CN212197564U - Stacking device for high-weather-resistance river sludge sintered bricks - Google Patents

Stacking device for high-weather-resistance river sludge sintered bricks Download PDF

Info

Publication number
CN212197564U
CN212197564U CN202020433523.6U CN202020433523U CN212197564U CN 212197564 U CN212197564 U CN 212197564U CN 202020433523 U CN202020433523 U CN 202020433523U CN 212197564 U CN212197564 U CN 212197564U
Authority
CN
China
Prior art keywords
lifting
lifting frame
pneumatic cylinder
cylinder
right sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020433523.6U
Other languages
Chinese (zh)
Inventor
王佰华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Sanguantang New Material Co.,Ltd.
Original Assignee
Jiaxing Sanguantang New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Sanguantang New Material Co ltd filed Critical Jiaxing Sanguantang New Material Co ltd
Priority to CN202020433523.6U priority Critical patent/CN212197564U/en
Application granted granted Critical
Publication of CN212197564U publication Critical patent/CN212197564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the brickmaking field, concretely relates to a pile up device for high resistant river course mud baked brick that waits, including conveying chain subassembly, lifting frame and lifting means and clamping components, lifting means is including setting up in the first pneumatic cylinder at lifting frame top, with the output shaft fixed fit of first pneumatic cylinder and upper and lower sliding fit's lifting arm in lifting frame, the left and right sides of lifting arm sets up the hoisting block respectively, clamping components has two, divide and locate lifting frame's the left and right sides, clamping components includes the second pneumatic cylinder of fixed fit on lifting frame, set up in the first mount pad of second pneumatic cylinder output shaft upper end, set up cylinder on first mount pad and with the tight head of the output shaft fixed fit of cylinder, press from both sides tight head and set up towards lifting frame inboard. The utility model discloses a first pneumatic cylinder, lift arm, promotion piece, second pneumatic cylinder, clamping head isotructure have realized piling up tray and fragment of brick fast, the efficient, and are very practical.

Description

Stacking device for high-weather-resistance river sludge sintered bricks
Technical Field
The utility model belongs to the brickmaking field, concretely relates to a pile up device that is used for high resistant river course mud baked brick of waiting.
Background
In the brick making process, bricks are usually supported by trays, the trays for loading the bricks need to be stacked for the reasons of convenient transportation, reduced occupied area and the like, and the work is generally finished manually, so that the time and the labor are wasted, and the efficiency is not high enough.
SUMMERY OF THE UTILITY MODEL
In order to compensate the deficiency of the prior art, the utility model provides a pile up device technical scheme that is used for high resistant river course mud baked brick of waiting.
A pile up device for high resistant river mud fritting brick of waiting, its characterized in that includes the conveying chain subassembly that the level set up, erect in the terminal lifting frame of conveying chain subassembly and set up lifting unit and clamping component on lifting frame, lifting unit is including setting up in the first pneumatic cylinder at lifting frame top, with the output shaft fixed fit of first pneumatic cylinder and upper and lower sliding fit lift arm in lifting frame, the left and right sides of lift arm sets up the promotion piece respectively, clamping component has two, the left and right sides of locating lifting frame separately, clamping component includes the second pneumatic cylinder of fixed fit on lifting frame, set up in the first mount pad of second pneumatic cylinder output shaft upper end, set up the cylinder on first mount pad and with the tight head of the output shaft fixed fit's of cylinder clamp, it sets up towards lifting frame inboard to press from both sides tight head.
A pile up device for high resistant river course mud baked brick of waiting, its characterized in that lift arm is the structure of falling the U-shaped, two promotion pieces set up in the lower extreme of the lift arm left and right sides.
A pile up device for high resistant river course mud baked brick of waiting, its characterized in that promotes piece and lift arm structure as an organic whole.
The utility model provides a pile up device that is used for high resistant river course mud baked brick of waiting, its characterized in that promotes the gyro wheel and the lift frame sliding fit that the left and right sides of arm passes through the setting.
The utility model provides a pile up device that is used for high resistant river course mud baked brick of waiting, its characterized in that promotes the second mount pad that the left and right sides of frame fixed fit was used for installing the second pneumatic cylinder respectively.
The stacking device for the high-weather-resistance river channel sludge baked bricks is characterized in that a supporting plate is vertically and fixedly matched with the outer side of a second mounting seat, and the outer side of a first mounting seat is in sliding fit with the supporting plate.
Compared with the prior art, the utility model discloses a first pneumatic cylinder, lift arm, promotion piece, second pneumatic cylinder, clamping head isotructure have realized piling up tray and fragment of brick fast, the efficient, and are very practical.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
fig. 3 is one of the working schematic diagrams of the lifting block and the clamping head of the present invention;
fig. 4 is a second working schematic diagram of the lifting block and the clamping head of the present invention;
fig. 5 is a third schematic view of the working of the lifting block and the clamping head of the present invention;
fig. 6 is a fourth schematic view of the working of the lifting block and the clamping head of the present invention.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in the figure, the stacking device for the high weather-resistant river channel sludge baked bricks comprises a horizontally arranged conveying chain component 1, a lifting frame 2 erected at the tail end of the conveying chain component 1, and a lifting component and a clamping component which are arranged on the lifting frame 2, wherein the conveying chain component 1 is a known technology, the lifting component comprises a first hydraulic cylinder 3 arranged at the top of the lifting frame 2, a lifting arm 4 fixedly matched with an output shaft of the first hydraulic cylinder 3 and in up-and-down sliding fit in the lifting frame 2, the left side and the right side of the lifting arm 4 are respectively provided with a lifting block 400, the two clamping components are respectively arranged at the left side and the right side of the lifting frame 2, the clamping component comprises a second hydraulic cylinder 5 fixedly matched on the lifting frame 2, a first mounting seat 6 arranged at the upper end of the output shaft of the second hydraulic cylinder 5, a cylinder 7 arranged on the first mounting seat 6 and a clamping head 8, the clamping head 8 is arranged towards the inside of the hoisting frame 2.
As the utility model discloses an optimize structure: the lifting arm 4 is of an inverted U-shaped structure, and two lifting blocks 400 are disposed at the lower ends of the left and right sides of the lifting arm 4.
As the utility model discloses an optimize structure: the lifting block 400 is of unitary construction with the lifting arm 4.
As the utility model discloses an optimize structure: the left and right sides of the lifting arm 4 are in sliding fit with the lifting frame 2 via the rollers 9 provided.
As the utility model discloses an optimize structure: the left and right sides of the lifting frame 2 are respectively and fixedly matched with a second mounting seat 10 for mounting the second hydraulic cylinder 5.
As the utility model discloses an optimize structure: the outer side of the second mounting seat 10 is vertically and fixedly matched with the supporting plate 11, the outer side of the first mounting seat 6 is in sliding fit with the supporting plate 11, and the sliding fit structure can be realized through a linear guide rail or a pulley.
During operation, the tray 12 carrying the bricks 13 is conveyed to the bottom of the lifting frame 2 through the conveying chain assembly 1, the lifting blocks 400 are located at the lower end of the tray 12 at the moment, and the distance between the two lifting blocks 400 is smaller than the width of the tray 12, so that when the first hydraulic cylinder 3 drives the lifting arm 4 to be communicated with the lifting blocks 400 to move upwards, the lifting blocks 400 can lift the tray 12 from the conveying chain assembly 1, and after the tray reaches a preset height, the air cylinder 7 drives the clamping heads 8 to clamp the tray 12 from two sides, as shown in fig. 3; then the second hydraulic cylinder 5 drives the cylinder 7, the clamping head 8 and the pallet 12 to move up by a height, the lifting block 400 is reset, and a new pallet 12 is transported to the upper end of the lifting block 400, as shown in fig. 4; then the lifting block 400 drives the new tray 12 to move up to a preset height, which just abuts against the previous tray 12, as shown in fig. 5; cylinder 7 drives the tight head 8 of clamp and withdraws next, and second pneumatic cylinder 5 drives cylinder 7 and presss from both sides tight head 8 and moves down a height, and the cylinder drives again and presss from both sides tight head 8 and press from both sides tight tray 12 below, then second pneumatic cylinder 5 drives cylinder 7, presss from both sides tight head 8 and moves up a height together with two trays 12, and lift piece 400 resets again at last, lifts new tray 12 and comes, piles up in proper order through above-mentioned mode.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (6)

1. The utility model provides a pile up device for high resistant river course mud baked brick that waits, its characterized in that includes the conveying chain subassembly that the level set up, erect in the terminal lifting frame of conveying chain subassembly and set up lifting unit and clamping components on lifting frame, lifting unit is including setting up in the first pneumatic cylinder at lifting frame top, with the output shaft fixed fit of first pneumatic cylinder and upper and lower sliding fit in the lifting arm in lifting frame, the left and right sides of lifting arm sets up the promotion piece respectively, clamping components has two, the left and right sides of lifting frame is located to the branch, clamping components is including the second pneumatic cylinder of fixed fit on lifting frame, set up in the first mount pad of second pneumatic cylinder output shaft upper end, set up the cylinder on first mount pad and with the tight head of the tight of output shaft fixed fit of cylinder clamp, it sets up towards lifting frame inboard to press from both sides tight.
2. The stacking device for high weather-resistant river sludge baked bricks as claimed in claim 1, wherein the lifting arm is of an inverted U-shaped structure, and two lifting blocks are disposed at the lower ends of the left and right sides of the lifting arm.
3. The stacking device for high weather resistance riverway sludge baked bricks according to claim 2, wherein the lifting blocks and the lifting arms are of an integral structure.
4. The stacking device for high weather resistance riverway sludge baked bricks according to claim 2, wherein the left and right sides of the lifting arm are in sliding fit with the lifting frame through rollers.
5. The stacking device for high weather-resistant river sludge baked bricks according to claim 1, wherein the left and right sides of the lifting frame are respectively and fixedly matched with a second mounting seat for mounting a second hydraulic cylinder.
6. The stacking device for high weather resistance riverway sludge baked bricks according to claim 5, wherein the outer side of the second mounting seat is vertically and fixedly matched with the support plate, and the outer side of the first mounting seat is in sliding fit with the support plate.
CN202020433523.6U 2020-03-30 2020-03-30 Stacking device for high-weather-resistance river sludge sintered bricks Active CN212197564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020433523.6U CN212197564U (en) 2020-03-30 2020-03-30 Stacking device for high-weather-resistance river sludge sintered bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020433523.6U CN212197564U (en) 2020-03-30 2020-03-30 Stacking device for high-weather-resistance river sludge sintered bricks

Publications (1)

Publication Number Publication Date
CN212197564U true CN212197564U (en) 2020-12-22

Family

ID=73826111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020433523.6U Active CN212197564U (en) 2020-03-30 2020-03-30 Stacking device for high-weather-resistance river sludge sintered bricks

Country Status (1)

Country Link
CN (1) CN212197564U (en)

Similar Documents

Publication Publication Date Title
CN210973030U (en) Offline stacking production line
CN108975229A (en) A kind of interval adjustable swing fork folder
CN109650025A (en) Cutting agency for fully-automatic laser marking press equipment
CN212197564U (en) Stacking device for high-weather-resistance river sludge sintered bricks
CN211003599U (en) Brick pile up neatly system permeates water
CN209867121U (en) Automatic production line for metal plate continuous stamping
CN218968116U (en) Tray jacking and shifting mechanism
CN214134001U (en) Automatic material collecting device on numerical control lathe
CN214516862U (en) Utmost point ear leveling device and utmost point ear flattening production line of electric core
CN214692329U (en) Feeding device of ink-water printing machine
CN212126994U (en) Transverse automatic stacking and stack changing system of gum dipping drying production line
CN114772201A (en) Automatic polar plate trades a set device production line unit
CN212100752U (en) Lifting device for mounting steel sheet
CN219525582U (en) Turnover box stacker
CN220148501U (en) Feeding device for whole stacked materials
CN221719875U (en) Feeding and discharging mechanism
CN221051464U (en) Guide rod loading and unloading machine
CN217457581U (en) Stacking device and solar laminating machine
CN221274316U (en) Feeding frame transfer device
CN216736243U (en) Gantry type high-position stacking machine
CN219234428U (en) Assembly structure for turnover feeding of smelting tool
CN218664060U (en) Automatic material feeding mechanism
CN216801187U (en) High efficiency ceiling fan motor stator leveling machine
CN214527120U (en) Film roller unloading and displacement device of film production line
CN221607124U (en) Suction plate machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 314318 North of Shen Jieting Bridge, Xuyou Che Village, Qinshan Street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Sanguantang New Material Co.,Ltd.

Address before: 314318 North of Shen Jieting Bridge, Xuyou Che Village, Qinshan Street, Haiyan County, Jiaxing City, Zhejiang Province

Patentee before: JIAXING SANGUANTANG NEW MATERIAL Co.,Ltd.

CP01 Change in the name or title of a patent holder