CN212427099U - Ground anchor dismounting device for power engineering - Google Patents
Ground anchor dismounting device for power engineering Download PDFInfo
- Publication number
- CN212427099U CN212427099U CN202020325408.7U CN202020325408U CN212427099U CN 212427099 U CN212427099 U CN 212427099U CN 202020325408 U CN202020325408 U CN 202020325408U CN 212427099 U CN212427099 U CN 212427099U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- wall
- earth anchor
- power engineering
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a device is demolishd to earth anchor for power engineering, including two bases and pivot, two the top outer wall of base is equipped with the water spray subassembly, the outer wall fixedly connected with mount of pivot, and the bottom outer wall equidistance fixedly connected with pneumatic cylinder No. one of mount, it is a plurality of the same link of bottom outer wall fixedly connected with of pneumatic cylinder. The utility model discloses a be provided with the motor, pivot and spiral crushing leaf, when carrying out the earth anchor and demolish, it revolves out near the soil of earth anchor to drive the epaxial spiral crushing leaf of commentaries on classics through the motor, thereby make earth anchor installation department soil not hard up, the couple that the cylinder of being convenient for drove the pivot below extracts the earth anchor, when extracting, can not cause near ground whole not hard up, and simultaneously, before carrying out soil and revolve out, reduce the compactness of soil through the water spray subassembly, make soil revolve out more high-efficient swift, thereby improve the practical value of this earth anchor demolishs device.
Description
Technical Field
The utility model relates to an electric power engineering technical field especially relates to an earth anchor demolishs device for electric power engineering.
Background
When the wire is erected or replaced on the circuit, all can use the interim acting line, the fixed of acting as go-between temporarily, the earth anchor of commonly using, after the engineering, demolish the earth anchor and be a work that wastes time and energy, general operating personnel strikes about the earth anchor with the sledgehammer earlier, makes it not hard up, then extracts out with the hand together by two people, this just causes to drop into great labour, and there is the potential safety hazard in operation process, consequently, needs to use the earth anchor demolishs the device.
The existing ground anchor dismounting device for the electric power engineering has the following defects: when the existing ground anchor removing device is used for removing the ground anchor, the hook hung on the ground anchor is driven to ascend through the air cylinder generally, so that the ground anchor is pulled out from the ground, the ground nearby the ground anchor is loosened easily by the ground anchor removing method, the tightness of soil nearby the ground anchor is affected, and the defect of the ground anchor removing device is overlarge.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a ground anchor dismounting device for power engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a device is demolishd to earth anchor for power engineering, includes two bases and pivot, two the top outer wall of base is equipped with the water spray subassembly, the outer wall fixedly connected with mount of pivot, and the bottom outer wall equidistance fixedly connected with pneumatic cylinder No. one of mount, it is a plurality of the same link of bottom outer wall fixedly connected with of a pneumatic cylinder, and the bottom outer wall fixedly connected with spiral crushing leaf of link, a plurality of pneumatic cylinders are connected with synchronous hydraulic system.
Preferably, the water spray assembly comprises two support rods, and the outer walls of the tops of the two support rods are fixedly connected with the same water pipe.
Preferably, the top outer wall of water pipe fixedly connected with inlet tube, and the bottom outer wall equidistance fixedly connected with nozzle of water pipe.
Preferably, two the equal fixedly connected with cylinder of top outer wall of base, and the same roof of top outer wall fixedly connected with of two cylinders.
Preferably, the top outer wall fixedly connected with motor of roof, and the pivot passes through shaft coupling fixed connection in the output shaft of motor.
Preferably, the outer wall of the bottom of the rotating shaft is fixedly connected with a hook.
Preferably, two the equal fixedly connected with connecting plate of both sides outer wall of base, and the equal fixedly connected with pneumatic cylinder No. two of one side outer wall of every connecting plate, the same bull-dozer board of other end fixedly connected with of two pneumatic cylinders that are located on same base, a plurality of pneumatic cylinders No. two are connected with synchronous hydraulic system.
The utility model has the advantages that:
1. through being provided with the motor, pivot and spiral crushing leaf, when carrying out the earth anchor and demolising, drive the epaxial spiral crushing leaf of commentaries on classics through the motor and unscrew near the soil of earth anchor to make earth anchor installation department soil not hard up, the couple that the cylinder of being convenient for drove the pivot below extracts the earth anchor, when extracting, can not cause near ground whole not hard up, and simultaneously, before carrying out the soil and unscrew, reduce the compactness of soil through the water spray subassembly, make soil unscrew more high-efficient swift, thereby improve the practical value of this earth anchor demolishment device.
2. Through installing the couple in the bottom of pivot, when driving the couple through the cylinder and extract the earth anchor, the motor drives the couple rotatory to make the earth anchor extract the process and for rotatory the rising, further improve the convenience that the earth anchor was extracted.
3. Through being provided with connecting plate, No. two pneumatic cylinders and bull dozer board, the bull dozer board is located spiral crushing leaf outside below, and the back is extracted to the earth anchor, adjusts No. two pneumatic cylinders and drives the soil that the bull dozer board will revolve out and fill back, prevents that the condition of soil loss from appearing in the earth anchor installation department, improves the device's functionality.
Drawings
Fig. 1 is a schematic view of the overall structure of a device for removing a ground anchor for power engineering according to the present invention;
fig. 2 is a structural bottom view of the ground anchor removing device for power engineering provided by the present invention;
fig. 3 is the utility model provides a base structure sketch map of ground anchor demolishs device for power engineering.
In the figure: the device comprises a base 1, a cylinder 2, a top plate 3, a fixing frame 4, a water inlet pipe 5, a motor 6, a hydraulic cylinder 7, a connecting frame 8, a spiral crushing blade 9, a water pipe 10, a nozzle 11, a rotating shaft 12, a hook 13, a supporting rod 14, a connecting plate 15, a hydraulic cylinder 16-II and a bulldozer 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1:
referring to fig. 1-2, a ground anchor removing device for power engineering comprises two bases 1 and a rotating shaft 12, wherein the outer wall of the top of each base 1 is provided with a water spraying assembly, the outer wall of the rotating shaft 12 is fixedly connected with a fixing frame 4, the outer wall of the bottom of the fixing frame 4 is fixedly connected with a first hydraulic cylinder 7 at equal intervals, the outer walls of the bottoms of the first hydraulic cylinders 7 are fixedly connected with a same connecting frame 8, the outer wall of the bottom of the connecting frame 8 is fixedly connected with a spiral crushing blade 9, the first hydraulic cylinders 7 are connected with a synchronous hydraulic system, when the ground anchor is removed, the spiral crushing blade 9 on the rotating shaft 12 is driven by a motor 6 to screw out soil near the ground anchor, so that the soil at the ground anchor mounting position is loosened, the air cylinder 2 drives a hook 13 below the rotating shaft 12 to pull out the ground anchor, when the ground anchor is pulled out, the whole ground near the ground is, reduce the compactness of soil through the water spray subassembly for soil back-out is more high-efficient swift, thereby improves the practical value that this earth anchor demolishs the device.
Wherein, the water spray assembly comprises two support rods 14, and the outer walls of the tops of the two support rods 14 are fixedly connected with the same water pipe 10.
Wherein, the top outer wall fixedly connected with inlet tube 5 of water pipe 10, and the bottom outer wall equidistance fixedly connected with nozzle 11 of water pipe 10.
Wherein, the equal fixedly connected with cylinder 2 of top outer wall of two bases 1, and the same roof 3 of top outer wall fixedly connected with of two cylinders 2.
Wherein, the top outer wall fixedly connected with motor 6 of roof 3, and pivot 12 passes through shaft coupling fixed connection in motor 6's output shaft.
Wherein, the outer wall of the bottom of the rotating shaft 12 is fixedly connected with a hook 13.
The working principle is as follows: during the use, remove the device to the earth anchor both sides, and then, inlet tube 5 on the subassembly that will spray water is connected with water jet equipment, spray nozzle 11 through water pipe 10 below is to the soil water spray near the earth anchor, reduce the compactness of soil, then, starter motor 6, motor 6 drives spiral crushing leaf 9 through pivot 12 and rotates, and simultaneously, pneumatic cylinder 7 drives spiral crushing leaf 9 and moves down, thereby the soil near the earth anchor is screwed out, then, adjust cylinder 2 and drive roof 3 and rise, it rises to drive the earth anchor rotation on the couple 13, extract it from subaerial.
Example 2:
referring to fig. 1-3, a device is demolishd to earth anchor for power engineering, compare with embodiment 1, the equal fixedly connected with connecting plate 15 of both sides outer wall of two bases 1, and the equal fixedly connected with pneumatic cylinder 16 No. two of one side outer wall of every connecting plate 15, the other end fixedly connected with same bull-dozer 17 of two pneumatic cylinders 16 that is located on same base 1, a plurality of pneumatic cylinders 16 No. two are connected with synchronous hydraulic system, after the earth anchor is extracted, adjust No. two pneumatic cylinders 16 and drive bull-dozer 17 and fill back the soil of unscrewing, prevent that the condition of soil loss from appearing in earth anchor installation department, improve the device's functionality.
The working principle is as follows: during the use, move the device to the earth anchor both sides, and then, be connected inlet tube 5 on the subassembly that will spray water with water spraying equipment, spray water to the soil near the earth anchor through nozzle 11 of water pipe 10 below, reduce the compactness of soil, then, starting motor 6, motor 6 drives spiral crushing leaf 9 through pivot 12 and rotates, and simultaneously, pneumatic cylinder 7 drives spiral crushing leaf 9 and moves down, thereby the soil near the earth anchor is rotated out, then, adjust cylinder 2 and drive roof 3 and rise, drive the earth anchor rotation on couple 13 and rise, extract it from the ground, after the earth anchor is extracted, close motor 6, pneumatic cylinder 7 drives spiral crushing leaf 9 and resets, adjust No. two pneumatic cylinders 16 and drive bull dozer board 17 and push back the soil that is rotated out to the original place, thereby make things convenient for the staff to refill soil.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a device is demolishd to earth anchor for power engineering, includes two bases (1) and pivot (12), its characterized in that, two the top outer wall of base (1) is equipped with the water spray subassembly, the outer wall fixedly connected with mount (4) of pivot (12), and the bottom outer wall equidistance fixedly connected with pneumatic cylinder (7) of mount (4), it is a plurality of the same link (8) of bottom outer wall fixedly connected with of pneumatic cylinder (7), and the bottom outer wall fixedly connected with spiral crushing leaf (9) of link (8), a plurality of pneumatic cylinder (7) are connected with synchronous hydraulic system.
2. An earth anchor dismounting device for electric power engineering according to claim 1, characterized in that the water spraying assembly comprises two support rods (14), and the same water pipe (10) is fixedly connected to the top outer walls of the two support rods (14).
3. An electric power engineering earth anchor dismounting device according to claim 2, characterized in that the top outer wall of said water pipe (10) is fixedly connected with a water inlet pipe (5), and the bottom outer wall of said water pipe (10) is fixedly connected with nozzles (11) with equal distance.
4. An electric power engineering earth anchor dismounting device according to claim 1, characterized in that the top outer walls of both said bases (1) are fixedly connected with air cylinders (2), and the top outer walls of both air cylinders (2) are fixedly connected with the same top plate (3).
5. An electric power engineering earth anchor demolition device according to claim 4, characterized in that the top outer wall of the top plate (3) is fixedly connected with a motor (6), and the rotating shaft (12) is fixedly connected with the output shaft of the motor (6) through a coupling.
6. An earth anchor dismantling device for power engineering as claimed in claim 1, wherein a hook (13) is fixedly connected to the outer wall of the bottom of the rotary shaft (12).
7. The ground anchor dismounting device for the electric power engineering according to any one of claims 1-6, characterized in that the outer walls of two sides of two bases (1) are fixedly connected with connecting plates (15), one outer wall of each connecting plate (15) is fixedly connected with a second hydraulic cylinder (16), the other ends of the two second hydraulic cylinders (16) on the same base (1) are fixedly connected with the same bulldozer plate (17), and a plurality of second hydraulic cylinders (16) are connected with a synchronous hydraulic system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020325408.7U CN212427099U (en) | 2020-03-16 | 2020-03-16 | Ground anchor dismounting device for power engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020325408.7U CN212427099U (en) | 2020-03-16 | 2020-03-16 | Ground anchor dismounting device for power engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212427099U true CN212427099U (en) | 2021-01-29 |
Family
ID=74291520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020325408.7U Expired - Fee Related CN212427099U (en) | 2020-03-16 | 2020-03-16 | Ground anchor dismounting device for power engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212427099U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113789785A (en) * | 2021-09-22 | 2021-12-14 | 国网江苏省电力有限公司建设分公司 | Portable dismounting device for grounding pile of emergency power supply system and using method of portable dismounting device |
-
2020
- 2020-03-16 CN CN202020325408.7U patent/CN212427099U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113789785A (en) * | 2021-09-22 | 2021-12-14 | 国网江苏省电力有限公司建设分公司 | Portable dismounting device for grounding pile of emergency power supply system and using method of portable dismounting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100777775B1 (en) | Winding apparatus of cable | |
CN212427099U (en) | Ground anchor dismounting device for power engineering | |
CN112012332A (en) | Underground pipeline dredging robot and dredging method | |
CN113120755A (en) | Segment dismounting device for urban shield tunnel and dismounting method thereof | |
CN213914718U (en) | Efficient sand screening equipment for civil engineering | |
CN211229458U (en) | A operation platform for cylinder mound concrete placement construction | |
CN2251595Y (en) | Outside scaffold for building construction | |
CN216788406U (en) | Primary lining air-raid shelter device for vertical shaft | |
CN207469334U (en) | A kind of construction power shovel being conveniently replaceable | |
CN211286905U (en) | Intelligence pole base and installation device | |
CN107234645A (en) | PHC pile tube internal expanding cutting equipments and its application method | |
CN207313191U (en) | A kind of oil slick cleaning plant | |
CN113522947A (en) | Soil remediation device for honeycomb cellular rainwater garden | |
CN111636428A (en) | Tube core cleaning device of building tubular pile | |
CN216240125U (en) | Safety device for construction | |
CN213143043U (en) | Foundation pile reinforcing apparatus for construction | |
CN218831265U (en) | Ecological restoration device | |
CN216669992U (en) | Device for monitoring water and soil loss of engineering construction | |
CN211596409U (en) | Bridge closure adjusting device | |
CN110593069A (en) | Pavement crusher | |
CN218715783U (en) | Dustproof fender that encloses | |
CN213979114U (en) | Installation device for continuous wall construction equipment cutting box | |
CN219366026U (en) | Extraction drilling machine for landfill gas recovery | |
CN216741833U (en) | Main tower pole of small wind power generator | |
CN111287098B (en) | Device for dismantling Bailey beam and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210330 Address after: 330000 No. 551, Nanjing West Road, Donghu District, Nanchang City, Jiangxi Province Patentee after: Jiangxi Tianyi Electric Power Construction Co.,Ltd. Address before: 442100 Daqiao Dongcheng Industrial Park, Fangxian Industrial Park, Shiyan City, Hubei Province Patentee before: Ren Yi |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |