CN212405869U - Through-wall dry-hanging structure - Google Patents

Through-wall dry-hanging structure Download PDF

Info

Publication number
CN212405869U
CN212405869U CN202021157911.2U CN202021157911U CN212405869U CN 212405869 U CN212405869 U CN 212405869U CN 202021157911 U CN202021157911 U CN 202021157911U CN 212405869 U CN212405869 U CN 212405869U
Authority
CN
China
Prior art keywords
wall
hanging
room
light partition
hang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021157911.2U
Other languages
Chinese (zh)
Inventor
冯飞
胡其林
韩伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202021157911.2U priority Critical patent/CN212405869U/en
Application granted granted Critical
Publication of CN212405869U publication Critical patent/CN212405869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a wall-through dry hanging structure, belonging to the field of interior decoration, which is used for arranging a main keel bearing force application part in a first room at the top of a second room separated by a light partition wall, and comprises a hanging part and a wall-through adapter part; the hanging piece is used for being fixed below a top concrete structure of the second room; one end of the wall-through adapter is fixedly connected with the hanger, and the other end of the wall-through adapter penetrates through the light partition wall and is fixedly connected with the main keel. Through the utility model provides a wear wall and hang structure futilely, the concrete structure that leads to next door room with the structure of main joist is installed, can solve this room passageway upper portion space and fill cloth tuber pipe, crane span structure, fire control water supply pipe etc. leads to hanging the unable bottom plate lower part that extends in main joist upper end futilely, is connected fixedly and the quality safety hidden danger that arouses with building concrete structure effective.

Description

Through-wall dry-hanging structure
Technical Field
The utility model relates to an interior decoration field particularly, relates to a wear wall and hang structure futilely.
Background
The installation mode of the interior decoration veneer can be divided into two types: wet operation pasting (cement mortar ) and keel dry hanging construction. The project building partition wall adopts a large number of polyphenyl granule light partition walls, a wall surface microlite surface layer adopts a keel dry hanging mode according to design requirements, main keels are installed by adopting upper and lower embedded plates to be effectively connected with concrete structural plates or beams through expansion screws, clamping lugs are welded on the embedded plates, and vertical main keels are installed and fixed through core-penetrating screws. The indoor main joist installation fixed point of normal condition is located vertical axis floor structural slab bottom and top respectively, but in actual construction, the passageway ceiling is narrow and small because of the space, and the more reason main joist of equipment pipeline crane span structure can't be extended to the ceiling board, roof beam down with the structural fixation according to the design, and the light partition wall can't be fixed fossil fragments on the partition wall futilely because of its congenital structure problem, and the construction has partial fossil fragments upper end and major structure and does not have effective reliable fixed connection's hidden danger.
SUMMERY OF THE UTILITY MODEL
The utility model provides a wear wall and hang structure futilely aims at solving the above-mentioned problem that wear wall and hang structure existence futilely among the prior art.
The utility model discloses a realize like this:
a through-wall dry-hanging structure is used for arranging a main keel load-bearing force application part in a first room on the top of a second room separated by a light partition wall and comprises a hanging piece and a through-wall adapter piece;
the hanging piece is used for being fixed below a top concrete structure of the second room;
one end of the through-wall adapter is fixedly connected with the hanger, and the other end of the through-wall adapter penetrates through the light partition wall and is fixedly connected with the main keel.
In one embodiment of the present invention, the hanger comprises a fixing plate and a first expansion bolt;
a plurality of first through holes are formed in the fixing flat plate, and the first expansion bolts penetrate through the first through holes.
In an embodiment of the present invention, the hanger includes an angle steel connector and a second expansion bolt;
and a plurality of second through holes are formed in the angle steel connecting piece, and the second expansion bolts penetrate through the second through holes.
The utility model discloses an in one embodiment, the hanger includes the hang pole, be provided with the connection on the hang pole wear the load connecting piece of wall adaptor.
In an embodiment of the present invention, the hanging rod is provided with a supporting rod extending toward the light partition wall, and the end of the supporting rod is provided with the force bearing connecting piece.
In an embodiment of the present invention, the wall-through adaptor includes a main keel fixing head and a plurality of wall-through screws;
one end of the wall-through screw is fixedly connected with the bearing connecting piece, and the other end of the wall-through screw penetrates through the light partition wall and is fixedly connected with the main keel fixing head.
In an embodiment of the present invention, the force-bearing connecting member is further provided with a gasket acting on the light partition wall.
In an embodiment of the present invention, the hanging rod is a galvanized angle steel rod.
The utility model has the advantages that: through the utility model provides a wear wall and hang structure futilely, the concrete structure that leads to next door room with the structure of main joist is installed, can solve this room passageway upper portion space and fill cloth tuber pipe, crane span structure, fire control water supply pipe etc. leads to hanging the unable bottom plate lower part that extends in main joist upper end futilely, is connected fixedly and the quality safety hidden danger that arouses with building concrete structure effective.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural view of a wall-through dry-hanging structure according to an embodiment of the present invention;
FIG. 2 is a schematic structural view of portion A of FIG. 1;
fig. 3 is a schematic structural view of a through-wall dry-hang structure provided by the second embodiment of the present invention;
FIG. 4 is a schematic structural view of portion B of FIG. 3;
icon: 100-a hanger; 200-a through-wall adaptor; 110-fixed flat plate; 130-a first expansion bolt; 150-hanging the rod; 151-strut; 153-force bearing connecting pieces; 155-a gasket; 210-main keel fixing head; 230-through-wall screw; 170-angle steel connectors; 001-light partition wall; 190-second expansion bolt.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention will be combined to clearly and completely describe the technical solutions of the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Example one
The embodiment provides a wall-through dry-hanging structure, which is used for arranging a main keel load-bearing force application part in a first room on the top of a second room separated by a light partition wall 001, and please refer to fig. 1 and 2, the wall-through dry-hanging structure comprises a hanger 100 and a wall-through adaptor 200;
the hanger 100 is used to be fixed under the top concrete structure of the second room; one end of the wall-through adaptor 200 is fixedly connected with the hanger 100, and the other end of the wall-through adaptor passes through the light partition wall 001 and is fixedly connected with the main keel.
In this embodiment, the hanger 100 is hung on the bottom of the floor, so the hanger 100 includes a fixing plate 110 and a first expansion bolt 130; the fixing plate 110 is provided with a plurality of first through holes through which the first expansion bolts 130 pass.
The fixing plate 110 may be directly matched with a plane at the bottom of the floor slab, and the fixing plate 110 is fixed by driving the first expansion bolt 130 into the floor slab, the hanger 100 further includes a hanging rod 150 fixedly connected with the fixing plate 110, one end of the hanging rod 150 far from the fixing plate 110 extends obliquely to the direction of the light partition wall 001, and a supporting rod 151 extending toward the light partition wall 001 is fixedly disposed at the middle.
The end of the hanging rod 150 and the supporting rod 151 are both provided with a bearing connecting piece 153, the bearing connecting piece 153 is formed by angle steel, and the angle steel is provided with a connecting through hole.
In order to avoid damaging the light partition wall 001, a gasket 155 is further arranged on one surface of the bearing connecting piece 153 close to the light partition wall 001, and the gasket 155 can be made of soft materials such as rubber and the like and can disperse and buffer stress.
The wall-through adaptor 200 comprises a main keel fixing head 210 and a wall-through screw 230, wherein one end of the wall-through screw 230 passes through the connecting through hole and is provided with a nut, and the other end of the wall-through screw passes through the light partition wall 001 and is fixedly connected with the main keel fixing head 210. The main keel fixing heads 210 are connected through the plurality of wall-penetrating screws 230 to ensure the stability of the main keel fixing heads 210, one ends, far away from the wall-penetrating screws 230, of the main keel fixing heads 210 are provided with clamping pieces, the main keels are clamped by the clamping pieces, and the main keels and the clamping pieces can be further fixed through fixing pieces such as fixing screws.
In order to ensure the life of the hanging rod 150, the hanging rod 150 is a galvanized angle steel rod.
Through the utility model provides a wear wall and hang structure futilely, the concrete structure that leads to next door room with the structure of main joist is installed, can solve this room passageway upper portion space and fill cloth tuber pipe, crane span structure, fire control water supply pipe etc. leads to hanging the unable bottom plate lower part that extends in main joist upper end futilely, is connected fixedly and the quality safety hidden danger that arouses with building concrete structure effective.
Example two
The embodiment provides a wall-through dry-hanging structure, which is used for arranging a main keel load-bearing force application part in a first room on the top of a second room separated by a light partition wall 001, and please refer to fig. 3 and 4, the wall-through dry-hanging structure comprises a hanger 100 and a wall-through adaptor 200;
the hanger 100 is used to be fixed under the top concrete structure of the second room; one end of the wall-through adaptor 200 is fixedly connected with the hanger 100, and the other end of the wall-through adaptor passes through the light partition wall 001 and is fixedly connected with the main keel.
In the embodiment, the hanger 100 is hung on the side of the building beam, and the hanger 100 comprises an angle steel connector 170 and a second expansion bolt 190; a plurality of second through holes are formed in the angle steel connector 170, and the second expansion bolts 190 pass through the second through holes.
One side of the angle steel connector 170 can be directly matched with the side of the building beam, and the contact area of the other vertical side can be increased with the hanging rod 150, so that the connection strength can be improved after the welding area is increased, the second expansion bolt 190 is driven into the building beam to fix the angle steel connector 170, the hanging piece 100 further comprises the hanging rod 150 fixedly connected with the angle steel connector 170, one end, far away from the fixed flat plate 110, of the hanging rod 150 extends obliquely towards the light partition wall 001, and the middle part of the hanging rod is fixedly provided with a support rod 151 extending towards the light partition wall 001.
The end of the hanging rod 150 and the supporting rod 151 are both provided with a bearing connecting piece 153, the bearing connecting piece 153 is formed by angle steel, and the angle steel is provided with a connecting through hole.
In order to avoid damaging the light partition wall 001, a gasket 155 is further arranged on one surface of the bearing connecting piece 153 close to the light partition wall 001, and the gasket 155 can be made of soft materials such as rubber and the like and can disperse and buffer stress.
The wall-through adaptor 200 comprises a main keel fixing head 210 and a wall-through screw 230, wherein one end of the wall-through screw 230 passes through the connecting through hole and is provided with a nut, and the other end of the wall-through screw passes through the light partition wall 001 and is fixedly connected with the main keel fixing head 210. The main keel fixing heads 210 are connected through the plurality of wall-penetrating screws 230 to ensure the stability of the main keel fixing heads 210, one ends, far away from the wall-penetrating screws 230, of the main keel fixing heads 210 are provided with clamping pieces, the main keels are clamped by the clamping pieces, and the main keels and the clamping pieces can be further fixed through fixing pieces such as fixing screws.
In order to ensure the life of the hanging rod 150, the hanging rod 150 is a galvanized angle steel rod.
Through the utility model provides a wear wall and hang structure futilely, the concrete structure that leads to next door room with the structure of main joist is installed, can solve this room passageway upper portion space and fill cloth tuber pipe, crane span structure, fire control water supply pipe etc. leads to hanging the unable bottom plate lower part that extends in main joist upper end futilely, is connected fixedly and the quality safety hidden danger that arouses with building concrete structure effective.
EXAMPLE III
The embodiment provides an installation method of a through-wall dry-hanging structure, which is used for realizing the installation of the through-wall dry-hanging structure provided by the first embodiment or the second embodiment on a room concrete structure, and comprises the following steps:
fixing one end of the hanger 100 under a concrete structure installed at the top of the second room by means of an expansion bolt;
the other end of the hanger 100 extends towards the light partition wall 001;
the wall-through adaptor 200 penetrates through the light partition wall 001 from the first room to be fixedly butted with the hanger 100;
one end of the through-wall adaptor 200 far away from the hanger 100 is fixedly connected with the main keel
Through the utility model provides a wear wall and hang structure's installation method futilely, the concrete structure that leads to next door room with the structure of main joist is installed, can solve this room passageway upper portion space and fill cloth tuber pipe, crane span structure, fire control water supply pipe etc. leads to hanging the main joist upper end futilely and can't extend to the bottom plate lower part, is effectively connected fixedly and the quality safety hidden danger that arouses with building concrete structure.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. A through-wall dry-hanging structure is used for arranging a main keel load-bearing force application part in a first room on the top of a second room separated by a light partition wall, and is characterized by comprising a hanging piece and a through-wall adapter piece;
the hanging piece is used for being fixed below a top concrete structure of the second room;
one end of the through-wall adapter is fixedly connected with the hanger, and the other end of the through-wall adapter penetrates through the light partition wall and is fixedly connected with the main keel.
2. A through-wall drywall hang drier structure as set forth in claim 1, wherein said hanger comprises a fixed plate and a first expansion bolt;
a plurality of first through holes are formed in the fixing flat plate, and the first expansion bolts penetrate through the first through holes.
3. The through-wall drywall hang drier of claim 1, wherein the hanger comprises an angle connection and a second expansion bolt;
and a plurality of second through holes are formed in the angle steel connecting piece, and the second expansion bolts penetrate through the second through holes.
4. The through-wall dry-hang structure of claim 1, wherein the hanger comprises a hanging rod, and a force-bearing connecting piece connected with the through-wall adaptor is arranged on the hanging rod.
5. A through-wall dry-hang structure as claimed in claim 4, wherein the hanging rod is provided with a support rod extending towards the light partition wall, and the end part of the support rod is provided with the bearing connecting piece.
6. A through-wall dry-hang structure as claimed in claim 4 or 5, wherein the through-wall adaptor comprises a main keel fixing head and a plurality of through-wall screws;
one end of the wall-through screw is fixedly connected with the bearing connecting piece, and the other end of the wall-through screw penetrates through the light partition wall and is fixedly connected with the main keel fixing head.
7. A through-wall dry-hang structure as claimed in claim 6, wherein a gasket acting on the light partition wall is further arranged on the bearing connecting piece.
8. A through-wall dry-hang structure as claimed in claim 4, wherein the hang-off pole is a galvanized angle steel pole.
CN202021157911.2U 2020-06-19 2020-06-19 Through-wall dry-hanging structure Active CN212405869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021157911.2U CN212405869U (en) 2020-06-19 2020-06-19 Through-wall dry-hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021157911.2U CN212405869U (en) 2020-06-19 2020-06-19 Through-wall dry-hanging structure

Publications (1)

Publication Number Publication Date
CN212405869U true CN212405869U (en) 2021-01-26

Family

ID=74407728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021157911.2U Active CN212405869U (en) 2020-06-19 2020-06-19 Through-wall dry-hanging structure

Country Status (1)

Country Link
CN (1) CN212405869U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982714A (en) * 2021-04-19 2021-06-18 黎斌 Anti-seismic type public ceiling frame based on Internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982714A (en) * 2021-04-19 2021-06-18 黎斌 Anti-seismic type public ceiling frame based on Internet of things
CN112982714B (en) * 2021-04-19 2022-05-27 山东华美建材有限公司 Public dress furred ceiling frame of antidetonation formula based on thing networking

Similar Documents

Publication Publication Date Title
CN211622212U (en) Decorate quick mounting structure of furred ceiling
CN212405869U (en) Through-wall dry-hanging structure
CN113530023A (en) Assembly type gypsum board partition wall structure system design
CN215888877U (en) Assembled furred ceiling keel structure
CN108978978B (en) Closed profiled steel sheet cast-in-situ floor elevator device, suspended ceiling structure and construction method
CN113235800A (en) Assembled bathroom suspended ceiling structure and installation mode thereof
CN111764540A (en) Light partition wall dry-hanging main keel structure and mounting method thereof
CN215670439U (en) Assembled bathroom furred ceiling structure
CN216766484U (en) Anti-bearing structure of furred ceiling
CN211369529U (en) A template for expansion joint department
JP2023062637A (en) Ceiling fall prevention structure
CN209891381U (en) Building structure
CN208202294U (en) Furred ceiling conversion layer structure
CN221053067U (en) Pack basket type integrated connection node
CN207846966U (en) A kind of ceramic tile dried hanging hang structure
CN219653902U (en) Corrugated aluminum plate suspended ceiling installation and fixing system for assembled steel mesh frame roof structure
CN219732473U (en) Electromechanical pipeline and decoration furred ceiling fossil fragments integrated connection spare and connection structure
CN215483995U (en) Corridor suspended ceiling unit
CN203097045U (en) Suspension system suitable for floor supporting plate system
CN217159174U (en) Be used for electric power engineering fire bulkhead installation connection structure
CN215802582U (en) Assembled antidetonation furred ceiling structure
CN218668167U (en) Assembled fire partition wall high-rise building structure
CN217998583U (en) Dry-hanging type indoor suspended ceiling structure
CN209817178U (en) Connection structure of shear wall and interior outer wall, wall and building
CN210597731U (en) Building outer wall double-plate connecting node and steel structure building outer wall body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant