the illustrated embodiments are provided to explain the present invention and not to limit the scope of the invention. The preferred embodiments of the present invention will be described in further detail below with reference to fig. 1-3:
example 1
As shown in figures 1-2, the preferable auxiliary pile capable of being circulated on the water drilling platform of the utility model comprises four positioning nuts 1, the positioning nuts 1 are fully welded and fixed on the water drilling platform 6 around the steel casing 4, the four positioning nuts 1 are correspondingly arranged on the circumference with the pile position center 5 as the circle center in a cross shape, each positioning nut 1 is connected with a bolt 2 with the length not less than 100mm in a threaded manner, two positioning ropes 3 made of red wide lines are horizontally connected on the two bolts 2 which are oppositely arranged, the two positioning ropes 3 are in a cross shape, the cross point is superposed with the pile position center 5, because the water drilling platform 6 has poor environment, in order to prevent the component from being rusted, the positioning nuts 1 and the bolts 2 are made of stainless steel materials, and provide a stable and reliable pivot for the measuring instrument when the pile position is rechecked after the pile position is formed, the two oppositely arranged positioning nuts 1 are also provided with a centering supporting plate 7, the centering supporting plate 7 is made of a portable and firm groove type aluminum profile, the centering supporting plate is horizontally arranged below the positioning rope 3, bolt holes are formed in two ends of the centering supporting plate, and during use, the bolts 2 penetrate through the bolt holes in the end portions of the centering supporting plate 7 and are fixed in the positioning nuts 1.
Example 2
As shown in fig. 1 and 3, the basic structure is the same as that of embodiment 1, in order to prevent the positioning nut 1 from protruding out of the water drilling platform 6 to stumble constructors and influence the normal operation of the constructors, a counter bore is formed in the water drilling platform 6, the positioning nut 1 is welded and fixed in the counter bore of the water drilling platform 6, and the positioning nut 1 is flush with the top surface of the water drilling platform 6.
The utility model utilizes the advantage that the drilling platform of the pile foundation in water is a steel structure, takes the pile position center 5 as an intersection point, measures and lofts, and assists four positioning nuts 1 welded around the steel casing 4 by cross wires, the positioning nuts 1 are fixed on the water drilling platform 6, and the cooperation of the bolts 2 and the centering support plate 7 completes the pile position rechecking, the drilling machine is in place and the steel reinforcement cage is centered,
pile position rechecking: the centering supporting plate 7 and the bolt 2 are both installed and fixed on the positioning nut 1, and the pile position center 5 is found by the aid of a prominent red broad-line cross wire, so that a measurer can recheck the pile position;
positioning a drilling machine: after the re-checking of the pile position by a measurer is finished, keeping the cross wire still, and enabling the drill bit to be aligned with the intersection point of the cross wire, namely the pile position center 5;
centering a reinforcement cage: when last pile foundation steel reinforcement cage installation and before not fixed yet, connecting bolt 2, with the cross, draw twice cross respectively on steel reinforcement cage and pile protection, will produce two nodical this moment, remove the nodical alignment of steel reinforcement cage cross to the nodical point of pile protection cross, accomplish pile foundation steel reinforcement cage centering.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (8)

1. The utility model provides a drilling platform on water can have enough to meet need supplementary stake which characterized in that: including four set nut (1), set nut (1) welded fastening is on drilling platform (6) on water around steel protects a section of thick bamboo (4), and four set nut (1) are the cross and correspond the setting on the circumference that uses stake position center (5) as the centre of a circle, and equal threaded connection has a bolt (2) on each set nut (1), and horizontal connection has a location rope (3) on two bolts (2) that set up relatively, and two location ropes (3) are the cross form, and its cross point coincides with stake position center (5).
2. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the water drilling platform (6) is provided with a counter bore, and the positioning nut (1) is welded and fixed in the counter bore of the water drilling platform (6).
3. An auxiliary pile rotatable on a water drilling platform according to any one of claims 1 or 2, wherein: the auxiliary pile further comprises a centering supporting plate (7), the centering supporting plate (7) is horizontally arranged below the positioning rope (3), bolt holes are formed in two ends of the centering supporting plate, and the bolts (2) penetrate through the bolt holes in the end portion of the centering supporting plate (7) to be fixed at the two oppositely-arranged positioning nuts (1).
4. A rotatable auxiliary pile for a water drilling platform according to claim 3, wherein: the centering supporting plate (7) is made of a groove type aluminum profile.
5. The auxiliary pile capable of being turned over for the water drilling platform according to claim 4, wherein: the length of the bolt (2) is not less than 100 mm.
6. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning nut (1) and the bolt (2) are made of stainless steel materials.
7. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning nut (1) and the water drilling platform (6) are welded in a full welding mode.
8. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning rope (3) is made of red wide lines.
CN202021325352.1U 2020-07-08 2020-07-08 Auxiliary pile capable of being turned over for water drilling platform Expired - Fee Related CN212688958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021325352.1U CN212688958U (en) 2020-07-08 2020-07-08 Auxiliary pile capable of being turned over for water drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021325352.1U CN212688958U (en) 2020-07-08 2020-07-08 Auxiliary pile capable of being turned over for water drilling platform

Publications (1)

Publication Number Publication Date
CN212688958U true CN212688958U (en) 2021-03-12

Family

ID=74897667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021325352.1U Expired - Fee Related CN212688958U (en) 2020-07-08 2020-07-08 Auxiliary pile capable of being turned over for water drilling platform

Country Status (1)

Country Link
CN (1) CN212688958U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338274A (en) * 2021-06-01 2021-09-03 中铁十八局集团有限公司 Anchor rod pile locator is built to underground space

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338274A (en) * 2021-06-01 2021-09-03 中铁十八局集团有限公司 Anchor rod pile locator is built to underground space

Similar Documents

Publication Publication Date Title
CN113356551B (en) Cantilever frame structure
CN212688958U (en) Auxiliary pile capable of being turned over for water drilling platform
CN113482312A (en) Guide type double-layer structure elevator shaft operating platform and construction method based on platform
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN111155759A (en) Novel unit truss type concrete frame structure formwork supporting system and construction method thereof
CN214738224U (en) Concrete prefabricated assembling tower crane foundation structure
CN105422140A (en) Template supporting device for concrete supporting construction of shaft and lane engineering
CN214219388U (en) Prefabricated pier stud and foundation pile peripheral hardware cuff embeds shaped steel connection structure
CN214883695U (en) Foundation pit supporting and reinforcing device convenient to disassemble and assemble
CN112523258B (en) Portable single-side formwork supporting system and construction method thereof
CN213507989U (en) Deepwater steel trestle capable of being constructed quickly
CN210341966U (en) Basic cushion cap instrumentization template structure
CN210195235U (en) Novel concrete column template device
CN221919826U (en) Round bamboo section bar connecting device
CN113216707A (en) Construction method of pool wall of towing pool
CN109898519B (en) Rotatable foundation pit inner support system and foundation pit inner support construction method
CN113482328A (en) Integral hoisting installation construction method for steel pipe template of outer shear wall
CN111535578A (en) Mounting process of template of cast-in-place structure
CN112227681A (en) Novel socket key groove type formwork support, formwork system and building method thereof
CN215760429U (en) Novel template wall formwork positioning tool
CN111576891A (en) Construction method of bolt-connected criss-cross H-shaped steel truss
CN214836045U (en) Ladder hanging device for template
CN117166520B (en) Wind power foundation pile clamping pouring formwork integrated structure and wind power foundation construction method
CN210127659U (en) Embedded bolt fixing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210312

CF01 Termination of patent right due to non-payment of annual fee