CN212688958U - Auxiliary pile capable of being turned over for water drilling platform - Google Patents
Auxiliary pile capable of being turned over for water drilling platform Download PDFInfo
- Publication number
- CN212688958U CN212688958U CN202021325352.1U CN202021325352U CN212688958U CN 212688958 U CN212688958 U CN 212688958U CN 202021325352 U CN202021325352 U CN 202021325352U CN 212688958 U CN212688958 U CN 212688958U
- Authority
- CN
- China
- Prior art keywords
- drilling platform
- water
- water drilling
- auxiliary pile
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 47
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 43
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 238000003466 welding Methods 0.000 claims abstract description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 3
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 3
- 241001330002 Bambuseae Species 0.000 claims abstract description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 3
- 239000011425 bamboo Substances 0.000 claims abstract description 3
- 239000000463 material Substances 0.000 claims description 4
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052782 aluminium Inorganic materials 0.000 claims description 3
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000010935 stainless steel Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 13
- 230000002787 reinforcement Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 206010017577 Gait disturbance Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a drilling platform on water can have enough to meet need supplementary stake, including four set nut, set nut welded fastening is on the drilling platform on water around the steel protects a section of thick bamboo, and four set nut are the cross and correspond the setting on the circumference that uses stake position center as the centre of a circle, and equal threaded connection has a bolt on each set nut, and horizontally connect has a location rope on two bolts that set up relatively, and two location ropes are cross-shaped, and its cross point coincides with stake position center. The utility model discloses only need with the nut welding on drilling platform on water, occupation space is very little, connect firm, difficult quilt destroy, its precision can not reduce along with the lapse of time, has avoided the problem that needs many times laying-outs, has improved the efficiency of construction, and the bolt can realize having enough to meet the need the use moreover, has greatly reduced construction cost.
Description
Technical Field
The utility model relates to a pile foundation construction technical field, concretely relates to drilling platform on water can have enough to meet need supplementary stake.
Background
With the social progress, the transportation industry is developed vigorously, and the construction industry of domestic large-span bridges is on the rise. At present, in the field of bridge pile foundation construction, the rechecking and protection work of a pile foundation is not perfect enough, and the traditional method usually adopts modes of timber pile, painting and marking, concrete block matched with a steel bar head and the like as pile position rechecking auxiliary pile protection. However, when drilling platform construction on water, traditional auxiliary pile occupies construction platform because the volume is great, and is not high with drilling platform connection stability, is moved easily, has both influenced constructor's operation, is destroyed easily again, and in addition wooden pile etc. is easily corroded, and the wind blows the sun, and the time precision of having of a specified duration can reduce, and traditional auxiliary pile preparation processing is more complicated moreover, and construction cost also can increase when increasing construction process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drilling platform on water can have enough to meet need auxiliary pile to solve the above-mentioned technical problem among the background art.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
the utility model provides a drilling platform on water can have enough to meet need supplementary stake, includes four set nut, set nut welded fastening is on the drilling platform on water around the steel protects a section of thick bamboo, and four set nut are the cross and correspond the setting on the circumference that uses stake position center as the centre of a circle, and equal threaded connection has a bolt on each set nut, and horizontally connect has a location rope on two relative bolts that set up, and two location ropes are the cross form, and its cross point coincides with stake position center.
Preferably, the counter bore has been seted up on the drilling platform on water, set nut welded fastening is in the counter bore of drilling platform on water, and set nut and drilling platform top surface parallel and level on water prevent that set nut protrusion drilling platform on water from stumbling constructor, influencing constructor's normal operation.
Preferably, in order to provide a stable and reliable fulcrum for the measuring instrument when the pile position is rechecked, the auxiliary pile further comprises a centering supporting plate, the centering supporting plate is horizontally arranged below the positioning rope, bolt holes are formed in two ends of the centering supporting plate, and the bolts penetrate through the bolt holes in the end portion of the centering supporting plate to be fixed at two positioning nuts which are arranged oppositely.
Preferably, the centering pallet is made of lightweight and strong channel aluminum profiles.
Preferably, in order to facilitate the binding of the positioning rope, the length of the bolt is not less than 100 mm.
Preferably, the above-water drilling platform is poor in environment, and in order to prevent the components from being rusted, the positioning nuts and the bolts are made of stainless steel materials.
Preferably, in order to improve the connection stability of the positioning nut and the water drilling platform, the welding mode of the positioning nut and the water drilling platform is full welding.
Preferably, in order to facilitate the observation and positioning of a constructor, the positioning rope is made of a prominent red wide line.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the aspect of efficiency, the connection stability of the traditional auxiliary pile and the water drilling platform is poor, the traditional auxiliary pile is easy to damage, so that a measuring person needs to perform lofting for multiple times, and the workload of the measuring person is increased;
2. in the aspect of precision, firstly, the traditional auxiliary pile occupies a construction platform due to large volume, is easy to move, and is easy to corrode in addition to a wooden pile and the like, and the precision can be reduced after the auxiliary pile is blown by wind and exposed to the sun for a long time; secondly, when the pile position is rechecked after the pile position is formed, a measurer needs to hold the instrument by hand to align to a cross point to carry out measurement and recheck, the bottom of the instrument is in a suspended state at the moment, and the measurer is easy to cause the misalignment of the instrument and the cross point due to shaking in the rechecking process and influence the accuracy of the rechecking;
3. in the aspect of the cost, traditional auxiliary pile preparation processing is more complicated, and construction cost also can increase when increasing construction process, the utility model discloses auxiliary pile preparation material is easy, and processing step is simple, and bolt, centering layer board can realize having enough to meet the need the use, have greatly reduced construction cost.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic structural view of an installation state of a rotatable auxiliary pile of an overwater drilling platform, which is related by the utility model;
fig. 2 is a schematic structural view of a positioning nut and a bolt of an auxiliary pile embodiment 1 of a rotatable water drilling platform according to the present invention;
fig. 3 is the utility model relates to a but drilling platform on water has enough to meet need positioning nut and bolt's of supplementary stake embodiment 2 structural sketch.
Reference numerals: 1-positioning nut, 2-bolt, 3-positioning rope, 4-steel casing, 5-pile position center and 6-water drilling platform.
Detailed Description
Hereinafter, embodiments of a rotatable auxiliary pile for a water drilling platform according to the present invention will be described with reference to the accompanying drawings. The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
The principles and features of the present invention are described below in conjunction with the following drawings, the illustrated embodiments are provided to explain the present invention and not to limit the scope of the invention. The preferred embodiments of the present invention will be described in further detail below with reference to fig. 1-3:
example 1
As shown in figures 1-2, the preferable auxiliary pile capable of being circulated on the water drilling platform of the utility model comprises four positioning nuts 1, the positioning nuts 1 are fully welded and fixed on the water drilling platform 6 around the steel casing 4, the four positioning nuts 1 are correspondingly arranged on the circumference with the pile position center 5 as the circle center in a cross shape, each positioning nut 1 is connected with a bolt 2 with the length not less than 100mm in a threaded manner, two positioning ropes 3 made of red wide lines are horizontally connected on the two bolts 2 which are oppositely arranged, the two positioning ropes 3 are in a cross shape, the cross point is superposed with the pile position center 5, because the water drilling platform 6 has poor environment, in order to prevent the component from being rusted, the positioning nuts 1 and the bolts 2 are made of stainless steel materials, and provide a stable and reliable pivot for the measuring instrument when the pile position is rechecked after the pile position is formed, the two oppositely arranged positioning nuts 1 are also provided with a centering supporting plate 7, the centering supporting plate 7 is made of a portable and firm groove type aluminum profile, the centering supporting plate is horizontally arranged below the positioning rope 3, bolt holes are formed in two ends of the centering supporting plate, and during use, the bolts 2 penetrate through the bolt holes in the end portions of the centering supporting plate 7 and are fixed in the positioning nuts 1.
Example 2
As shown in fig. 1 and 3, the basic structure is the same as that of embodiment 1, in order to prevent the positioning nut 1 from protruding out of the water drilling platform 6 to stumble constructors and influence the normal operation of the constructors, a counter bore is formed in the water drilling platform 6, the positioning nut 1 is welded and fixed in the counter bore of the water drilling platform 6, and the positioning nut 1 is flush with the top surface of the water drilling platform 6.
The utility model utilizes the advantage that the drilling platform of the pile foundation in water is a steel structure, takes the pile position center 5 as an intersection point, measures and lofts, and assists four positioning nuts 1 welded around the steel casing 4 by cross wires, the positioning nuts 1 are fixed on the water drilling platform 6, and the cooperation of the bolts 2 and the centering support plate 7 completes the pile position rechecking, the drilling machine is in place and the steel reinforcement cage is centered,
pile position rechecking: the centering supporting plate 7 and the bolt 2 are both installed and fixed on the positioning nut 1, and the pile position center 5 is found by the aid of a prominent red broad-line cross wire, so that a measurer can recheck the pile position;
positioning a drilling machine: after the re-checking of the pile position by a measurer is finished, keeping the cross wire still, and enabling the drill bit to be aligned with the intersection point of the cross wire, namely the pile position center 5;
centering a reinforcement cage: when last pile foundation steel reinforcement cage installation and before not fixed yet, connecting bolt 2, with the cross, draw twice cross respectively on steel reinforcement cage and pile protection, will produce two nodical this moment, remove the nodical alignment of steel reinforcement cage cross to the nodical point of pile protection cross, accomplish pile foundation steel reinforcement cage centering.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (8)
1. The utility model provides a drilling platform on water can have enough to meet need supplementary stake which characterized in that: including four set nut (1), set nut (1) welded fastening is on drilling platform (6) on water around steel protects a section of thick bamboo (4), and four set nut (1) are the cross and correspond the setting on the circumference that uses stake position center (5) as the centre of a circle, and equal threaded connection has a bolt (2) on each set nut (1), and horizontal connection has a location rope (3) on two bolts (2) that set up relatively, and two location ropes (3) are the cross form, and its cross point coincides with stake position center (5).
2. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the water drilling platform (6) is provided with a counter bore, and the positioning nut (1) is welded and fixed in the counter bore of the water drilling platform (6).
3. An auxiliary pile rotatable on a water drilling platform according to any one of claims 1 or 2, wherein: the auxiliary pile further comprises a centering supporting plate (7), the centering supporting plate (7) is horizontally arranged below the positioning rope (3), bolt holes are formed in two ends of the centering supporting plate, and the bolts (2) penetrate through the bolt holes in the end portion of the centering supporting plate (7) to be fixed at the two oppositely-arranged positioning nuts (1).
4. A rotatable auxiliary pile for a water drilling platform according to claim 3, wherein: the centering supporting plate (7) is made of a groove type aluminum profile.
5. The auxiliary pile capable of being turned over for the water drilling platform according to claim 4, wherein: the length of the bolt (2) is not less than 100 mm.
6. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning nut (1) and the bolt (2) are made of stainless steel materials.
7. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning nut (1) and the water drilling platform (6) are welded in a full welding mode.
8. The auxiliary pile capable of being turned over for the water drilling platform according to claim 1, wherein: the positioning rope (3) is made of red wide lines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021325352.1U CN212688958U (en) | 2020-07-08 | 2020-07-08 | Auxiliary pile capable of being turned over for water drilling platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021325352.1U CN212688958U (en) | 2020-07-08 | 2020-07-08 | Auxiliary pile capable of being turned over for water drilling platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212688958U true CN212688958U (en) | 2021-03-12 |
Family
ID=74897667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021325352.1U Expired - Fee Related CN212688958U (en) | 2020-07-08 | 2020-07-08 | Auxiliary pile capable of being turned over for water drilling platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212688958U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338274A (en) * | 2021-06-01 | 2021-09-03 | 中铁十八局集团有限公司 | Anchor rod pile locator is built to underground space |
-
2020
- 2020-07-08 CN CN202021325352.1U patent/CN212688958U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338274A (en) * | 2021-06-01 | 2021-09-03 | 中铁十八局集团有限公司 | Anchor rod pile locator is built to underground space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113356551B (en) | Cantilever frame structure | |
CN212688958U (en) | Auxiliary pile capable of being turned over for water drilling platform | |
CN113482312A (en) | Guide type double-layer structure elevator shaft operating platform and construction method based on platform | |
CN108661301B (en) | Modular assembly platform for vertical frames of well frames and use method | |
CN111622347A (en) | Cross-shaped node connecting structure of assembled frame structure and construction method thereof | |
CN111155759A (en) | Novel unit truss type concrete frame structure formwork supporting system and construction method thereof | |
CN214738224U (en) | Concrete prefabricated assembling tower crane foundation structure | |
CN105422140A (en) | Template supporting device for concrete supporting construction of shaft and lane engineering | |
CN214219388U (en) | Prefabricated pier stud and foundation pile peripheral hardware cuff embeds shaped steel connection structure | |
CN214883695U (en) | Foundation pit supporting and reinforcing device convenient to disassemble and assemble | |
CN112523258B (en) | Portable single-side formwork supporting system and construction method thereof | |
CN213507989U (en) | Deepwater steel trestle capable of being constructed quickly | |
CN210341966U (en) | Basic cushion cap instrumentization template structure | |
CN210195235U (en) | Novel concrete column template device | |
CN221919826U (en) | Round bamboo section bar connecting device | |
CN113216707A (en) | Construction method of pool wall of towing pool | |
CN109898519B (en) | Rotatable foundation pit inner support system and foundation pit inner support construction method | |
CN113482328A (en) | Integral hoisting installation construction method for steel pipe template of outer shear wall | |
CN111535578A (en) | Mounting process of template of cast-in-place structure | |
CN112227681A (en) | Novel socket key groove type formwork support, formwork system and building method thereof | |
CN215760429U (en) | Novel template wall formwork positioning tool | |
CN111576891A (en) | Construction method of bolt-connected criss-cross H-shaped steel truss | |
CN214836045U (en) | Ladder hanging device for template | |
CN117166520B (en) | Wind power foundation pile clamping pouring formwork integrated structure and wind power foundation construction method | |
CN210127659U (en) | Embedded bolt fixing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210312 |
|
CF01 | Termination of patent right due to non-payment of annual fee |