CN207846966U CN201721917692.1U CN201721917692U CN207846966U CN 207846966 U CN207846966 U CN 207846966U CN 201721917692 U CN201721917692 U CN 201721917692U CN 207846966 U CN207846966 U CN 207846966U
Authority
CN
China
Prior art keywords
hanger
ceramic tile
hanging hang
dried hanging
hang structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721917692.1U
Other languages
Chinese (zh)
Inventor
赵长宇
王琪
孟泽国
朱华飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Fuhai Decoration Engineering Co Ltd
Original Assignee
Nanjing Fuhai Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Fuhai Decoration Engineering Co Ltd filed Critical Nanjing Fuhai Decoration Engineering Co Ltd
Priority to CN201721917692.1U priority Critical patent/CN207846966U/en
Application granted granted Critical
Publication of CN207846966U publication Critical patent/CN207846966U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of ceramic tile dried hanging hang structures, it is related to construction and decoration construction applications, its key points of the technical solution are that including hanger, it further include holder, hanger is rack-mount, and the holder includes crossbeam, main joist and false keel, and the crossbeam is fixed on metope, the main joist is installed in parallel in crossbeam, and false keel is mounted side by side on main joist.The utility model has the advantages that:With higher structural strength and bearing capacity;Whole uniform force, will not there is a situation where stress raisers, make metal will not too fast fatigue, extend service life.

Description

A kind of ceramic tile dried hanging hang structure
Technical field
The utility model is related to construction and decoration construction applications, more particularly to a kind of ceramic tile dried hanging hang structure.
Background technology
Ceramic tile is applied to the construction and decoration field of various scales, installs ceramic tile at present and is broadly divided into two ways:Wet combining and Cladding, using the mounting means of wet combining, the binder viscosity for bonding after use after a period of time declines, and causes to crack Occur with the case where falling off.Therefore more and more people select cladding mode.
Currently, the Chinese patent that Authorization Notice No. is CN203867113U discloses a kind of furring tile and dried hanging hang structure, It includes that includes ceramic tile and connection hanging piece, and connection hanging piece is fixed on metope by fixing bolt while being connect with ceramic tile, will Ceramic tile is fixed on metope.
But when ceramic tile area and quality it is larger, rely solely on fixing bolt and be fixed on metope, stress, which concentrates on, fixes On bolt, accelerate fixing bolt fatigue, reduced service life.
Utility model content
The purpose of this utility model is to provide a kind of ceramic tile dried hanging hang structure, is suitable for hanging the ceramic tile of large area, and stress is equal Even dispersion, prolongs the service life.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of ceramic tile dried hanging hang structure, including hanger, further include holder, and hanger is rack-mount by bolt, the branch Frame includes crossbeam, main joist and false keel, and the crossbeam is fixed on metope, and the main joist is installed in parallel in crossbeam, secondary dragon Bone is mounted side by side on main joist.
By using above-mentioned technical proposal, ceramic tile is mounted on by being suspended on hanger on metope, and holder is mainly used for increasing Add whole load-bearing capacity, while ensureing that there is higher structural strength, when avoiding due to load-bearing, since stress concentration leads to office Portion's discontinuity causes the situation of support construction fatigue to occur.
Further setting:Main joist is arranged in vertical direction, and the false keel and main joist are orthogonal.
By using above-mentioned technical proposal, false keel uses such distributing position with main joist, further increases whole The structural strength of body.
Further setting:Holder further includes hanger fixed plate, and the hanger fixed plate is set to main joist and false keel encloses At rectangular enclosure in.
By using above-mentioned technical proposal, hanger fixed plate is mainly used for being fixed on metope, makes hanger fixed plate conduct The main structure in succession of hanger has preferable bearing capacity.
Further setting:Hanger fixed plate is equipped with several chemical bolts, and the hanger fixed plate is solid by chemical bolt Due on metope.
By using above-mentioned technical proposal, chemical bolt makes hanger fixed plate firmly be connected to metope, avoids due to negative It carries and increases the case where hanger fixed plate falls off from metope.
Further setting:The upper end of hanger is connected with connector, and the hanger is connected by connector with crossbeam, the company Fitting is L-shaped.
By using above-mentioned technical proposal, when work, hanger is fixed on crossbeam and is connected, and the two, which passes through connector, fixes and connect It connects, reinforces the structural strength of junction.
Further setting:Connector one end parallel with metope is connected with hanger girder.
By using above-mentioned technical proposal, hanger girder is the main force structure of total, ensure that ceramic tile is hung Stabilization.
Further setting:One end of hanger girder is equipped with connecting groove, and the hanger girder deviates from the one of connecting groove End is equipped with connection convex block.
By using above-mentioned technical proposal, multistage hanger girder can pass through the side of connecting groove and connection convex block cooperation Formula, the splicing of the two sections of hanger girders in complete field.
Further setting:Hanger girder is equipped with clamping portion away from the side of metope, and clamping portion is domed.
By using above-mentioned technical proposal, clamping portion is mainly used for the convex block of installation clamping ceramic tile, and clamping portion is domed to be made With such design, there is preferable force structure, uniform stressed local stress concentration will not occur.
Further setting:It is provided with threaded hole in the middle part of clamping portion, fixed convex block, fixed convex block are installed on the clamping portion One end from far from metope one side be inserted into threaded hole.
By using above-mentioned technical proposal, it is equipped on clamping portion in fixed convex block, fixed convex block can be embedded in the ceramic tile back of the body In the groove in face.
Further setting:One end of fixed convex block is rotary with fixing nut, and rubber pad is equipped between fixing nut and clamping portion Circle.
By using above-mentioned technical proposal, fixed convex block is fixed by way of the nut that is tightened with clamping portion, rubber Washer is used for that the surface of clamping portion is protected not abraded by nut, pressure of the dispersion nut to clamping portion.
In conclusion the utility model has the advantages that:
1. having higher structural strength and bearing capacity;
2. whole uniform force, will not there is a situation where stress raisers, make metal will not too fast fatigue, extending makes Use the service life.
Description of the drawings
Fig. 1 is the structural schematic diagram of ceramic tile dried hanging hang structure;
Fig. 2 is the side structure schematic view of ceramic tile dried hanging hang structure;
Fig. 3 is the close-up schematic view at A;
Fig. 4 is the close-up schematic view at B.
In figure, 1, holder;11, crossbeam;12, main joist;13, false keel;14, hanger fixed plate;141, chemical bolt;2、 Hanger;21, connector;211, U-type groove;212, connecting stud;213, bolt is connected;22, hanger girder;221, connecting groove; 222, convex block is connected;223, support leg;23, clamping portion;231, threaded hole;24, fixed convex block;241, fixing nut;242, rubber Rubber gasket;3, ceramic tile;31, fixed card slot.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:A kind of ceramic tile dried hanging hang structure, as shown in Figure 1, solid including holder 1, hanger 2 and ceramic tile 3, the holder 1 Due on metope, the hanger 2 is connected to holder 1, and ceramic tile 3 is fixed on hanger 2, achievees the purpose that be laid with ceramic tile 3 in metope.
Holder 1 includes crossbeam 11, main joist 12 and false keel 13, and crossbeam 11 is fixed on metope, and several main joists 12 are flat Row is mounted on crossbeam 11, and the main joist 12 is arranged in vertical direction.Several false keels 13 are mounted side by side on main joist 12, The false keel 13 and main joist 12 are orthogonal, and false keel 13 is mainly used for further increasing 1 structural strength of holder.
Holder 1 further includes hanger fixed plate 14, and hanger fixed plate 14 is set to the square that main joist 12 and false keel 13 surround In shape cavity, hanger fixed plate 14 is equipped with several chemical bolts 141, and hanger fixed plate 14 is fixed on by chemical bolt 141 On metope, be conducive to hanger fixed plate 14 and be firmly fixed on metope, reduction hanger fixed plate 14 occurs and falls off possibility.
In conjunction with Fig. 1 and Fig. 3, ceramic tile dried hanging hang structure further includes hanger 2, and hanger 2 is equipped with connector 21, and hanger 2 passes through connection Part 21 is connected with crossbeam 11, and connector 21 is L-shaped, and the horizontal part of connector 21 is equipped with U-type groove 211 and connecting stud 212, Gu Periodically, the top of connector 21 and the upper surface of crossbeam 11 first contradicts, and connecting stud 212 is plugged among U-type groove 211 and revolves The mode of tight nut, connector 21 is connect with crossbeam 11.
The vertical portion of connector 21 is equipped with connection bolt 213, and the vertical portion of connector 21 is connected with hanger girder 22, connects The one side that the vertical portion of part 21 is right against metope with hanger girder 22 is bonded, and connection bolt 213 is mainly used for connecting hanger girder 22 and connector 21.
In conjunction with Fig. 2 and Fig. 4, one end of hanger girder 22 is equipped with connecting groove 221, and the hanger girder 22 is away from connection One end of groove 221 is equipped with connection convex block 222, wherein connection convex block 222 and connecting groove 221 can be intermeshed, when installation, The connecting groove 221 of one section of hanger girder 22 and the connection convex block 222 of another section of hanger girder 22 coordinate, i.e., by two sections of hanger masters Beam 22 is connected.
Hanger girder 22 is additionally provided with support leg 223, and support leg 223 is secured by bolts in hanger fixed plate 14, into one The bonding strength for reinforcing hanger girder 22 of step.
Hanger girder 22 is equipped with clamping portion 23 away from the side of metope, and clamping portion 23 is domed, the middle part of clamping portion 23 It is provided with threaded hole 231.Fixed convex block 24 is installed, one end of fixed convex block 24 is inserted into from the one side far from metope on clamping portion 23 Threaded hole 231, later fixing nut 241 be tightened on one end of fixed convex block 24, keep clamping portion 23 and fixed convex block 24 firm Connection.Be additionally provided with rubber washer 242 on fixed convex block 24, rubber washer 242 between fixing nut 241 and clamping portion 23, Rubber washer 242 is mainly used for reducing the surface abrasion generated when different component installations.
As shown in Figure 1, the back side of ceramic tile 3 is provided with fixed card slot 31, fixed convex block 24 is embedded in fixed card slot 31, by ceramic tile 3 It is suspended in on-hook.
The installation process of total is as follows:Main joist 12 is fixed on vertically on the crossbeam 11 of building first, main dragon Bone 12 and crossbeam 11 are fixed by connector 21.False keel 13 passes through across on main joist 12 and the two infall later The mode for wearing bolt is connected and fixed, and main joist 12 and false keel 13 is made to form fenestral fabric.Hanger 2 is one section and connects one section Hanger girder 22 is spliced, and the scale of wherein hanger 2 is determined according to metope size.22 the top of hanger girder is equipped with company Fitting 21 is connected with crossbeam 11, and is bolted in hanger girder 22 and 13 infall of false keel, while hanger girder Support leg 223 on 22 is fixed on metope by hanger fixed plate 14, and hanger fixed plate 14 fixes chemical bolt 141 and ensures connection It is secured.Finally by ceramic tile 3 on fixed card slot 31, be connected on the clamping portion 23 of hanger girder 22, connect on clamping portion 23 It is connected to fixed convex block 24, fixed convex block 24 is embedded into fixed card slot 31 nut 241 that is tightened later, ceramic tile 3 is made to be fixed on On hanger girder 22.
The above embodiments are only the explanation to the utility model, are not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.

Claims (10)

1. a kind of ceramic tile dried hanging hang structure, including hanger(2), it is characterized in that:It further include holder(1), hanger(2)It is installed by bolt In holder(1)On, the holder(1)Including crossbeam(11), main joist(12)And false keel(13), the crossbeam(11)It is fixed on On metope, the main joist(12)It is installed in parallel in crossbeam(11), false keel(13)It is mounted side by side on main joist(12)On.
2. a kind of ceramic tile dried hanging hang structure according to claim 1, it is characterized in that:The main joist(12)It is set in vertical direction It sets, the false keel(13)With main joist(12)It is orthogonal.
3. a kind of ceramic tile dried hanging hang structure according to claim 2, it is characterized in that:The holder(1)Further include that hanger is fixed Plate(14), the hanger fixed plate(14)It is set to main joist(12)And false keel(13)In the rectangular enclosure surrounded.
4. a kind of ceramic tile dried hanging hang structure according to claim 3, it is characterized in that:The hanger fixed plate(14)If equipped with Dry chemical bolt(141), the hanger fixed plate(14)Pass through chemical bolt(141)It is fixed on metope.
5. a kind of ceramic tile dried hanging hang structure according to claim 1, it is characterized in that:The hanger(2)Upper end be connected with Fitting(21), the hanger(2)Pass through connector(21)With crossbeam(11)It is connected, the connector(21)It is L-shaped.
6. a kind of ceramic tile dried hanging hang structure according to claim 5, it is characterized in that:The connector(21)It is parallel with metope One end is connected with hanger girder(22).
7. a kind of ceramic tile dried hanging hang structure according to claim 6, it is characterized in that:The hanger girder(22)One end on set There is connecting groove(221), the hanger girder(22)Away from connecting groove(221)One end be equipped with connection convex block(222).
8. a kind of ceramic tile dried hanging hang structure according to claim 6, it is characterized in that:The hanger girder(22)Away from metope Side is equipped with clamping portion(23), the clamping portion(23)It is domed.
9. a kind of ceramic tile dried hanging hang structure according to claim 8, it is characterized in that:The clamping portion(23)Middle part be provided with spiral shell Pit(231), clamping portion(23)On fixed convex block is installed(24), fixed convex block(24)One end from far from metope one side insert Enter threaded hole(231).
10. a kind of ceramic tile dried hanging hang structure according to claim 9, it is characterized in that:The fixed convex block(24)One end rotation There is fixing nut(241), fixing nut(241)The clamping portion and(23)Between be equipped with rubber washer(242).
CN201721917692.1U 2017-12-29 2017-12-29 A kind of ceramic tile dried hanging hang structure Expired - Fee Related CN207846966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721917692.1U CN207846966U (en) 2017-12-29 2017-12-29 A kind of ceramic tile dried hanging hang structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721917692.1U CN207846966U (en) 2017-12-29 2017-12-29 A kind of ceramic tile dried hanging hang structure

Publications (1)

Publication Number Publication Date
CN207846966U true CN207846966U (en) 2018-09-11

Family

ID=63416396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721917692.1U Expired - Fee Related CN207846966U (en) 2017-12-29 2017-12-29 A kind of ceramic tile dried hanging hang structure

Country Status (1)

Country Link
CN (1) CN207846966U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232933A (en) * 2022-01-11 2022-03-25 华诚建设集团股份有限公司 Structure is hung futilely to green building decoration ceramic tile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232933A (en) * 2022-01-11 2022-03-25 华诚建设集团股份有限公司 Structure is hung futilely to green building decoration ceramic tile

Similar Documents

Publication Publication Date Title
CN207846966U (en) A kind of ceramic tile dried hanging hang structure
CN103306371B (en) Assembled-type house PC prefabricated units fabrication and installation structure
CN205444780U (en) General system of hanging futilely of wall of interchangeable surface course material
CN207905358U (en) A kind of beam building template
CN103590565A (en) Glass tile cladding mounting structure
CN102561645A (en) Stone hanging and attaching component
CN203412154U (en) Stone back suspension type single transverse beam structure
CN205894577U (en) Bulky heavy stone material flip -chip structure
CN212078409U (en) Suspended ceiling component
CN212743106U (en) Suspension beam for suspended ceiling plate
CN210239018U (en) Wall brick mounting structure
CN108385895A (en) A kind of fast-assembling walling system
CN106436977A (en) Outside hanging wall board installation structure and installation method
CN203066416U (en) Splayed stone/tile dry hanging piece
CN218374901U (en) Novel ceramic tile dry-hanging system
CN206784960U (en) Lower supporting type overhanging unloading platform
CN207053086U (en) A kind of grid bridge connection sheet
CN204983510U (en) Seat is hung to convenient to use's stone material
CN213390693U (en) Prefabricated factory building wallboard structure
CN213710188U (en) Marble mounting rack
CN212641898U (en) Connecting piece of furred ceiling structure and furred ceiling panel
CN211817324U (en) Indoor corrugated suspended ceiling external corner installation node structure
CN215630743U (en) Gypsum board top surface expansion joint construction scheme
CN210685137U (en) Hanger rod for pipeline and ceiling fixing support
CN213979720U (en) Assembled wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911