CN212246016U - A jib front support device of a crane - Google Patents
A jib front support device of a crane Download PDFInfo
- Publication number
- CN212246016U CN212246016U CN201922193081.2U CN201922193081U CN212246016U CN 212246016 U CN212246016 U CN 212246016U CN 201922193081 U CN201922193081 U CN 201922193081U CN 212246016 U CN212246016 U CN 212246016U
- Authority
- CN
- China
- Prior art keywords
- rod
- tower
- fixedly connected
- balance
- away
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及起重机技术领域,尤其涉及一种起重机的副臂前支架装置。The utility model relates to the technical field of cranes, in particular to a front support device of a jib of a crane.
背景技术Background technique
塔吊是建筑工地上最常用的一种起重设备,又名“塔式起重机”,以一节一节的接长(高)(简称“标准节”),用来吊施工用的钢筋、木楞、混凝土、钢管等施工的原材料。塔吊是工地上一种必不可少的设备。塔吊尖的功能是承受臂架拉绳及平衡臂拉绳传来的上部荷载,并通过回转塔架、转台、承座等的结构部件式直接通过转台传递给塔身结构,自升塔顶有截锥柱式、前倾或后倾截锥柱式、人字架式及斜撑架式,凡是上回转塔机均需设平衡重,其功能是支承平衡重,用以构成设计上所要求的作用方面与起重力矩方向相反的平衡力矩。除平衡重外,还常在其尾部装设起升机构。起升机构之所以同平衡重一起安放在平衡臂尾端,一则可发挥部分配重作用,二则增大绳卷筒与塔尖导轮间的距离,以利钢丝绳的排绕并避免发生乱绳现象。平衡重的用量与平衡臂的长度成反比关系,而平衡臂长度与起重臂长度之间又存在一定比例关系。平衡重量相当可观,轻型塔机一般至少要三吨到四吨,重型的要近三十吨。Tower cranes are the most commonly used lifting equipment on construction sites, also known as "tower cranes". Corrugated, concrete, steel pipe and other construction raw materials. The tower crane is an indispensable equipment on the construction site. The function of the tower crane tip is to bear the upper load from the boom rope and the balance arm rope, and directly transmit it to the tower body structure through the turntable through the structural components of the rotating tower, turntable, and bearing seat. The top of the self-elevating tower has For truncated cone column type, forward or backward truncated cone column type, herringbone frame type and inclined support frame type, all upper slewing tower cranes need to be equipped with counterweight, whose function is to support the counterweight to form the design requirements The balancing moment that acts in the opposite direction to the lifting moment. In addition to the counterweight, a hoisting mechanism is often installed at its tail. The reason why the hoisting mechanism is placed at the end of the balance arm together with the counterweight is that it can play a part of the counterweight role, and secondly, it increases the distance between the rope drum and the tower tip guide wheel, so as to facilitate the winding of the wire rope and avoid the occurrence of The rope disorder phenomenon. The amount of balance weight is inversely proportional to the length of the balance arm, and there is a certain proportional relationship between the length of the balance arm and the length of the boom. The balance weight is quite considerable. Light tower cranes generally need at least three to four tons, and heavy tower cranes need nearly 30 tons.
在传统技术中为了使特塔吊起重机平衡在起重机主臂后侧位置设置一根配重副臂,为了减少风和节约材料阻副臂一般设置较短并设置有配重块,但是由于副臂的配重只有通过改变配重重量和改变副臂长短来改变,故在起重机搭建好之后主臂能吊起的最大重量也就限定了,当在起吊重量较大的材料时通常要分批起吊搬运,使得工作效率低。In the traditional technology, in order to balance the special tower crane, a counterweight jib is set at the rear of the crane main boom. In order to reduce wind and save material resistance, the jib is generally set shorter and equipped with a counterweight, but due to the jib The counterweight can only be changed by changing the weight of the counterweight and changing the length of the jib, so after the crane is built, the maximum weight that the main boom can lift is limited. , resulting in low work efficiency.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种起重机的副臂前支架装置。The purpose of the utility model is to solve the shortcomings existing in the prior art, and proposes a jib front support device of a crane.
为了实现上述目的,本实用新型采用了如下技术方案:一种起重机的副臂前支架装置,包括底板,所述底板正上方固定连接有若干位于同一铅垂线的标准节架,若干所述标准节架远离底板一端固定连接有转动塔,所述转动塔上表面固定连接有主臂和副臂,所述副臂包括固定杆,所述固定杆与转动塔上表面固定连接,所述固定杆远离转动塔一端开设有滑腔,所述滑腔内滑动连接有第一伸长杆,所述第一伸长杆远离转动塔一端固定连接有配重杆,所述配重杆远离固定杆一端固定连接有配重块,所述副臂上方设置有副臂前支架。In order to achieve the above purpose, the utility model adopts the following technical scheme: a jib front support device of a crane, comprising a base plate, a number of standard sections located on the same vertical line are fixedly connected directly above the base plate, and a number of the standard One end of the segment frame away from the bottom plate is fixedly connected with a rotating tower, the upper surface of the rotating tower is fixedly connected with a main arm and an auxiliary arm, the auxiliary arm includes a fixed rod, the fixed rod is fixedly connected with the upper surface of the rotating tower, and the fixed rod A sliding cavity is opened at one end away from the rotating tower, a first extension rod is slidably connected in the sliding cavity, a counterweight rod is fixedly connected at one end of the first extension rod away from the rotation tower, and the end of the counterweight rod is away from the fixed rod A counterweight is fixedly connected, and a front bracket of the jib is arranged above the jib.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
转动塔顶部固定连接有平衡塔,所述平衡塔塔尖位置与固定连接有第一平衡钢管,所述第一平衡钢管远离转动塔一端与主臂远离转动塔一端顶部固定连接。The top of the rotating tower is fixedly connected with a balance tower, the top of the balance tower is fixedly connected with a first balance steel pipe, and the end of the first balance steel pipe away from the rotation tower is fixedly connected with the top of the end of the main arm away from the rotation tower.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述配重杆上表面转动连接有限位杆,所述限位杆远离配重杆一端固定连接有第二伸长杆,所述平衡塔塔尖位置转动连接有第二平衡钢管,所述第二平衡钢管远离平衡塔一端端口与第二伸长杆滑动连接。The upper surface of the counterweight rod is rotatably connected to a limit rod, one end of the limit rod away from the counterweight rod is fixedly connected with a second extension rod, and a second balance steel pipe is rotatably connected to the top of the balance tower. One end port of the two balance steel pipes away from the balance tower is slidably connected with the second extension rod.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述副臂前支架包括臂杆,所述臂杆一端与固定杆侧壁转动连接,所述臂杆远离固定杆一端与第二平衡钢管侧壁转动连接,所述第二平衡钢管和臂杆之间转动连接有液压缸。The jib front support includes an arm rod, one end of the arm rod is rotatably connected with the side wall of the fixed rod, and one end of the arm rod away from the fixed rod is rotatably connected with the side wall of the second balance steel pipe, the second balance steel pipe and the arm rod A hydraulic cylinder is rotatably connected between them.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述主臂下方滑动连接有吊钩。A hook is slidably connected under the main arm.
作为上述技术方案的进一步描述:As a further description of the above technical solution:
所述配重杆、固定杆、第一伸长杆、限位杆、第二伸长杆、第二平衡钢管和臂杆均为锰钢材料。The weight rod, the fixed rod, the first extension rod, the limit rod, the second extension rod, the second balance steel pipe and the arm rod are all made of manganese steel.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
本实用新型通过设置副臂、副壁前支架和液压缸,通过液压缸伸长和缩短可以控制副臂前支架带动第二平衡钢管推动配重杆移动,使得副臂伸长或缩短,当副臂伸长使主臂的起吊重量极限就会增加,同时当起吊重量较小时使副臂长度减小,减小副臂的风阻。The utility model arranges the jib, the front support of the auxiliary wall and the hydraulic cylinder, and the extension and shortening of the hydraulic cylinder can control the front support of the jib to drive the second balance steel pipe to push the counterweight rod to move, so that the jib can be extended or shortened. The extension of the boom will increase the lifting weight limit of the main boom, and at the same time, when the lifting weight is small, the length of the jib will be reduced, and the wind resistance of the jib will be reduced.
本实用新型可以根据货物的重量调节副臂长短,从而实现改变主臂的起吊重量的极限,使塔吊起重机受货起吊极限重量影响小。The utility model can adjust the length of the jib according to the weight of the cargo, so as to change the limit of the hoisting weight of the main jib, so that the tower crane is less affected by the hoisting limit weight of the cargo.
附图说明Description of drawings
图1为本实用新型提出的一种起重机的副臂前支架装置的主视图;Fig. 1 is the front view of the jib front support device of a kind of crane proposed by the utility model;
图2为本实用新型提出的一种起重机的副臂前支架装置的副臂位置放大图。FIG. 2 is an enlarged view of the position of the jib of a jib front support device of a crane proposed by the utility model.
图例说明:illustration:
1、底板;2、标准节架;3、转动塔;4、配重块;5、副臂;6、副臂前支架;7、平衡塔;8、第一平衡钢管;9、吊钩;10、主臂;51、配重杆;52、固定杆;53、滑腔;54、第一伸长杆;61、第二平衡钢管;62、液压缸;63、臂杆;64、限位杆;65、第二伸长杆。1. Bottom plate; 2. Standard section frame; 3. Rotating tower; 4. Counterweight; 5. Jib; 6. Front support of jib; 7. Balance tower; 8. First balance steel pipe; 9. Hook; 10, main arm; 51, counterweight rod; 52, fixed rod; 53, sliding cavity; 54, first extension rod; 61, second balance steel pipe; 62, hydraulic cylinder; 63, arm rod; 64, limit rod; 65. The second extension rod.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
在本实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制;术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性,此外,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner" and "outer" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, with a specific orientation. Therefore, it should not be construed as a limitation to the present invention; the terms "first", "second" and "third" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance. In addition, Unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection, It can also be an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
参照图1-2,本实用新型提供的一种实施例:一种起重机的副臂前支架装置,包括底板1,底板1正上方固定连接有若干位于同一铅垂线的标准节架2,若干标准节架2远离底板1一端固定连接有转动塔3,转动塔3上表面固定连接有主臂10和副臂5,副臂5包括固定杆52,固定杆52与转动塔3上表面固定连接,固定杆52远离转动塔3一端开设有滑腔53,滑腔53内滑动连接有第一伸长杆54,第一伸长杆54远离转动塔3一端固定连接有配重杆51,配重杆51远离固定杆52一端固定连接有配重块4,副臂5上方设置有副臂前支架6。Referring to Figures 1-2, an embodiment provided by the present invention: a jib front support device of a crane, comprising a
转动塔3顶部固定连接有平衡塔7,平衡塔7塔尖位置与固定连接有第一平衡钢管8,第一平衡钢管8远离转动塔3一端与主臂10远离转动塔3一端顶部固定连接。A
配重杆51上表面转动连接有限位杆64,限位杆64远离配重杆51一端固定连接有第二伸长杆65,平衡塔7塔尖位置转动连接有第二平衡钢管61,第二平衡钢管61远离平衡塔7一端端口与第二伸长杆65滑动连接。The upper surface of the
副臂前支架6包括臂杆63,臂杆63一端与固定杆52侧壁转动连接,臂杆63远离固定杆52一端与第二平衡钢管61侧壁转动连接,第二平衡钢管61和臂杆63之间转动连接有液压缸62,通过液压缸62可以带动副臂5的长度伸长,使得力臂增大。主臂10下方滑动连接有吊钩9。配重杆51、固定杆52、第一伸长杆54、限位杆64、第二伸长杆65、第二平衡钢管61和臂杆63均为锰钢材料,锰钢材料强度高。The
工作原理:该装置安装在地面上,当塔吊起重机吊起货物重量大于目前起吊的极限值时,启动液压缸62,使液压缸62推动副臂前支架6,使副臂前支架6反作用力与第二平衡钢管61,使第二平衡钢管61推动配重杆51往远离转动塔3一侧移动,增加副臂5的长度,使主臂10的吊起极限增加。Working principle: The device is installed on the ground. When the weight of the goods lifted by the tower crane is greater than the current lifting limit, the
最后应说明的是:以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that the above are only the preferred embodiments of the present invention, and are not intended to limit the present invention. , it can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements to some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model, All should be included within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922193081.2U CN212246016U (en) | 2019-12-10 | 2019-12-10 | A jib front support device of a crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922193081.2U CN212246016U (en) | 2019-12-10 | 2019-12-10 | A jib front support device of a crane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212246016U true CN212246016U (en) | 2020-12-29 |
Family
ID=73972408
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922193081.2U Expired - Fee Related CN212246016U (en) | 2019-12-10 | 2019-12-10 | A jib front support device of a crane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212246016U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114572862A (en) * | 2022-03-07 | 2022-06-03 | 济南恒起工程机械有限公司 | Double-hoisting-end hoisting tower crane |
-
2019
- 2019-12-10 CN CN201922193081.2U patent/CN212246016U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114572862A (en) * | 2022-03-07 | 2022-06-03 | 济南恒起工程机械有限公司 | Double-hoisting-end hoisting tower crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103848360B (en) | A kind of group tower tower crane being provided with packaged type balance weight system | |
| CN104787690B (en) | A kind of single movable-arm floor mast with circulating water Weighting system | |
| CN101301981A (en) | a hoisting method | |
| CN204529166U (en) | A kind of circulating water Weighting system for single movable-arm floor mast | |
| CN103613012A (en) | Amplitude changing device of crane capable of changing angles | |
| CN204848038U (en) | Roll over cantilever crane | |
| CN206799021U (en) | A kind of full circle swinging traveling derrick crane | |
| CN212246016U (en) | A jib front support device of a crane | |
| CN203474321U (en) | Tower crane used for constructing and erecting electric transmission line iron towers | |
| CN103523682A (en) | Luffing jib tower crane | |
| CN111137796A (en) | Novel jib crane | |
| CN202322106U (en) | crane | |
| CN211769922U (en) | Hoisting trolley for hoisting guardrail formwork | |
| CN212953908U (en) | Liftable trackless portal crane for constructional engineering | |
| CN220866943U (en) | Crane with anti-swing device | |
| CN219363050U (en) | PC assembly type building hoisting machine with stable hoisting function | |
| CN205312925U (en) | Hydraulic luffing formula swing arm tower machine | |
| CN212198253U (en) | tower crane | |
| CN111824975A (en) | High-rise tower crane boom mast | |
| CN102745598A (en) | Tower crane | |
| CN202346650U (en) | Suspension arm for 400 KN crane | |
| CN218665138U (en) | Amplitude changing device for crane and crane | |
| CN114701957B (en) | Floor counterweight device and telescopic arm crawler crane | |
| CN219507521U (en) | Variable amplitude arm head and crane thereof | |
| CN218754685U (en) | Crane with telescopic and pitching boom |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201229 |