CN212340695U - Geological detection device for building construction - Google Patents

Geological detection device for building construction Download PDF

Info

Publication number
CN212340695U
CN212340695U CN202020163910.2U CN202020163910U CN212340695U CN 212340695 U CN212340695 U CN 212340695U CN 202020163910 U CN202020163910 U CN 202020163910U CN 212340695 U CN212340695 U CN 212340695U
Authority
CN
China
Prior art keywords
slider
top end
wall
push pedal
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020163910.2U
Other languages
Chinese (zh)
Inventor
虎焕姨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yizheng Rongrong Electromechanical Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020163910.2U priority Critical patent/CN212340695U/en
Application granted granted Critical
Publication of CN212340695U publication Critical patent/CN212340695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Earth Drilling (AREA)

Abstract

The utility model discloses a geological survey device for construction, the top intermediate position department of base is provided with the lift storehouse, be provided with the second lead screw between the top of horizontal pole bottom base, and the outer wall of second lead screw is provided with the fifth slider, the both sides of bracing piece outer wall fifth slider all are provided with the second slider, one side of second slider one side fifth slider all is through connecting piece fixedly connected with pivot cover. The utility model discloses a the inside of drill bit is provided with the push pedal, and the top of push pedal extends to the top of drill bit, the inside of push pedal is provided with hydrophobic hole, and the top of bracing piece outer wall second slider all is provided with first slider, one side of first slider all is provided with the first in command, and one side of push pedal all through connecting piece fixed connection in one side of first slider to the outer wall of push pedal is provided with the second spring, has realized the coring function of device, is favorable to the completion of core appearance.

Description

Geological detection device for building construction
Technical Field
The utility model relates to a geological exploration field specifically is a geological detection device for construction.
Background
In the process of building construction, engineering geological exploration is very important. Because construction has high requirements on geological conditions. The soil quality and the soil structure can influence the construction progress. Therefore, before construction, the local geological conditions should be known, and a solution and a specific construction scheme should be proposed to perform the next work, and the site exploration work is generally divided into two parts: first, a specific geological composition is known. Second, a mechanical objective is provided. The geology of the area where the construction site is constructed determines the specific treatment scheme and also influences the construction cost. A general construction team can know the local geology through a drilling and surveying mode;
the existing geological detection device has the following defects: the device does not have a stabilizing function, and accidents are easily caused; the device has no measuring function, and the drilling depth cannot be known when the drill bit drills into the ground; the core taking function is not provided, the core needs to be manually beaten, and the core is easily broken.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a geological detection device for construction to what provide does not possess the coring function in solving above-mentioned background art, get the core and need artifically beat, the easy disconnected core.
In order to achieve the above object, the utility model provides a following technical scheme: a geological detection device for building construction comprises a cross rod, a support rod, a base lifting bin and a measuring rod, wherein the lifting bin is arranged in the middle of the top end of a base, the support rod is uniformly arranged on the other side of the top end of the base, the top ends of the support rods are respectively provided with the cross rod, a second lead screw is arranged between the top ends of the bases at the bottom ends of the cross rods, the top end of the second lead screw is connected with a first motor through a rotating shaft, a fifth slide block is arranged on the outer wall of the second lead screw, second slide blocks are arranged on two sides of the fifth slide block on the outer wall of the support rod, one side of each second slide block is fixedly connected to one side of the fifth slide block through a connecting piece, a rotating shaft sleeve is fixedly connected to one side of the fifth slide block on one side of the second slide block through a connecting piece, a drill bit is arranged on the top end of the rotating shaft sleeve, the, the top end of the measuring rod is fixedly connected to the bottom end of the transverse plate, a second motor is arranged on one side of the top end of the transverse plate, and a first belt is installed between the outer walls of the top end of the outer wall drill bit at the bottom end of the second motor.
Preferably, the inside one end of lift storehouse is provided with the third lead screw, and the rocker is installed through the pivot on the top of third lead screw, the top of rocker extends to the top of lift storehouse, and the top of rocker is provided with the carousel, one side on carousel top is provided with the second handle, and the one end of the inside one end third lead screw of lift storehouse is provided with first lead screw, install the second belt between the outer wall on first lead screw top outer wall third lead screw top, and the outer wall of the first lead screw outer wall third lead screw of second belt below all installs the third slider, the both sides of third slider all evenly are provided with the connecting rod, and the inside of lift storehouse both sides evenly is provided with the sliding tray, one side of connecting rod all runs through in the inside of sliding tray and extends to one side of lift storehouse, and the bottom of connecting rod one side all is provided with the supporting legs.
Preferably, one side in base top one side lift storehouse is provided with outer support column, and the inside of outer support column is provided with interior support column, first spring is installed to the inside bottom of interior support column, and is provided with the measuring stick above the inside first spring of interior support column, the top of measuring stick extends to interior support column top, and the inside of measuring stick one side is provided with the spacing groove, the inside of spacing groove is provided with the fourth slider, and one side fixed connection of fourth slider is in the top of interior support column.
Preferably, the inside of drill bit is provided with the push pedal, and the top of push pedal extends to the top of drill bit, the inside of push pedal is provided with hydrophobic hole, and the top of bracing piece outer wall second slider all is provided with first slider, one side of first slider all is provided with the first in command, and one side of push pedal all through connecting piece fixed connection in one side of first slider to the outer wall of push pedal is provided with the second spring.
Preferably, one side of the second motor on one side of the top end of the transverse plate is provided with a water storage tank, a cooling water-feeding pump is installed on one side of the top end of the water storage tank, and one side of the top end of the cooling water-feeding pump is fixedly connected to the top end of the push plate through a water pipe.
Preferably, the both sides of base bottom all evenly are provided with the gyro wheel, and the gyro wheel is inside to be provided with braking structure.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the transverse plate moves downwards to press the measuring rod downwards, the measuring rod moves linearly under the limitation of the limiting groove and the fourth sliding block, and the drill bit and the measuring rod are connected to the transverse plate, so that the depth of the drill bit can be judged by observing the scale of the measuring rod, and the measuring function of the device is realized;
(2) the second handle is shaken to drive the turntable to rotate so as to drive the third screw rod to rotate, the third screw rod drives the first screw rod to rotate through the second belt, so that the third slider moves downwards, the supporting legs also move downwards, and the device is lifted up because the supporting legs are blocked by the ground, so that the roller is not contacted with the ground any more, and the stabilizing function of the device is realized;
(3) through installing the first in command, first slider and push pedal, the first in command of pushing down drives the push pedal through the removal of first slider and moves down for the core appearance is pushed away the drill bit by even power, thereby can take out the core appearance is complete, has realized the coring function of device.
Drawings
FIG. 1 is a front view of the device of the present invention;
FIG. 2 is a schematic right sectional view of the device of the present invention;
FIG. 3 is a schematic view of a cross-sectional structure of the drill of the device of the present invention;
FIG. 4 is a schematic view of a side view structure of the elevating chamber of the device of the present invention;
FIG. 5 is an enlarged schematic view of the device A of the present invention;
in the figure: 1. a first motor; 2. a cross bar; 3. a first handle; 4. a first slider; 5. pushing the plate; 6. a support bar; 7. a first belt; 8. a second slider; 9. a rotating shaft sleeve; 10. a drill bit; 11. a roller; 12. a first lead screw; 13. a base; 14. a first spring; 15. a transverse plate; 16. a second motor; 17. a water storage tank; 18. A cooling feed pump; 19. a second lead screw; 20. a hydrophobic pore; 21. a rocker; 22. a third screw rod; 23. a connecting rod; 24. supporting legs; 25. a sliding groove; 26. a third slider; 27. a second belt; 28. a lifting bin; 29. A second spring; 30. a turntable; 31. a second handle; 32. a measuring rod; 33. a limiting groove; 34. a fourth slider; 35. an inner support column; 36. an outer support column; 37. and a fifth slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a geological detection device for building construction comprises a cross rod 2, supporting rods 6, a lifting bin 28 of a base 13 and a measuring rod 32, wherein the lifting bin 28 is arranged at the middle position of the top end of the base 13, the supporting rods 6 are uniformly arranged on the other side of the top end of the base 13, the top ends of the supporting rods 6 are respectively provided with the cross rod 2, a second lead screw 19 is arranged between the top ends of the bases 13 at the bottom ends of the cross rod 2, the top end of the second lead screw 19 is connected with a first motor 1 through a rotating shaft, the model of the first motor 1 can be Y90S-2, the outer wall of the second lead screw 19 is provided with a fifth slide block 37, the two sides of the fifth slide block 37 on the outer wall of the supporting rod 6 are respectively provided with a second slide block 8, one side of the second slide block 8 is fixedly connected to one side of the fifth slide block 37 through a connecting piece, one, a drill bit 10 is arranged at the top end of the rotating shaft sleeve 9, the bottom end of the drill bit 10 extends to the lower portion of the rotating shaft sleeve 9, a transverse plate 15 is arranged above the lifting bin 28 on one side of the fifth slider 37 on one side of the second slider 8, the top end of the measuring rod 32 is fixedly connected to the bottom end of the transverse plate 15, a second motor 16 is arranged on one side of the top end of the transverse plate 15, the model of the second motor 16 is Y90S-2, and a first belt 7 is arranged between the outer walls of the top ends of the drill bits 10 on the outer walls of the bottom ends of the second motors;
a third screw rod 22 is arranged at one end inside the lifting bin 28, a rocker 21 is arranged at the top end of the third screw rod 22 through a rotating shaft, the top end of the rocker 21 extends to the upper part of the lifting bin 28, and the top end of the rocker 21 is provided with a turntable 30, one side of the top end of the turntable 30 is provided with a second handle 31, and one end of a third screw rod 22 at one end inside the lifting bin 28 is provided with a first screw rod 12, a second belt 27 is arranged between the outer walls of the top ends of the first screw rod 12 and the outer wall of the top end of the third screw rod 22, and the outer walls of the first screw mandrel 12 and the third screw mandrel 22 below the second belt 27 are all provided with a third slide block 26, both sides of the third slide block 26 are all evenly provided with connecting rods 23, sliding grooves 25 are uniformly formed in the inner parts of the two sides of the lifting bin 28, one side of the connecting rod 23 penetrates through the inner part of the sliding grooves 25 and extends to one side of the lifting bin 28, and supporting legs 24 are arranged at the bottom end of one side of the connecting rod 23;
the second handle 31 is shaken, the second handle 31 drives the turntable 30 to rotate, so as to drive the third screw rod 22 to rotate, the third screw rod 22 drives the first screw rod 12 to rotate through the second belt 27, so that the third slide block 26 moves downwards, the supporting leg 24 also moves downwards, and the device is lifted up because the supporting leg is blocked by the ground, so that the roller 11 is not contacted with the ground any more, and the stable function of the device is realized;
an outer supporting column 36 is arranged on one side of the lifting bin 28 on one side of the top end of the base 13, an inner supporting column 35 is arranged inside the outer supporting column 36, a first spring 14 is mounted at the bottom end inside the inner supporting column 35, a measuring rod 32 is arranged above the first spring 14 inside the inner supporting column 35, the top end of the measuring rod 32 extends to the position above the inner supporting column 35, a limiting groove 33 is arranged inside one side of the measuring rod 32, a fourth sliding block 34 is arranged inside the limiting groove 33, and one side of the fourth sliding block 34 is fixedly connected to the top end of the inner supporting column 35;
the transverse plate 15 moves downwards, the measuring rod 32 is pressed downwards, the measuring rod 32 moves straightly under the limitation of the limiting groove 33 and the fourth sliding block 34, and at the moment, the depth of the drill 10 can be judged by observing the scales of the measuring rod 32, so that the measuring function of the device is realized;
a push plate 5 is arranged inside the drill bit 10, the top end of the push plate 5 extends to the upper side of the drill bit 10, a drain hole 20 is formed inside the push plate 5, a first slide block 4 is arranged above a second slide block 8 on the outer wall of the support rod 6, a first handle 3 is arranged on one side of each first slide block 4, one side of the push plate 5 is fixedly connected to one side of each first slide block 4 through a connecting piece, and a second spring 29 is arranged on the outer wall of the push plate 5;
the first handle 3 is pressed downwards, the push plate 5 is driven to move downwards through the movement of the first sliding block 4, so that the core sample is pushed away from the drill 10 by uniform force, the core sample is completely taken out, and the coring function of the device is realized;
a water storage tank 17 is arranged on one side of the second motor 16 on one side of the top end of the transverse plate 15, a cooling water-feeding pump 18 is arranged on one side of the top end of the water storage tank 17, the type of the cooling water-feeding pump 18 can be HCP-100S, and one side of the top end of the cooling water-feeding pump 18 is fixedly connected to the top end of the push plate 5 through a water pipe;
adding water into the water storage tank 17, starting the cooling water feeding pump 18, sending the water in the water storage tank 17 into the push plate 5 by the cooling water feeding pump 18, and allowing the water to flow out of the drain hole 20 to help the drill 10 dissipate heat, so that the advantage of ensuring the working efficiency is achieved;
the two sides of the bottom end of the base 13 are uniformly provided with the rollers 11, and the rollers 11 are internally provided with braking structures;
the roller 11 can easily place the device at a designated position, and has the advantage of convenient movement.
The working principle is as follows: when drilling on the ground is needed, firstly, the roller 11 is moved to a designated place, at the moment, the second handle 31 is shaken, the second handle 31 drives the turntable 30 to rotate, so as to drive the third screw rod 22 to rotate, the third screw rod 22 drives the first screw rod 12 to rotate through the second belt 27, so that the third slide block 26 moves downwards, the supporting leg 24 also moves downwards, the device is lifted up because the supporting leg is blocked by the ground, so that the roller 11 is not contacted with the ground, the device is stable, water is added into the water storage tank 17, the cooling water feed pump 18 is turned on, the cooling water feed pump 18 sends the water in the water storage tank 17 into the push plate 5, the water flows out through the drain hole 20 to help the drill bit 10 to dissipate heat, the working efficiency is ensured, at the moment, the first motor 1 and the second motor 16 are turned on, the first motor 1 drives the second screw rod 19 to rotate, so as to enable the fifth slide block 37 to move downwards, the drill bit 10 is given a downward force, the second, give drill bit 10 with the rotation cutting force, two forces are held, drill bit 10 drills to ground, diaphragm 15 moves down simultaneously, push down measuring stick 32, measuring stick 32 translates under the restriction of spacing groove 33 and fourth slider 34, the degree of depth of drill bit 10 is judged to the scale of accessible observation measuring stick 32 this moment, the suitable back of degree of depth, close second motor 16, reverse first motor 1, pull out ground with drill bit 10, push down the first in command 3 this moment, through the removal of first slider 4, drive push pedal 5 moves down, make the core appearance pushed away from drill bit 10 by even power, thereby take out the core appearance completely, take out the back, treat after rivers clear away the impurity of drill bit 10 inner wall, it can to close cooling feed water pump 18.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a geological detection device for construction, includes horizontal pole (2), bracing piece (6), base (13), lift storehouse (28) and measuring stick (32), its characterized in that: a lifting bin (28) is arranged in the middle of the top end of the base (13), supporting rods (6) are uniformly arranged on the other side of the top end of the base (13), transverse rods (2) are mounted at the top ends of the supporting rods (6), second lead screws (19) are arranged between the top ends of the bases (13) at the bottom ends of the transverse rods (2), the top ends of the second lead screws (19) are connected with a first motor (1) through rotating shafts, fifth sliders (37) are arranged on the outer walls of the second lead screws (19), second sliders (8) are arranged on two sides of the fifth sliders (37) on the outer walls of the supporting rods (6), one sides of the second sliders (8) are fixedly connected to one side of the fifth sliders (37) through connecting pieces, a rotating shaft sleeve (9) is fixedly connected to one side of the fifth sliders (37) on one side of the second sliders (8), and drill bits (10) are arranged at the top ends of the rotating, the bottom of drill bit (10) extends to the below of pivot cover (9), and the top of second slider (8) one side fifth slider (37) one side lift storehouse (28) is provided with diaphragm (15), the top fixed connection of measuring stick (32) is in the bottom of diaphragm (15), and one side on diaphragm (15) top is provided with second motor (16) to install first belt (7) between the top outer wall of second motor (16) bottom outer wall drill bit (10).
2. The geological detection device for building construction according to claim 1, characterized in that: a third screw rod (22) is arranged at one end inside the lifting bin (28), a rocker (21) is installed at the top end of the third screw rod (22) through a rotating shaft, the top end of the rocker (21) extends to the upper side of the lifting bin (28), a rotary disc (30) is arranged at the top end of the rocker (21), a second handle (31) is arranged on one side of the top end of the rotary disc (30), a first screw rod (12) is arranged at one end of the third screw rod (22) at the inner end of the lifting bin (28), a second belt (27) is installed between the outer walls of the top ends of the third screw rods (22) on the outer wall of the top end of the first screw rod (12), third sliding blocks (26) are installed on the outer wall of the first screw rod (12) below the second belt (27), connecting rods (23) are evenly arranged on two sides of the third sliding blocks (26), sliding grooves (25) are evenly arranged inside two sides of the lifting bin (28), one side of the connecting rod (23) runs through the inside of the sliding groove (25) and extends to one side of the lifting bin (28), and supporting legs (24) are arranged at the bottom end of one side of the connecting rod (23).
3. The geological detection device for building construction according to claim 1, characterized in that: one side of base (13) top one side lift storehouse (28) is provided with outer support column (36), and the inside of outer support column (36) is provided with interior support column (35), first spring (14) are installed to the inside bottom of interior support column (35), and are provided with measuring stick (32) above the inside first spring (14) of interior support column (35), the top of measuring stick (32) extends to interior support column (35) top, and the inside of measuring stick (32) one side is provided with spacing groove (33), the inside of spacing groove (33) is provided with fourth slider (34), and one side fixed connection of fourth slider (34) in the top of interior support column (35).
4. The geological detection device for building construction according to claim 1, characterized in that: the inside of drill bit (10) is provided with push pedal (5), and the top of push pedal (5) extends to the top of drill bit (10), the inside of push pedal (5) is provided with hydrophobic hole (20), and the top of bracing piece (6) outer wall second slider (8) all is provided with first slider (4), one side of first slider (4) all is provided with the first in command (3), and one side of push pedal (5) all through connecting piece fixed connection in one side of first slider (4) to the outer wall of push pedal (5) is provided with second spring (29).
5. The geological detection device for building construction according to claim 1, characterized in that: one side of the second motor (16) on one side of the top end of the transverse plate (15) is provided with a water storage tank (17), one side of the top end of the water storage tank (17) is provided with a cooling water-feeding pump (18), and one side of the top end of the cooling water-feeding pump (18) is fixedly connected to the top end of the push plate (5) through a water pipe.
6. The geological detection device for building construction according to claim 1, characterized in that: the two sides of the bottom end of the base (13) are uniformly provided with rollers (11), and braking structures are arranged inside the rollers (11).
CN202020163910.2U 2020-02-12 2020-02-12 Geological detection device for building construction Expired - Fee Related CN212340695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020163910.2U CN212340695U (en) 2020-02-12 2020-02-12 Geological detection device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020163910.2U CN212340695U (en) 2020-02-12 2020-02-12 Geological detection device for building construction

Publications (1)

Publication Number Publication Date
CN212340695U true CN212340695U (en) 2021-01-12

Family

ID=74064729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020163910.2U Expired - Fee Related CN212340695U (en) 2020-02-12 2020-02-12 Geological detection device for building construction

Country Status (1)

Country Link
CN (1) CN212340695U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295452A (en) * 2021-04-22 2021-08-24 贵州盘江煤层气开发利用有限责任公司 Multifunctional drilling machine for coal sample core sampling suitable for multi-coal-bed conditions
CN116952650A (en) * 2023-09-18 2023-10-27 中国矿业大学(北京) Coal body material coring device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295452A (en) * 2021-04-22 2021-08-24 贵州盘江煤层气开发利用有限责任公司 Multifunctional drilling machine for coal sample core sampling suitable for multi-coal-bed conditions
CN116952650A (en) * 2023-09-18 2023-10-27 中国矿业大学(北京) Coal body material coring device and method
CN116952650B (en) * 2023-09-18 2023-12-26 中国矿业大学(北京) Coal body material coring device and method

Similar Documents

Publication Publication Date Title
CN212340695U (en) Geological detection device for building construction
CN113984435B (en) Geological prospecting device for gold ore deposit convenient to use
CN214943988U (en) Drilling rig for geotechnical engineering investigation
CN219101329U (en) Geological environment monitoring device
CN210858703U (en) Geotechnical geology reconnaissance degree of depth measuring equipment
CN211401725U (en) Geotechnical engineering stone sampling device convenient to control depth
CN219142272U (en) Sampling device for geological experiment test
CN208333323U (en) A kind of land surveying soil thickness measuring device
CN221148093U (en) Soil sampler
CN112816249A (en) A quick water intaking equipment for geothermol power investigation
CN219176256U (en) Karst stratum engineering drilling device
CN220451761U (en) Measuring equipment for geotechnical engineering investigation
CN220508470U (en) Rock sample sampling device
CN217976110U (en) Barrel drill for treating complex rock stratum
CN220819485U (en) Geological exploration sampling mechanism
CN214616508U (en) Drilling rig for geotechnical engineering investigation
CN220153942U (en) Deep sampling device for coal mine geological investigation
CN216717852U (en) Geodetic prospecting geodetic apparatus
CN216477307U (en) Underground water level monitoring tool for geological survey
CN219757763U (en) Portable soil sampler
CN211500651U (en) Drilling tool for tunneling operation
CN221173951U (en) Building soil exploration sampling device
CN217542474U (en) Geological engineering investigation is with getting core fixing device
CN219637866U (en) Water conservancy and hydropower engineering foundation surveys appearance
CN217901244U (en) Novel a sample for geological environment monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211014

Address after: 225000 No. 1-29 Jiangning Road, Xinji Town, Yizheng City, Yangzhou City, Jiangsu Province

Patentee after: Yizheng Rongrong electromechanical Co.,Ltd.

Address before: 471000 Henan Liujian construction group, Wangcheng Yayuan, Xigong District, Luoyang City, Henan Province

Patentee before: Aunt Hu Huan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210112

Termination date: 20220212