CN212249386U - Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower - Google Patents
Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower Download PDFInfo
- Publication number
- CN212249386U CN212249386U CN202020112856.9U CN202020112856U CN212249386U CN 212249386 U CN212249386 U CN 212249386U CN 202020112856 U CN202020112856 U CN 202020112856U CN 212249386 U CN212249386 U CN 212249386U
- Authority
- CN
- China
- Prior art keywords
- hydraulic hoist
- hoist room
- room
- gate slot
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Barrages (AREA)
Abstract
The utility model provides a sinking type arrangement structure of a hydraulic hoist room on a power generation water inlet tower, which comprises a hydraulic hoist room and two quick gate slot oil cylinder layers, wherein the hydraulic hoist room is arranged between the two quick gate slot oil cylinder layers, a hoisting hole is arranged at the top of the hydraulic hoist room, and instruments and equipment in the hydraulic hoist room enter and exit through the tower top hoisting hole; the hydraulic hoist room is separated from the rapid gate slot by a barrier wall. The utility model discloses when satisfying service function and all ring edge borders and fuse, still accomplished the coordination in hydroelectric engineering top, pleasing to the eye organic unity, built clean brief operational environment, can optimize the concrete simultaneously, improve the shock resistance of opening and close the computer lab, through using in the large-scale hydropower station of certain western portion intakes the tower, the effect is showing.
Description
Technical Field
The utility model relates to a hydraulic and hydroelectric engineering especially relates to hydraulic hoist and control computer lab of high dam big storehouse and arranges.
Background
In large-scale water conservancy and hydropower engineering, the top of the power generation water inlet tower usually can be a hydraulic hoist machine room matched with each quick gate, and is used for placing equipment such as an oil storage tank, an oil pump machine and an electric cabinet and facilitating the operation of hoisting and hoisting the quick gate. For the water inlet towers with more water inlets and arranged in a straight line, the hydraulic hoist engine room is respectively arranged on each tower and is slightly abrupt, so that the coordination and the attractiveness of the top of a high dam and large warehouse building are influenced. Therefore, the part of the opening and closing machine room at the top of some hydropower stations adopts a half-in type arrangement, and some hydropower stations adopt a sinking type arrangement, but staircase rooms are reserved, and the corridor type arrangement brings much inconvenience for passing, overhauling, running and maintenance.
Disclosure of Invention
To the above situation, the to-be-solved technical problem of the utility model is: the top of the high dam warehouse is coordinated, attractive and elegant in appearance under the condition of realizing functions and safety.
The utility model adopts the technical proposal that: a submerged arrangement structure of a hydraulic hoist room on a power generation water inlet tower is characterized by comprising a hydraulic hoist room and rapid gate slot oil cylinder layers, wherein the hydraulic hoist room is arranged between the two rapid gate slot oil cylinder layers, a hoisting hole is arranged at the top of the hydraulic hoist room, and instruments and equipment in the hydraulic hoist room enter and exit through the tower top hoisting hole; the hydraulic hoist room is separated from the rapid gate slot by a barrier wall.
Furthermore, the blocking wall is provided with an entrance door of the hydraulic hoist room, and personnel in the hydraulic hoist room enter the hydraulic hoist room through the steel ladder and the entrance door in the quick gate slot oil cylinder layer.
Furthermore, the blocking wall is not covered to the top or is provided with a ventilation facility, and the hydraulic opening and closing machine room is connected with the outside through a gate slot grating cover plate at the top of the rapid gate slot oil cylinder layer.
The utility model discloses on the basis of considering in the past that hydraulic engineering hydraulic pressure is opened and close computer lab arrangement advantage and disadvantage, provided a novel formula arrangement structure that sinks, when satisfying service function and all ring edge borders and fuse mutually, still accomplished the coordination in hydroelectric engineering top, pleasing to the eye organic unity, built clean brief operational environment, can optimize the concrete simultaneously, improve the shock resistance of opening and close the computer lab, through using in the large-scale hydropower station of a certain western portion of intaking tower, the effect is showing.
Drawings
Fig. 1 is a schematic plan view of the hydraulic hoist room structure of the present invention.
Fig. 2 is a schematic sectional view of the hydraulic hoist room structure of the present invention, which is a sectional view from a to a in fig. 1.
Detailed Description
The sinking type arrangement structure of the hydraulic hoist room on the power generation water inlet tower of the embodiment is shown in figure 1-2, the hydraulic hoist room 1 is arranged between two rapid gate slot oil cylinder layers 2, instruments and equipment in the hydraulic hoist room 1 enter and exit through a tower top hanging hole 3, an operator enters the hydraulic hoist room 1 through a steel ladder 4 of the rapid gate slot oil cylinder layers 2 and an entrance door 5 at a retaining wall 6 in the operation period, the hydraulic hoist room 1 and the rapid gate slot oil cylinder layers 2 are separated by the retaining wall 6, when the highest water level is ensured, water cannot flow into the hydraulic hoist room 1, the upper part of the hydraulic hoist room 1 is communicated with the rapid gate slot oil cylinder layer 2, the blocking wall 6 can be arranged below the top or a ventilation facility is arranged, and the hydraulic hoist room 1 is connected with the outside through the gate slot grating cover plate 7 at the top of the rapid gate slot oil cylinder layer 2, so that the indoor air circulation is ensured.
The above description is only for the specific embodiment of the present invention, but the structural features of the present invention are not limited thereto, and any person skilled in the art is in the field of the present invention, and all the changes or modifications are covered in the protection scope of the present invention.
Claims (3)
1. A submerged arrangement structure of a hydraulic hoist room on a power generation water inlet tower is characterized by comprising a hydraulic hoist room (1) and two quick gate slot oil cylinder layers (2), wherein the hydraulic hoist room (1) is arranged between the two quick gate slot oil cylinder layers (2), a hoisting hole (3) is formed in the top of the hydraulic hoist room (1), and instruments and equipment in the hydraulic hoist room enter and exit through the tower top hoisting hole; the hydraulic opening and closing machine room (1) is separated from the quick gate slot oil cylinder layer (2) by a retaining wall (6).
2. The submerged arrangement structure of the hydraulic hoist room on the power generation water intake tower as claimed in claim 1, characterized in that the barricade (6) is provided with an entrance door (5) of the hydraulic hoist room (1), and personnel in the hydraulic hoist room (1) enter the hydraulic hoist room (1) through the steel ladder (4) and the entrance door (5) in the fast gate slot cylinder layer (2).
3. The submerged arrangement structure of the hydraulic hoist room on the power generation intake tower as claimed in claim 1, characterized in that the barricade (6) is not to the top or is provided with a ventilation facility, and the hydraulic hoist room is connected with the outside through the gate slot grating cover plate on the top of the fast gate slot cylinder layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020112856.9U CN212249386U (en) | 2020-01-17 | 2020-01-17 | Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020112856.9U CN212249386U (en) | 2020-01-17 | 2020-01-17 | Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212249386U true CN212249386U (en) | 2020-12-29 |
Family
ID=73989381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020112856.9U Active CN212249386U (en) | 2020-01-17 | 2020-01-17 | Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212249386U (en) |
-
2020
- 2020-01-17 CN CN202020112856.9U patent/CN212249386U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202610835U (en) | Integral underground comprehensive pipeline corridor | |
CN102660961A (en) | Integral underground comprehensive pipe rack | |
CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
CN212249386U (en) | Submerged arrangement structure of hydraulic opening and closing machine room on power generation water inlet tower | |
CN104532907B (en) | pump station structure | |
CN113410768A (en) | Buried intelligent ring net cage | |
CN105178565A (en) | Vertical shaft with cable output feeders doubling as safe evacuation passages in underground powerhouse | |
CN106013013B (en) | Tubular power station separate combination type factory building system | |
CN103362290A (en) | Shaft with combined arrangement of underground powerhouse cable line outgoing system and air exhausting system | |
CN106284409A (en) | Integration underground pipe gallery | |
CN206456571U (en) | The non-maintaining electronic and manual counterweight lift ground well of full waterproof | |
CN204185833U (en) | For the sump well system of Power Plant | |
CN214089978U (en) | Multifunctional auxiliary construction structure of comprehensive pipe gallery | |
CN111997140A (en) | Reservoir tubular type overhaulable layered water taking structure, water taking method and overhauling process | |
CN212175857U (en) | Hidden safety exit of subway | |
CN216041309U (en) | Underground factory building tail water pipe layer stairwell door opening structure | |
CN209025107U (en) | A kind of pipe gallery combined joint structure | |
CN208202107U (en) | Novel sewage processing pond sluice | |
CN220908607U (en) | Flow guiding structure applied to compact pump room | |
CN206916715U (en) | A kind of tail water emergency gate device | |
CN213358542U (en) | Tower type water inlet maintenance passage | |
CN220394736U (en) | Integrated vertical shaft pump station | |
CN218565662U (en) | A suspension type fan room for underground garage | |
CN213805272U (en) | Multi-unit hydropower station technical water supply pump house structure | |
CN214169234U (en) | Reservoir tubular type overhaulable layered water taking structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |