CN212299512U - Anti-reflux wellhead device for middle-deep geothermal well - Google Patents

Anti-reflux wellhead device for middle-deep geothermal well Download PDF

Info

Publication number
CN212299512U
CN212299512U CN202022213360.3U CN202022213360U CN212299512U CN 212299512 U CN212299512 U CN 212299512U CN 202022213360 U CN202022213360 U CN 202022213360U CN 212299512 U CN212299512 U CN 212299512U
Authority
CN
China
Prior art keywords
current
cavity
well
reflux
check valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022213360.3U
Other languages
Chinese (zh)
Inventor
刘中成
崔国华
李吉武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Minghui New Energy Technology Co ltd
Original Assignee
Dongying Minghui New Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Minghui New Energy Technology Co ltd filed Critical Dongying Minghui New Energy Technology Co ltd
Priority to CN202022213360.3U priority Critical patent/CN212299512U/en
Application granted granted Critical
Publication of CN212299512U publication Critical patent/CN212299512U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a well deep geothermal well anti-reflux wellhead assembly, including the bleeder that is equipped with on the one-way check valve that is equipped with on the water supply line in the well head and the deep well wall of a well, concatenate on the bleeder and be equipped with the cavity against the current, be equipped with the valve clack in the cavity against the current, the bottom of cavity against the current is equipped with spring connecting rod, spring connecting rod is connected with valve clack elastic support, and the right-hand member of cavity against the current leads to pipe to connect in parallel to one-way check valve right side water supply line, and the cavity upper end is connected with the copper pipe to connect in parallel. The utility model discloses can not receive any influence, inside entire system's the anti-reflux water had all got back to the geothermal well, can not flow back or arrange outward through manual or a series of electrically controlled device like current geothermal well head yet.

Description

Anti-reflux wellhead device for middle-deep geothermal well
Technical Field
The utility model relates to a wellhead assembly, concretely relates to well deep geothermal well anti-reflux wellhead assembly.
Background
At present, no special countercurrent-preventing device is arranged in a deep geothermal well head device, so that when the electric submersible pump of the deep well stops running or the water pump breaks down, water in a pipeline system completely flows against the countercurrent, a large amount of water countercurrent and impurities in the pipeline violently impact the electric submersible pump of the geothermal well, and the service life of the electric submersible pump can be shortened and the end of the service life of the electric submersible pump can be ended after multiple times of impact. The existing individual system is only provided with a check valve to control the backflow of system pipeline water, the water in the geothermal well system pipeline can only be remained in the pipeline due to the arrangement of the check valve, the water cannot be discharged in non-heating seasons, the pipeline is corroded, and the pollution to the surrounding environment of the geothermal well is caused due to manual discharge.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a well head device is prevented against current by the middle and deep geothermal well against current to the defect that prior art exists.
The technical scheme is as follows: well deep geothermal well anti-reflux wellhead assembly, the lateral pipe that is equipped with on the one-way check valve that is equipped with on the water supply line in the well head and the deep well wall of a well, concatenate on the lateral pipe and be equipped with the cavity against the current, be equipped with the valve clack in the cavity against the current, the bottom of cavity against the current is equipped with spring connecting rod, spring connecting rod and valve clack elastic support are connected, the right-hand member of cavity against the current leads to pipe to connect in parallel on the one-way check valve right side water supply line, be connected with the copper pipe on the cavity against the current.
Preferably, the branch pipe is provided with a butterfly valve positioned on the left side of the reverse flow cavity, and the water supply pipeline is provided with a second butterfly valve positioned on the left side of the one-way check valve.
Preferably, be equipped with the manometer on the water supply line and the thermometer is located one-way check valve's right side, still is equipped with hole for hoist, water level measurement hole, pressure release exhaust hole and cable hole on the wellhead assembly.
Preferably, a sealing ring is arranged at the joint of the valve flap of the countercurrent cavity and the right water pipe of the countercurrent cavity.
Compared with the prior art, the utility model, have following advantage: by adopting the device, the phenomenon of impeller blockage caused by that impurities in a geothermal water supply pipeline cannot flow back into a high-temperature electric submersible pump can be prevented, the electric submersible pump is not impacted due to a large amount of water backflow, the water backflow time of a long distance on the water supply pipeline without the device is difficult to control, the circulating water pump needs to wait for a very long time when being restarted, and otherwise, the motor is burnt down due to the load of the electric submersible pump caused by the large difference of the backflow water. The system can not be influenced, the anti-backflow water of the whole system returns to the interior of the geothermal well, and the anti-backflow water can not flow back or be discharged outside through manual operation or a series of electric control devices like the existing geothermal well head.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
Referring to fig. 1, well deep geothermal well prevents wellhead assembly against current, lateral pipe 2 that is equipped with on the one-way check valve 1 that is equipped with on the water supply line in the well head and the deep well wall of a well on, it is equipped with cavity 4 against the current to concatenate on the lateral pipe 2, be equipped with valve clack 6 in the cavity 4 against the current, the bottom of cavity 4 against the current is equipped with spring connecting rod 5, spring connecting rod 5 is connected with 6 elastic support of valve clack, the right-hand member of cavity 4 against the current leads to pipe and connects in parallel on the 1 right side delivery pipe of one-way check valve, be connected with on the 1 left side delivery pipe of copper.
Be equipped with butterfly valve 3 on the bleeder 2 and be located the left side of cavity 4 against current, be equipped with the left side that second butterfly valve 8 is located one-way check valve 1 on the water supply line.
Be equipped with manometer 10 and thermometer 9 on the water supply line and be located one-way check valve 1's right side, still be equipped with hole for hoist 11, water level measuring hole 12, pressure release exhaust hole 13 and cable hole 14 on the wellhead assembly.
And a sealing ring 7 is arranged at the joint of the valve clack 6 of the countercurrent cavity 4 and the right water pipe thereof.
The working principle is as follows: the deep geothermal well utilizes a high-temperature electric submersible pump installed in the geothermal well, and is connected with a wellhead device through a water pump lifting pipe in the geothermal well, and the wellhead device is connected with a water supply pipeline leading to a machine room. After the local thermoelectric submersible pump starts, water can pass through the water pump lifting pipe and pass through the well head device, most water can be carried to the heat supply computer lab through one-way check valve 1, few partial water can enter into in the cavity 4 against the current through gate valve 16 and the copper pipe 15 of installing at 1 front end of one-way valve, valve clack 6 reduces after the water pressure of cavity 4 inside reaches certain numerical value against the current, valve clack 6 reduces and is keeping off 4 imports of cavity against the current, geothermal water through the well head device this moment can not flow to cause the short circuit circulation in the geothermal well, valve clack 6 of cavity 4 inside is by spring connecting rod 5 jack-up against the current when the system breaks down, the water of cavity 4 inside against the current can pass through copper pipe 15 inside to the water pump lifting pipe against the current, the water of system's pipeline can get into in the geothermal well mouth.

Claims (4)

1. Well deep geothermal well anti-reflux wellhead assembly, its characterized in that: one-way check valve (1) that are equipped with on the water supply line in the well head and lateral pipe (2) that are equipped with on the deep well wall of a well, it is equipped with cavity (4) against the current to concatenate on lateral pipe (2), be equipped with valve clack (6) in cavity (4) against the current, the bottom of cavity (4) is equipped with spring connecting rod (5) against the current, spring connecting rod (5) are connected with valve clack (6) elastic support, the right-hand member of cavity (4) against the current leads to pipe and connects in parallel on one-way check valve (1) right side water supply line, be connected with copper pipe (15) on the cavity (4) against the current and connect in parallel on one-way check valve (.
2. The anti-reflux wellhead device for the middle-deep geothermal well according to claim 1, characterized in that: be equipped with butterfly valve (3) on lateral pipe (2) and be located the left side of adverse current cavity (4), be equipped with second butterfly valve (8) on the water supply line and be located the left side of one-way check valve (1).
3. The anti-reflux wellhead device for the middle-deep geothermal well according to claim 1, characterized in that: be equipped with manometer (10) and thermometer (9) on the water supply line and be located the right side of one-way check valve (1), still be equipped with hole for hoist (11), water level measurement hole (12), pressure release exhaust hole (13) and cable hole (14) on the wellhead assembly.
4. The anti-reflux wellhead device for the middle-deep geothermal well according to claim 1, characterized in that: and a sealing ring (7) is arranged at the joint of the valve clack (6) of the countercurrent cavity (4) and the right water pipe thereof.
CN202022213360.3U 2020-10-07 2020-10-07 Anti-reflux wellhead device for middle-deep geothermal well Active CN212299512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022213360.3U CN212299512U (en) 2020-10-07 2020-10-07 Anti-reflux wellhead device for middle-deep geothermal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022213360.3U CN212299512U (en) 2020-10-07 2020-10-07 Anti-reflux wellhead device for middle-deep geothermal well

Publications (1)

Publication Number Publication Date
CN212299512U true CN212299512U (en) 2021-01-05

Family

ID=73934056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022213360.3U Active CN212299512U (en) 2020-10-07 2020-10-07 Anti-reflux wellhead device for middle-deep geothermal well

Country Status (1)

Country Link
CN (1) CN212299512U (en)

Similar Documents

Publication Publication Date Title
CN212299512U (en) Anti-reflux wellhead device for middle-deep geothermal well
CN106593894A (en) Intelligent control submersible motor pump with novel structure
CN112033033A (en) Anti-reflux wellhead device for middle-deep geothermal well
CN209782982U (en) Circulating water path structure of water heater and water heater with same
CN107747546B (en) High-lift down-suction self-cooling submersible electric pump
CN113670622B (en) Cooling water return system and method for bench test of marine diesel engine
CN110332965A (en) A kind of water flow sensor and gas heater
CN109578293A (en) A kind of double suction Downdraught submersible electric pump
CN205875373U (en) Two box sewage lifting device of integration
CN206571698U (en) A kind of intelligent control submersible pump of new structure
CN106593896A (en) Intelligent control submersible motor pump
CN207393501U (en) A kind of vertical axial sucking centrifugal pump semi-submersible type waterpower test device
CN206571699U (en) A kind of intelligent control submersible pump
PL204069B1 (en) Pump station
CN207554448U (en) A kind of crushing mechanism hydraulic device
CN206328852U (en) A kind of sewage lifting system
CN210066992U (en) Novel prefabricated pump station of integration
CN217206711U (en) Automatic water discharging device for top cover of water turbine
CN105066488B (en) The incubator of the solar water heater of automatic water supplement
CN214788265U (en) Hydraulic ram
CN219974833U (en) Automatic water diversion device of coal mine centrifugal pump
CN105650037B (en) Reliable aqueous vapor mutually presses case and the water pumping system of case is mutually pressed with the reliable aqueous vapor
CN219795436U (en) Siphon type water turbine top cover drainage device
CN209556057U (en) Intelligent closestool flush box combines water-spilling mechanism
CN216280686U (en) Multifunctional valve combined box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Anti counter flow wellhead device for middle and deep geothermal wells

Effective date of registration: 20210629

Granted publication date: 20210105

Pledgee: Dongying laishang village bank Limited by Share Ltd. Development Zone sub branch

Pledgor: DONGYING MINGHUI NEW ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2021980005522

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220627

Granted publication date: 20210105

Pledgee: Dongying laishang village bank Limited by Share Ltd. Development Zone sub branch

Pledgor: DONGYING MINGHUI NEW ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2021980005522

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Counterflow prevention wellhead device for medium and deep geothermal wells

Effective date of registration: 20230317

Granted publication date: 20210105

Pledgee: Dongying rural commercial bank Limited by Share Ltd. Dongcheng sub branch

Pledgor: DONGYING MINGHUI NEW ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2023980035236

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210105

Pledgee: Dongying rural commercial bank Limited by Share Ltd. Dongcheng sub branch

Pledgor: DONGYING MINGHUI NEW ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2023980035236

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Anti backflow wellhead device for mid to deep geothermal wells

Granted publication date: 20210105

Pledgee: Dongying rural commercial bank Limited by Share Ltd. Dongcheng sub branch

Pledgor: DONGYING MINGHUI NEW ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2024980007354