CN212426758U - Bent cap core rod penetrating hanging rack formwork system - Google Patents
Bent cap core rod penetrating hanging rack formwork system Download PDFInfo
- Publication number
- CN212426758U CN212426758U CN201922236429.1U CN201922236429U CN212426758U CN 212426758 U CN212426758 U CN 212426758U CN 201922236429 U CN201922236429 U CN 201922236429U CN 212426758 U CN212426758 U CN 212426758U
- Authority
- CN
- China
- Prior art keywords
- core
- pvc pipe
- penetrating
- rod
- bearing support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a bent cap core-penetrating rod hanging rack formwork system, which comprises a distribution beam, a bracket, a core-penetrating steel rod, a hanging seat, a PVC pipe and a triangular bearing bracket; the top of the thin-wall pier is embedded with a PVC pipe, a core penetrating steel bar is arranged in the PVC pipe, and the hanging seat is erected through the core penetrating steel bar; and two ends of the core-penetrating steel bar are provided with prestress-treated triangular bearing supports, and distribution beams and brackets are arranged on the triangular bearing supports. The utility model has the advantages that: the utility model has the advantages that the radiation structure is arranged outside the PVC pipe, so as to be embedded accurately, ensure the engineering quality and have simple structure; the utility model discloses a carry out prestressing force to triangle bearing support and handle, horizontal roof beam realizes tripod prestressing force, level promptly and realizes prestressing force between the tripod to the pull rod with vertical roof beam combination, has improved structural stability, simple structure, and has ensured engineering quality and safety.
Description
Technical Field
The utility model relates to a bridge construction technical field, concretely relates to bent cap wears plug stores pylon formwork system.
Background
In the process of building a bridge, a construction method of erecting supports is generally adopted when pouring pier bent caps, the method needs to reinforce the foundation at the bottoms of the supports, and the quantity of supports erected on the lower portions of the bent caps is large. Therefore, the method has the defects of long construction period and large capital investment. Meanwhile, for unfavorable geological conditions, the casting quality of the pier capping beam is affected due to the fact that the support is prone to sedimentation and deformation caused by uneven sedimentation of the ground, and meanwhile, safety hidden dangers are brought to the bridge construction process.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough among the prior art, providing a bent cap and wearing plug stores pylon formwork system to set up the support when pouring the pier bent cap among the solution prior art and have the long, the fund drops into big, the support non-uniform settlement who sets up warp the problem that influences pier bent cap quality.
The bent cap core rod penetrating hanging frame formwork system comprises a distribution beam, a bracket, a core rod penetrating steel rod, a hanging seat, a PVC pipe and a triangular bearing support; the top of the thin-wall pier is embedded with a PVC pipe, a core penetrating steel bar is arranged in the PVC pipe, and the hanging seat is erected through the core penetrating steel bar; and two ends of the core-penetrating steel bar are provided with prestress-treated triangular bearing supports, and distribution beams and brackets are arranged on the triangular bearing supports.
Preferably, the method comprises the following steps: and a radiation structure is arranged on the PVC pipe.
Preferably, the method comprises the following steps: the plane position deviation of the PVC pipe is less than or equal to 5mm, and the height error of the PVC pipe is less than or equal to 5 mm.
Preferably, the method comprises the following steps: the two ends of the core penetrating steel rod are provided with coarse threads, and the two ends of the core penetrating steel rod penetrate through the hanging seat and are fixed through nuts.
Preferably, the method comprises the following steps: the hanging seat is a ribbed plate reinforced steel plate combined hanging seat.
Preferably, the method comprises the following steps: the triangular bearing support mainly comprises a transverse beam, a longitudinal beam, an inclined strut and a cantilever beam, wherein the inclined strut is arranged between the transverse beam and the longitudinal beam, and the cantilever beam is arranged between the transverse beam and the inclined strut; i-shaped steel is welded on the triangular bearing support, and a multi-stage hoop is arranged at the lower part of the triangular bearing support.
Preferably, the method comprises the following steps: and side molds and bottom molds are erected above the distribution beams and the brackets.
Preferably, the method comprises the following steps: the side above the triangular bearing support is provided with a guardrail.
The utility model has the advantages that:
1) the utility model discloses a PVC outside of tubes portion is provided with radial structure to it is accurate pre-buried, guarantee the engineering quality, and simple structure.
2) The utility model discloses a carry out prestressing force to triangle bearing support and handle, horizontal roof beam realizes tripod prestressing force, level promptly and realizes prestressing force between the tripod to the pull rod with vertical roof beam combination, has improved structural stability, simple structure, and has ensured engineering quality and safety.
3) The utility model discloses a to hanging the seat and increasing floor formation floor strenghthened type steel sheet combination and hanging the seat, increase node structure resistance has ensured constructor's safety, has promoted structural stability.
4) The utility model discloses a carry out counter-force pre-compaction to distribution roof beam and bracket and handle, improved die block formwork efficiency.
Drawings
Fig. 1 is a schematic structural view of a bent cap core-through rod hanging rack formwork system of the present invention;
fig. 2 is a schematic structural view between the core-through steel bar and the hanging rack of the present invention;
fig. 3 is a cross-sectional view taken along line 1-1 of fig. 2 according to the present invention;
fig. 4 is a structural diagram of the triangular bearing support of the present invention.
Description of reference numerals: 1: side mould; 2: bottom die; 3: a guardrail; 4: a distribution beam and a bracket; 5: a core penetrating steel bar; 6: a transverse beam; 7: hanging a seat; 8: bracing; 9: PVC pipes; 10: a cantilever beam; 11: welding seams; 12: a longitudinal beam; 13: a multi-stage hoop; 14: and (5) thin-wall pier.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
The utility model discloses a bent cap core-piercing rod stores pylon formwork system through adopting pre-buried PVC pipe 9, sets up a through-hole that runs through the thin wall mound at the top of thin wall mound 14, will wear core rod 5 to pass PVC pipe 9, erect the triangle bearing bracket of prestressing force processing at the both ends of wearing core rod 5, utilize triangle bearing bracket to form the support, installation distribution roof beam and bracket 4, after distribution roof beam and the 4 counter-force pre-compaction of bracket, erect die block 2 and side form 1, pour the concrete to form solid mound bent cap.
Compared with the traditional construction method, the bent cap core rod-penetrating hanging rack formwork system has simpler construction process and strong repeatability, and is beneficial to the skillful grasp of operators; the construction period is short, the required components are produced in a factory, the prestress treatment is carried out on partial components, and the quality is easy to guarantee.
In order to guarantee the effort equilibrium of triangle bearing frame to the thin wall mound, the utility model discloses in innovated PVC pipe 9's structure for its plane positional deviation is less than or equal to 5mm, and the high error of PVC pipe is less than or equal to 5mm, thereby in order to guarantee PVC pipe 9's levelness.
In order to further ensure that the PVC pipe does not take place the off normal at the in-process of pouring, guarantee promptly to be used for installing the effort equilibrium of punching rod iron 5 on the thin wall mound, the utility model discloses outside to PVC pipe 9 increases scattered column structure to it is accurate pre-buried to be convenient for PVC pipe, as shown in fig. 3.
The utility model discloses a both ends of wearing core rod iron 5 are equipped with thick tooth screw thread, and the both ends of wearing core rod iron 5 are passed and are hung seat 7 and pass through the nut in order to fix.
In order to ensure the stability of the prestressed triangular bearing support, the triangular bearing support is formed by welding two triangular frameworks into a whole through a transverse beam 6, wherein the single triangular framework is formed by welding profile steels. The triangular bearing support is subjected to prestress treatment, namely the transverse beam 6 and the longitudinal beam 12 are combined to realize triangular support prestress, and the pull rod is horizontally combined to realize the prestress between the triangular supports. In addition, in order to facilitate disassembly, the cantilever beam 10 is welded on the triangular bearing support, and the length of the cantilever beam is larger than the width of the cover beam of the thin-wall pier.
That is to say, the clear width ratio thin wall mound body width 5cm of two triangle-shaped skeletons, its front end "7 font" structure department is stress concentration position, in order to guarantee the safety of steel construction, adopts the steel sheet to carry out the stick welding to make triangle bearing support weld firmly.
The triangular framework is installed by a crane, the suspension end of the 7-shaped structure is hung on the hanging seat 7, the longitudinal beam 12 at the lower part is attached to the thin-wall pier body, the pier body provides supporting counter force, and the suspension end and the hanging wall need to be closely attached, so that a gap between the suspension end and the hanging wall is filled by a steel plate.
Claims (5)
1. A bent cap core-penetrating rod hanging rack formwork system is characterized by comprising a distribution beam, a bracket (4), a core-penetrating steel rod (5), a hanging seat (7), a PVC pipe (9) and a triangular bearing support; the top of the thin-wall pier is embedded with a PVC pipe (9), a core penetrating steel bar (5) is installed in the PVC pipe (9), and a hanging seat (7) is erected through the core penetrating steel bar (5); two ends of the core-penetrating steel bar (5) are provided with a prestress-treated triangular bearing support, and the triangular bearing support is provided with a distribution beam and a bracket (4); a radiation structure is arranged on the PVC pipe (9); the lower part of the triangular bearing support is provided with a multi-stage hoop (13); a side die (1) and a bottom die (2) are erected above the distribution beam and the bracket (4); the side edge above the triangular bearing support is provided with a guardrail (3).
2. The capping beam through mandrel rack formwork system of claim 1, wherein the deviation of the plane position of the PVC pipe (9) is less than or equal to 5mm and the height error of the PVC pipe (9) is less than or equal to 5 mm.
3. The capping beam core-through rod hanger formwork system of claim 1, wherein both ends of the core-through steel rod (5) are provided with coarse threads, and both ends of the core-through steel rod (5) pass through the hanging seat (7) and are fixed by nuts.
4. The bent cap core rod-penetrating hanging rack formwork system as claimed in claim 1, wherein the hanging seat (7) is a ribbed plate reinforced steel plate combined hanging seat.
5. The bent cap core rod-penetrating hanger formwork system as claimed in claim 1, wherein the triangular bearing support mainly comprises a transverse beam (6), a longitudinal beam (12), an inclined strut (8) and an outrigger (10), the inclined strut (8) is arranged between the transverse beam (6) and the longitudinal beam (12), and the outrigger (10) is arranged between the transverse beam (6) and the inclined strut (8); and I-shaped steel is welded on the triangular bearing support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922236429.1U CN212426758U (en) | 2019-12-13 | 2019-12-13 | Bent cap core rod penetrating hanging rack formwork system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922236429.1U CN212426758U (en) | 2019-12-13 | 2019-12-13 | Bent cap core rod penetrating hanging rack formwork system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212426758U true CN212426758U (en) | 2021-01-29 |
Family
ID=74275676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922236429.1U Active CN212426758U (en) | 2019-12-13 | 2019-12-13 | Bent cap core rod penetrating hanging rack formwork system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212426758U (en) |
-
2019
- 2019-12-13 CN CN201922236429.1U patent/CN212426758U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243651B (en) | Method for fixedly installing and leveling base of metal upright column of bridge guardrail | |
CN211447708U (en) | Super high-rise building construction elevator feeding platform support system that encorbelments | |
CN103306206B (en) | A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar | |
CN110172912A (en) | A kind of solid pier capping beam processing construction method | |
CN106087744B (en) | Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device and method | |
CN111101701A (en) | Basement outer wall unilateral formwork supporting system and construction method thereof | |
CN201686972U (en) | Variable arc steel moulding plate for arch crown of dam gallery | |
CN210134353U (en) | Bracket type hoop bracket for bent cap construction | |
CN215107376U (en) | Inclined wall formwork support system | |
CN102733599A (en) | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam | |
CN103343639A (en) | Efficiently-adjusting module sliding system | |
CN212426758U (en) | Bent cap core rod penetrating hanging rack formwork system | |
CN111691300A (en) | A concrete placement support device for steel-concrete composite beam | |
CN110670873B (en) | Support system of steel formwork of ultrahigh large-section concrete column and construction method | |
CN212247894U (en) | A concrete placement support device for steel-concrete composite beam | |
CN212000638U (en) | Overhead cover beam type steel supporting structure | |
CN211368420U (en) | Main tower lower beam bracing support system | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN110790113B (en) | Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator | |
CN211473320U (en) | Tool type external hanging rack for corridor | |
CN103334584A (en) | Template regulating system for sliding form system | |
CN202706543U (en) | Fastener-type steel pipe scaffold formwork support applicable to skeleton reinforced concrete girder | |
CN205741886U (en) | A kind of extension die shoe frame for the construction of bridge rectangle pier | |
CN218263465U (en) | Cable tower X supports and sets up | |
CN216275257U (en) | But quick assembly disassembly formula bent cap bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Cover beam through core rod hanging frame support formwork system Effective date of registration: 20230927 Granted publication date: 20210129 Pledgee: Industrial Bank Limited by Share Ltd. Wuhan branch Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd. Registration number: Y2023980059401 |