CN111139964A - Mounting structure of prefabricated drop level furred ceiling of assembled - Google Patents

Mounting structure of prefabricated drop level furred ceiling of assembled Download PDF

Info

Publication number
CN111139964A
CN111139964A CN202010045910.7A CN202010045910A CN111139964A CN 111139964 A CN111139964 A CN 111139964A CN 202010045910 A CN202010045910 A CN 202010045910A CN 111139964 A CN111139964 A CN 111139964A
Authority
CN
China
Prior art keywords
fastener
ceiling
plate
vertical
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010045910.7A
Other languages
Chinese (zh)
Inventor
汪建垚
佘予然
王建圣
何志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Original Assignee
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Mantis Fine Decoration Technology Suzhou Co Ltd filed Critical Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority to CN202010045910.7A priority Critical patent/CN111139964A/en
Publication of CN111139964A publication Critical patent/CN111139964A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/28Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides a mounting structure of an assembled prefabricated drop ceiling, which comprises: the top surface of the ceiling plate is provided with a first dovetail groove positioned on one side of the ceiling plate and a second dovetail groove positioned in the middle of the ceiling plate; the vertical connecting piece comprises a hanging rod, a first connecting frame and a first fastener which are sequentially connected, the bottom of the first fastener is clamped with the first dovetail groove, and the top of the hanging rod is connected with the top wall; the horizontal connecting piece comprises a second fastener, a second connecting frame and a third fastener which are sequentially connected, the second fastener is connected with the side wall, and the third fastener is clamped with the second dovetail groove; the light trough assembly comprises a vertical plate and a light belt, the vertical plate is arranged in the vertical direction, and the bottom of the vertical plate is connected with the top surface of the ceiling plate. Compared with the prior art, the invention has the following advantages: the dry operation installation method for realizing factory prefabrication and field installation has the advantages of simple whole construction process, high construction efficiency, low construction cost, good installation quality, greenness and no pollution.

Description

Mounting structure of prefabricated drop level furred ceiling of assembled
Technical Field
The invention relates to a drop-level ceiling, in particular to an installation structure of an assembled prefabricated drop-level ceiling.
Background
Assembly decoration is a form of decorative construction emerging in recent years. The assembled decoration is as the name implies, namely, each part required to be used for decoration is produced and completed in a factory and then is transported to a decoration site for combined installation, so that the operations of measurement, cutting and the like of each part in the traditional decoration site are omitted, the construction is simpler and more convenient, the construction efficiency of the decoration site can be greatly improved, the construction site is cleaner and more beautiful, excessive decorative material garbage cannot be generated, and the assembled decoration is a more environment-friendly decoration construction form.
The falling lamp groove is an indispensable decoration technique in a built-in suspended ceiling system, the existing fabricated suspended ceiling is manufactured by using closing-up lines in the installation process, the quality is difficult to control, the manufacturing is complicated, the factory production is not facilitated, and the purposes of time saving and labor saving of the fabricated suspended ceiling cannot be achieved.
Disclosure of Invention
In view of the above, the invention provides an installation structure of an assembled prefabricated drop-level ceiling, which is a dry operation installation method for realizing factory prefabrication and field installation, and has the advantages of simple whole construction process, high construction efficiency, low construction cost, good installation quality, greenness and no pollution.
To this end, the present invention provides a mounting structure of an assembled prefabricated drop ceiling, comprising:
the ceiling plate is arranged along the horizontal direction, the top surface of the ceiling plate is provided with a hanging groove, and the hanging groove comprises a first dovetail groove positioned on one side of the ceiling plate and a second dovetail groove positioned in the middle of the ceiling plate;
the vertical connecting piece comprises a hanging rod, a first connecting frame and a first fastener which are sequentially connected, the bottom of the first fastener is clamped with the first dovetail groove, and the top of the hanging rod is connected with the top wall;
the horizontal connecting piece comprises a second fastener, a second connecting frame and a third fastener which are sequentially connected, the second fastener is connected with the side wall, and the third fastener is clamped with the second dovetail groove;
the light trough assembly comprises a vertical plate and a light belt, the vertical plate is arranged in the vertical direction, and the bottom of the vertical plate is connected with the top surface of the ceiling plate.
Further, the first fastener and the third fastener are inverted T-shaped fasteners.
Further, the second fastener is an L-shaped fastener.
Furthermore, the bottom of the vertical plate is provided with a positioning fastener, the side edge of the positioning fastener is connected with the vertical plate, and the bottom edge of the positioning fastener is clamped with the ceiling plate.
Furthermore, the side shape of the positioning fastener is L-shaped.
Furthermore, the top surface of the ceiling board is also provided with a clamping groove, one side of the clamping groove is right-angled, and the other side of the clamping groove is semi-dovetail.
Furthermore, the bottom edge of the positioning fastener is clamped with the clamping groove.
Furthermore, the side shapes of the first connecting frame and the second connecting frame are square.
Furthermore, a lamp groove edge strip is arranged on the outer side of the ceiling board, and the height of the lamp groove edge strip is lower than that of the vertical board.
Further, vertical connecting piece and horizontal connecting piece all set up along the length direction of furred ceiling board, and all set up to a plurality ofly.
The invention provides an installation structure of an assembled prefabricated drop-level suspended ceiling, which mainly comprises a suspended ceiling plate, a vertical connecting piece, a horizontal connecting piece and a lamp groove assembly, wherein the top surface of the suspended ceiling plate is provided with a first dovetail groove and a second dovetail groove; the horizontal connecting piece is used for connecting the ceiling board with the side wall and comprises a second fastener, a second connecting frame and a third fastener, the third fastener is clamped with the second dovetail groove, and the second fastener is connected with the side wall; the light trough component comprises a vertical plate and a light strip and is used for presenting the effect of the luminous ceiling.
During installation, the structural base layer is measured on site, the prefabricated ceiling board is subjected to size adjustment and matched with the prefabricated vertical board, and the vertical board is connected with the ceiling board; then, installing an L-shaped fastener and an inverted T-shaped fastener into the dovetail groove of the prefabricated ceiling plate to complete the connection of the vertical connecting piece and the horizontal connecting piece with the ceiling plate; and finally, hoisting the suspended ceiling plate.
Through the structure, compared with the prior art, the mounting structure of the prefabricated drop-level ceiling mainly has the following advantages:
firstly, the assembled characteristic is maintained, and the problem of plate sagging can be solved in an auxiliary manner;
the use difficulty of the design of the stepped lamp trough in the assembled top surface is reduced;
thirdly, the decoration concept of saving resources, reducing decoration cost and protecting environment is realized;
and fourthly, the dry operation construction method of factory prefabrication and field direct splicing can be realized, the whole construction process is simple, green and environment-friendly, and the problems of material waste, complex process and more construction waste are solved.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a side view of a mounting structure of a fabricated prefabricated drop grade ceiling according to an embodiment of the present invention;
FIG. 2 is a side view of a ceiling tile in an embodiment of the present invention;
FIG. 3 is a side view of a first fastener of an embodiment of the present invention;
FIG. 4 is a side view of a second fastener of the present embodiment;
FIG. 5 is a side view of a third fastener of the present invention;
FIG. 6 is a side view of a retaining clip according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The first embodiment is as follows:
referring to fig. 1 to 2, a mounting structure of a fabricated prefabricated drop-grade ceiling according to an embodiment of the present invention is shown, including: the suspended ceiling plate 1 is arranged along the horizontal direction, a suspended connection groove is formed in the top surface of the suspended ceiling plate 1, and the suspended connection groove comprises a first dovetail groove 11 located on one side of the suspended ceiling plate 1 and a second dovetail groove 12 located in the middle of the suspended ceiling plate 1; the vertical connecting piece comprises a hanging rod 21, a first connecting frame 22 and a first fastener 23 which are connected in sequence, the bottom of the first fastener 23 is clamped with the first dovetail groove 11, and the top of the hanging rod 21 is connected with a top wall; the horizontal connecting piece comprises a second fastener 31, a second connecting frame 32 and a third fastener 33 which are sequentially connected, the second fastener 31 is connected with the side wall, and the third fastener 33 is clamped with the second dovetail groove 12; the light trough assembly comprises a vertical plate 41 and a light strip 42, the vertical plate 41 is arranged along the vertical direction, and the bottom of the vertical plate 42 is connected with the top surface of the ceiling plate 1. Wherein, the side shapes of the first connecting frame 22 and the second connecting frame 32 are both square.
The mounting structure of the prefabricated drop-level ceiling provided by the embodiment mainly comprises a ceiling board 1, a vertical connecting piece, a horizontal connecting piece and a lamp groove assembly, wherein the top surface of the ceiling board 1 is provided with a first dovetail groove 11 and a second dovetail groove 12, the vertical connecting piece is used for connecting the ceiling board 1 with a top wall and comprises a hanging rod 21, a first connecting frame 22 and a first fastener 23, the first fastener 23 is clamped with the first dovetail groove 11, and the top of the hanging rod 21 is connected with the top wall; the horizontal connecting piece is used for connecting the ceiling board 1 with the side wall and comprises a second fastener 31, a second connecting frame 32 and a third fastener 33, the third fastener 33 is clamped with the second dovetail groove 12, and the second fastener 31 is connected with the side wall; the light trough assembly comprises a vertical plate 41 and a light strip 42, and is used for presenting the effect of a luminous ceiling.
During installation, the structural base layer is measured on site, the prefabricated ceiling board 1 is subjected to size adjustment and matched with the prefabricated vertical board 41, and the vertical board 41 is connected with the ceiling board 1; then, installing an L-shaped fastener and an inverted T-shaped fastener into the dovetail groove of the prefabricated ceiling plate 1 to complete the connection of the vertical connecting piece and the horizontal connecting piece with the ceiling plate 1; and finally, hoisting the suspended ceiling plate 1.
Through the structure, compared with the prior art, the mounting structure of the prefabricated drop-level ceiling mainly has the following advantages:
firstly, the assembled characteristic is maintained, and the problem of plate sagging can be solved in an auxiliary manner;
the use difficulty of the design of the stepped lamp trough in the assembled top surface is reduced;
thirdly, the decoration concept of saving resources, reducing decoration cost and protecting environment is realized;
and fourthly, the dry operation construction method of factory prefabrication and field direct splicing can be realized, the whole construction process is simple, green and environment-friendly, and the problems of material waste, complex process and more construction waste are solved.
Example two:
referring to fig. 3 to fig. 5, an installation structure of a fabricated prefabricated drop-grade ceiling according to a second embodiment of the present invention is shown, and the present embodiment further provides the following improvements on the basis of the above embodiments: the first fastener 23 and the third fastener 33 are inverted T-shaped fasteners; the second fastening member 31 is an L-shaped fastening member. Through the arrangement of the structure, the inverted T-shaped fastener is convenient to clamp and can improve the connection strength; the L-shaped fastener facilitates the connection of the side wall and the horizontal connecting piece, and the connecting effect is good.
Example three:
referring to fig. 1 and fig. 6, an installation structure of a fabricated prefabricated drop-grade ceiling according to a third embodiment of the present invention is shown, and the present embodiment further provides the following improvements on the basis of the above embodiments: the bottom of the vertical plate 42 is provided with a positioning fastener 43, the side edge of the positioning fastener 43 is connected with the vertical plate 42, and the bottom edge of the positioning fastener 43 is clamped with the ceiling board 1; the side surface of the positioning fastener 43 is in an L shape; the top surface of the suspended ceiling plate 1 is also provided with a clamping groove 13, one side of the clamping groove 13 is right-angled, and the other side is half-dovetail; the bottom edge of the positioning fastener 43 is clamped with the clamping groove 13. Through the arrangement of the structure, the vertical plate 41 is firmly positioned, the inclination phenomenon cannot occur, and the installation effect of the vertical plate 41 can be improved.
Example four:
referring to fig. 1, a mounting structure of a fabricated prefabricated drop-grade ceiling according to a fourth embodiment of the present invention is shown, and on the basis of the foregoing embodiments, the present embodiment further provides the following improvements: the outer side of the ceiling board 1 is provided with a lamp groove edge strip 5, and the height of the lamp groove edge strip 5 is lower than that of the vertical board 42. Through the arrangement of the structure, the light trough structure is beautified, and the modeling sense of the whole ceiling is improved.
Example five:
referring to fig. 1, a mounting structure of a fabricated prefabricated drop-grade ceiling according to a fifth embodiment of the present invention is shown, and on the basis of the foregoing embodiments, the present embodiment further provides the following improvements: vertical connection spare and horizontal connection spare all set up along the length direction of furred ceiling board 1, and all set up to a plurality ofly. Through the setting of above-mentioned structure, can ensure the balanced atress of furred ceiling board 1, prevent to concentrate the atress and influence the plane degree of furred ceiling board 1, and then improve the bulk strength of furred ceiling board 1.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. The utility model provides a mounting structure of prefabricated drop level furred ceiling of assembled which characterized in that includes:
the suspended ceiling plate (1) is arranged along the horizontal direction, a suspended connection groove is formed in the top surface of the suspended ceiling plate (1), and the suspended connection groove comprises a first dovetail groove (11) located on one side of the suspended ceiling plate (1) and a second dovetail groove (12) located in the middle of the suspended ceiling plate (1);
the vertical connecting piece comprises a hanging rod (21), a first connecting frame (22) and a first fastener (23) which are sequentially connected, the bottom of the first fastener (23) is clamped with the first dovetail groove (11), and the top of the hanging rod (21) is connected with a top wall;
the horizontal connecting piece comprises a second fastener (31), a second connecting frame (32) and a third fastener (33) which are sequentially connected, the second fastener (31) is connected with the side wall, and the third fastener (33) is clamped with the second dovetail groove (12);
the light trough assembly comprises a vertical plate (41) and a light belt (42), the vertical plate (41) is arranged in the vertical direction, and the bottom of the vertical plate (42) is connected with the top surface of the ceiling plate (1).
2. An installation structure of an assembled prefabricated drop grade ceiling according to claim 1, wherein the first fastener (23) and the third fastener (33) are inverted T-shaped fasteners.
3. An installation structure of an assembled prefabricated drop level ceiling according to claim 2, wherein the second fastening members (31) are L-shaped fastening members.
4. The mounting structure of an assembled prefabricated drop-level ceiling according to claim 3, wherein a positioning fastener (43) is arranged at the bottom of the vertical plate (42), the side edge of the positioning fastener (43) is connected with the vertical plate (42), and the bottom edge of the positioning fastener is clamped with the ceiling plate (1).
5. An installation structure of an assembled prefabricated drop grade ceiling according to claim 4, wherein the positioning fastener (43) is L-shaped in side shape.
6. The mounting structure of an assembled prefabricated drop ceiling according to claim 5, wherein the top surface of the ceiling plate (1) is further provided with a clamping groove (13), one side of the clamping groove (13) is right-angled, and the other side of the clamping groove (13) is semi-dovetail-shaped.
7. The mounting structure of an assembled prefabricated drop ceiling according to claim 6, wherein the bottom edges of the positioning fasteners (43) are clamped with the clamping grooves (13).
8. A mounting structure of an assembled prefabricated drop level ceiling according to claim 1, wherein the first connecting frame (22) and the second connecting frame (32) are square in side shape.
9. An installation structure of an assembled prefabricated drop-grade ceiling according to claim 8, wherein a light groove edge strip (5) is arranged on the outer side of the ceiling plate (1), and the height of the light groove edge strip (5) is lower than that of the vertical plate (42).
10. An installation structure of an assembled prefabricated drop level ceiling according to claim 1, wherein the vertical connecting pieces and the horizontal connecting pieces are arranged along the length direction of the ceiling plate (1) and are arranged in a plurality.
CN202010045910.7A 2020-01-16 2020-01-16 Mounting structure of prefabricated drop level furred ceiling of assembled Pending CN111139964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010045910.7A CN111139964A (en) 2020-01-16 2020-01-16 Mounting structure of prefabricated drop level furred ceiling of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010045910.7A CN111139964A (en) 2020-01-16 2020-01-16 Mounting structure of prefabricated drop level furred ceiling of assembled

Publications (1)

Publication Number Publication Date
CN111139964A true CN111139964A (en) 2020-05-12

Family

ID=70525363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010045910.7A Pending CN111139964A (en) 2020-01-16 2020-01-16 Mounting structure of prefabricated drop level furred ceiling of assembled

Country Status (1)

Country Link
CN (1) CN111139964A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443070A (en) * 2020-12-01 2021-03-05 浙江亚厦装饰股份有限公司 Finished product ceiling stepped mounting structure and mounting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443070A (en) * 2020-12-01 2021-03-05 浙江亚厦装饰股份有限公司 Finished product ceiling stepped mounting structure and mounting method

Similar Documents

Publication Publication Date Title
CN111075091A (en) Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled
CN111075097A (en) Aluminum honeycomb panel composite board ceiling system
CN111139964A (en) Mounting structure of prefabricated drop level furred ceiling of assembled
CN202416777U (en) Installation fastener for building
CN212224372U (en) Mounting structure of prefabricated drop level furred ceiling of assembled
CN213296844U (en) Assembled furred ceiling structure
CN114197726A (en) Hook-up type assembled ceiling and installation method
CN212224517U (en) Assembled wall mounting structure capable of lifting and fixing
CN212224370U (en) Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled
CN113323250A (en) Assembled double-layer keel structure and mounting method thereof
CN113417419A (en) Assembly type wall system with decorative lines and installation method thereof
CN210134610U (en) Dry hanging structure of indoor wall surface
CN111734066A (en) Vertical dry-hanging mounting structure of assembled ceramic tile
CN110656725A (en) Mounting structure and mounting method of embedded ceiling fastener
CN111622448A (en) Dry hanging structure of assembled composite ceramic tile
CN213626483U (en) Mosaic design glass brick's suspended structure
CN111364723A (en) Mounting structure of wall is hung to assembled
CN217000607U (en) Fast-assembling ceramic tile structure
CN212897339U (en) Mounting structure of wall is hung to assembled
CN220451302U (en) Hidden seam hanging wallboard system
CN213682981U (en) Dry hanging structure of first PP ceramic tile of assembled
CN111075139A (en) Assembled wall mounting structure capable of lifting and fixing
CN212836447U (en) Dry-hanging type composite ceramic tile structure
CN217680228U (en) Wall surface three-dimensional adjustable keel system
CN221682219U (en) Assembled furred ceiling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination