CN212269041U - Water conservancy construction pipe laying pay-off - Google Patents

Water conservancy construction pipe laying pay-off Download PDF

Info

Publication number
CN212269041U
CN212269041U CN202020289684.2U CN202020289684U CN212269041U CN 212269041 U CN212269041 U CN 212269041U CN 202020289684 U CN202020289684 U CN 202020289684U CN 212269041 U CN212269041 U CN 212269041U
Authority
CN
China
Prior art keywords
fixedly connected
clamping plate
vehicle body
motor
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020289684.2U
Other languages
Chinese (zh)
Inventor
成诚
单媛媛
姜国华
杨忠田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020289684.2U priority Critical patent/CN212269041U/en
Application granted granted Critical
Publication of CN212269041U publication Critical patent/CN212269041U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of hydraulic engineering, and discloses a water conservancy construction pipe laying pay-off device, which comprises a vehicle body, a bridge plate is sleeved in a through groove on the right side of the vehicle body, one end of the bridge plate is fixedly connected with the bottom of the left side surface of a second clamping plate, the front end and the rear end on the right side of the vehicle body are fixedly connected with first telescopic rods, one end of each first telescopic rod is fixedly connected with the bottom of the left side of the second clamping plate, the left end of the top of the vehicle body is fixedly connected with the first clamping plate, the height of a rotating shaft can be adjusted through a motor, an adjusting slider and the second telescopic rod, so that the pay-off device can adapt to winding drums with different diameters, the stable pay-off speed is realized by adjusting the rotating speed of the motor, the phenomenon of wire resistance is reduced, the pay-off device can adapt to winding wheels with different lengths through the, the engineering cost is greatly saved.

Description

Water conservancy construction pipe laying pay-off
Technical Field
The utility model relates to a hydraulic engineering technical field especially relates to a water conservancy construction pipe laying pay-off.
Background
In the hydraulic engineering construction, some electric wires or other sensing wires need to be buried underground, the sizes of the electric wires with different specifications and the wire winding wheels used by the sensing wires are different, and a wire releasing device is needed when the wires are buried.
The prior patent (publication number: CN209618546U) discloses a water conservancy construction pipe laying and paying-off device, which comprises a working bin, a storage bin, a spring, a telescopic rod, a sliding groove and the like, so that the whole device has the function of damping and storing articles. In the wire paying-off device, the wire paying-off device can only be suitable for the wire winding wheels with certain specification and size, but cannot be suitable for the wire winding wheels with large-scale specification, and some wire winding wheels with specifications exceeding the specification cannot normally pay off, so that the paying-off cost is greatly increased when the construction wire paying-off device is added, and the whole engineering cost is also increased.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model is to solve the shortcoming that exists among the prior art, if: the specification range of the winding wheel is small, and the water conservancy construction pipe laying and paying-off device is provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a water conservancy construction pipe laying and paying-off device comprises a vehicle body, wherein a bridge plate is sleeved in a through groove on the right side of the vehicle body, one end of the bridge plate is fixedly connected with the bottom end of the left side surface of a second clamping plate, the front end and the rear end of the right side of the vehicle body are fixedly connected with first telescopic rods, one ends of the two first telescopic rods are fixedly connected with the bottom of the left side of the second clamping plate, the left end of the top of the vehicle body is fixedly connected with the first clamping plate, the second telescopic rods are fixedly connected in the through grooves in the middle parts of the first clamping plate and the second clamping plate, the top of the two second telescopic rods is sleeved with a rotating shaft, the left side of the first clamping plate is fixedly connected with a motor sleeve, the bottom of the motor sleeve is fixedly connected with the left side of the top of the vehicle body, a motor is fixedly connected with the bottom inside of the motor sleeve, a lead, one end of the screw rod penetrates through the rear side of the first clamping plate and extends to the outside of the first clamping plate, the handle is fixedly connected with the rotating handle, and the driving wheel at the output end of the motor is in transmission connection with the driven wheel on the rotating shaft of the first clamping plate and the driven wheel on the right side of the adjusting slide block through a transmission belt.
Preferably, the four corners of the bottom of the vehicle body and the bridge plate are fixedly connected with wheels, and the lowest points of the eight wheels are located in the same horizontal plane.
Preferably, the telescopic length of the bridge plate is the same as that of the first telescopic rods, and the two first telescopic rods are respectively arranged on the left side and the right side of the bridge plate.
Preferably, the ball nut is sleeved inside the adjusting slider, and the lowest positions of the axis of the adjusting slider and the axis of the rotating shaft are on the same horizontal line.
Preferably, the axis of the motor and the axis of the rotating shaft are in the same vertical plane.
Preferably, the drive belt is arranged inside the motor housing.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses a motor, adjusting block and second telescopic link can adjust the height of pivot for pay-off can be adapted to the take-up pulley of different diameters size, can adapt to the line of most types, and steady unwrapping wire speed is realized through the accommodate motor rotational speed, reduces the phenomenon of hindering the line.
(2) The utility model discloses an adjustment of first telescopic link can make the pay-off adapt to the take-up reel of different length, and the kind and the specification that can be used for the unwrapping wire are more, have practiced thrift engineering cost greatly.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a top view of the structure of the present invention;
fig. 3 is a left side sectional view of the structure of the present invention.
In the figure: 1. a vehicle body; 2. a bridge plate; 3. a first telescopic rod; 4. a first splint; 5. a second splint; 6. a second telescopic rod; 7. a rotating shaft; 8. a motor cover; 9. a drive belt; 10. a motor; 11. a screw rod; 12. adjusting the sliding block; 13. turning a handle; 14. and (7) wheels.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a water conservancy construction pipe laying and paying-off device comprises a vehicle body 1, a bridge plate 2 is sleeved in a through groove on the right side of the vehicle body 1, four corners of the bottom of the vehicle body 1 and the bottom of the bridge plate 2 are fixedly connected with wheels 14, the lowest points of the eight wheels 14 are in the same horizontal plane, the heights of rotating shafts 7 on two sides are conveniently adjusted, the heights of the rotating shafts 7 are always kept the same, one end of the bridge plate 2 is fixedly connected with the bottom end of the left side surface of a second clamping plate 5, the telescopic length of the bridge plate 2 is the same as that of a first telescopic rod 3, the two first telescopic rods 3 are respectively arranged on the left side and the right side of the bridge plate 2, when the paying-off device is extended, the whole device is stably extended, the stability of the device is ensured, the front end and the rear end of the vehicle body 1 are fixedly connected with the first telescopic rods 3 on the, the left end of the top of the vehicle body 1 is fixedly connected with a first clamping plate 4, the through grooves in the middle parts of the first clamping plate 4 and a second clamping plate 5 are fixedly connected with second telescopic rods 6, the tops of the two second telescopic rods 6 are respectively sleeved with a rotating shaft 7, the left side of the first clamping plate 4 is fixedly connected with a motor sleeve 8, the bottom of the motor sleeve 8 is fixedly connected with the left side of the top of the vehicle body 1, the bottom inside the motor sleeve 8 is fixedly connected with a motor 10, the axis of the motor 10 and the axis of the rotating shaft 7 are in the same vertical plane, the height of the rotating shaft 7 can be adjusted to the maximum extent by a transmission belt 9, a screw rod 11 is inserted into the through groove at the rear end on the right side of the first clamping plate 4, the surface of the screw rod 11 is sleeved with an adjusting slide block 12, a ball nut is sleeved inside the adjusting slide block 12, and the lowest position of the axis of the adjusting, when the rotary shaft 7 is ensured to be at different heights, the whole device can normally work in a transmission way, one end of a screw rod 11 penetrates through the rear side of the first clamping plate 4 and extends to the outside of the first clamping plate 4, a rotating handle 13 is fixedly connected with the screw rod, a driving wheel at the output end of a motor 10 is in transmission connection with a driven wheel of the rotary shaft 7 on the first clamping plate 4 and a driven wheel at the right side of an adjusting slide block 12 through a transmission belt 9, the transmission belt 9 is arranged inside a motor sleeve 8, so that the motor 10, the transmission belt 9, the driven wheel of the rotary shaft 7 and the adjusting slide block 12 can normally work in a sealed environment, the dustproof and anticorrosive effects are achieved, the service life of the device can be prolonged, the height of the rotary shaft 7 can be adjusted through the motor 10, the adjusting slide block 12 and a second telescopic rod 6, so that the pay-off device can be suitable for winding wheels with different diameters and can be suitable for, reduce the phenomenon of hindering the line, through the regulation of first telescopic link 3, can make pay-off adapt to the take-up pulley of different length, the kind and the specification that can be used for the unwrapping wire are more, have practiced thrift engineering cost greatly.
The utility model discloses in, when the user used the device, the output of motor 10 passed through driving belt 9 and drives pivot 7 and the driven rotation on the adjust the slider 12, and the height of pivot 7 is adjusted to second telescopic link 6, rotates the handle simultaneously and makes adjust the elasticity that driving belt 9 was adjusted in the slip of adjust slider 12, and first telescopic link 3 adjusts the distance between two pivots 7, comes the tight reel rotation unwrapping wire of clamp.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.

Claims (6)

1. A water conservancy construction pipe laying and paying-off device comprises a vehicle body (1) and is characterized in that a bridge plate (2) is sleeved in a through groove in the right side of the vehicle body (1), one end of the bridge plate (2) is fixedly connected with the bottom end of the left side face of a second clamping plate (5), first telescopic rods (3) are fixedly connected with the front end and the rear end of the right side of the vehicle body (1), one ends of the two first telescopic rods (3) are fixedly connected with the bottom of the left side of the second clamping plate (5), the left end of the top of the vehicle body (1) is fixedly connected with a first clamping plate (4), second telescopic rods (6) are fixedly connected in through grooves in the middle parts of the first clamping plate (4) and the second clamping plate (5), a rotating shaft (7) is sleeved at the top of each second telescopic rod (6), a motor sleeve (8) is fixedly connected with the left side of the top of the first clamping plate (4), and the bottom of the motor sleeve (8) is fixedly connected, the inside bottom fixedly connected with motor (10) of motor cover (8), the rear end on first splint (4) right side leads to the inslot to peg graft has lead screw (11), adjusting block (12) have been cup jointed on the surface of lead screw (11), the one end of lead screw (11) runs through the rear side of first splint (4) and extends to the outside of first splint (4), and fixedly connected with changes (13), the action wheel of motor (10) output passes through driving belt (9) and is connected with the driving wheel transmission on the driven wheel and the adjusting block (12) right side of pivot (7) on first splint (4).
2. The water conservancy construction pipe laying and paying off device as claimed in claim 1, wherein wheels (14) are fixedly connected to four corners of the bottoms of the vehicle body (1) and the bridge plate (2), and the lowest points of the eight wheels (14) are in the same horizontal plane.
3. The water conservancy construction pipe laying and paying off device according to claim 1, wherein the telescopic length of the bridge plate (2) is the same as that of the first telescopic rods (3), and the two first telescopic rods (3) are respectively arranged on the left side and the right side of the bridge plate (2).
4. The water conservancy construction pipe laying and paying off device as claimed in claim 1, wherein a ball nut is sleeved inside the adjusting slide block (12), and the lowest positions of the axis of the adjusting slide block (12) and the axis of the rotating shaft (7) are on the same horizontal line.
5. The water conservancy construction pipe laying and paying off device according to claim 1, wherein the axis of the motor (10) and the axis of the rotating shaft (7) are in the same vertical plane.
6. A water conservancy construction pipe laying and paying out device according to claim 1, characterized in that the driving belt (9) is arranged inside the motor sleeve (8).
CN202020289684.2U 2020-03-10 2020-03-10 Water conservancy construction pipe laying pay-off Expired - Fee Related CN212269041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020289684.2U CN212269041U (en) 2020-03-10 2020-03-10 Water conservancy construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020289684.2U CN212269041U (en) 2020-03-10 2020-03-10 Water conservancy construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN212269041U true CN212269041U (en) 2021-01-01

Family

ID=73873998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020289684.2U Expired - Fee Related CN212269041U (en) 2020-03-10 2020-03-10 Water conservancy construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN212269041U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938126A (en) * 2021-02-23 2021-06-11 国网山东省电力公司栖霞市供电公司 Simple and easy bunching device of movable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938126A (en) * 2021-02-23 2021-06-11 国网山东省电力公司栖霞市供电公司 Simple and easy bunching device of movable

Similar Documents

Publication Publication Date Title
CN208182215U (en) A kind of industrial chamber robot for carrying and piling
CN211305608U (en) But anchor clamps based on angle regulation for machinery
CN212269041U (en) Water conservancy construction pipe laying pay-off
JPS6368380A (en) Robot arm
CN212101481U (en) Pay-off for engineering survey
CN106041272B (en) A kind of narrow gap SAW machine
CN210438182U (en) Steel wire winding machine for fire hose joint
CN116298428A (en) Overhauling device for new energy automobile
CN217102439U (en) Cable pay-off rack device for construction
CN212712695U (en) Positioning and conveying mechanism for filling barreled water
CN214359444U (en) Wire and cable pay-off device
CN213707302U (en) Welding wire unreels frame
CN211699840U (en) Wire winding and tension regulation and control assembly for wire twisting machine
CN210505334U (en) Hybrid power's quick hank grinds machine
CN213001899U (en) A roll up core structure for preparing brass wire winding usefulness
CN215239999U (en) Cylindrical surface crater grinding device for metal processing
CN212082339U (en) Colliery is measured range finding prism and is hung connecting device
CN218195035U (en) Tool for charging straight pipe of laying pipe
CN215903090U (en) Fixing device is used in gear box processing
CN211163186U (en) Comprehensive grinding device for driving shaft
CN212875248U (en) Net twine drawing-in machine
CN218088415U (en) Winding displacement guiding mechanism that robot used
CN216889512U (en) Cable reel convenient to cable storage is stacked
CN216254321U (en) Ornamental trees and shrubs protection device
CN210334135U (en) Lead shaping tool convenient to adjust

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210101

CF01 Termination of patent right due to non-payment of annual fee