CN212202575U - Fan system control cabinet - Google Patents

Fan system control cabinet Download PDF

Info

Publication number
CN212202575U
CN212202575U CN202020721824.9U CN202020721824U CN212202575U CN 212202575 U CN212202575 U CN 212202575U CN 202020721824 U CN202020721824 U CN 202020721824U CN 212202575 U CN212202575 U CN 212202575U
Authority
CN
China
Prior art keywords
fan
fan system
cabinet
human
system control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020721824.9U
Other languages
Chinese (zh)
Inventor
简雪勇
罗靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinyu Yufeng Electric Equipment Co ltd
Original Assignee
Xinyu Yufeng Electric Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinyu Yufeng Electric Equipment Co ltd filed Critical Xinyu Yufeng Electric Equipment Co ltd
Priority to CN202020721824.9U priority Critical patent/CN212202575U/en
Application granted granted Critical
Publication of CN212202575U publication Critical patent/CN212202575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model provides a fan system control cabinet, including the cabinet body, fan device, power cord port and data line port, the internally mounted of the cabinet body has the fan device, and the top of fan device installs power cord port and data line port, and the inside of fan device is equipped with the contactor, and there is the cabinet door left side of the cabinet body through hinge swing joint, and the inner wall middle-end embedding of cabinet door is provided with human-computer interface, and human-computer interface's bottom is provided with the function button. This fan system control cabinet uses through the cooperation of contactor, current detector and electric zone detector under, detects current, the electric zone when fan system uses, and fan system contactor quick control when load appears, protection fan system.

Description

Fan system control cabinet
Technical Field
The utility model relates to a switch board technical field specifically is a fan system control cabinet.
Background
Most of the existing fan systems are regulated, detected, started or closed on site through workers, the labor consumption is high, and due to the fact that the current and the electric area required by the fan systems are large, certain danger exists during data detection, and real-time detection cannot be achieved.
SUMMERY OF THE UTILITY MODEL
The utility model provides a fan system control cabinet, fan system operation manpower consumption is big, and has certain danger during electric current, electric zone detection data, can not accomplish the problem of real-time detection.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fan system control cabinet, includes the cabinet body, fan device, power cord port and data line port, the internally mounted of the cabinet body has the fan device, and the top of fan device installs power cord port and data line port, the inside of fan device is equipped with the contactor, there is the cabinet door left side of the cabinet body through hinge swing joint, the inner wall middle-end embedding of cabinet door is provided with human-computer interface, and human-computer interface's bottom is provided with the function button, current detector and electric zone detector are installed to the bottom of fan device, and install PLC in the left side of current detector and electric zone detector, automatic control device is installed to PLC's bottom.
Preferably, the fan device is in signal connection with the contactor, the current detector and the electric area detector through data lines.
Preferably, the automatic control device is in signal connection with the PLC and the human-computer interface through a data line.
Preferably, the signal transmitting end of the automatic control device is in signal connection with the signal receiving end of the client terminal of the monitoring picture.
Preferably, the human-computer interface, the contactor, the current detector, the electric area detector and the PLC are in signal connection with the monitoring picture client terminal through the cloud platform.
Preferably, the power line port and the data line port are electrically connected with a human-computer interface, a function key, a fan device, a current detector, an electric area detector, a PLC and an automatic control device and are in signal connection.
The utility model provides a fan system control cabinet. The method has the following beneficial effects:
(1) this fan system control cabinet uses through the cooperation of contactor, current detector and electric zone detector under, detects current, the electric zone when fan system uses, and fan system contactor quick control when load appears, protection fan system.
(2) The fan system control cabinet is used by matching the PLC and the automatic control device, the data detected by the current detector and the electric area detector are sent to a monitoring picture client terminal in real time, the PLC quickly controls the fan system to protect when an abnormality occurs, and the PLC stores instructions for executing operations such as logic operation, sequence control, timing, counting, arithmetic operation and the like in the PLC, so that remote control is achieved, and the labor expenditure and unnecessary danger during detection are reduced.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a partial schematic view of the inside of the cabinet body of the present invention.
Fig. 3 is the schematic view of the whole operation flow of the present invention.
In the figure: 1. a cabinet body; 101. a cabinet door; 102. a human-machine interface; 103. function keys; 2. a fan device; 201. a contactor; 3. a current detector; 4. an electrical zone detector; 5. a PLC; 6. a power line port; 7. a data line port; 8. and (3) an automatic control device.
Detailed Description
As shown in fig. 1-3, the utility model provides a technical solution: the utility model provides a fan system control cabinet, including the cabinet body 1, fan device 2, power cord port 6 and data line port 7, cabinet body 1's internally mounted has fan device 2, and fan device 2's top is installed power cord port 6 and data line port 7, fan device 2's inside is equipped with contactor 201, there is cabinet door 101 cabinet body 1's left side through hinge swing joint, the inner wall middle-end embedding of cabinet door 101 is provided with human-computer interface 102, and human-computer interface 102's bottom is provided with function button 103, current detection appearance 3 and electric zone detector 4 are installed to fan device 2's bottom, and PLC5 is installed in current detection appearance 3 and electric zone detector 4's left side, automatic control device 8 is installed to PLC 5's bottom.
Preferably, the fan device 2 is in signal connection with the contactor 201, the current detector 3 and the electric area detector 4 through data lines, so that the current and the electric area can be detected in real time and the load can be controlled conveniently.
Preferably, the automatic control device 8 is in signal connection with the PLC5 and the human-computer interface 102 through data lines, so that the real-time data display and the load control of the fan device 2 are facilitated.
Preferably, the signal transmitting end of the automatic control device 8 is in signal connection with the signal receiving end of the monitoring picture client terminal, so that remote monitoring is facilitated, and the labor expenditure is reduced.
Preferably, the human-computer interface 102, the contactor 201, the current detector 3, the electric area detector 4 and the PLC5 are in signal connection with a monitoring picture client terminal through a cloud platform, and collect real-time data, so as to facilitate better control.
Preferably, the power line port 6 and the data line port 7 are electrically connected and in signal connection with the human-machine interface 102, the function keys 103, the fan device 2, the current detector 3, the electric area detector 4, the PLC5 and the automatic control device 8, so as to provide effective remote operation and monitoring.
In use, firstly, the cabinet body 1 is installed at a required place, the power supply and the data receiving end are respectively connected with the human-computer interface 102, the function keys 103, the fan device 2, the current detector 3, the electric area detector 4, the PLC5 and the automatic control device 8 through the power line port 6 and the data line port 7, then the automatic control device 8 receives real-time detection data of the fan device 2 from the current detector 3 and the electric area detector 4, sends the real-time detection data to the human-computer interface 102 for display, and sends the real-time detection data to the monitoring picture client terminal again, if the fan device 2 has a load phenomenon, the contactor 201 senses and controls the fan device, if the fan device 2 has a fault, the client terminal feeds back signals to the automatic control device, the automatic control device sends signals to the PLC5, and controls the fan device 2 through the PLC5, wherein the PLC stores and executes logic operation in the interior of, And the whole process is completed by instructions of operations such as sequential control, timing, counting, arithmetic operation and the like.

Claims (6)

1. The utility model provides a fan system control cabinet, includes the cabinet body (1), fan device (2), power cord port (6) and data line port (7), its characterized in that: the internally mounted of the cabinet body (1) has fan device (2), and installs supply line port (6) and data line port (7) on the top of fan device (2), the inside of fan device (2) is equipped with contactor (201), there are cabinet door (101) in the left side of the cabinet body (1) through hinge swing joint, the inner wall middle-end embedding of cabinet door (101) is provided with human-computer interface (102), and the bottom of human-computer interface (102) is provided with function button (103), current detection appearance (3) and electric zone detector (4) are installed to the bottom of fan device (2), and install PLC (5) in the left side of current detection appearance (3) and electric zone detector (4), automatic control device (8) are installed to the bottom of PLC (5).
2. The fan system control cabinet of claim 1, wherein: the fan device (2) is in signal connection with the contactor (201), the current detector (3) and the electric area detector (4) through data lines.
3. The fan system control cabinet of claim 1, wherein: the automatic control device (8) is in signal connection with the PLC (5) and the human-computer interface (102) through a data line.
4. The fan system control cabinet of claim 1, wherein: and the signal transmitting end of the automatic control device (8) is in signal connection with the signal receiving end of the client terminal for monitoring pictures.
5. The fan system control cabinet of claim 1, wherein: the human-computer interface (102), the contactor (201), the current detector (3), the electric area detector (4) and the PLC (5) are in signal connection with a monitoring picture client terminal through a cloud platform.
6. The fan system control cabinet of claim 1, wherein: and the power line port (6) and the data line port (7) are electrically connected with the human-computer interface (102), the function keys (103), the fan device (2), the current detector (3), the electric area detector (4), the PLC (5) and the automatic control device (8) and are in signal connection.
CN202020721824.9U 2020-05-06 2020-05-06 Fan system control cabinet Active CN212202575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020721824.9U CN212202575U (en) 2020-05-06 2020-05-06 Fan system control cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020721824.9U CN212202575U (en) 2020-05-06 2020-05-06 Fan system control cabinet

Publications (1)

Publication Number Publication Date
CN212202575U true CN212202575U (en) 2020-12-22

Family

ID=73830707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020721824.9U Active CN212202575U (en) 2020-05-06 2020-05-06 Fan system control cabinet

Country Status (1)

Country Link
CN (1) CN212202575U (en)

Similar Documents

Publication Publication Date Title
CN105910291B (en) A kind of control system of electric water heater intelligently powered off
CN203154692U (en) Intelligent firefighting patrol inspection equipment
CN106515515A (en) Detection method and device of automatic passing phase insulator system for electric locomotive
CN110632875A (en) Equipment health monitoring method and device based on AIoT intelligent Internet of things
CN206696144U (en) Airborne dust monitors and automatic dustfall system
CN109038810A (en) A kind of electronic remote hang tag system based on the comprehensive self-monitoring system of electric power
CN212202575U (en) Fan system control cabinet
CN110633000A (en) Method and system for cabinet switch operation applied to mobile data center
CN105823949A (en) Lightning arrester online monitor
CN203135582U (en) Outdoor power distribution equipment remote monitoring device
CN206946273U (en) A kind of large kitchen intelligent management system
CN106771639B (en) High pressure pole tower ground resistance on-line monitoring system
CN206401232U (en) A kind of SF6 density monitors temperature and humidity monitor adjusting means
CN205312805U (en) Construction elevator intelligence operation panel
CN211297330U (en) Case capable of being remotely monitored and controlled
CN204302788U (en) Cluster observing and controlling and intelligent networking aerator system
CN211878465U (en) Dual-power cabinet
CN210743183U (en) Remote control device for subway train door
CN208353024U (en) Photovoltaic generation unit booting-self controller device and power supply system
CN209168347U (en) A kind of electric disaster hidden-trouble on-line monitoring alarming apparatus
CN209575577U (en) One kind can take into account substation's nitrogen charging extinguishment fire suppression inspection car
CN207833305U (en) A kind of computer network automatic control device
CN205371051U (en) Fan water pump intelligent control ware
CN205038276U (en) Intelligence boundary switch computer protection device output functional test platform
CN219496933U (en) Novel building energy online supervision device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant