CN212350963U - Fixing support for constructional engineering - Google Patents

Fixing support for constructional engineering Download PDF

Info

Publication number
CN212350963U
CN212350963U CN202020343981.0U CN202020343981U CN212350963U CN 212350963 U CN212350963 U CN 212350963U CN 202020343981 U CN202020343981 U CN 202020343981U CN 212350963 U CN212350963 U CN 212350963U
Authority
CN
China
Prior art keywords
arc
sliding groove
fixing
fixed
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020343981.0U
Other languages
Chinese (zh)
Inventor
周佑霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangshan aodu Construction Engineering Co.,Ltd.
Original Assignee
周佑霞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周佑霞 filed Critical 周佑霞
Priority to CN202020343981.0U priority Critical patent/CN212350963U/en
Application granted granted Critical
Publication of CN212350963U publication Critical patent/CN212350963U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a fixed bolster for building engineering, including the fixed column, all vertically on the both ends lateral wall around the fixed column be equipped with first spout, all be equipped with a pair of assorted first slider with it in two first spouts, one side of fixed column is equipped with a pair of fixed establishment, and two fixed establishment keep away from the one end lateral wall fixed connection of first spout inner wall with two pairs of first sliders respectively, are equipped with about on the fixed column and control the movable hole that link up, the movable hole be equipped with a pair of respectively with two fixed establishment assorted chucking mechanisms. The utility model discloses can make single workman also can carry out vertical or horizontal direction's welding to two kinds of steel pipes of multiple pipe diameter, the effectual effect and the utilization ratio of manpower resources that have improved the construction.

Description

Fixing support for constructional engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a fixed bolster for building engineering.
Background
The building engineering is an engineering entity for planning, surveying, designing, constructing and completing various technical works such as new building, reconstruction or extension of building buildings and auxiliary structures and installation engineering of lines, pipelines and equipment matched with the engineering entity, also refers to the construction engineering of various buildings and buildings, also called construction workload, and the part of investment amount needs to be realized by construction activities with the help of engineering materials.
The workman is carrying out the building activity if when welding two steel pipes, needs two or even a plurality of workman's cooperation to carry out the operation, and a workman aligns the support and another workman welds, and this kind of form is comparatively loaded down with trivial details troublesome, and single workman also can't carry out the operation to it, has not only reduced the efficiency of workman's operation, also is simultaneously one kind to manpower resources's waste.
To this end, we propose a fixing bracket for construction engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a fixing bracket for constructional engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a fixed bolster for building engineering, includes the fixed column, equal vertical first spout that is equipped with on the both ends lateral wall around the fixed column, two all be equipped with a pair of assorted first slider with it in the first spout, one side of fixed column is equipped with a pair of fixed establishment, two fixed establishment keeps away from the one end lateral wall fixed connection of first spout inner wall with two pairs of first sliders respectively, be equipped with the movable hole that link up about on the fixed column, be equipped with in the movable hole a pair of respectively with two fixed establishment assorted chucking mechanisms.
Preferably, the fixing mechanisms are arranged on a pair of arc-shaped fixing clamps on one side of the fixing column, one ends of the two arc-shaped fixing clamps are respectively and rotatably connected with the side walls of the pair of first sliding blocks, one of the arc-shaped fixing clamps is provided with a first moving mechanism, and the other arc-shaped fixing clamp is provided with a second moving mechanism used for being matched with the first moving mechanism.
Preferably, the first movable mechanism includes a first sliding groove arranged on the arc-shaped fixing clamp, an opening is arranged at one end, away from the fixing column, of the first sliding groove, a connecting plate is arranged in the first sliding groove, a left through connecting hole and a right through connecting hole are arranged on the connecting plate, a fixing rod is inserted into the connecting hole, a second sliding groove is arranged on one end inner wall of the first sliding groove, a second sliding block matched with the second sliding groove is arranged in the second sliding groove, and one end side wall of the second sliding block is fixedly connected with one end side wall of the connecting plate.
Preferably, the second movable mechanism comprises a second sliding groove arranged on the arc-shaped fixed clamp, a plurality of jacks used for being matched with the fixing rod are arranged on the inner wall of the second sliding groove, and a notch is arranged on the inner wall, close to the other arc-shaped fixed clamp, of the second sliding groove.
Preferably, chucking mechanism locates the movable block in the movable hole including the card, movable block and movable hole sliding connection, be equipped with the screw hole that link up about on the movable block, screw hole female connection has the threaded rod, the threaded rod is close to the one end rotation of the fixed pincers of arc and is connected with calliper, the other end fixedly connected with knob of threaded rod.
Preferably, calliper is the setting of half arc, be equipped with the corrugate line on calliper keeps away from the one end inner wall of fixed column.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the cooperation of the fixed pincers of a plurality of arcs that set up and calliper to reach the effect that the fixed pincers of the usable two sets of arcs of single workman come to connect fixed operation respectively to two steel pipes that need butt joint welding, still can conveniently dismantle simultaneously, the effectual effect and the utilization ratio of manpower resources that have improved the construction.
2. Through the cooperation of the first slider and the second slider that set up and movable block to reach the effect of its position of adjustment that operating personnel can be timely, thereby satisfy and weld the steel pipe of different size and dimension, can effectually adapt to different building site demands, improved its actual practicality.
Drawings
Fig. 1 is a schematic view of an external structure of a fixing bracket for construction engineering according to the present invention;
FIG. 2 is a side perspective view of FIG. 1;
FIG. 3 is a schematic diagram of the right side structure of FIG. 1;
FIG. 4 is an enlarged view of a portion of FIG. 1 at A;
fig. 5 is a partially enlarged view of fig. 2 at B.
In the figure: the device comprises a fixing column 1, a first sliding groove 2, a first sliding block 3, a fixing mechanism 4, a movable hole 5, a clamping mechanism 6, arc-shaped fixing pliers 7, a first movable mechanism 8, a second movable mechanism 9, a first sliding groove 10, a connecting plate 11, a fixing rod 12, a second sliding groove 13, a second sliding block 14, a second sliding groove 15, a jack 16, a movable block 17, a threaded rod 18, a caliper 19 and a knob 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a fixed bolster for building engineering, including fixed column 1, all vertically be equipped with first spout 2 on the both ends lateral wall around fixed column 1, all be equipped with a pair of assorted first slider 3 with it in two first spouts 2, one side of fixed column 1 is equipped with a pair of fixed establishment 4, two fixed establishment 4 keep away from the one end lateral wall fixed connection of 2 inner walls of first spout with two pairs of first sliders 3 respectively, fixed establishment 4 sets up a pair of arc fixing clamp 7 in fixed column 1 one side, arc fixing clamp 7 is semicircle form and is the steel structure, its inner wall is equipped with the multilayer fold and is used for the increase with the frictional force of external object, the one end of two arc fixing clamp 7 rotates with the lateral wall of one of them pair of first slider 3 respectively to be connected, be equipped with first moving mechanism 8 on one of them arc fixing clamp 7.
A second movable mechanism 9 for matching with the first movable mechanism 8 is arranged on the other arc-shaped fixed clamp 7, the first movable mechanism 8 comprises a first sliding groove 10 arranged on the arc-shaped fixed clamp 7, an opening is arranged at one end of the first sliding groove 10 far away from the fixed column 1, a connecting plate 11 is arranged in the first sliding groove 10, the connecting plate 11 is inserted in the first sliding groove 10 and can move in a sliding manner, a connecting hole which penetrates through the connecting plate from left to right is arranged on the connecting plate 11, a fixed rod 12 is inserted in the connecting hole, a second sliding groove 13 is arranged on the inner wall of one end of the first sliding groove 10, a second sliding block 14 matched with the second sliding groove 13 is arranged in the second sliding groove 13, the side wall of one end of the second sliding block 14 is fixedly connected with the side wall of one end of the connecting plate 11, the second movable mechanism 9 comprises a second sliding groove 15 arranged on the arc-shaped fixed clamp 7, a, a plurality of jacks 16 are arranged in sequence at equal intervals, and a notch is arranged on the inner wall of the second sliding groove 15 close to the other arc-shaped fixed clamp 7 and used for the connection plate 11 to slide.
Be equipped with on fixed column 1 about the movable hole 5 that link up, movable hole 5 is respectively on two vertically terminal surfaces with first spout 2, be equipped with in the movable hole 5 a pair of respectively with two 4 assorted chucking mechanisms 6 of fixed establishment, chucking mechanism 6 is including the movable block 17 of locating in movable hole 5, movable block 17 and movable hole 5 sliding connection, the screw hole that link up about being equipped with on the movable block 17, screw hole female connection has threaded rod 18, threaded rod 18 is close to the one end rotation of arc stationary dog 7 and is connected with calliper 19, the other end fixedly connected with knob 20 of threaded rod 18, knob 20 can be convenient for operating personnel rotate then drive threaded rod 18 and calliper 19 come the back-and-forth movement, carry out fixed chucking to the steel pipe.
The working principle of the utility model is that, when using, the operator connects one of the arc fixing tongs 7 with a steel pipe, then slides the connecting plate 11 and inserts to the second sliding groove 15, after the position moves properly, the fixed rod 12 is inserted into the jack 16 and fixed, then the movable block 17 is moved and the knob 20 is rotated to make the caliper 19 clamp the steel pipe, after the clamping is finished, the operator inserts another steel pipe and fixes it through another pair of arc fixing tongs 7, then the knob 20 is rotated to fix it again, after two steel pipes are fixed, the operator can weld between two pairs of arc fixing tongs 7, until the welding is finished, the fixed rod 12 can be pulled out.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a fixed bolster for building engineering, includes fixed column (1), its characterized in that, all vertically on the both ends lateral wall around fixed column (1) be equipped with first spout (2), two all be equipped with a pair of assorted first slider (3) with it in first spout (2), one side of fixed column (1) is equipped with a pair of fixed establishment (4), two fixed establishment (4) keep away from the one end lateral wall fixed connection of first spout (2) inner wall with two pairs of first sliders (3) respectively, be equipped with on fixed column (1) about link up movable hole (5), be equipped with in movable hole (5) a pair of respectively with two fixed establishment (4) assorted chucking mechanism (6).
2. The fixing bracket for the constructional engineering as recited in claim 1, wherein the fixing mechanism (4) is provided with a pair of arc-shaped fixing clamps (7) on one side of the fixing column (1), one end of each of the two arc-shaped fixing clamps (7) is rotatably connected with the side wall of one of the pair of first sliding blocks (3), one of the arc-shaped fixing clamps (7) is provided with a first moving mechanism (8), and the other arc-shaped fixing clamp (7) is provided with a second moving mechanism (9) for matching with the first moving mechanism (8).
3. The fixing bracket for the constructional engineering as recited in claim 2, wherein the first movable mechanism (8) comprises a first sliding groove (10) disposed on the arc-shaped fixing clamp (7), an opening is disposed at one end of the first sliding groove (10) away from the fixing column (1), a connecting plate (11) is disposed in the first sliding groove (10), a left-right through connecting hole is disposed on the connecting plate (11), a fixing rod (12) is inserted into the connecting hole, a second sliding groove (13) is disposed on an inner wall of one end of the first sliding groove (10), a second sliding block (14) is disposed in the second sliding groove (13) and is matched with the second sliding block, and a side wall of one end of the second sliding block (14) is fixedly connected with a side wall of one end of the connecting plate (11).
4. The fixing bracket for the building engineering as claimed in claim 3, wherein the second movable mechanism (9) comprises a second sliding groove (15) arranged on the arc-shaped fixing clamp (7), the inner wall of the second sliding groove (15) is provided with a plurality of insertion holes (16) for matching with the fixing rod (12), and the inner wall of the second sliding groove (15) close to the other arc-shaped fixing clamp (7) is provided with a notch.
5. The fixing bracket for the constructional engineering as recited in claim 2, wherein the clamping mechanism (6) comprises a movable block (17) clamped in the movable hole (5), the movable block (17) is slidably connected with the movable hole (5), a threaded hole which is through from left to right is formed in the movable block (17), a threaded rod (18) is connected in the threaded hole in a threaded manner, one end of the threaded rod (18) close to the arc-shaped fixing pliers (7) is rotatably connected with the calipers (19), and the other end of the threaded rod (18) is fixedly connected with a knob (20).
6. The fixing bracket for the constructional engineering as recited in claim 5, characterized in that the calipers (19) are arranged in a semi-arc shape, and corrugated lines are arranged on the inner wall of one end of the calipers (19) far away from the fixing column (1).
CN202020343981.0U 2020-03-18 2020-03-18 Fixing support for constructional engineering Active CN212350963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020343981.0U CN212350963U (en) 2020-03-18 2020-03-18 Fixing support for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020343981.0U CN212350963U (en) 2020-03-18 2020-03-18 Fixing support for constructional engineering

Publications (1)

Publication Number Publication Date
CN212350963U true CN212350963U (en) 2021-01-15

Family

ID=74146760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020343981.0U Active CN212350963U (en) 2020-03-18 2020-03-18 Fixing support for constructional engineering

Country Status (1)

Country Link
CN (1) CN212350963U (en)

Similar Documents

Publication Publication Date Title
CN106392147A (en) Pipe fitting connecting flange drilling clamp
CN212350963U (en) Fixing support for constructional engineering
CN112570976B (en) Semicircle steel pipe fixed-position welding device for steel structure building
CN211388401U (en) Connecting device for pipeline installation
CN202010751U (en) Bending machine for rebars
CN215467287U (en) Pipe bending machine capable of realizing midway turning of bent pipe and working left and right
CN201169923Y (en) Grouting and joint pointing dual-purpose tools
CN213499543U (en) Cutting and holding device for pipe production
CN210548993U (en) Multi-way pipe flange assembly equipment
CN205074706U (en) Can install instrument of pipeline backplate fast
CN214579474U (en) High-efficient firm building pipeline interfacing apparatus
CN215238951U (en) Workpiece positioning device for digital welding processing
CN217413255U (en) Bilateral synchronous clamping equipment
CN219224382U (en) Expansion bolt tensile force testing device
CN220942700U (en) Simple on-site pipe bending equipment
CN212665283U (en) Clamp for welding steel pipe
CN216264184U (en) Welding device for metal tube machining
CN215089962U (en) Multi-time bending processing device for steel pipe
CN214719641U (en) Numerical control pipe bending machine with guiding function
CN212131534U (en) Pipe drawing device for water supply pipeline construction
CN214246672U (en) Steel crossbeam hoist and mount positioner
CN220921419U (en) Auxiliary welding device for pipe fittings
CN213809336U (en) A pipeline fixed connection device for municipal building engineering
CN214216649U (en) Pipeline fastener for construction
CN215291462U (en) Combined floor water pipe pressure groove device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210617

Address after: Room 810 and 811, building 24, Shanhai Road, Qinghu street, Jiangshan City, Quzhou City, Zhejiang Province

Patentee after: Jiangshan aodu Construction Engineering Co.,Ltd.

Address before: Hubei Chuxiong Construction Engineering Co., Ltd

Patentee before: Zhou Youxia