CN114572862A - Double-hoisting-end hoisting tower crane - Google Patents
Double-hoisting-end hoisting tower crane Download PDFInfo
- Publication number
- CN114572862A CN114572862A CN202210215461.5A CN202210215461A CN114572862A CN 114572862 A CN114572862 A CN 114572862A CN 202210215461 A CN202210215461 A CN 202210215461A CN 114572862 A CN114572862 A CN 114572862A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- support body
- hoisting
- bearing block
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/06—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/74—Counterweights or supports for balancing lifting couples separate from jib
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/88—Safety gear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本发明涉及起重塔吊技术领域,具体为双吊端起重塔吊。The invention relates to the technical field of hoisting tower cranes, in particular to a double hoisting end hoisting tower crane.
背景技术Background technique
塔吊是建筑工地上最常用的一种起重设备 又名“塔式起重机”,以一节一节的接长(高)(简称“标准节”),用来吊施工用的钢筋、木楞、混凝土、钢管等施工的原材料。塔吊是工地上一种必不可少的设备。Tower cranes are the most commonly used lifting equipment on construction sites, also known as "tower cranes". , concrete, steel pipes and other construction raw materials. The tower crane is an indispensable equipment on the construction site.
塔吊(tower crane)尖的功能是承受臂架拉绳及平衡臂拉绳传来的上部荷载,并通过回转塔架、转台、承座等的结构部件式直接通过转台传递给塔身结构。自升塔顶有截锥柱式、前倾或后倾截锥柱式、人字架式及斜撑架式。 凡是上回转塔机均需设平衡重,其功能是支承平衡重,用以构成设计上所要求的作用方面与起重力矩方向相反的平衡力矩。除平衡重外,还常在其尾部装设起升机构。起升机构之所以同平衡重一起安放在平衡臂尾端,一则可发挥部分配重作用,二则增大绳卷筒与塔尖导轮间的距离,以利钢丝绳的排绕并避免发生乱绳现象。平衡重的用量与平衡臂的长度成反比关系,而平衡臂长度与起重臂长度之间又存在一定比例关系。平衡重量相当可观,轻型塔机一般至少要3~4t,重型的要近30t,通常双吊端起重塔吊多用于大型建筑场地,由于双吊端起重塔吊可提高建筑施工效率,从而使双吊端起重塔吊备受青睐。The function of the tip of the tower crane is to bear the upper load from the jib pull rope and the balance arm pull rope, and directly transmit it to the tower body structure through the rotary tower, turntable, bearing and other structural components. The top of the self-elevating tower has a truncated cone column type, a forward or backward truncated cone column type, a herringbone frame type and a diagonal support frame type. All upper slewing tower cranes need to be equipped with a counterweight, and its function is to support the counterweight to form a counterbalancing moment that is opposite to the direction of the lifting moment in the function required by the design. In addition to the counterweight, a hoisting mechanism is often installed at its tail. The reason why the hoisting mechanism is placed at the end of the balance arm together with the counterweight is that it can play a part of the counterweight role, and secondly, it increases the distance between the rope drum and the tower tip guide wheel, so as to facilitate the winding of the wire rope and avoid the occurrence of The rope disorder phenomenon. The amount of balance weight is inversely proportional to the length of the balance arm, and there is a certain proportional relationship between the length of the balance arm and the length of the boom. The balance weight is quite considerable. Light tower cranes are generally at least 3-4t, and heavy-duty tower cranes are nearly 30t. Usually, double-end lifting tower cranes are mostly used in large construction sites. Lifting tower cranes are very popular.
但是现有的双吊端起重塔吊在对物件进行塔吊时,两端架体的重量不同容易出现失衡影响使用,同时物件塔吊过程中平衡性较差,导致钢丝绳左右摆动造成危险。However, when the existing double-end hoisting tower crane hoists the object, the weight of the two ends of the frame body is different, and it is easy to cause imbalance and affect the use.
发明内容SUMMARY OF THE INVENTION
(一)解决的技术问题(1) Technical problems solved
针对现有技术的不足,本发明提供了双吊端起重塔吊,解决了锅内烧糊后产生的黑垢不易进行清除的问题。In view of the deficiencies of the prior art, the present invention provides a double-end lifting tower crane, which solves the problem that the black scale generated after burning in the pot is difficult to remove.
(二)技术方案(2) Technical solutions
为实现以上目的,本发明通过以下技术方案予以实现:双吊端起重塔吊,包括底座,所述底座的上表面固定连接有第一架体,所述第一架体的上表面设置有顶套,所述顶套的上表面固定连接有转板,所述转板的上表面固定连接有固定架,所述固定架的侧表面固定连接有第二架体,所述第二架体的内部固定连接有重力机构,所述固定架的侧表面位于第二架体的右侧固定连接有第三架体,所述第三架体的前表面滑动连接有平衡机构。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: a double-end hoisting tower crane includes a base, the upper surface of the base is fixedly connected with a first frame body, and the upper surface of the first frame body is provided with a roof; The upper surface of the top sleeve is fixedly connected with a turning plate, the upper surface of the turning plate is fixedly connected with a fixing frame, the side surface of the fixing frame is fixedly connected with a second frame body, and the second frame body is fixedly connected to the upper surface of the turning plate. A gravity mechanism is fixedly connected inside, the side surface of the fixing frame is located on the right side of the second frame body is fixedly connected with a third frame body, and the front surface of the third frame body is slidably connected with a balance mechanism.
优选的,所述重力机构包括第一承重块,所述第一承重块的内部固定连接有电动伸缩杆,所述电动伸缩杆的输出端固定连接有第二承重块,且第二承重块与第一承重块滑动连接。Preferably, the gravity mechanism includes a first load-bearing block, an electric telescopic rod is fixedly connected to the inside of the first load-bearing block, and a second load-bearing block is fixedly connected to the output end of the electric telescopic rod, and the second load-bearing block is connected to the The first bearing block is slidingly connected.
优选的,所述平衡机构包括平衡板,所述平衡板的前表面滑动连接有滑板。Preferably, the balance mechanism includes a balance plate, and a sliding plate is slidably connected to the front surface of the balance plate.
优选的,所述顶套的内部固定连接有液压缸,且液压缸的输出端与第一架体固定连接。Preferably, a hydraulic cylinder is fixedly connected to the inside of the top sleeve, and the output end of the hydraulic cylinder is fixedly connected to the first frame body.
优选的,所述第三架体的内部固定连接有齿条,所述齿条的上表面啮合连接有齿轮,所述齿轮的后表面设置有移动板。Preferably, a rack is fixedly connected to the inside of the third frame body, a gear is meshed and connected to the upper surface of the rack, and a moving plate is provided on the rear surface of the gear.
优选的,所述移动板的上表面固定连接有第一步进电机,所述第一步进电机的输出端固定连接有收卷板,所述收卷板的侧表面设置有钢丝绳所述钢丝绳远离收卷板的一端固定连接有安装板,且安装板与滑板固定连接,所述安装板的下表面固定连接有托板,所述安装板的内部螺纹连接有螺纹杆,所述螺纹杆靠近托板的一端设置有压板,且压板位于托板的上方。Preferably, a first step motor is fixedly connected to the upper surface of the moving plate, a winding plate is fixedly connected to the output end of the first step motor, and a steel wire rope is provided on the side surface of the winding plate. One end away from the rewinding plate is fixedly connected with a mounting plate, and the mounting plate is fixedly connected with the slide plate, the lower surface of the mounting plate is fixedly connected with a support plate, and a threaded rod is threadedly connected to the inside of the mounting plate, and the threaded rod is close to the One end of the support plate is provided with a pressure plate, and the pressure plate is located above the support plate.
优选的,所述第三架体的后表面滑动连接有第二步进电机,且第二步进电机的输出端与齿轮通过花键连接。Preferably, a second stepping motor is slidably connected to the rear surface of the third frame body, and the output end of the second stepping motor is connected to the gear through splines.
(三)有益效果(3) Beneficial effects
本发明提供了双吊端起重塔吊。具备以下有益效果:The present invention provides a double-end hoisting tower crane. Has the following beneficial effects:
1、与现有的技术相比,通过设置的重力机构,利用第一承重块与第二承重块可增加第二架体重量,当第三架体在塔吊物件时,使第二架体与第三架体之间的重量较为平衡,同时利用电动伸缩杆的伸缩可推动第二承重块移动,使第二承重块可从第一承重块的内部伸出,使第二架体的重量集中在下方,使该装置在对物件进行塔吊时,不易出现失衡。1. Compared with the existing technology, the weight of the second frame can be increased by using the first load-bearing block and the second load-bearing block through the set gravity mechanism. When the third frame is hanging on the tower, the second frame is The weight of the third frame body is relatively balanced, and at the same time, the extension and contraction of the electric telescopic rod can push the second bearing block to move, so that the second bearing block can protrude from the inside of the first bearing block, so that the weight of the second frame body can be concentrated At the bottom, the device is less likely to be unbalanced when the object is tower-hoisted.
2、与现有的技术相比,通过设置的平衡机构,当安装板在移动时,可带动滑板在平衡板的表面滑动,使其可提高安装板移动时的平稳性,有效防止钢丝绳在对物件进行塔吊时出现晃动造成危险。2. Compared with the existing technology, through the set balance mechanism, when the mounting plate is moving, the slide plate can be driven to slide on the surface of the balance plate, so that it can improve the stability of the mounting plate when moving, and effectively prevent the wire rope from The object is shaking when the tower crane is carried out, causing danger.
3、与现有的技术相比,通过安装的托板、螺纹杆与压板,将物件放置在托板的表面托住,拧动螺纹杆使压板可将物件的表面压住,使物件在塔吊时较为牢固。3. Compared with the existing technology, the object is placed on the surface of the pallet through the installed support plate, threaded rod and pressure plate, and the threaded rod is twisted so that the pressure plate can press the surface of the object, so that the object can be placed on the tower crane. more solid.
附图说明Description of drawings
图1为本发明正视结构示意图;Fig. 1 is the front view structure schematic diagram of the present invention;
图2为本发明后视结构示意图;Fig. 2 is the rear view structure schematic diagram of the present invention;
图3为本发明局部结构示意图;Fig. 3 is the partial structure schematic diagram of the present invention;
图4为本发明移动板结构示意图;FIG. 4 is a schematic structural diagram of the mobile board of the present invention;
图5为本发明第一承重块内部结构示意图;5 is a schematic diagram of the internal structure of the first load-bearing block of the present invention;
图6为本发明图1中A处结构示意图;Fig. 6 is the structural representation of place A in Fig. 1 of the present invention;
图7为本发明第三架体内部结构示意图;7 is a schematic diagram of the internal structure of the third frame of the present invention;
图8为本发明图7中B处结构示意图。FIG. 8 is a schematic diagram of the structure at B in FIG. 7 of the present invention.
其中,1、底座;2、第一架体;3、重力机构;301、第一承重块;302、第二承重块;303、电动伸缩杆;4、第二架体;5、转板;6、固定架;7、顶套;8、第三架体;9、平衡机构;901、平衡板;902、滑板;10、第一步进电机;11、收卷板;12、钢丝绳;13、齿条;14、第二步进电机;15、移动板;16、液压缸;17、齿轮;18、螺纹杆;19、压板;20、托板;21、安装板。Among them, 1. the base; 2. the first frame body; 3. the gravity mechanism; 301, the first bearing block; 302, the second bearing block; 303, the electric telescopic rod; 4, the second frame body; 5, the turning plate; 6. Fixed frame; 7. Top cover; 8. Third frame body; 9. Balance mechanism; 901, Balance plate; 902, Skateboard; 10, First step motor; 11, Rewinding plate; 12, Steel wire rope; 13 14, the second stepper motor; 15, the moving plate; 16, the hydraulic cylinder; 17, the gear; 18, the threaded rod; 19, the pressure plate;
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
实施例:Example:
如图1-8所示,本发明实施例提供双吊端起重塔吊,包括底座1,底座1的上表面固定连接有第一架体2,第一架体2的上表面设置有顶套7,顶套7的内部固定连接有液压缸16,且液压缸16的输出端与第一架体2固定连接,利用液压缸16的伸缩可推动顶套7上下移动,从而可对第二架体4与第三架体8的高度进行调节,顶套7的上表面固定连接有转板5,通过外界控制转板5使固定架6可带动第二架体4与第三架体8转动,转板5的上表面固定连接有固定架6,固定架6的侧表面固定连接有第二架体4,第二架体4的内部固定连接有重力机构3,重力机构3包括第一承重块301,第一承重块301的内部固定连接有电动伸缩杆303,电动伸缩杆303的输出端固定连接有第二承重块302,且第二承重块302与第一承重块301滑动连接,利用第一承重块301与第二承重块302可增加第二架体4重量,使托板20在对物件进行塔吊时,使第二架体4与第三架体8之间的重量较为平衡,同时利用电动伸缩杆303的伸缩可推动第二承重块302移动,使第二承重块302可从第一承重块301的内部伸出,使第二架体4的重量集中在下方,使该装置在对物件进行塔吊时,不易出现失衡。As shown in Figures 1-8, the embodiment of the present invention provides a double-end lifting tower crane, including a
通过设置以上结构,可较好的平衡第二架体4与第三架体8的重量,使该装置不易出现失衡现象。By arranging the above structure, the weights of the second frame body 4 and the
固定架6的侧表面位于第二架体4的右侧第三架体8,第三架体8的前表面滑动连接有平衡机构9,平衡机构9包括平衡板901,平衡板901的前表面滑动连接有滑板902,当托板20在对物件进行塔吊时,利用安装板21的移动使滑板902可在平衡板901的表面滑动,使物件在移动时,钢丝绳12不易晃动造成危险。The side surface of the fixed
通过设置以上结构,有效防止钢丝绳12在对物件进行塔吊时出现晃动造成危险。By arranging the above structure, the
第三架体8的内部固定连接有齿条13,齿条13的上表面啮合连接有齿轮17,齿轮17的后表面设置有移动板15,第三架体8的后表面滑动连接有第二步进电机14,且第二步进电机14的输出端与齿轮17通过花键连接,启动第二步进电机14使齿轮17可转动,由于齿轮17与齿条13的啮合,当齿轮17在转动时移动板15可在第三架体8的表面移动,移动板15的上表面固定连接有第一步进电机10,第一步进电机10的输出端固定连接有收卷板11,收卷板11的侧表面设置有钢丝绳12,启动第一步进电机10使收卷板11可转动对钢丝绳12进行放卷或收卷,钢丝绳12远离收卷板11的一端固定连接有安装板21,且安装板21与滑板902固定连接,利用安装板21与滑板902的固定,当安装板21上下移动时,滑板902可在平衡板901的表面上下滑动,当移动板15带动安装板21左右移动时,由于平衡板901与第三架体8的外表面滑动连接,当安装板21在移动时,平衡板901可在第三架体8的外表面滑动,安装板21的下表面固定连接有托板20,安装板21的内部螺纹连接有螺纹杆18,螺纹杆18靠近托板20的一端设置有压板19,且压板19位于托板20的上方,利用钢丝绳12的放卷或收卷,使安装板21可移动,将物件放置在托板20的表面托住,拧动螺纹杆18使压板19可移动将物件的表面压住进行固定,利用收卷板11的转动可对钢丝绳12进行收卷,通过移动板15的移动,使工作人员可对塔吊的物价进行安装。A
通过设置以上结构,使该装置在对物件进行塔吊时较为便捷,从而可提高物件塔吊效率。By arranging the above structure, the device is more convenient when the object is tower-hoisted, so that the tower-hoisting efficiency of the object can be improved.
工作原理:启动第一步进电机10使收卷板11可转动对钢丝绳12进行放卷,使安装板21可移动,当安装板21在移动时滑板902可在平衡板901的表面滑动,将物件放置在托板20的表面托住,拧动螺纹杆18使压板19可移动将物件的表面压住进行固定,利用电动伸缩杆303的伸缩可推动第二承重块302移动,使第二承重块302可从第一承重块301的内部伸出,使第二架体4的重量集中在下方,使该装置在对物件进行塔吊时,不易出现失衡,利用收卷板11的转动可对钢丝绳12进行收卷,使安装板21可带动滑动向上移动,启动第二步进电机14,使齿轮17可转动,由于齿轮17与齿条13的啮合,当齿轮17在转动时移动板15可带动第二步进电机14在第三架体8的内部移动,由于平衡板901与第三架体8的外表面滑动连接,当移动板15在移动时,平衡板901可在第三架体8的外表面滑动,从而方便工作人员对塔吊的物件进行安装。Working principle: start the
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210215461.5A CN114572862A (en) | 2022-03-07 | 2022-03-07 | Double-hoisting-end hoisting tower crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210215461.5A CN114572862A (en) | 2022-03-07 | 2022-03-07 | Double-hoisting-end hoisting tower crane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN114572862A true CN114572862A (en) | 2022-06-03 |
Family
ID=81779198
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210215461.5A Pending CN114572862A (en) | 2022-03-07 | 2022-03-07 | Double-hoisting-end hoisting tower crane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN114572862A (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU1169930A1 (en) * | 1983-01-28 | 1985-07-30 | Центральное Конструкторское Бюро "Строймаш" Научно-Производственного Объединения "Ленстроймаш" | Method of mounting the girder boom of crane |
| CN201999649U (en) * | 2011-02-20 | 2011-10-05 | 刘永森 | Movable tower crane |
| CN106542444A (en) * | 2016-11-10 | 2017-03-29 | 四川宇盛智创科技有限公司 | A kind of moment of flexure reduction structure set up in tower body revolution |
| CN207890926U (en) * | 2018-01-26 | 2018-09-21 | 南通杰品起重设备有限公司 | A kind of crane anti-sway device |
| CN109019304A (en) * | 2018-09-25 | 2018-12-18 | 胡新军 | A kind of Steel plate hoist |
| CN211769946U (en) * | 2020-03-09 | 2020-10-27 | 青岛方圆达建设集团有限公司 | Counterweight device of building tower crane |
| CN212246016U (en) * | 2019-12-10 | 2020-12-29 | 天津邬金机械设备股份有限公司 | A jib front support device of a crane |
| CN212954002U (en) * | 2020-08-03 | 2021-04-13 | 四川省隆昌机械制造有限公司 | Multifunctional tower crane |
-
2022
- 2022-03-07 CN CN202210215461.5A patent/CN114572862A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU1169930A1 (en) * | 1983-01-28 | 1985-07-30 | Центральное Конструкторское Бюро "Строймаш" Научно-Производственного Объединения "Ленстроймаш" | Method of mounting the girder boom of crane |
| CN201999649U (en) * | 2011-02-20 | 2011-10-05 | 刘永森 | Movable tower crane |
| CN106542444A (en) * | 2016-11-10 | 2017-03-29 | 四川宇盛智创科技有限公司 | A kind of moment of flexure reduction structure set up in tower body revolution |
| CN207890926U (en) * | 2018-01-26 | 2018-09-21 | 南通杰品起重设备有限公司 | A kind of crane anti-sway device |
| CN109019304A (en) * | 2018-09-25 | 2018-12-18 | 胡新军 | A kind of Steel plate hoist |
| CN212246016U (en) * | 2019-12-10 | 2020-12-29 | 天津邬金机械设备股份有限公司 | A jib front support device of a crane |
| CN211769946U (en) * | 2020-03-09 | 2020-10-27 | 青岛方圆达建设集团有限公司 | Counterweight device of building tower crane |
| CN212954002U (en) * | 2020-08-03 | 2021-04-13 | 四川省隆昌机械制造有限公司 | Multifunctional tower crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104925673B (en) | A kind of many cranes integration of operation auxiliary hoisting device and method | |
| CN101962156B (en) | Foldable fast-assembling tower crane | |
| CN101357739B (en) | Column crane special for movable arm type group tower | |
| CN214298989U (en) | A revolving tower crane without counterweight | |
| CN116573530A (en) | A kind of hoisting device and installation method for installing bridge body of road and bridge construction | |
| CN102689845B (en) | Miniature crane | |
| CN114476966A (en) | Hoisting equipment for building engineering construction and working method thereof | |
| CN216997387U (en) | Crane with movable balancing weight mechanism | |
| CN204588550U (en) | A kind of lifting mechanism inhead type lands electric power pole | |
| CN216737299U (en) | Bracket of tower crane | |
| CN114572862A (en) | Double-hoisting-end hoisting tower crane | |
| CN212374757U (en) | Tower crane stable in installation | |
| CN116462108B (en) | Mobile crane for road construction | |
| CN209522508U (en) | A kind of arm tower crane mobile counterweight implementation mechanism | |
| CN214570286U (en) | Convenient type slat wall installation assists utensil | |
| CN212198253U (en) | tower crane | |
| CN211226078U (en) | Luffing mechanism of cantilever crane | |
| CN105271022A (en) | Quick-assembly tower crane | |
| CN212246016U (en) | A jib front support device of a crane | |
| CN204752021U (en) | Symmetrical train of two jib loading boom towers machine | |
| CN116101914A (en) | crane | |
| CN218317496U (en) | Building materials lifts by crane ligature device | |
| CN208454365U (en) | A kind of lifting apparatus used for steel girder erection | |
| CN220432142U (en) | Building construction tower crane | |
| CN222729299U (en) | Steel box girder hoisting device for bridge construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20220603 |