CN212249070U - High-speed railway station curtain overhauls scaffold - Google Patents

High-speed railway station curtain overhauls scaffold Download PDF

Info

Publication number
CN212249070U
CN212249070U CN202020408483.XU CN202020408483U CN212249070U CN 212249070 U CN212249070 U CN 212249070U CN 202020408483 U CN202020408483 U CN 202020408483U CN 212249070 U CN212249070 U CN 212249070U
Authority
CN
China
Prior art keywords
scaffold
connecting plate
fixed pipe
fixed
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020408483.XU
Other languages
Chinese (zh)
Inventor
金龙
黄杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020408483.XU priority Critical patent/CN212249070U/en
Application granted granted Critical
Publication of CN212249070U publication Critical patent/CN212249070U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a high-speed railway station curtain overhauls scaffold, including the scaffold, fixed surface installs fixed pipe in the middle part of the scaffold top, fixed pipe middle-end table is inside to have seted up first spacing screw, the inside movable mounting that runs through of first spacing screw has spacing bolt. The utility model discloses because there is the propelling movement jar at construction stage surface mounting, and there is the catch bar at propelling movement jar surface mounting, the length of propelling movement can be adjusted through the operation drive of propelling movement jar, and then the height of adjusting the connecting plate, be convenient for adjust the high adaptation maintenance height of placing the maintenance instrument on connecting plate surface, and there is fixed pipe at construction stage surface mounting, and there is the telescopic link at fixed intraductal internally mounted, and then can be after the position of having adjusted the connecting plate, can be at the length position of pulling telescopic link in fixed intraduct, and then support the connecting plate wholly from the mid-end through the telescopic link, and is comparatively practical, and is suitable for extensive popularization and use.

Description

High-speed railway station curtain overhauls scaffold
Technical Field
The utility model is suitable for a curtain overhauls auxiliary device field, in particular to curtain of high-speed railway station overhauls scaffold.
Background
At present, a curtain wall is an outer wall enclosure of a building and is hung like a curtain, so the curtain wall is also called a hanging wall and is a light wall body with a decoration effect commonly used by modern large and high-rise buildings, the curtain wall of a high-speed rail station needs to be periodically overhauled, and for the curtain wall at a high position, a corresponding scaffold is needed to be used for facilitating the overhaul of the curtain wall by a constructor.
However, there are still some disadvantages in the curtain wall repair scaffold used today: 1. when the curtain wall is overhauled, a user needs to adjust the curtain wall according to the actual overhauling height, but the overhauling efficiency is affected due to insufficient adjusting speed, and the stability of the whole overhauling scaffold cannot be ensured after the overhauling height is adjusted; 2. the overall size of the scaffold used at present is too large, so that the scaffold cannot be rapidly split and treated, and the speed of a subsequent transportation process is influenced. Therefore, the curtain wall overhauling scaffold for the high-speed rail station is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a high-speed railway station curtain overhauls scaffold can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a high-speed railway station curtain wall overhauling scaffold comprises a construction table, wherein a fixed pipe is fixedly arranged on the surface of the middle part of the top end of the construction table, a first limiting screw hole is formed in the inner part of the middle end surface of the fixed pipe, a limiting bolt penetrates through the inner part of the first limiting screw hole and is movably installed, a telescopic rod penetrates through the inner part of the middle end of the fixed pipe and is movably installed, the inner part of the middle end of the fixed pipe is connected with the inner part of the telescopic rod through the limiting bolt, a plurality of second limiting screw holes are formed in the inner part of the telescopic rod at equal intervals, the diameter of the inner side wall of each first limiting screw hole is the same as that of the inner side wall of each second limiting screw hole, a first internal thread is formed in the inner side wall of the;
the equal fixed mounting in construction table left and right sides top surface has the propulsion cylinder, every the equal movable mounting in propulsion cylinder top surface has the catch bar, every fixed mounting has the connecting plate between the catch bar top surface, construction table right side front end fixed surface installs control panel.
Preferably, the connecting screw hole has all been seted up inside the connecting plate left and right sides top, every there is the bracing piece, every all runs through movable mounting connecting screw inside wall about the bracing piece second external screw thread has all been seted up to both ends lateral wall, every connecting screw inside wall has all been seted up the second internal thread, second internal thread and second external screw thread looks adaptation.
Preferably, every equal fixed mounting in both ends surface has coupling hose about the bracing piece right side, every the inside fixed mounting that all runs through of coupling hose middle-end has the connecting rod, every the equal cross fixed mounting of connecting rod is inside two coupling hose middle-ends.
Preferably, the fixed pipe, the telescopic rod, the push rod, the connecting plate and the support rod are all made of stainless steel materials.
Preferably, the input end of the control panel is electrically connected with an external power supply through a power transmission line, and the output end of the control panel is electrically connected with the output end of the pushing cylinder through the power transmission line.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a curtain wall maintenance scaffold of high-speed railway station, because install the push cylinder at the construction stage surface, and install the catch bar at the push cylinder surface, can drive the length of adjusting the catch bar through the operation of push cylinder, and then adjust the height of connecting plate, the height adaptation maintenance height of the maintenance instrument of conveniently adjusting to place on the connecting plate surface, and install the fixed pipe at the construction stage surface, and install the telescopic link in the fixed pipe, and then can have adjusted the position of connecting plate, can be in the length position of pulling the telescopic link in the fixed pipe inside, and then support the connecting plate whole from the middle part end through the telescopic link, guarantee the stability of connecting plate, and set up first spacing screw and second spacing screw respectively in fixed pipe and telescopic link inside, can have adjusted the telescopic link after the height in fixed intraductal, can pass corresponding spacing screw inside simultaneously with the spacing bolt, thereby ensuring the stability of the telescopic rod in the fixed pipe.
2. The utility model discloses a high-speed railway station curtain overhauls scaffold owing to connect the screw at connecting plate inside seted up to install the bracing piece inside connecting the screw through second internal thread and second external screw thread looks adaptation, and then can carry out the separation processing with the bracing piece of the height-adjusting device of construction platform bottom and upper end, and then subsequent transportation of being convenient for is removed.
3. The utility model discloses a high-speed railway station curtain overhauls scaffold, because there is coupling hose at every bracing piece surface mounting to and install the connecting rod between two coupling hose between two bracing pieces, and then can install between coupling hose is inside through the bracing piece, and then can support fixedly through the connecting rod to two bracing pieces, guarantee to install another connecting plate in the bracing piece top back, the stability of whole device.
Drawings
Fig. 1 is a schematic view of the overall front section structure of the curtain wall maintenance scaffold of the high-speed rail station;
fig. 2 is the utility model discloses the whole of high-speed railway station curtain overhauls scaffold overlooks the structure schematic diagram.
Reference numerals: the construction platform comprises a construction platform 1, a fixing pipe 2, a first limiting screw hole 3, a limiting bolt 4, an expansion rod 5, a second limiting screw hole 6, a control panel 7, a first internal thread 8, a first external thread 9, a pushing cylinder 10, a pushing rod 11, a connecting plate 12, a connecting screw hole 13, a second internal thread 14, a second external thread 15, a supporting rod 16, a connecting hose 17 and a connecting rod 18.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
As shown in fig. 1-2, a curtain wall overhauling scaffold for a high-speed rail station comprises a construction table 1, a fixed pipe 2 is fixedly arranged on the surface of the middle part of the top end of the construction table 1, a first limit screw hole 3 is arranged in the middle end surface of the fixed pipe 2, a limit bolt 4 is movably arranged in the first limit screw hole 3 in a penetrating way, a telescopic rod 5 is movably arranged in the middle end of the fixed tube 2 in a penetrating way, the middle end of the fixed tube 2 is connected with the inside of the telescopic rod 5 through a limit bolt 4, a plurality of second limit screw holes 6 are equidistantly arranged in the telescopic rod 5, the diameter of the inner side wall of each first limit screw hole 3 is the same as that of the inner side wall of each second limit screw hole 6, a first internal thread 8 is formed on the inner side wall of the first limiting screw hole 3, a first external thread 9 is formed on the outer side wall of the top end of the right side of the limiting bolt 4, and the first external thread 9 is matched with the first internal thread 8;
the equal fixed mounting in 1 left and right sides top surface of construction platform has propelling movement jar 10, every the equal movable mounting in 10 top surface of propelling movement jar has catch bar 11, every fixed mounting has connecting plate 12 between the 11 top surfaces of catch bar, 1 right side front end fixed surface of construction platform installs control panel 7.
In the embodiment, as shown in fig. 1 and 2, since the pushing cylinder 10 is installed on the surface of the construction platform 1, and the pushing rod 11 is installed on the surface of the pushing cylinder 10, the length of the pushing rod 11 can be adjusted by driving the pushing cylinder 10 to operate, so as to adjust the height of the connecting plate 12, which facilitates adjusting the height of the maintenance tool placed on the surface of the connecting plate 12 to adapt to the maintenance height, the fixed pipe 2 is installed on the surface of the construction platform 1, the telescopic rod 5 is installed inside the fixed pipe 2, so as to pull the length position of the telescopic rod 5 inside the fixed pipe 2 after adjusting the position of the connecting plate 12, so as to support the whole connecting plate 12 from the middle end through the telescopic rod 5, so as to ensure the stability of the connecting plate 12, and the first limit screw hole 3 and the second limit screw hole 6 are respectively formed inside the fixed pipe 2 and the telescopic rod 5, so as to adjust the height of the telescopic rod, can pass inside corresponding spacing screw with spacing bolt 4 simultaneously, and then guarantee the stability of telescopic link 5 in fixed pipe 2 inside.
Wherein, connecting screw 13 has all been seted up inside the connecting plate 12 left and right sides top, every there is the bracing piece 16 connecting screw 13 inside wall all runs through movable mounting, every second external screw thread 15 has all been seted up to the bracing piece 16 both ends lateral wall about, every second internal thread 14 has all been seted up to connecting screw 13 inside wall, second internal thread 14 and 15 looks adaptations of second external screw thread.
In this embodiment, as shown in fig. 1, a connection screw hole 13 is formed in the connection plate 12, and the support rod 16 is installed inside the connection screw hole 13 through the second internal thread 14 and the second external thread 15 in a matching manner, so that the height adjusting device at the bottom end of the construction platform 1 and the support rod 16 at the upper end can be separated, and further subsequent transportation and movement are facilitated.
Wherein, every equal fixed mounting in both ends surface has coupling hose 17 about the bracing piece 16 right side, every coupling hose 17 middle-end inside all runs through fixed mounting has connecting rod 18, every connecting rod 18 all crosses fixed mounting inside two coupling hose 17 middle-end.
In this embodiment, as shown in fig. 1 and fig. 2, a connection hose 17 is installed on the surface of each support bar 16, and a connection rod 18 is installed between the two connection hoses 17 between the two support bars 16, so that the support bars 16 can be installed between the inside of the connection hoses 17, and then the two support bars 16 can be supported and fixed by the connection rod 18, thereby ensuring the stability of the whole device after another connection plate 12 is installed at the top end of the support bar 16.
The fixed pipe 2, the telescopic rod 5, the push rod 11, the connecting plate 12 and the support rod 16 are all made of stainless steel materials.
In the embodiment, as shown in fig. 1, the carbon steel material has the characteristics of low price and easy smelting, and can be molded into a required shape.
The input end of the control panel 7 is electrically connected with an external power supply through a power line, and the output end of the control panel 7 is electrically connected with the output end of the pushing cylinder 10 through a power line.
In this embodiment, as shown in fig. 1 and 2, the control panel 7 controls the push cylinder 10, so that the control difficulty can be reduced.
It should be noted that the utility model relates to a high-speed railway station curtain wall overhauls scaffold, including construction platform 1, fixed pipe 2, first spacing screw 3, spacing bolt 4, telescopic link 5, second spacing screw 6, control panel 7, first internal thread 8, first external screw thread 9, promote jar 10, catch bar 11, connecting plate 12, connecting screw 13, second internal thread 14, second external screw thread 15, bracing piece 16, connecting hose 17, connecting rod 18, the part is the component that general standard or this neighborhood technical staff knows, its structure and principle all can all be known or can be known through routine experimental method to this technical staff, in the time of work, put into connecting plate 12 surfaces with the bracing piece 16 rotation, open the pushing jar 10 through control panel 7, after adjusting the height position of connecting plate 12, take out spacing bolt 4 with the rotation, stimulate telescopic link 5, compared with the traditional curtain wall maintenance auxiliary device, the device has the advantages that the surface of the top end of the telescopic rod 5 is tightly attached to the surface of the connecting plate 12, the limiting bolt 4 is placed in the corresponding second limiting screw hole 9, and the connecting rod 18 penetrates into the corresponding two connecting hoses 17, the pushing cylinder 10 is arranged on the surface of the construction platform 1, the pushing rod 11 is arranged on the surface of the pushing cylinder 10, the length of the pushing rod 11 can be driven and adjusted through the operation of the pushing cylinder 10, the height of the connecting plate 12 can be adjusted, the height of a maintenance tool placed on the surface of the connecting plate 12 can be conveniently adjusted to adapt to the maintenance height, the fixed pipe 2 is arranged on the surface of the construction platform 1, the telescopic rod 5 is arranged inside the fixed pipe 2, the telescopic rod 5 can be used for pulling the length position of the telescopic rod 5 inside the fixed pipe 2 after the position of the connecting plate 12 is adjusted, and the connecting, guarantee the stability of connecting plate 12 to at fixed pipe 2 and the inside first spacing screw 3 and the spacing screw 6 of second of having seted up respectively of telescopic link 5, can adjust telescopic link 5 after the height of fixed pipe 2 inside, can pass corresponding spacing screw inside with spacing bolt 4 simultaneously, and then guarantee telescopic link 5 at the inside stability of fixed pipe 2.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a high-speed railway station curtain overhauls scaffold, includes scaffold (1), its characterized in that: the construction table is characterized in that a fixed pipe (2) is fixedly arranged on the surface of the middle of the top end of the construction table (1), a first limit screw hole (3) is formed in the middle end surface of the fixed pipe (2), a limit bolt (4) penetrates through and is movably arranged in the first limit screw hole (3), a telescopic rod (5) penetrates through and is movably arranged in the middle end of the fixed pipe (2), the inner part of the middle end of the fixed pipe (2) is connected with the inner part of the telescopic rod (5) through the limit bolt (4), a plurality of second limit screw holes (6) are formed in the telescopic rod (5) at equal intervals, the diameter of the inner side wall of each first limit screw hole (3) is the same as that of the inner side wall of each second limit screw hole (6), a first internal thread (8) is formed in the inner side wall of each first limit screw hole (3), the first external thread (9) is matched with the first internal thread (8);
construction platform (1) left and right sides top surface equal fixed mounting has promotion jar (10), every promotion jar (10) top surface equal movable mounting has catch bar (11), every fixed mounting has connecting plate (12) between catch bar (11) top surface, construction platform (1) right side front end fixed surface installs control panel (7).
2. The curtain wall overhauling scaffold for the high-speed rail station as set forth in claim 1, wherein: connecting screw (13), every have all been seted up inside connecting screw (13) of having seted up in connecting plate (12) left and right sides top connecting screw (13) inside wall all runs through movable mounting and has bracing piece (16), every second external screw thread (15), every have all been seted up to both ends lateral wall about bracing piece (16) connecting screw (13) inside wall has all seted up second internal thread (14), second internal thread (14) and second external screw thread (15) looks adaptation.
3. The curtain wall overhauling scaffold for the high-speed rail station as set forth in claim 2, wherein: every equal fixed mounting in both ends surface has coupling hose (17), every about bracing piece (16) right side coupling hose (17) middle-end inside all runs through fixed mounting has connecting rod (18), every connecting rod (18) are all alternately fixed mounting inside two coupling hose (17) middle-end.
4. The curtain wall overhauling scaffold for the high-speed rail station as set forth in claim 2, wherein: the fixed pipe (2), the telescopic rod (5), the push rod (11), the connecting plate (12) and the support rod (16) are all made of stainless steel materials.
5. The curtain wall overhauling scaffold for the high-speed rail station as set forth in claim 1, wherein: the input end of the control panel (7) is electrically connected with an external power supply through a power transmission line, and the output end of the control panel (7) is electrically connected with the output end of the pushing cylinder (10) through the power transmission line.
CN202020408483.XU 2020-03-26 2020-03-26 High-speed railway station curtain overhauls scaffold Expired - Fee Related CN212249070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020408483.XU CN212249070U (en) 2020-03-26 2020-03-26 High-speed railway station curtain overhauls scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020408483.XU CN212249070U (en) 2020-03-26 2020-03-26 High-speed railway station curtain overhauls scaffold

Publications (1)

Publication Number Publication Date
CN212249070U true CN212249070U (en) 2020-12-29

Family

ID=73986508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020408483.XU Expired - Fee Related CN212249070U (en) 2020-03-26 2020-03-26 High-speed railway station curtain overhauls scaffold

Country Status (1)

Country Link
CN (1) CN212249070U (en)

Similar Documents

Publication Publication Date Title
CN109973717B (en) Running water conveying pipeline laying device
CN212249070U (en) High-speed railway station curtain overhauls scaffold
CN219885503U (en) Automatic plugboard device for hoisting rotor of hydraulic generator
CN210476124U (en) Air-blowing type hanging piece
CN211708733U (en) But clamping device is used in mechanical automation processing of altitude mixture control
CN220042679U (en) Distribution control equipment convenient to overhaul
CN208022380U (en) A kind of electromagnetic sucker type lifting equipment for waste metal recycling
CN205387447U (en) A device that equipment hoisted on was used for overhead power line pole and mounting tool thereof
CN217299107U (en) Excavator power switch mounting structure convenient to overhaul
CN217123228U (en) Adjustable fixing equipment for artificial intelligent robot
CN213452083U (en) Pipeline bracket convenient to water conservancy pipeline installation
CN218465434U (en) Construction installation equipment
CN212711192U (en) Belt type lifting conveyor
CN215748936U (en) Impeller extracting tool of pump body
CN107717846A (en) A kind of special fixture for being used to dismantle cutting knife
CN218325280U (en) Stable liquid ring vacuum pump
CN209620626U (en) A kind of efficient C-type steel lifting device
CN213015519U (en) Device for reinforcing flexural concrete member
CN216615929U (en) Open caisson construction and carrying device for urban sewage zero-direct-drainage project
CN220522038U (en) ALC board installation device under structural beam
CN214359887U (en) Lightweight gallows is used in steel construction installation
CN211720897U (en) Electrical cabinet with detachable top
CN219779505U (en) High-voltage compensation cabinet
CN210504678U (en) Vacuum carrying device
CN219751637U (en) Part hoisting jig convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201229