CN212249103U - Steel column construction operation platform - Google Patents

Steel column construction operation platform Download PDF

Info

Publication number
CN212249103U
CN212249103U CN202020218346.XU CN202020218346U CN212249103U CN 212249103 U CN212249103 U CN 212249103U CN 202020218346 U CN202020218346 U CN 202020218346U CN 212249103 U CN212249103 U CN 212249103U
Authority
CN
China
Prior art keywords
construction
platform
steel column
protection
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020218346.XU
Other languages
Chinese (zh)
Inventor
何金金
马亚超
李强
邓光凯
马援
苟春波
杨隆庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Science and Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Industry Corp Ltd filed Critical China Construction Science and Industry Corp Ltd
Priority to CN202020218346.XU priority Critical patent/CN212249103U/en
Application granted granted Critical
Publication of CN212249103U publication Critical patent/CN212249103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel column construction operation platform, including construction portion and protection portion, construction portion is equipped with the installation passageway including construction platform and fixed unit on the construction platform, and fixed unit installs in construction platform's lateral part, and protection portion encloses the outside that closes in construction platform, and protection portion includes the protection frame and covers the protection network on the protection frame. The utility model provides a steel column construction operation platform does not need progressively hoist and mount platform component, assemble in the high altitude again, when the steel column did not hoist, operation platform has installed the completion, reduce the danger of constructor high altitude equipment, fixed unit can carry on spacingly to the steel column of placing in the erection channel, prevent that the steel column from removing, turn on one's side, and, operation platform is provided with the construction platform that the constructor of being convenient for carried out the activity, and enclose in construction platform's the outside and establish the guard portion, be used for protecting constructor, improve operation platform's security in the work progress.

Description

Steel column construction operation platform
Technical Field
The utility model belongs to the technical field of the construction technique and specifically relates to a steel column construction operation platform is related to.
Background
The steel structure building has been widely used in high-rise buildings, large-scale factories, large-span space structures, traffic energy engineering and residential buildings because of its short construction period, high strength, good earthquake resistance and reusability.
The steel structure installation includes the installation of steel column and girder steel, the steel column needs be according to the on-the-spot construction condition when the installation, condition such as transportation condition and hoisting equipment hoist and mount performance, carry out the assembly of one deck festival or two-layer festival, operating personnel such as hoist and mount, correction, welding, flaw detection in the steel column installation are under construction on the floor, current steel column operation platform need hoist and mount and use after assembling many times, the operation is comparatively inconvenient, and during because of the steel column installation, constructor is in the position of encorbelmenting, the potential safety hazard that leads to high altitude construction is great.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides a steel column construction operation platform can improve steel column construction operation platform's construction security.
An embodiment of the utility model provides a steel column construction operation platform, include:
the construction part comprises a construction platform and a fixing unit, wherein the construction platform is provided with an installation channel, and the fixing unit is installed on the side part of the construction platform;
the protection portion, the protection portion enclose close in the outside of construction platform, the protection portion include the protection frame and cover in protection network on the protection frame.
The embodiment of the utility model provides an in steel column construction operation platform has following beneficial effect at least:
the utility model provides a steel column construction operation platform does not need progressively hoist and mount platform component, assembles in the high altitude again, when the steel column did not hoist, operation platform has installed the completion, reduces the danger of constructor high altitude equipment to, operation platform is provided with the construction platform that the constructor of being convenient for carried out the activity, and encloses in construction platform's the outside and establishes the guard portion, is used for protecting constructor, improves the security of operation platform in the work progress.
According to the utility model discloses a steel column construction operation platform of other embodiments, construction platform includes bearing frame and bearing plate, the bearing plate lay in the top of bearing frame, fixed unit install in the lateral part of bearing frame.
According to the utility model discloses a steel column construction operation platform of other embodiments, the bearing frame includes many bearing unit, the mutual staggered connection of bearing unit forms a plurality of first installation check, the bearing plate is laid in on the first installation check.
According to the utility model discloses a steel column construction operation platform of other embodiments, the protection frame includes many protection units, the mutual staggered connection of protection unit forms a plurality of second installation check, the protection network is laid on the second installation check.
According to the utility model discloses a steel column construction operation platform of other embodiments, construction platform has a breach, so that construction platform is the U type.
According to the utility model discloses a steel column construction operation platform of other embodiments, the fixed unit seals the breach, the fixed unit with form between the breach installation passageway.
According to the utility model discloses a steel column construction operation platform of other embodiments follows installation channel's circumference is in be equipped with a plurality of support risers on the construction platform.
According to the utility model discloses a steel column construction operation platform of other embodiments the lower part of protection portion is followed the circumference of protection portion encloses and is equipped with the baseboard.
According to the utility model discloses a steel column construction operation platform of other embodiments, construction platform's lateral part distributes and has a plurality of mount pads, the inside cavity of mount pad, fixed unit can wear to locate in the mount pad.
According to the utility model discloses a steel column construction operation platform of other embodiments, fixed unit is square pipe.
Drawings
FIG. 1 is a schematic structural view of one embodiment of a steel column construction work platform;
FIG. 2 is a schematic view of the structure of the carrier of FIG. 1;
FIG. 3 is a schematic view of a steel column construction operation platform in use.
Detailed Description
The conception and the resulting technical effects of the present invention will be described clearly and completely with reference to the following embodiments, so that the objects, features and effects of the present invention can be fully understood. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and other embodiments obtained by those skilled in the art without inventive labor based on the embodiments of the present invention all belong to the protection scope of the present invention.
In the description of the embodiments of the present invention, if an orientation description is referred to, for example, the directions or positional relationships indicated by "upper", "lower", "front", "rear", "left", "right", etc. are based on the directions or positional relationships shown in the drawings, only for convenience of description and simplification of description, but not for indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.
In the description of the embodiments of the present invention, if a feature is referred to as being "disposed", "fixed", "connected", or "mounted" on another feature, it can be directly disposed, fixed, or connected to the other feature or indirectly disposed, fixed, connected, or mounted on the other feature. In the description of the embodiments of the present invention, if "a plurality" is referred to, it means one or more, if "a plurality" is referred to, it means two or more, if "greater than", "less than" or "more than" is referred to, it is understood that the number is not included, and if "more than", "less than" or "within" is referred to, it is understood that the number is included. If reference is made to "first" or "second", this should be understood to distinguish between features and not to indicate or imply relative importance or to implicitly indicate the number of indicated features or to implicitly indicate the precedence of the indicated features.
Fig. 1 is a schematic structural view of an embodiment of a steel column construction operating platform, and referring to fig. 1, the steel column construction operating platform in the embodiment includes a construction portion 100 and a protection portion 200, the construction portion 100 is used for providing a platform on which a construction member 100 can stand or be placed for a constructor, and the protection portion 200 is a protection member, so that construction safety is improved. Specifically, the construction portion 100 includes a construction platform 110 and a fixing unit 120, the construction platform 110 is provided with an installation channel 111, the installation channel 111 is used for a steel column to pass through, so as to facilitate hoisting and other operations of the steel column, and a part of the construction platform 110 located outside the installation channel 111 forms an operation platform for an operator to stand on, so that the operator can perform corresponding operations on the steel column; the fixing unit 120 is installed at the side of the construction platform 110, and the fixing unit 120 limits the steel column placed in the installation channel 111, so that the steel column is prevented from moving and turning on one side, and the construction safety is improved; the protection part 200 is enclosed outside the construction platform 110 and is held by constructors, and the constructors can be prevented from sliding down from high altitude, so that the construction safety is improved; the protection part 200 comprises a protection frame 210 and a protection net 220 covering the protection frame 210, the protection frame 210 is fixedly connected with the construction platform 110, the protection frame 210 and the construction platform 110 form a fixed structure, the protection net 220 is installed on the protection frame 210, the protection frame 210 provides support for installation of the protection net 220, the protection net 220 covers the protection frame 210, the hollow part of the protection frame 210 is shielded, and construction safety of the steel column construction operation platform is further optimized.
The steel column construction operation platform in the embodiment does not need to gradually hoist the platform components, and then is assembled at high altitude, when the steel column is not hoisted, the operation platform is installed, so that the risk of high altitude assembly of constructors is reduced, moreover, the operation platform is provided with the construction platform 110 which is convenient for the constructors to move, and the protection part 200 is arranged outside the construction platform 110 in an enclosing manner, so that the constructors are protected, and the safety of the operation platform in the construction process is improved.
Referring to fig. 1 and 2, the construction platform 110 includes a bearing frame 112 and a bearing plate 113, the bearing plate 113 is laid above the bearing frame 112, the bearing frame 112 is a main bearing component of the whole operation platform, the protection part 200 and the bearing plate 113 are both installed on the bearing frame 112, and after the bearing plate 113 is laid on the weighing frame, a platform for workers to walk, perform various operation activities and place construction tools is formed. It is conceivable that after the bearing plates 113 are laid, the heights of the adjacent bearing plates 113 are consistent, so that the upper surfaces of the bearing plates 113 form a plane, which is convenient for construction personnel to walk and perform various operations.
The bearing frame 112 includes a plurality of bearing units 1121, the bearing units 1121 are connected in a staggered manner to form a plurality of first installation grids, and the bearing plate 113 is laid on the first installation grids and shields the first installation grids. Bearing frame 112 provides the installation basis for bearing plate 113, and bearing plate 113 covers the fretwork part of first installation check to guarantee construction safety, through bearing frame 112 and bearing plate 113's combination on guaranteeing that construction platform 110 has sufficient structural strength's basis, provide operation platform for constructor. In this embodiment, the different load-bearing units 1121 are parallel to each other or perpendicular to each other, so as to form a first grid-shaped installation grid, the load-bearing plate 113 is also rectangular, and the different load-bearing units 1121 can be fixedly connected by welding. The distance between two adjacent and parallel bearing units 1121 can be selected according to the actual construction condition of the steel column, the distance between the bearing units 1121 in this embodiment is set to be 600mm, and the bearing units 1121 can be selected to be angle steels.
The construction platform 110 has a notch 114, and the notch 114 is located at one side of the construction platform 110, so that the steel column can conveniently enter, and when the steel column is hoisted, the steel column does not need to be inserted into the construction platform 110 from top to bottom, so that the operation is more convenient. The construction platform 110 with the notch 114 is U-shaped, the fixing unit 120 is just installed on one side of the construction platform 110 with the notch 114, after the fixing unit 120 is installed on the construction platform 110, an installation channel 111 is formed between the fixing unit 120 and the notch 114 of the construction platform 110, and the fixing unit 120 can limit a steel column in the installation channel 111 to prevent the steel column from turning on one side.
Set up a plurality of support risers 115 on construction platform 110 along the circumference of erection channel 111, this support riser 115 can support the steel column in erection channel 111, prevents that the steel column from rocking in hoist and mount process or work progress, optimizes the stability of steel column and the security in the constructor work progress. In this embodiment, two supporting vertical plates 115 are respectively disposed on two sides (a portion without the notch 114) of the installation channel 111, the two supporting vertical plates 115 are symmetrical with respect to the center of the installation channel 111, and the two supporting vertical plates 115 are combined to support and limit the steel column.
The side of the construction platform 110 (the side having the gap 114) is distributed with a plurality of installation seats 116, and the installation seats 116 are used for installing the fixing units 120. Specifically, the inside of the mounting seat 116 is hollow, the fixing unit 120 can be inserted into the mounting seat 116, the mounting seat 116 can position the fixing unit 120, and the mounting seat 116 can be further connected with the fixing unit 120 through welding and thread fastening. In this embodiment, two mounting seats 116 are disposed on two sides of the gap 114 of the construction platform 110 to ensure the balance and stability of the fixed unit 120 after installation; the fixing unit 120 may be a square tube, and the fixing unit 120 does not roll relative to the mounting base 116, thereby improving the mounting stability of the fixing unit 120.
Protection frame 210 still includes many protective unit 211, and mutual staggered connection forms a plurality of second installation check between the protective unit 211, and protection network 220 lays on this second installation check to shelter from the second installation check, protection frame 210 provides the installation basis for protection network 220, and protection network 220 covers the fretwork part of second installation check, avoids constructor error to fall, improves the construction safety nature. In this embodiment, the different protection units 211 are either parallel to each other or perpendicular to each other, and the different protection units 211 can be fixedly connected by welding. The distance between two adjacent and parallel protection units 211 can be selected according to the actual construction condition of the steel column, the protection units 211 can be square pipes, and the protection net 220 can be a steel wire net.
The lower portion of the protection portion 200 is further surrounded with a skirting board 230, the skirting board 230 is surrounded along the circumference of the protection portion 200, and the skirting board 230 is used for shielding the installation gap between the protection portion 200 and the construction platform 110 and can prevent the feet of the constructors from touching the objects outside the construction platform 110 or extending out of the construction platform 110.
Fig. 3 is a schematic view of the steel column construction operation platform in the use process of the embodiment, referring to fig. 3, the construction platform 110 and the protection portion 200 are assembled without assembling a hoisting member at a high altitude, the steel column is inserted into the installation channel 111 from the notch 114 of the construction platform 110, the fixing unit 120 is fixed on the construction platform 110 to limit the steel column, the steel column is prevented from turning over, the supporting vertical plate 115 is welded with the steel column, the supporting effect of the supporting vertical plate 115 on the steel column is realized, and then hoisting or other operations are performed.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art. Furthermore, the embodiments of the present invention and features of the embodiments may be combined with each other without conflict.

Claims (10)

1. The utility model provides a steel column construction operation platform which characterized in that includes:
the construction part comprises a construction platform and a fixing unit, wherein the construction platform is provided with an installation channel, and the fixing unit is installed on the side part of the construction platform;
the protection portion, the protection portion enclose close in the outside of construction platform, the protection portion include the protection frame and cover in protection network on the protection frame.
2. The steel column construction operation platform of claim 1, wherein the construction platform comprises a bearing frame and a bearing plate, the bearing plate is laid above the bearing frame, and the fixing unit is installed on a side portion of the bearing frame.
3. The steel column construction operation platform of claim 2, wherein the bearing frame comprises a plurality of bearing units, the bearing units are connected in a staggered manner to form a plurality of first installation grids, and the bearing plates are laid on the first installation grids.
4. The steel column construction operation platform according to claim 1, wherein the protection frame comprises a plurality of protection units, the protection units are connected in a staggered manner to form a plurality of second installation grids, and the protection net is laid on the second installation grids.
5. The steel column construction work platform of claim 1, wherein the construction platform has a gap to make the construction platform U-shaped.
6. The steel column construction operation platform according to claim 5, wherein the fixing unit closes the gap, and the installation channel is formed between the fixing unit and the gap.
7. The steel column construction operation platform as claimed in claim 1, wherein a plurality of supporting vertical plates are arranged on the construction platform along the circumferential direction of the installation channel.
8. The steel column construction operation platform as claimed in claim 1, wherein a skirting board is arranged at the lower part of the protection part and is surrounded along the circumferential direction of the protection part.
9. The steel column construction operation platform according to claim 1, wherein a plurality of installation seats are distributed on the side portion of the construction platform, the installation seats are hollow inside, and the fixing units can be arranged in the installation seats in a penetrating mode.
10. The steel column construction operation platform of claim 1, wherein the fixing unit is a square pipe.
CN202020218346.XU 2020-02-27 2020-02-27 Steel column construction operation platform Active CN212249103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020218346.XU CN212249103U (en) 2020-02-27 2020-02-27 Steel column construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020218346.XU CN212249103U (en) 2020-02-27 2020-02-27 Steel column construction operation platform

Publications (1)

Publication Number Publication Date
CN212249103U true CN212249103U (en) 2020-12-29

Family

ID=73989580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020218346.XU Active CN212249103U (en) 2020-02-27 2020-02-27 Steel column construction operation platform

Country Status (1)

Country Link
CN (1) CN212249103U (en)

Similar Documents

Publication Publication Date Title
CN103669815B (en) Unsettled rope pipe combined type full hall scaffold operation platform and guard system building method
KR20130001947A (en) Guide rail system for climbing gang forms
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN212249103U (en) Steel column construction operation platform
KR20110014341A (en) Tower ctane wall bracing with a safety fence
AU2006100471A4 (en) Guard Panel
CN203430066U (en) Closed protective platform for core tube
JP6151528B2 (en) Air conditioning unit construction method
JP6177150B2 (en) Independent foundation reinforcement structure and independent foundation
KR20120097839A (en) Device for protecting a falling accident of opening
KR20090113042A (en) Gang form assembly
CN211775082U (en) Jig frame for large-span pipe truss
CN106968376A (en) A kind of assembled hanging platform structure and its construction method
CN209369289U (en) Detachable safety operating platform
CN211714542U (en) Movable operating platform used in pipeline well
CN209244301U (en) A kind of packaged type high-altitude protective net installation component
CN217631164U (en) Overhanging type operating platform for mounting steel structure corridor type steel beam
CN205348726U (en) Steel frame - steel sheet shear wall structure system construction tool formula operation platform
KR102583454B1 (en) Scaffolding system for construction works with improved safety
CN220228131U (en) High-altitude pavement
CN218760232U (en) Internal platform structure for inclined tower barrel of wind generating set
CN213417584U (en) Assembled overhead working face-edge protection platform
CN211622551U (en) Scaffold protection shed and scaffold protection shed mounting structure
CN210598081U (en) Integrally assembled scaffold support system
CN216664930U (en) Hanging rack for overhanging and assembly type structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant