CN212409600U - Support for hanging line pendant and verticality detection tool - Google Patents

Support for hanging line pendant and verticality detection tool Download PDF

Info

Publication number
CN212409600U
CN212409600U CN202021198176.XU CN202021198176U CN212409600U CN 212409600 U CN212409600 U CN 212409600U CN 202021198176 U CN202021198176 U CN 202021198176U CN 212409600 U CN212409600 U CN 212409600U
Authority
CN
China
Prior art keywords
connecting rod
supporting rod
rod
length direction
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021198176.XU
Other languages
Chinese (zh)
Inventor
宫显利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202021198176.XU priority Critical patent/CN212409600U/en
Application granted granted Critical
Publication of CN212409600U publication Critical patent/CN212409600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The application discloses a support and straightness detection instrument that hangs that is used for hanging plumb line, the support includes bracing piece, first connecting rod and second connecting rod. The first connecting rod is provided with scales and is vertically connected with the supporting rod. The second connecting rod is provided with scales, the second connecting rod is vertically connected with the supporting rod and can slide along the length direction of the supporting rod, the second connecting rod and the first connecting rod are positioned at the same side of the supporting rod, and one end of the second connecting rod, which is far away from the supporting rod, is flush with one end of the first connecting rod, which is far away from the supporting rod. This application is through making the second connecting rod can follow the length direction of bracing piece and slide for the measurement personnel accessible is adjusted the second connecting rod so that the support is applicable to multiple determinand, and the regulation of second connecting rod is comparatively convenient, thereby makes the detection achievement of straightness that hangs down more convenient.

Description

Support for hanging line pendant and verticality detection tool
Technical Field
The application relates to the field of constructional engineering construction, in particular to a support and a verticality detection tool for a suspension line pendant.
Background
The method is characterized in that the verticality of templates of vertical components such as wall columns and the like is detected, the most original detection method is that a line weight is matched with a box ruler for detection, the line weight is fixed on the side face of the vertical component such as the wall column and the like to be detected, the box ruler is used for measuring the readings of the upper position, the middle position and the lower position of a vertical line, and when a higher template is met, an upper climbing frame body and a lower climbing frame body are needed, and the detection can be completed only by matching.
SUMMERY OF THE UTILITY MODEL
The application provides a support and straightness detection instrument that hangs for hanging plumb bob can make the detection achievement of straightness that hangs more convenient.
In a first aspect, embodiments of the present application provide a support for suspending a line weight, the support comprising a support bar, a first link, and a second link. The first connecting rod is provided with scales and is vertically connected with the supporting rod. The second connecting rod is provided with scales, the second connecting rod is vertically connected with the supporting rod and can slide along the length direction of the supporting rod, the second connecting rod and the first connecting rod are positioned at the same side of the supporting rod, and one end of the second connecting rod, which is far away from the supporting rod, is flush with one end of the first connecting rod, which is far away from the supporting rod.
In some of these embodiments, the bracing piece has the spout, and the spout extends along the length direction of bracing piece, and the bracing piece still has two at least locating holes, and each locating hole is arranged along the length direction of bracing piece. The second connecting rod is provided with a sliding rail, the sliding rail is arranged in the sliding groove, the second connecting rod is further provided with a connecting hole, and the connecting hole is configured to enable a bolt to pass through the positioning hole and the connecting hole so that the second connecting rod can be positioned.
In some of these embodiments, the scale includes a plurality of scale marks, and each scale mark is arranged along the length direction of first link, and scale mark department has the installation department, and the installation department is configured to make the suspension line location of plummet.
In some of these embodiments, the mounting portion includes a mounting hole.
In some of these embodiments, the mounting portion includes a groove disposed around the first link.
In some of these embodiments, the number of the mounting portions is at least two, and each mounting portion is arranged along the length direction of the first link.
In some embodiments, the number of the second connecting rods is at least two, and each second connecting rod is positioned on the same side of the supporting rod.
In some of these embodiments, the bracket further comprises a fixing portion located at the support rod and at a side of the second link remote from the first link, the fixing portion being configured to fix the free end of the box ruler.
In some embodiments, the number of the fixing parts is multiple, and each fixing part is arranged along the length direction of the supporting rod.
In a second aspect, an embodiment of the present application further provides a verticality detection tool, where the verticality detection tool includes the support and the line weight in any of the above embodiments, and the line weight is suspended from the first connecting rod of the support.
According to an embodiment of the present application, there is provided a support for hanging a line weight, the support including a support bar, a first link, and a second link. The first connecting rod is provided with scales and is vertically connected with the supporting rod. The second connecting rod is provided with scales, the second connecting rod is vertically connected with the supporting rod and can slide along the length direction of the supporting rod, the second connecting rod and the first connecting rod are positioned at the same side of the supporting rod, and one end of the second connecting rod, which is far away from the supporting rod, is flush with one end of the first connecting rod, which is far away from the supporting rod. This application is through making the second connecting rod can follow the length direction of bracing piece and slide for the measurement personnel accessible is adjusted the second connecting rod so that the support is applicable to multiple determinand, and the regulation of second connecting rod is comparatively convenient, thereby makes the detection achievement of straightness that hangs down more convenient.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural view of a stent in an embodiment of the present application;
FIG. 2 is a schematic view of a portion of a support rod according to an embodiment of the present disclosure;
FIG. 3 is a schematic partial structural view of a second link according to an embodiment of the present application;
FIG. 4 is a schematic structural diagram of a verticality detection tool according to an embodiment of the present disclosure;
FIG. 5 is a schematic structural diagram of the verticality detection tool in the embodiment of the present application.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
Referring to fig. 1 to 3, embodiments of the present application provide a support 10 for hanging a wire bob, and the support 10 may include a support bar 100, a first link 200, and a second link 300. Wherein, the support rod 100 may be a straight rod. The support bar 100 serves to support the first link 200 and the second link 300.
The first link 200 may be a straight rod shape. The first link 200 may be vertically connected to the support bar 100. Alternatively, one end of the first link 200 is connected to one end of the support bar 100. When the support 10 is used for detecting perpendicularity, the first connecting rod 200 is used for suspending the wire drop 400. The first link 200 may have a scale. The scale is used to mark the upper side position of the suspension line of the line bob 400.
The second link 300 may be a straight rod shape. The second link 300 may be vertically connected to the support bar 100. Alternatively, one end of the second link 300 is connected to the middle of the support bar 100. The second link 300 may be located at the same side of the support bar 100 as the first link 200. An end of the second link 300 away from the support bar 100 may be flush with an end of the first link 200 away from the support bar 100. The second link 300 may have a scale. The scale is used for marking the middle position of the suspension line. The scale may be the same as that of the first link 200.
Through the support 10 of this application, only need a measurement personnel can realize that the straightness that hangs down of determinand detects, and measurement personnel need not repetitious usage box chi and measure, and to higher determinand, measurement personnel need not climb the support body from top to bottom and can accomplish simultaneously.
Wherein, the second link 300 can slide along the length direction of the support rod 100. This application is through making second connecting rod 300 can follow the length direction slip of bracing piece 100 for the testing personnel accessible is adjusted second connecting rod 300 so that support 10 is applicable to multiple template, and the regulation of second connecting rod 300 is comparatively convenient, thereby makes the detection achievement of straightness that hangs down more convenient.
In order to allow the second link 300 to slide along the length direction of the support bar 100, the support bar 100 may have a slide groove 110, and the slide groove 110 extends along the length direction of the support bar 100. The support bar 100 further has at least two positioning holes 120, and each positioning hole 120 is disposed along the length direction of the support bar 100. The second link 300 may have a slide rail disposed in the slide groove 110. The second link 300 also has a coupling hole 310, and the coupling hole 310 is configured such that a bolt can pass through the positioning hole 120 and the coupling hole 310 to position the second link 300.
The scale of the first link 200 includes a plurality of scale lines, each of which is arranged in a length direction of the first link 200, and a mounting portion at which the mount is configured to position a hanging line of the line bob 400.
The mounting portion may include a mounting hole. At this time, the suspension wire may be fastened after passing through the mounting hole, so that the wire drop 400 is stably suspended from the first link 200. The mount portion may further include a groove disposed around the first link 200. At this time, the suspension wire is tied after being trapped in the groove.
The number of the installation parts is at least two, and each installation part is arranged along the length direction of the first link 200. Each installation part is respectively positioned at one scale mark. To enable adjustment of the hanging position of the plummet 400.
The number of the second links 300 is at least two, and each second link 300 is located on the same side of the support rod 100. Alternatively, the number of the second links 300 is two. At the moment, the detection of the upper, middle and lower positions of the suspension line is just realized.
The support 10 further comprises a fixing portion located at the support bar 100 and at a side of the second link 300 remote from the first link 200, the fixing portion being configured to fix a free end of the box ruler. The number of the fixing parts may be plural, and each fixing part is arranged along the length direction of the support bar 100, so that the inspector selects an appropriate fixing part while sliding the second link 300 along the length direction of the support bar 100. The fixing portion may include a fixing groove such that the hook of the box ruler is placed in the fixing groove.
The first link 200 and the support bar 100 may be integrally formed, or may be two connected components, so as to reduce the occupied space of the stand 10 during storage, transportation, etc.
Referring to fig. 4, the embodiment of the present application further provides a verticality detection tool 20, where the verticality detection tool 20 includes a support 10 and a wire weight 400 in any one of the above embodiments, and the wire weight 400 is suspended from the first link 200 of the support 10.
Referring to fig. 5, in practical application, a formwork 50 is installed, and then concrete 60 is placed in a space defined by the formwork 50, a batten 40 is arranged on the outer side of the formwork 50, a scaffold tube 30 is arranged on the outer side of the batten 40, and the perpendicularity detection tool 20 can pass through the scaffold tube 30 and the batten 40 to detect the perpendicularity of the formwork 50.
The same or similar reference numerals in the drawings of the present embodiment correspond to the same or similar components; in the description of the present application, it is to be understood that if there is an orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", etc. based on the orientation or positional relationship shown in the drawings, it is only for convenience of description and simplification of description, but it is not intended to indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore, the terms describing the positional relationship in the drawings are only for illustrative purposes and are not to be construed as limitations of the present patent, and specific meanings of the above terms may be understood by those skilled in the art according to specific situations.
The above description is only exemplary of the present application and should not be taken as limiting the present application, as any modification, equivalent replacement, or improvement made within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims (10)

1. A support for hanging a line drop, comprising:
a support bar;
the first connecting rod is provided with scales and is vertically connected with the supporting rod; and
the second connecting rod is provided with the scales, the second connecting rod is vertically connected with the supporting rod and can slide along the length direction of the supporting rod, the second connecting rod and the first connecting rod are positioned at the same side of the supporting rod, and one end of the second connecting rod, which is far away from the supporting rod, is flush with one end of the first connecting rod, which is far away from the supporting rod.
2. The holder of claim 1,
the supporting rod is provided with a sliding groove, the sliding groove extends along the length direction of the supporting rod, the supporting rod is also provided with at least two positioning holes, and the positioning holes are arranged along the length direction of the supporting rod;
the second connecting rod is provided with a sliding rail, the sliding rail is arranged in the sliding groove, and the second connecting rod is further provided with a connecting hole, and a bolt can penetrate through the positioning hole and the connecting hole to enable the second connecting rod to be positioned.
3. The holder of claim 1,
the scale comprises a plurality of scale marks, each scale mark is arranged along the length direction of the first connecting rod, an installation part is arranged at the scale mark, and the installation part is configured to enable the hanging line of the line drop to be positioned.
4. The cradle of claim 3,
the mounting portion includes a mounting hole.
5. The cradle of claim 3,
the mounting portion includes a groove disposed around the first link.
6. The cradle of claim 3,
the number of installation department is at least two, each the installation department is arranged along the length direction of first connecting rod.
7. The holder of claim 1,
the number of the second connecting rods is at least two, and each second connecting rod is positioned on the same side of the supporting rod.
8. The stent of claim 1, further comprising:
the fixing part is positioned on the supporting rod and on one side, far away from the first connecting rod, of the second connecting rod, and the fixing part is configured to fix the free end of the box ruler.
9. The cradle of claim 8,
the number of the fixing parts is multiple, and the fixing parts are arranged along the length direction of the supporting rod.
10. A verticality detection tool, comprising:
the scaffold of any one of claims 1-9; and
the line weighs down, hang in the first connecting rod of support.
CN202021198176.XU 2020-06-24 2020-06-24 Support for hanging line pendant and verticality detection tool Active CN212409600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021198176.XU CN212409600U (en) 2020-06-24 2020-06-24 Support for hanging line pendant and verticality detection tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021198176.XU CN212409600U (en) 2020-06-24 2020-06-24 Support for hanging line pendant and verticality detection tool

Publications (1)

Publication Number Publication Date
CN212409600U true CN212409600U (en) 2021-01-26

Family

ID=74406908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021198176.XU Active CN212409600U (en) 2020-06-24 2020-06-24 Support for hanging line pendant and verticality detection tool

Country Status (1)

Country Link
CN (1) CN212409600U (en)

Similar Documents

Publication Publication Date Title
CN206095249U (en) Verticality ruler
CN210135926U (en) Adjustable simple detection device for perpendicularity of bridge pier column
CN210719192U (en) Template straightness check device that hangs down based on BIM
CN212409600U (en) Support for hanging line pendant and verticality detection tool
CN211373625U (en) Building engineering detecting instrument template perpendicularity measuring frame
CN210154575U (en) Verticality measuring device
CN205066772U (en) Perpendicular detector of datumization wall body
CN207936901U (en) The verticality measuring tool of wall column formwork
CN210135880U (en) Verticality detection tool
CN213874288U (en) Verticality or right angle precision measuring instrument
CN207147493U (en) The testing apparatus for verticality of vertical member
CN206719472U (en) A kind of heel angle measurement tool based on ship inclination experiment
CN210774082U (en) Template verticality measuring device
CN214793144U (en) Special gradient measuring device of building engineering
CN212129261U (en) Perpendicularity tester for pile hole of cast-in-situ bored pile
CN206235286U (en) Extension type mold plate verticality detector
CN211425319U (en) Prefabricated crashproof wall straightness detection device that hangs down
CN211696422U (en) Tool for detecting verticality of template
CN211178501U (en) Wall post template straightness measuring tool that hangs down
CN210036740U (en) Prefabricated wall body installation straightness measuring tool that hangs down
CN103471575B (en) Template perpendicularity detection device and detection method thereof
CN208313309U (en) Detection hanging rack for verticality of aluminum template
CN218443915U (en) Tool for detecting perpendicularity of prefabricated wall
CN214470797U (en) Building engineering quality detection device
CN218035061U (en) Aluminum die verticality detection tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant