CN212224372U - Mounting structure of prefabricated drop level furred ceiling of assembled - Google Patents
Mounting structure of prefabricated drop level furred ceiling of assembled Download PDFInfo
- Publication number
- CN212224372U CN212224372U CN202020098939.7U CN202020098939U CN212224372U CN 212224372 U CN212224372 U CN 212224372U CN 202020098939 U CN202020098939 U CN 202020098939U CN 212224372 U CN212224372 U CN 212224372U
- Authority
- CN
- China
- Prior art keywords
- fastener
- prefabricated
- ceiling
- installation structure
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种跌级吊顶,具体而言,涉及一种装配式预制跌级吊顶的安装结构。The utility model relates to a drop ceiling, in particular to an installation structure of an assembled prefabricated drop ceiling.
背景技术Background technique
装配式装饰是近年新兴的一种装饰施工形式。装配式装饰顾名思义,即是将装饰所需要使用的各个部品部件在工厂内实现生产完成,然后运输到装饰现场进行组合安装,免去了传统的装饰现场对各部品部件的测量、切割等作业,施工更为简单方便,可以极大地提高装饰现场的施工效率,并且施工现场更为整洁和美观,不会产生过多的装饰材料垃圾,是一种更为绿色环保的装饰施工形式。Prefabricated decoration is an emerging form of decoration construction in recent years. As the name implies, prefabricated decoration is to complete the production of various parts and components required for decoration in the factory, and then transport them to the decoration site for combined installation, eliminating the need for the traditional decoration site to measure and cut each part. The construction is simpler and more convenient, which can greatly improve the construction efficiency of the decoration site, and the construction site is more tidy and beautiful, and will not generate too much decoration material waste, which is a more green and environmentally friendly decoration construction form.
跌级灯槽是内装吊顶系统中不可或缺的一种装饰手法,现有的装配式吊顶在安装时多使用收口线条制作灯槽跌级,此种方式难以控制质量,制作繁琐,且不利于工厂化生产,无法达到装配式省时省工的目的。The downgrade light trough is an indispensable decoration method in the built-in ceiling system. The existing prefabricated ceilings often use closing lines to make the light trough downgrade. This method is difficult to control the quality, cumbersome to manufacture, and unfavorable. Factory production cannot achieve the purpose of saving time and labor by assembly.
实用新型内容Utility model content
鉴于此,本实用新型提供了一种装配式预制跌级吊顶的安装结构,实现工厂预制、现场安装的干作业安装方法,整个施工过程简单,施工效率高,施工成本低,安装质量佳,且绿色无污染。In view of this, the utility model provides an installation structure of a prefabricated prefabricated drop ceiling, which realizes a dry operation installation method of factory prefabrication and on-site installation, the whole construction process is simple, the construction efficiency is high, the construction cost is low, the installation quality is good, and Green and pollution-free.
为此,本实用新型提供了一种装配式预制跌级吊顶的安装结构,其包括:To this end, the present utility model provides an installation structure of a prefabricated prefabricated drop ceiling, which includes:
吊顶板,其沿水平方向设置,吊顶板的顶面设置有吊接槽,吊接槽包括位于吊顶板一侧的第一燕尾槽和位于吊顶板中间的第二燕尾槽;The ceiling panel is arranged in a horizontal direction, the top surface of the ceiling panel is provided with a hoisting groove, and the suspending groove includes a first dovetail groove located on one side of the ceiling panel and a second dovetail groove located in the middle of the ceiling panel;
垂直连接件,其包括依次相连接的吊杆、第一连接架以及第一扣件,第一扣件的底部与第一燕尾槽相卡接,吊杆的顶部连接顶墙;a vertical connecting piece, which includes a boom, a first connecting frame and a first fastener that are connected in sequence, the bottom of the first fastener is clamped with the first dovetail groove, and the top of the boom is connected to the top wall;
水平连接件,其包括依次相连接的第二扣件、第二连接架以及第三扣件,第二扣件连接侧墙,第三扣件与第二燕尾槽相卡接;a horizontal connector, which includes a second fastener, a second connection frame and a third fastener connected in sequence, the second fastener is connected to the side wall, and the third fastener is clamped with the second dovetail groove;
灯槽组件,其包括立板和灯带,立板沿竖直方向设置,立板的底部与吊顶板的顶面相连接。The lamp trough assembly includes a vertical plate and a light strip, the vertical plate is arranged along the vertical direction, and the bottom of the vertical plate is connected with the top surface of the ceiling plate.
进一步地,上述第一扣件和第三扣件为倒T型扣件。Further, the first fastener and the third fastener are inverted T-shaped fasteners.
进一步地,上述第二扣件为L型扣件。Further, the above-mentioned second fastener is an L-shaped fastener.
进一步地,上述立板的底部设置有定位扣件,定位扣件的侧边与立板相连接,其底边与吊顶板相卡接。Further, the bottom of the vertical plate is provided with a positioning fastener, the side edges of the positioning fastener are connected with the vertical plate, and the bottom edge of the positioning fastener is clamped with the ceiling plate.
进一步地,上述定位扣件的侧面形状呈“L”型。Further, the lateral shape of the above-mentioned positioning fastener is an "L" shape.
进一步地,上述吊顶板的顶面还设置有卡接槽,卡接槽的一侧呈直角形,另一侧呈半燕尾型。Further, the top surface of the above-mentioned ceiling panel is also provided with a clamping groove, one side of the clamping groove is in the shape of a right angle, and the other side is in the shape of a half dovetail.
进一步地,上述定位扣件的底边与卡接槽相卡接。Further, the bottom edge of the positioning fastener is engaged with the engaging groove.
进一步地,上述第一连接架和第二连接架的侧面形状均呈方形。Further, the side shapes of the first connecting frame and the second connecting frame are both square.
进一步地,上述吊顶板的外侧设置有灯槽收边条,灯槽收边条的高度低于立板的高度。Further, the outer side of the ceiling panel is provided with a lamp slot edge strip, and the height of the lamp slot edge strip is lower than the height of the vertical plate.
进一步地,垂直连接件和水平连接件均沿吊顶板的长度方向设置,且均设置为多个。Further, both the vertical connecting piece and the horizontal connecting piece are arranged along the length direction of the ceiling panel, and are arranged in plural.
本实用新型所提供的一种装配式预制跌级吊顶的安装结构,主要包括吊顶板、垂直连接件、水平连接件以及灯槽组件,吊顶板的顶面设置有第一燕尾槽和第二燕尾槽,垂直连接件用于将吊顶板和顶墙连接,包括吊杆、第一连接架以及第一扣件,第一扣件和第一燕尾槽相卡接,吊杆顶部与顶墙连接;水平连接件用于将吊顶板与侧墙连接,包括第二扣件、第二连接架以及第三扣件,第三扣件和第二燕尾槽相卡接,第二扣件和侧墙连接;灯槽组件中包括立板和灯带,用于呈现发光吊顶的效果。The installation structure of a prefabricated prefabricated drop ceiling provided by the utility model mainly includes a ceiling board, a vertical connecting piece, a horizontal connecting piece and a lamp trough assembly. The top surface of the ceiling board is provided with a first dovetail groove and a second dovetail. The slot, the vertical connector is used to connect the ceiling panel and the top wall, including a boom, a first connecting frame and a first fastener, the first fastener and the first dovetail groove are clamped, and the top of the boom is connected to the top wall; The horizontal connector is used to connect the ceiling panel to the side wall, including a second fastener, a second connecting frame and a third fastener, the third fastener is clamped with the second dovetail groove, and the second fastener is connected to the side wall ; The light trough assembly includes a vertical plate and a light strip to present the effect of a luminous ceiling.
安装时,对结构基层进行现场测量,将预制吊顶板进行尺寸调整,并与预制立板相匹配,将立板与吊顶板相连接;之后在预制吊顶板的燕尾槽中装入L 型扣件及倒T型扣件,完成垂直连接件和水平连接件与吊顶板的连接;最后吊装吊顶板。During installation, make on-site measurements on the structural base, adjust the size of the prefabricated ceiling panels, match them with the prefabricated vertical panels, and connect the vertical panels to the ceiling panels; then install L-shaped fasteners into the dovetail grooves of the prefabricated ceiling panels And the inverted T-shaped fasteners to complete the connection between the vertical connectors and the horizontal connectors and the ceiling panel; finally, the ceiling panel is hoisted.
通过上述结构,使得本实用新型所提供的一种装配式预制跌级吊顶的安装结构相较于现有技术主要具有以下优点:Through the above structure, the installation structure of the prefabricated prefabricated drop ceiling provided by the present utility model mainly has the following advantages compared with the prior art:
一、保持了装配化的特征,可辅助解决板材下垂的问题;1. It maintains the characteristics of assembly, which can help solve the problem of sagging of the board;
二、降低了跌级灯槽设计在装配式顶面中的使用难度;2. Reduce the difficulty of using the degraded lamp trough design in the assembled top surface;
三、实现了节约资源、减少装修成本及绿色环保的装修理念;3. Realize the decoration concept of saving resources, reducing decoration costs and green environmental protection;
四、可以实现工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,绿色环保,解决了材料浪费、工艺繁琐,施工废料多的问题。4. The dry construction method of factory prefabrication and direct assembly on site can be realized. The whole construction process is simple, green and environmentally friendly, which solves the problems of material waste, cumbersome process and many construction wastes.
附图说明Description of drawings
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本实用新型的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The accompanying drawings are only for the purpose of illustrating the preferred embodiments, and are not considered to be a limitation of the present invention. Also, the same components are denoted by the same reference numerals throughout the drawings. In the attached image:
图1为本实用新型实施例提供的一种装配式预制跌级吊顶的安装结构的侧视图;1 is a side view of an installation structure of a prefabricated prefabricated drop ceiling provided by an embodiment of the present utility model;
图2为本实用新型实施例中吊顶板的侧视图;Fig. 2 is the side view of the ceiling plate in the embodiment of the utility model;
图3为本实用新型实施例中第一扣件的侧视图;3 is a side view of a first fastener in an embodiment of the present invention;
图4为本实用新型实施例中第二扣件的侧视图;4 is a side view of the second fastener in the embodiment of the present invention;
图5为本实用新型实施例中第三扣件的侧视图;5 is a side view of the third fastener in the embodiment of the present invention;
图6为本实用新型实施例中定位扣件的侧视图。FIG. 6 is a side view of a positioning fastener in an embodiment of the present invention.
具体实施方式Detailed ways
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided so that the present disclosure will be more thoroughly understood, and will fully convey the scope of the present disclosure to those skilled in the art.
实施例一:Example 1:
参见图1至图2,图中示出了本实用新型实施例一提供的一种装配式预制跌级吊顶的安装结构,包括:吊顶板1,其沿水平方向设置,吊顶板1的顶面设置有吊接槽,吊接槽包括位于吊顶板1一侧的第一燕尾槽11和位于吊顶板1 中间的第二燕尾槽12;垂直连接件,其包括依次相连接的吊杆21、第一连接架22以及第一扣件23,第一扣件23的底部与第一燕尾槽11相卡接,吊杆21 的顶部连接顶墙;水平连接件,其包括依次相连接的第二扣件31、第二连接架 32以及第三扣件33,第二扣件31连接侧墙,第三扣件33与第二燕尾槽12相卡接;灯槽组件,其包括立板41和灯带42,立板41沿竖直方向设置,立板 41的底部与吊顶板1的顶面相连接。其中,第一连接架22和第二连接架32 的侧面形状均呈方形。Referring to Figures 1 to 2, the figures show an installation structure of a prefabricated prefabricated drop ceiling provided by the first embodiment of the present invention, including: a
本实施例所提供的一种装配式预制跌级吊顶的安装结构,主要包括吊顶板 1、垂直连接件、水平连接件以及灯槽组件,吊顶板1的顶面设置有第一燕尾槽11和第二燕尾槽12,垂直连接件用于将吊顶板1和顶墙连接,包括吊杆21、第一连接架22以及第一扣件23,第一扣件23和第一燕尾槽11相卡接,吊杆 21顶部与顶墙连接;水平连接件用于将吊顶板1与侧墙连接,包括第二扣件 31、第二连接架32以及第三扣件33,第三扣件33和第二燕尾槽12相卡接,第二扣件31和侧墙连接;灯槽组件中包括立板41和灯带42,用于呈现发光吊顶的效果。The installation structure of a prefabricated prefabricated drop ceiling provided in this embodiment mainly includes a
安装时,对结构基层进行现场测量,将预制吊顶板1进行尺寸调整,并与预制立板41相匹配,将立板41与吊顶板1相连接;之后在预制吊顶板1的燕尾槽中装入L型扣件及倒T型扣件,完成垂直连接件和水平连接件与吊顶板1 的连接;最后吊装吊顶板1。During installation, the structural base is measured on site, the size of the
通过上述结构,使得本实用新型所提供的一种装配式预制跌级吊顶的安装结构相较于现有技术主要具有以下优点:Through the above structure, the installation structure of the prefabricated prefabricated drop ceiling provided by the present utility model mainly has the following advantages compared with the prior art:
一、保持了装配化的特征,可辅助解决板材下垂的问题;1. It maintains the characteristics of assembly, which can help solve the problem of sagging of the board;
二、降低了跌级灯槽设计在装配式顶面中的使用难度;2. Reduce the difficulty of using the degraded lamp trough design in the assembled top surface;
三、实现了节约资源、减少装修成本及绿色环保的装修理念;3. Realize the decoration concept of saving resources, reducing decoration costs and green environmental protection;
四、可以实现工厂预制,现场直接进行拼装的干作业施工方法,整个施工过程简单,绿色环保,解决了材料浪费、工艺繁琐,施工废料多的问题。4. The dry construction method of factory prefabrication and direct assembly on site can be realized. The whole construction process is simple, green and environmentally friendly, which solves the problems of material waste, cumbersome process and many construction wastes.
实施例二:Embodiment 2:
参见图3至图5,图中示出了本实用新型实施例二提供的一种装配式预制跌级吊顶的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:第一扣件23和第三扣件33为倒T型扣件;第二扣件 31为L型扣件。通过上述结构的设置,倒T型扣件的设置不仅方便卡接,同时能够提高连接强度;L型扣件方便侧墙和水平连接件的连接,且连接效果好。Referring to FIGS. 3 to 5 , the figures show the installation structure of a prefabricated prefabricated drop ceiling provided by the second embodiment of the present invention. On the basis of the above-mentioned embodiments, this embodiment further makes the following As an improved technical solution, the
实施例三:Embodiment three:
参见图1、图6,图中示出了本实用新型实施例三提供的一种装配式预制跌级吊顶的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:立板41的底部设置有定位扣件43,定位扣件43的侧边与立板41相连接,其底边与吊顶板1相卡接;定位扣件43的侧面形状呈“L”型;吊顶板1的顶面还设置有卡接槽13,卡接槽13的一侧呈直角形,另一侧呈半燕尾型;定位扣件43的底边与卡接槽13相卡接。通过上述结构的设置,立板41定位牢靠,不会发生倾斜现象,能够提高立板41的安装效果。Referring to FIG. 1 and FIG. 6, the drawings show the installation structure of a prefabricated prefabricated drop ceiling provided by the third embodiment of the present invention. This embodiment further makes the following on the basis of the above-mentioned embodiments As an improved technical solution: the bottom of the
实施例四:Embodiment 4:
参见图1,图中示出了本实用新型实施例四提供的一种装配式预制跌级吊顶的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:吊顶板1的外侧设置有灯槽收边条5,灯槽收边条5的高度低于立板41的高度。通过上述结构的设置,美化灯槽结构,提高整体吊顶的造型感。Referring to FIG. 1, the figure shows the installation structure of a prefabricated prefabricated drop ceiling provided by the fourth embodiment of the present utility model. This embodiment further makes the following improvements on the basis of the above-mentioned embodiments. Technical solution: the outer side of the
实施例五:Embodiment 5:
参见图1,图中示出了本实用新型实施例五提供的一种装配式预制跌级吊顶的安装结构,本实施例在上述各实施例的基础上还进一步地做出了以下作为改进的技术方案:垂直连接件和水平连接件均沿吊顶板1的长度方向设置,且均设置为多个。通过上述结构的设置,能够确保吊顶板1的均衡受力,防止集中受力而影响吊顶板1的平面度,进而提高吊顶板1的整体强度。Referring to FIG. 1, the figure shows the installation structure of a prefabricated prefabricated drop ceiling provided by the fifth embodiment of the present invention. This embodiment further makes the following improvements on the basis of the above-mentioned embodiments. Technical solution: the vertical connectors and the horizontal connectors are both arranged along the length direction of the
显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些修改和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present utility model fall within the scope of the claims of the present utility model and their equivalents, the present utility model is also intended to include these modifications and variations.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020098939.7U CN212224372U (en) | 2020-01-16 | 2020-01-16 | Mounting structure of prefabricated drop level furred ceiling of assembled |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020098939.7U CN212224372U (en) | 2020-01-16 | 2020-01-16 | Mounting structure of prefabricated drop level furred ceiling of assembled |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212224372U true CN212224372U (en) | 2020-12-25 |
Family
ID=73912324
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020098939.7U Expired - Fee Related CN212224372U (en) | 2020-01-16 | 2020-01-16 | Mounting structure of prefabricated drop level furred ceiling of assembled |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212224372U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111139964A (en) * | 2020-01-16 | 2020-05-12 | 金螳螂精装科技(苏州)有限公司 | Installation structure of a prefabricated prefabricated drop ceiling |
-
2020
- 2020-01-16 CN CN202020098939.7U patent/CN212224372U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111139964A (en) * | 2020-01-16 | 2020-05-12 | 金螳螂精装科技(苏州)有限公司 | Installation structure of a prefabricated prefabricated drop ceiling |
| CN111139964B (en) * | 2020-01-16 | 2025-04-29 | 金螳螂精装科技(苏州)有限公司 | An installation structure for an assembled prefabricated drop ceiling |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111962789A (en) | Wall surface hanging flush joint system and mounting method thereof | |
| CN112112317A (en) | Novel indoor space integrated assembly type keel system | |
| CN111075091A (en) | Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled | |
| CN212427882U (en) | Wall surface hanging type external corner system | |
| CN203475674U (en) | Composite hoisting structure for flat pasting of mineral-wool acoustic board | |
| CN111139964B (en) | An installation structure for an assembled prefabricated drop ceiling | |
| CN217897121U (en) | Assembled kitchen wall structure | |
| CN205314448U (en) | Side fascia anchor assembly | |
| CN105133772B (en) | A kind of duplex integrated ceiling and its installation method | |
| CN204715602U (en) | A kind of duplex integrated ceiling | |
| CN110761479A (en) | Mounting structure and mounting method of assembly type ceiling | |
| CN208844782U (en) | A kind of fast-assembling walling system and hangar system | |
| CN205348693U (en) | Horizontal big moulding of stone material curtain | |
| CN110306714B (en) | Assembled partition wall furred ceiling structure | |
| CN108385895A (en) | A kind of fast-assembling walling system | |
| CN209686770U (en) | A kind of object hanging buckle for building | |
| CN208473060U (en) | A kind of metal curtain wall | |
| CN212224507U (en) | Fast-assembling system of assembled wall ceramic tile veneer | |
| CN217326035U (en) | Novel furred ceiling corner connecting piece | |
| CN214220217U (en) | Multifunctional profile assembly part for building architectural decoration honeycomb plate | |
| CN212140142U (en) | A combined curtain box | |
| CN205444782U (en) | Install pendant structure of wall ceramic tile fast | |
| CN212224370U (en) | Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled | |
| CN209779975U (en) | Short pendant limit notch argil board connection structure | |
| CN211421692U (en) | Decorative wallboard for indoor design |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201225 |