CN212172465U - Offshore wind power operation and maintenance ship boarding device - Google Patents

Offshore wind power operation and maintenance ship boarding device Download PDF

Info

Publication number
CN212172465U
CN212172465U CN202020016895.9U CN202020016895U CN212172465U CN 212172465 U CN212172465 U CN 212172465U CN 202020016895 U CN202020016895 U CN 202020016895U CN 212172465 U CN212172465 U CN 212172465U
Authority
CN
China
Prior art keywords
ship
pile
chain
maintenance
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020016895.9U
Other languages
Chinese (zh)
Inventor
管义锋
李岳洋
赵铁军
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Original Assignee
JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd filed Critical JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Priority to CN202020016895.9U priority Critical patent/CN212172465U/en
Application granted granted Critical
Publication of CN212172465U publication Critical patent/CN212172465U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Abstract

The utility model discloses a marine wind power fortune dimension ship is stepped on and is leaned on device, including anticollision institution, anticollision institution is equipped with boats and ships fender between the armful pile including two armful piles that are located wind-powered electricity generation stake front. And the embracing pile is also provided with a embracing pile tying and fixing ring which is used for matching and fixing the operation and maintenance ship. The mooring mechanism comprises a pair of drum winches, the drum winches are arranged on the ship sides of the ship head of the operation and maintenance ship, a rope is wound in each drum winch, and the rope extends out of or retracts into each drum winch. The locking mechanism comprises a chain and a locking part, wherein one end of the chain is connected with the rope, and the other end of the chain is connected with the locking part. The utility model discloses a but step on and lean on device to berth fast, simple to use and with low costs improve the security and the efficiency that the staff climbed the fan, reduce misoperation and the danger that probably leads to. The problem that the conventional small ship cannot be berthed when waves fluctuate is solved, and the problem that the small ship cannot use the wave compensation device due to cost is also solved.

Description

Offshore wind power operation and maintenance ship boarding device
Technical Field
The utility model relates to a boats and ships field and offshore wind farm service field, in particular to marine wind power fortune dimension ship is stepped on and is leaned on device.
Background
At present, the development of domestic offshore wind power is very fierce, and the operation and maintenance work of an offshore wind power plant becomes a major problem which is not neglected.
Due to the complex and variable factors of the offshore environment and climate, the offshore wind power operation and maintenance ship is influenced by severe sea area conditions when the offshore wind power operation and maintenance ship leans on the offshore wind turbine, so that the maintenance personnel are difficult to land and dangerous accidents are easy to happen.
The existing ships for providing operation and maintenance service for offshore wind farms in China are mostly non-professional ships, the operation and maintenance efficiency is low, the safety risk is large, the operation and maintenance management experience is poor, the operation and maintenance are influenced by ship shapes and ship leaning pile forms, and the operation and maintenance ship mainly depends on lateral berthing; the large professional operation and maintenance ships mostly use the wave compensation devices, the influence of multiple degrees of freedom needs to be considered, the manufacturing cost is high, and the energy consumption is large.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a marine wind power fortune dimension ship is stepped on and is leaned on device, under abominable marine environment, maintainer accessible the device carry out simple and stable stepping on and lean on, easy operation, the security is higher, and used cost is lower.
In order to achieve the above object, the utility model adopts the following technical scheme: an offshore wind power operation and maintenance ship boarding device comprises: the anti-collision mechanism comprises two embracing piles positioned in front of the wind power piles, and a ship fender is arranged between the embracing piles and used for preventing a bow of the operation and maintenance ship from being damaged when the ship bow is embarked; each embracing pile is also provided with a embracing pile tying and fixing ring which is used for matching and fixing the operation and maintenance ship.
The mooring mechanism comprises a pair of drum winches, the drum winches are arranged on the ship sides of the ship head of the operation and maintenance ship, a rope is wound in each drum winch, and the rope extends out of or retracts into each drum winch and is used for controlling the distance between the ship head of the operation and maintenance ship and a holding pile;
the locking mechanism comprises a chain and a locking part, wherein one end of the chain is connected with the rope, and the other end of the chain is connected with the locking part; the lock catch part is movably connected with a holding pile fastening ring on the holding pile and is used for quickly connecting the operation and maintenance ship with the holding pile;
and chain stoppers are further arranged on the two sides of the ship board at the ship head of the operation and maintenance ship, and the two chain stoppers are used for fixing chains of the locking mechanism.
Preferably, in the technical scheme, the ship fender is made of rubber.
Preferably for this technical scheme, still have the approach bridge on the fortune dimension ship bow, the approach bridge links to each other with the amplexiform pile, and the staff climbs the wind-powered electricity generation stake through the approach bridge.
Preferably, the holding pile fastening ring is a circular ring welded on the holding pile.
Preferably, in the technical scheme, the locking part is a deformed D-ring type quick-hanging part.
Preferably, in the technical scheme, the chain stopper is a knife type chain stopper or a spiral type chain stopper, and each chain stopper is fixed between the drum winch and the pile through a base.
Compared with the prior art, the beneficial effects of the utility model are that:
1. step on to lean on device can berth fast, simple to use and with low costs improve the security and the efficiency that the staff climbed the fan, reduce misoperation and the danger that probably leads to.
2. The utility model provides a problem that conventional small-size ship can't lean on to berth when the wave fluctuates, also avoided because of the unable small-size ship that uses wave compensation arrangement of cost reason leans on the berth problem.
3. The utility model discloses utilize simple structure's latched device fast, safely with fortune dimension ship and hold the stake and be connected, simplified and stepped on the flow, improved fortune dimension work's efficiency under the prerequisite of guaranteeing safety, avoided because of the danger that operating time overlength probably arouses.
Drawings
Fig. 1 is a plan view of the reclining device of the present invention;
FIG. 2 is a side perspective view of the reclining device of the present invention;
fig. 3 is a schematic structural view of the latch mechanism of the present invention;
fig. 4 is a schematic view of a structure of a holding pile fastening ring of the present invention;
1. the device comprises a wind power pile, 2 a holding pile, 21 a holding pile, 22 a holding pile fastening ring, 3 a maintenance ship, 4 a drum winch, 41 a rope, 5 a chain, 6 a locking part, 7 a chain stopper, 8 and an approach bridge.
Detailed Description
The following description and the accompanying drawings are included to further explain the specific aspects of the present invention.
Example 1:
as shown in fig. 1-4, the berthing device for the offshore wind power operation and maintenance ship comprises an anti-collision mechanism, wherein the anti-collision mechanism comprises two embracing piles 2 positioned in front of a wind power pile 1, and a ship fender 21 is arranged between the embracing piles to prevent a bow of the operation and maintenance ship from being damaged during berthing; each pile 2 is further provided with a pile tying and fixing ring 22, and the pile tying and fixing ring 22 is used for matching and fixing the operation and maintenance ship 3.
The mooring mechanism comprises a pair of drum winches 4, the drum winches 4 are arranged on the two sides of the bow of the operation and maintenance ship 3, a rope 41 is wound in each drum winch 4, and the rope 41 extends out of or retracts into each drum winch 4 to control the distance between the bow of the operation and maintenance ship 3 and the pilings 2;
the locking mechanism comprises a chain 5 and a locking part 6, wherein one end of the chain 5 is connected with the rope 41, and the other end of the chain is connected with the locking part 6; the locking part 6 is movably connected with a holding pile fastening ring 22 on the holding pile 2 and is used for quickly connecting the operation and maintenance ship with the holding pile;
chain stoppers 7 are further arranged on the two sides of the ship bow of the operation and maintenance ship, and two chain stoppers 7 are used for fixing chains of the locking mechanisms.
In this embodiment, boats and ships fender is made by rubber, avoids the fortune dimension ship to directly touch with the holding pile and leads to the damage of boats and ships board to influence the hull life-span.
In this embodiment, still have approach bridge 8 on the fortune dimension ship bow, the approach bridge links to each other with the amplexiform pile, and the staff climbs the wind-powered electricity generation stake through the approach bridge.
In this embodiment, the anchor is a circular ring welded to the anchor.
In this embodiment, the locking part is a deformed D-ring type quick-hanging, and the degree of opening and closing of this type of gate is relatively large, so that it is easier to hook equipment or ensure the device.
In this embodiment, the chain stopper is a knife type chain stopper, and each chain stopper is fixed between the drum winch and the pile through the base, and is used for further fixing the position of the chain and preventing the movement of the ship body.
The utility model discloses when using, fortune dimension ship utilizes the top to lean on the boats and ships fender board top between mode and embrace the stake to lean on, and the staff uses latch mechanism to be connected with embracing the stake system solid ring, adjusts rope and chain length through the reel winch and to stepping on to lean on suitable distance, uses the fixed chain of chain stopper, and the staff climbs the wind motor stake through the approach bridge, maintains the work and accomplishes the back, and the staff returns fortune dimension ship through the approach bridge.
Example 2:
the chain stopper is a spiral chain stopper, and the rest is the same as the embodiment 1.
The above embodiments are not intended to limit the present invention, and the present invention is not limited to the above examples, and the technical personnel in the technical field are in the present invention, which can also belong to the protection scope of the present invention.

Claims (6)

1. The utility model provides an offshore wind power fortune dimension ship device of logging on, its characterized in that includes:
the anti-collision mechanism comprises two embracing piles positioned in front of the wind power piles, and a ship fender is arranged between the embracing piles and used for preventing a bow of the operation and maintenance ship from being damaged when the ship bow is embarked; each pile is also provided with a pile tying and fixing ring which is used for matching and fixing the operation and maintenance ship;
the mooring mechanism comprises a pair of drum winches, the drum winches are arranged on the ship sides of the ship head of the operation and maintenance ship, a rope is wound in each drum winch, and the rope extends out of or retracts into each drum winch and is used for controlling the distance between the ship head of the operation and maintenance ship and a holding pile;
the locking mechanism comprises a chain and a locking part, wherein one end of the chain is connected with the rope, and the other end of the chain is connected with the locking part; the lock catch part is movably connected with a holding pile fastening ring on the holding pile and is used for quickly connecting the operation and maintenance ship with the holding pile;
and chain stoppers are further arranged on the two sides of the ship board at the ship head of the operation and maintenance ship, and the two chain stoppers are used for fixing chains of the locking mechanism.
2. The offshore wind power operation and maintenance ship boarding device according to claim 1, characterized in that: the ship fender is made of rubber.
3. The offshore wind power operation and maintenance ship boarding device according to claim 1, characterized in that: still there is the approach bridge on the fortune dimension ship bow, the approach bridge links to each other with the amplexiform pile, and the staff climbs the wind-powered pile through the approach bridge.
4. The offshore wind power operation and maintenance ship boarding device according to claim 1, characterized in that: the holding pile fastening ring is a circular ring welded on the holding pile.
5. The offshore wind power operation and maintenance ship boarding device according to claim 1, characterized in that: the locking part is a deformed D-ring type quick hanger.
6. The offshore wind power operation and maintenance ship boarding device according to claim 1, characterized in that: the chain stopper is a knife type chain stopper or a spiral type chain stopper, and each chain stopper is fixed between the drum winch and the holding pile through a base.
CN202020016895.9U 2020-01-06 2020-01-06 Offshore wind power operation and maintenance ship boarding device Active CN212172465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020016895.9U CN212172465U (en) 2020-01-06 2020-01-06 Offshore wind power operation and maintenance ship boarding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020016895.9U CN212172465U (en) 2020-01-06 2020-01-06 Offshore wind power operation and maintenance ship boarding device

Publications (1)

Publication Number Publication Date
CN212172465U true CN212172465U (en) 2020-12-18

Family

ID=73772703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020016895.9U Active CN212172465U (en) 2020-01-06 2020-01-06 Offshore wind power operation and maintenance ship boarding device

Country Status (1)

Country Link
CN (1) CN212172465U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111071394A (en) * 2020-01-06 2020-04-28 江苏现代造船技术有限公司 Offshore wind power operation and maintenance ship boarding device and method
CN112960069A (en) * 2021-02-21 2021-06-15 上海瓯洋电力工程有限公司 Offshore wind power plant maintenance and repair equipment for wave-penetrating catamaran and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111071394A (en) * 2020-01-06 2020-04-28 江苏现代造船技术有限公司 Offshore wind power operation and maintenance ship boarding device and method
CN112960069A (en) * 2021-02-21 2021-06-15 上海瓯洋电力工程有限公司 Offshore wind power plant maintenance and repair equipment for wave-penetrating catamaran and using method thereof
CN112960069B (en) * 2021-02-21 2022-02-15 上海瓯洋电力工程有限公司 Offshore wind power plant maintenance and repair equipment for wave-penetrating catamaran and using method thereof

Similar Documents

Publication Publication Date Title
CN212172465U (en) Offshore wind power operation and maintenance ship boarding device
US11560277B2 (en) Method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor
EP0081258B1 (en) A device of tensioning an anchor line, in particular for testing an anchor, particularly comprising a cable or chain tensioner
US4724789A (en) Device for laying-out and breaking-out of the sea-bottom and weighing an anchor
DK181006B1 (en) METHOD OF ATTACHING AND TRANSFERRING A CARGO BETWEEN A VESSEL AND AN OFFSHORE INSTALLATION AND DEVICE THEREOF
CN114104195A (en) Mooring system suitable for medium-shallow water floating type offshore wind power foundation platform
CN216636762U (en) Mooring system of offshore floating type wind power generation platform
CN110217346B (en) Method for towing offshore wind power installation vessel based on multi-point anchoring and positioning system
US10495052B2 (en) Wave energy converter with mooring system comprising buoyant elements
CN111071394A (en) Offshore wind power operation and maintenance ship boarding device and method
CN204587223U (en) A kind of floating landing stage testing device
CN203601528U (en) Three-boat side-by-side mooring system
CN105398545B (en) A kind of tensioning method of mooring anchor leg
CN108791738B (en) A kind of Large marine blower entirety floating support mounting method
CN214930431U (en) Automatic berthing device
KR101297669B1 (en) Installation method using vessel for installing sea wind power generator
CN102587340A (en) Installation platform of bottom-supported fan and method for installing fan equipment
CN212133725U (en) Ship mooring force monitoring and adjusting system
CN104294796B (en) High tide-difference zone blower fan grouped piles cap basis integration docking system
JP2018039474A (en) Method for mooring floating body structure and method for construction of floating body type offshore wind power generation facility
KR100988124B1 (en) A mooring equipment using strand jack
Dymarski et al. Technology concept of TLP platform towing and installation in waters with depth of 60 m
CN205737992U (en) A kind of Emergency Ladder of FLNG boats and ships
CN204151747U (en) The integrated docking system in high tide-difference zone blower fan grouped piles cap basis
CN213768900U (en) Automatic anchoring device for back slip of caisson

Legal Events