CN212376596U - Quick pay-off excavating gear for building engineering - Google Patents

Quick pay-off excavating gear for building engineering Download PDF

Info

Publication number
CN212376596U
CN212376596U CN202020424084.2U CN202020424084U CN212376596U CN 212376596 U CN212376596 U CN 212376596U CN 202020424084 U CN202020424084 U CN 202020424084U CN 212376596 U CN212376596 U CN 212376596U
Authority
CN
China
Prior art keywords
water
drill bit
baffle
water storage
bit main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020424084.2U
Other languages
Chinese (zh)
Inventor
何康生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kunyu Garden Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020424084.2U priority Critical patent/CN212376596U/en
Application granted granted Critical
Publication of CN212376596U publication Critical patent/CN212376596U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a quick feeding and excavating device for building engineering, which belongs to the technical field of feeding and excavating and comprises a drill bit main body, wherein a water storage tank and a water pump are arranged at the upper end inside the drill bit main body, the water storage tank is positioned at one side of the water pump, a water pumping pipe and a water inlet pipe are fixedly connected inside the drill bit main body, the water pumping pipe and the water inlet pipe are arranged in parallel, an adsorption cavity is connected below the water pumping pipe, the water pumping pipe is connected with the water pump, a spraying cavity is arranged below the water inlet pipe, a filter screen is arranged inside the spraying cavity, the water inlet pipe is connected with the water storage tank, a water feeding pipe is arranged at the upper end of the water storage tank, a baffle is movably connected between the water storage tank and the water inlet pipe, the labor intensity of workers is reduced, the water feeding amount can be changed according to the rotation speed of, the device is more convenient and fast, the smoothness of the work of the adsorption cavity can be ensured, and the service life of the device is further prolonged.

Description

Quick pay-off excavating gear for building engineering
Technical Field
The utility model relates to a pay-off excavates technical field, specifically is a quick pay-off excavating gear for building engineering.
Background
Need excavate the flattening to the ground when carrying out building construction, because building construction's position diverse, the soil of ground is wet degree and soft or hard degree also diverse futilely, and dry soil excavates at this moment and is harder, and the inconvenient operation of the low efficiency of especially making the higher soil of water content of watering excavates needs an excavating gear for the building for this.
This kind of current drill bit need the drill bit to pass through to connect and outside water piping connection when adding water to soil softening, uses convenient inadequately, is difficult to guarantee the homogeneity that rivers added, and the regulation of in-process water yield is also convenient inadequately, based on this, the utility model designs a quick pay-off excavating gear for building engineering is with solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a quick pay-off excavating gear for building engineering to the homogeneity that is difficult to guarantee rivers and add that proposes in solving above-mentioned background art, and the regulation of in-process water yield is convenient enough problem yet.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a quick pay-off excavating gear for building engineering, includes the drill bit main part, the inside upper end position of drill bit main part is provided with water storage box and water pump, the water storage box is located one side of water pump, the inside fixedly connected with drinking-water pipe and the inlet tube of drill bit main part, and drinking-water pipe and the parallel setting of inlet tube, the below of drinking-water pipe is connected with the absorption chamber, and the drinking-water pipe is connected with the water pump, the below of inlet tube is provided with sprays the chamber, and sprays the inside in chamber and be provided with the filter screen, the inlet tube is connected with the water storage box, the upper end of water storage box is provided with the filler pipe, swing joint has the baffle.
Preferably, a hinge is arranged between the baffle and the drill bit main body, and a fixing rod is fixedly connected to one side of the baffle.
Preferably, the fixed rod is an arc plate which takes the hinge as a circle center and takes the length between the connection point of the fixed rod and the baffle and the hinge as a radius.
Preferably, the outer surface of one side of the fixing rod is fixedly connected with a connecting ball, a spring is arranged on one side of the connecting ball, and the spring is always in a compressed state.
Preferably, the inside fixedly connected with fixed block of water storage box, and the fixed block is located one side of baffle, fixed lever swing joint is in the inside of fixed block.
Preferably, the outer surface of the lower end of the baffle is arc-shaped, and a sealing gasket is arranged at the position where the baffle is contacted with the drill bit main body.
Compared with the prior art, the beneficial effects of the utility model are that:
the water storage tank is filled with water before use, so that the baffle can be propped open by the water under the action of centrifugal force in the rotating process of the drill bit main body, the spring can ensure that the baffle cannot be propped open easily, the communication between the water storage tank and the water inlet pipe can be ensured when the drill bit main body operates at a high speed to a certain degree, water can be sprayed out through the spraying cavity, the excavation position is soaked, the soil softening function is realized, water delivery can be automatically carried out, better controllability and independence are realized, a worker does not need to connect the drill bit main body with the outer pipe or frequently add water by self, the labor intensity of the worker is reduced, the water adding amount can be changed according to the rotation speed of the drill bit main body within a certain range of rotation speed, the excavation work is better adapted, the convenience is realized, the sewage at the excavation position can be extracted through the adsorption cavity, the filter screen is arranged inside the excavation position, thereby prolonging the service life of the device.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a view of the drill bit body and the water inlet pipe according to the present invention;
FIG. 3 is a view of the spring and hinge combination of the present invention;
fig. 4 is a combined view of the water inlet pipe and the spraying chamber of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a drill bit body; 2. a water inlet pipe; 3. a spray chamber; 4. an adsorption chamber; 5. a water pumping pipe; 6. a water pump; 7. a water storage tank; 8. a baffle plate; 9. a water feeding pipe; 10. filtering with a screen; 11. a spring; 12. a hinge; 13. a fixed block; 14. fixing the rod; 15. and connecting the ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the utility model provides a quick feeding and excavating device for construction engineering, which comprises: a quick feeding and excavating device for constructional engineering comprises a drill bit main body 1, a water storage tank 7 and a water pump 6 are arranged at the upper end position in the drill bit main body 1, the water storage tank 7 is positioned on one side of the water pump 6, a water pumping pipe 5 and a water inlet pipe 2 are fixedly connected in the drill bit main body 1, the water pumping pipe 5 and the water inlet pipe 2 are arranged in parallel, an adsorption cavity 4 is connected below the water pumping pipe 5, the water pumping pipe 5 is connected with the water pump 6, a spraying cavity 3 is arranged below the water inlet pipe 2, a filter screen 10 is arranged in the spraying cavity 3, the water inlet pipe 2 is connected with the water storage tank 7, a water adding pipe 9 is arranged at the upper end of the water storage tank 7, a baffle 8 is movably connected between the water storage tank 7 and the water inlet pipe 2, a hinge 12 is arranged between the baffle 8 and the drill bit main body 1, and a, the dead lever 14 is with hinge 12 as the centre of a circle, and uses dead lever 14 and 8 tie points of baffle to the length between the hinge 12 as radial circular arc board, one side external fixed surface of dead lever 14 is connected with and connects ball 15, and the one side of connecting ball 15 is provided with spring 11, spring 11 is in the state of being compressed all the time, the inside fixedly connected with fixed block 13 of water storage box 7, and fixed block 13 is located one side of baffle 8, 14 swing joint of dead lever is in the inside of fixed block 13, the lower extreme outward appearance of baffle 8 is the arc setting, and the position of baffle 8 and the contact of drill bit main part 1 is provided with sealed the pad.
One specific application of this embodiment is: the drill bit main body 1 is moved by an external tractor, the drill bit main body 1 is connected with a motor to drive the motor to rotate, water is added into the water storage tank 7 before the drill bit main body 1 is used, so that the baffle 8 can be propped open by the water under the action of centrifugal force in the rotating process of the drill bit main body 1, the spring 11 can ensure that the baffle 8 cannot be easily propped open, the communication between the water storage tank 7 and the water inlet pipe 2 can be ensured when the drill bit main body 1 operates to a certain degree at high speed, water can be sprayed out through the spraying cavity 3 to soak the excavation position, the soil softening function is realized, the water conveying can be automatically carried out, the controllability and the independence are good, a worker does not need to connect the drill bit main body 1 with an outer pipe or frequently add water by self, the labor intensity of the worker is reduced, the water adding amount can be changed according to the rotating speed of, it is more convenient later to have the accessible to adsorb the sewage of chamber 4 to the excavation position and extract, has the work of quick pay-off through 6 extraction sewage of water pump, and inside is provided with filter screen 10, can guarantee the smooth and easy nature of 4 work in absorption chamber, and then has prolonged the life of device, and the model of water pump 6 is LY-JLM.
The utility model provides a product model is only for the use that this technical scheme goes on according to the structural feature of product, and its product can be adjusted and reform transform after purchasing, makes it match more and accord with the utility model belongs to technical scheme, it is the technical scheme of an optimal application of this technical scheme, and the model of its product can be replaced and reform transform according to the technical parameter of its needs, and it is familiar for technical staff that belongs to in the field, consequently, what technical staff that belongs to in the field can be clear passes through the utility model provides a technical scheme obtains corresponding result of use.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a quick pay-off excavating gear for building engineering, includes drill bit main part (1), its characterized in that: the utility model discloses a drill bit, including drill bit main part (1), the inside upper end position of drill bit main part (1) is provided with water storage box (7) and water pump (6), water storage box (7) are located one side of water pump (6), the inside fixedly connected with drinking-water pipe (5) and inlet tube (2) of drill bit main part (1), and drinking-water pipe (5) and inlet tube (2) parallel set up side by side, the below of drinking-water pipe (5) is connected with adsorbs chamber (4), and drinking-water pipe (5) are connected with water pump (6), the below of inlet tube (2) is provided with sprays chamber (3), and sprays the inside in chamber (3) and be provided with filter screen (10), inlet tube (2) are connected with water storage box (7), the upper end of water storage box (7) is provided with filler pipe (9), swing joint has baffle (8) between water storage box (7) and.
2. The rapid feeding and excavating device for the constructional engineering as claimed in claim 1, wherein: a hinge (12) is arranged between the baffle (8) and the drill bit main body (1), and a fixing rod (14) is fixedly connected to one side of the baffle (8).
3. The rapid feeding and excavating device for the constructional engineering as claimed in claim 2, wherein: the fixed rod (14) is an arc plate which takes the hinge (12) as the center of a circle and takes the length between the connecting point of the fixed rod (14) and the baffle (8) and the hinge (12) as the radius.
4. The rapid feeding and excavating device for the constructional engineering as claimed in claim 2, wherein: the outer surface of one side of the fixing rod (14) is fixedly connected with a connecting ball (15), a spring (11) is arranged on one side of the connecting ball (15), and the spring (11) is always in a compressed state.
5. The rapid feeding and excavating device for the constructional engineering as claimed in claim 2, wherein: the water storage tank (7) is fixedly connected with a fixing block (13) in the inside, the fixing block (13) is located on one side of the baffle (8), and the fixing rod (14) is movably connected in the fixing block (13).
6. The rapid feeding and excavating device for the constructional engineering as claimed in claim 1, wherein: the outer surface of the lower end of the baffle (8) is arc-shaped, and a sealing gasket is arranged at the position where the baffle (8) is contacted with the drill bit main body (1).
CN202020424084.2U 2020-03-30 2020-03-30 Quick pay-off excavating gear for building engineering Active CN212376596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020424084.2U CN212376596U (en) 2020-03-30 2020-03-30 Quick pay-off excavating gear for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020424084.2U CN212376596U (en) 2020-03-30 2020-03-30 Quick pay-off excavating gear for building engineering

Publications (1)

Publication Number Publication Date
CN212376596U true CN212376596U (en) 2021-01-19

Family

ID=74159304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020424084.2U Active CN212376596U (en) 2020-03-30 2020-03-30 Quick pay-off excavating gear for building engineering

Country Status (1)

Country Link
CN (1) CN212376596U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338807A (en) * 2021-06-09 2021-09-03 徐州永冠铸业有限公司 Anti-breaking drill bit of excavator for engineering machinery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338807A (en) * 2021-06-09 2021-09-03 徐州永冠铸业有限公司 Anti-breaking drill bit of excavator for engineering machinery

Similar Documents

Publication Publication Date Title
CN212376596U (en) Quick pay-off excavating gear for building engineering
CN211973668U (en) Be used for environmental protection irrigation hydraulic engineering equipment
CN110374542A (en) A kind of mine gas extraction drilling blowout prevention aperture apparatus
CN207167048U (en) A kind of self-propelled water-fertilizer integral irrigation machinery
CN208236411U (en) A kind of mine fully mechanized workface negative pressure suspension dust-extraction unit
CN204877339U (en) Down -hole drill of effective dust fall
CN204670039U (en) A kind of portable type water conservancy irrigation device
CN2915957Y (en) Well special for ground type hydrant
CN203161132U (en) Underwater sediment removing cylinder of rotary pile drilling machine
CN214546258U (en) Forestry engineering afforestation is with water-saving jack device that waters
CN218563922U (en) Multipurpose high-pressure pump
CN114258843B (en) Ecological environment restoration system with landscape effect
CN208080120U (en) A kind of solar energy draws water irrigation rig
CN212414141U (en) Afforestation sprays watering device
CN204261513U (en) Job site atomizing de-dusting apparatus
CN217315111U (en) Forestry management and maintenance soil prosthetic devices with many scenes adaptation functions
CN219386449U (en) River course is administered desilting device
CN210203064U (en) Energy-saving gardens equipment of spraying
CN214282575U (en) Gardens irrigation equipment for afforestation
CN213719201U (en) Agricultural high-speed irrigation equipment
CN213784065U (en) Acid soil improvement device
CN214883343U (en) Municipal administration public works construction is with dust arrester
CN210610254U (en) Wet spraying machine for waste mining area soil environment improvement engineering
CN220036221U (en) Anti-blocking high-pressure grouting machine
CN217680589U (en) Waterproof high pressure slip casting machine that uses of building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220525

Address after: 242803 No. 79 Wuhu Road, group 1, wusheng village, Muzhen Town, Qingyang County, Chizhou City, Anhui Province

Patentee after: Anhui Kunyu Garden Construction Co.,Ltd.

Address before: No. 76, Zhongyuan West Road, Meijiang district, Meizhou City, Guangdong Province, 514000

Patentee before: He Kangsheng