CN212200416U - Pile driving equipment for water conservancy construction - Google Patents

Pile driving equipment for water conservancy construction Download PDF

Info

Publication number
CN212200416U
CN212200416U CN201922175515.6U CN201922175515U CN212200416U CN 212200416 U CN212200416 U CN 212200416U CN 201922175515 U CN201922175515 U CN 201922175515U CN 212200416 U CN212200416 U CN 212200416U
Authority
CN
China
Prior art keywords
fixedly connected
piling
pile
stake
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922175515.6U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Yitong Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922175515.6U priority Critical patent/CN212200416U/en
Application granted granted Critical
Publication of CN212200416U publication Critical patent/CN212200416U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a water conservancy construction is with pile equipment, which comprises a ground, the installation base is all installed to the both sides at ground top, the top fixedly connected with sill bar of installation base, the top fixedly connected with cylinder of sill bar, the output fixedly connected with horizontal pole of cylinder, the bottom fixedly connected with of horizontal pole case of piling. The utility model discloses a cylinder promotes the horizontal pole rebound, the removal of horizontal pole makes the pile case remove, remove to highly the same with the stake, insert the stake incasement portion of piling with the stake, at this moment stake and limiting plate contact, the limiting plate moves to the outside, the removal of limiting plate makes chucking spring take place deformation, the top and the bottom contact of the pole of piling up of stake until the stake, the advantage that stability is good has been reached, it is not good to have solved current water conservancy construction with pile equipment stability effect when using, often the slope takes place easily for pile in-process pile foundation, so that the pile is inaccurate, be not convenient for the problem that people used.

Description

Pile driving equipment for water conservancy construction
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a pile equipment for water conservancy construction.
Background
The hydraulic engineering is an engineering which is built for controlling and allocating surface water and underground water in the nature to achieve the purpose of removing harm and benefiting, is also called as water engineering, water is a valuable resource essential for production and life of human beings, but the naturally existing state of the water engineering does not completely meet the needs of the human beings, and the existing piling equipment for the hydraulic construction has poor stability effect when in use, and a pile base is easy to incline in the piling process, so that the piling is inaccurate and is not convenient for people to use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a pile equipment is used in water conservancy construction possesses the advantage that stability is good, and it is not good to have solved current pile equipment is used in water conservancy construction stability effect when using, often the slope takes place easily for pile in-process pile base to the pile is inaccurate, the problem that people used not convenient for.
(II) technical scheme
For the purpose that realizes above-mentioned stability is good, the utility model provides a following technical scheme: the piling equipment for water conservancy construction comprises a ground, wherein mounting bases are mounted on two sides of the top of the ground, the top of each mounting base is fixedly connected with a bottom rod, the top of each bottom rod is fixedly connected with an air cylinder, the output end of each air cylinder is fixedly connected with a cross rod, and the bottom of each cross rod is fixedly connected with a piling box;
the dorsal top of case of piling is provided with the motor, the output fixedly connected with main shaft of motor, the front side of main shaft runs through to the inner chamber of the case of piling, the fixed surface of main shaft is connected with the disc, the top on disc surface is provided with the transfer line, the bottom of transfer line is provided with the connecting block, the bottom fixedly connected with movable plate of connecting block, the bottom fixedly connected with pole of piling of movable plate, the bottom swing joint of pole of piling has the stake, the equal swing joint in both sides of stake has the limiting plate, the outside fixedly connected with chucking spring of limiting plate, the outside of chucking spring and the inner wall fixed connection of the case of piling, the bottom of stake is run through to the bottom of the case of piling.
Preferably, the top and the bottom of the motor are both fixedly connected with a fixed support, and the left side of the fixed support is fixedly connected with the right side of the piling box.
Preferably, the top of the inner cavity of the transmission rod is movably connected with the surface of the disc through a first pin shaft, and the bottom of the inner cavity of the transmission rod is movably connected with the surface of the connecting block through a second pin shaft.
Preferably, the transverse groove has been seted up to the bottom of pile driving incasement wall, the inner wall of transverse groove all is sliding connection with the surface of stake and limiting plate, the bottom of limiting plate is the slope setting.
Preferably, both sides of the moving plate are in sliding connection with the inner wall of the piling box, and the front side of the main shaft is in sliding connection with the inner wall of the piling box.
(III) advantageous effects
Compared with the prior art, the utility model provides a water conservancy construction is with pile equipment possesses following beneficial effect:
1. the utility model discloses a cylinder promotes the horizontal pole rebound, the removal of horizontal pole makes the pile case remove, remove to highly the same with the stake, insert the stake incasement portion of piling with the stake, at this moment stake and limiting plate contact, the limiting plate moves to the outside, the removal of limiting plate makes chucking spring take place deformation, the top and the bottom contact of the pole of piling up of stake until the stake, the advantage that stability is good has been reached, it is not good to have solved current water conservancy construction with pile equipment stability effect when using, often the slope takes place easily for pile in-process pile foundation, so that the pile is inaccurate, be not convenient for the problem that people used.
2. The utility model discloses a chucking spring, energy storage is carried out to energy when chucking spring takes place to deform, promotes limiting plate extrusion stake when further recovering deformation, avoids the stake to take place to squint.
3. The utility model discloses a fixed bolster has improved the stability of motor during operation, prevents that the motor can take place to rock at the during operation in-process.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the piling box structure of the present invention;
fig. 3 is a side view of the piling box structure of the present invention.
In the figure: 1. a ground surface; 2. piling wood; 3. installing a base; 4. a bottom bar; 5. a cylinder; 6. a cross bar; 7. piling a box; 8. a limiting plate; 9. a disc; 10. connecting blocks; 11. a chucking spring; 12. a transverse groove; 13. piling a pile rod; 14. moving the plate; 15. a transmission rod; 16. a main shaft; 17. fixing a bracket; 18. an electric motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a ground 1, stake 2, installation base 3, sill bar 4, cylinder 5, horizontal pole 6, pile case 7, limiting plate 8, disc 9, connecting block 10, chucking spring 11, transverse groove 12, pile pole 13, movable plate 14, transfer line 15, main shaft 16, fixed bolster 17 and 18 parts of motor are the parts that general standard or technical personnel in the field know, and its structure and principle all are that this technical personnel all can learn through the technical manual or learn through conventional experimental method.
Referring to fig. 1-3, the piling equipment for water conservancy construction comprises a ground 1, wherein mounting bases 3 are respectively mounted on two sides of the top of the ground 1, the top of each mounting base 3 is fixedly connected with a bottom rod 4, the top of each bottom rod 4 is fixedly connected with an air cylinder 5, the output end of each air cylinder 5 is fixedly connected with a cross rod 6, and the bottom of each cross rod 6 is fixedly connected with a piling box 7;
the top of the back side of the pile driving box 7 is provided with a motor 18, the top and the bottom of the motor 18 are both fixedly connected with a fixed support 17, the left side of the fixed support 17 is fixedly connected with the right side of the pile driving box 7, the working stability of the motor 18 is improved through the fixed support 17, the motor 18 is prevented from shaking in the working process, the output end of the motor 18 is fixedly connected with a main shaft 16, the front side of the main shaft 16 penetrates into the inner cavity of the pile driving box 7, the surface of the main shaft 16 is fixedly connected with a disc 9, the top of the surface of the disc 9 is provided with a transmission rod 15, the bottom of the transmission rod 15 is provided with a connecting block 10, the top of the inner cavity of the transmission rod 15 is movably connected with the surface of the disc 9 through a first pin shaft, the bottom of the inner cavity of the transmission rod 15 is movably connected with the surface of the connecting block 10 through a second, the front side of main shaft 16 is sliding connection with the inner wall of pile case 7, the bottom fixedly connected with pile driving pole 13 of movable plate 14, pile driving pole 13's bottom swing joint has stake 2, the equal swing joint in both sides of stake 2 has limiting plate 8, cross slot 12 has been seted up to the bottom of pile case 7 inner wall, the inner wall of cross slot 12 all is sliding connection with the surface of stake 2 and limiting plate 8, the bottom of limiting plate 8 is the slope setting, the outside fixedly connected with chucking spring 11 of limiting plate 8, the outside of chucking spring 11 and the inner wall fixed connection of pile case 7, through chucking spring 11, chucking spring 11 carries out the energy storage when taking place to deform, promote limiting plate 8 extrusion stake 2 when further recovering to deform, avoid stake 2 to take place to squint, the bottom of stake 2 runs through to the bottom of pile case 7.
When the device is used, firstly, the air cylinder 5 is started through the external controller, the air cylinder 5 pushes the cross rod 6 to move upwards, the movement of the cross rod 6 enables the piling box 7 to move, the piling box 7 moves to the same height as the wood pile 2, the wood pile 2 is inserted into the piling box 7, the wood pile 2 is in contact with the limiting plate 8, the limiting plate 8 moves outwards, the movement of the limiting plate 8 enables the clamping spring 11 to deform until the top of the wood pile 2 is in contact with the bottom of the piling rod 13, then the air cylinder 5 pulls the cross rod 6 to move downwards, the cross rod 6 drives the piling box 7 to move, the piling box 7 drives the wood pile 2 to move until the wood pile 2 is in contact with the top of the ground 1, finally, the motor 18 is started through the external controller, the motor 18 drives the main shaft 16 to rotate, the main shaft 16 drives the disc 9 to rotate, the disc 9 drives the transmission rod 15 to rotate, the transmission rod 15 drives, the moving plate 14 moves the piling bar 13 to drive the timber pile 2 into the ground 1 (the external controller is DATA-7311 in the present application, and meanwhile, two wiring ends of the external controller are connected with a power plug through a wire, and the power plug supplies power through commercial power in the present application).
While embodiments of the present invention have been shown and described, it will be apparent to those skilled in the art that various modifications and changes can be made in the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (5)

1. The utility model provides a water conservancy construction is with pile equipment, includes ground (1), its characterized in that: the pile driving device is characterized in that mounting bases (3) are mounted on two sides of the top of the ground (1), a bottom rod (4) is fixedly connected to the top of each mounting base (3), an air cylinder (5) is fixedly connected to the top of each bottom rod (4), a cross rod (6) is fixedly connected to the output end of each air cylinder (5), and a pile driving box (7) is fixedly connected to the bottom of each cross rod (6);
the dorsal top of piling box (7) is provided with motor (18), the output fixedly connected with main shaft (16) of motor (18), the front side of main shaft (16) runs through to the inner chamber of piling box (7), the fixed surface of main shaft (16) is connected with disc (9), the top on disc (9) surface is provided with transfer line (15), the bottom of transfer line (15) is provided with connecting block (10), the bottom fixedly connected with movable plate (14) of connecting block (10), the bottom fixedly connected with piling rod (13) of movable plate (14), the bottom swing joint of piling rod (13) has stake (2), the equal swing joint in both sides of stake (2) has limiting plate (8), the outside fixedly connected with chucking spring (11) of limiting plate (8), the outside of chucking spring (11) and the inner wall fixed connection of piling box (7), the bottom of the timber pile (2) penetrates to the bottom of the piling box (7).
2. Pile driving equipment for water conservancy construction according to claim 1, characterized in that: the top and the bottom of the motor (18) are fixedly connected with a fixed support (17), and the left side of the fixed support (17) is fixedly connected with the right side of the piling box (7).
3. Pile driving equipment for water conservancy construction according to claim 1, characterized in that: the top of the inner cavity of the transmission rod (15) is movably connected with the surface of the disc (9) through a first pin shaft, and the bottom of the inner cavity of the transmission rod (15) is movably connected with the surface of the connecting block (10) through a second pin shaft.
4. Pile driving equipment for water conservancy construction according to claim 1, characterized in that: transverse groove (12) have been seted up to the bottom of piling case (7) inner wall, the inner wall of transverse groove (12) all is sliding connection with the surface of stake (2) and limiting plate (8), the bottom of limiting plate (8) is the slope setting.
5. Pile driving equipment for water conservancy construction according to claim 1, characterized in that: the two sides of the moving plate (14) are in sliding connection with the inner wall of the piling box (7), and the front side of the main shaft (16) is in sliding connection with the inner wall of the piling box (7).
CN201922175515.6U 2019-12-08 2019-12-08 Pile driving equipment for water conservancy construction Expired - Fee Related CN212200416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922175515.6U CN212200416U (en) 2019-12-08 2019-12-08 Pile driving equipment for water conservancy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922175515.6U CN212200416U (en) 2019-12-08 2019-12-08 Pile driving equipment for water conservancy construction

Publications (1)

Publication Number Publication Date
CN212200416U true CN212200416U (en) 2020-12-22

Family

ID=73805886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922175515.6U Expired - Fee Related CN212200416U (en) 2019-12-08 2019-12-08 Pile driving equipment for water conservancy construction

Country Status (1)

Country Link
CN (1) CN212200416U (en)

Similar Documents

Publication Publication Date Title
CN212359641U (en) Novel drilling for hydraulic engineering device
CN212200416U (en) Pile driving equipment for water conservancy construction
CN218386133U (en) Quick extraction element of well drilling scene ground connection stake
CN210999229U (en) Environment-friendly efficient concrete block forming machine
CN210828210U (en) Plastering machine for building construction
CN212052929U (en) Hydraulic engineering desilting device
CN211742494U (en) Warning sign for building engineering
CN211144367U (en) Stable pile driver for traffic engineering construction
CN212844443U (en) Auxiliary supporting device used in rock-soil engineering exploration cliff rock-soil sampling
CN108222819B (en) High-efficient pile driver
CN209837027U (en) Foundation construction is with pile equipment
CN217538724U (en) Two lining concrete cavity prevention devices in tunnel
CN111271001A (en) Pile-driving drilling machine capable of efficiently replacing drill bit
CN216640573U (en) Piling device for building construction
CN213204110U (en) Piling system for building construction
CN211735387U (en) Pile pressing mechanism
CN221032428U (en) Pile foundation bottom expanding equipment
CN212506265U (en) Energy-saving environment-friendly pile driver
CN219235761U (en) Tool for roughening inner wall of concrete cup-shaped foundation
CN212697372U (en) Bird repelling device for electric iron tower
CN214615287U (en) Electric concrete leveling machine
CN213508451U (en) Stable pile driver for traffic engineering construction
CN212867075U (en) Telegraph pole upwarping equipment
CN215165466U (en) Road bridge is road bed tamping unit for construction
CN211813154U (en) Mounting mechanism for electric hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210715

Address after: 110000 372, No. 37-6, Changjiang North Street, Yuhong District, Shenyang City, Liaoning Province

Patentee after: Liaoning Yitong Construction Engineering Co.,Ltd.

Address before: No.38, Zheda Road, Hangzhou, Zhejiang Province, 310000

Patentee before: Gong Xinyi

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201222

CF01 Termination of patent right due to non-payment of annual fee